SU877015A1 - Method of mining thick sloping coal beds - Google Patents
Method of mining thick sloping coal beds Download PDFInfo
- Publication number
- SU877015A1 SU877015A1 SU802874260A SU2874260A SU877015A1 SU 877015 A1 SU877015 A1 SU 877015A1 SU 802874260 A SU802874260 A SU 802874260A SU 2874260 A SU2874260 A SU 2874260A SU 877015 A1 SU877015 A1 SU 877015A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- strip
- mining
- ventilation
- well
- transport
- Prior art date
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Description
Изобретение относится к горной промышленности и может быть использовано при отработке мощных крутых угольных пластов. сThe invention relates to the mining industry and can be used in mining powerful steep coal seams. from
Известен способ разработки мощ- э ных крутых угольных пластов, включающий проведение транспортного и вентиляционного штреков, нарезных выработок и отработку пласта полоса- . * ми с закладкой выработанного пространства твердеющим материалом [1}.Known way to develop powerful e GOVERNMENTAL steep coal seams, comprising carrying out the transport and airway, threaded workings and refinement polosa- formation. * mi with the laying of the worked out space with hardening material [1}.
Известен также способ разработки мощных крутых угольных пластов, включающий проведение транспортного и вентиляционного штреков й отработку 15 пласта столбами по простиранию с отработкой столбов полосами по падению путем проведения в каждой полосе от транспортного штрека к вентиляционному скажины у почвы пласта и последую- 20 щей выемки полосы [2].There is also a known method of developing powerful steep coal seams, including transport and ventilation drifts and mining 15 of the seam with columns along strike and stripping of the strips by strips in the fall by drawing in each lane from the transport drift to the ventilation mark at the soil of the seam and the subsequent 20 excavation of the strip [ 2].
Однако указанные способы недостаточно эффективны в определенных горногеологических условиях.However, these methods are not effective enough in certain mining conditions.
Цель изобретения - повышение эф- ' 75 фективности разработки.The purpose of the invention is to increase the efficiency of the development.
Поставленная цель достигается·тем, что выемку каждой полосы производят из скважины гидромониторным агрегатом заходками с отработкой Каждой за- 30 ходки в направлении от почвы пласта к его кровле, при этом очередную скважину проводят в каждой полосе одновременно с отработкой смежной полосы, а после отработки каждой полосы производят ее закладку твердеющим материалом.The goal is achieved · by the fact that the extraction of each strip is made from the well by a hydromonitor unit with penetrations with development Each of 30 completions in the direction from the formation soil to its roof, while the next well is carried out in each strip simultaneously with the development of an adjacent strip, and after each stripes produce its laying with hardening material.
На фиг. 1 представлена схема ведения горных работ в пределах выемочного участка; на фиг. 2 - схема отработки Полосы.In FIG. 1 is a diagram of mining operations within a mining site; in FIG. 2 - strip mining scheme.
Способ осуществляется следующим образом.The method is as follows.
При отработке мощного крутого . угольного пласта на вентиляционном горизонте проводят рассечку 1, которую закладывают твердеющей смесью. Под закладкой проводят выработку 2, являющуюся вентиляционной. На основном горизонте проводят транспортный штрек'3. После оконтуривания выемочного столба по простиранию пласта приступают к его отработке полосами 4 по падению. Для этого в почвы пласта гидромониторным агрегатом 5 от транспортного штрека к вентиляционному проводят скважину 6..Полосу отрабатывают тем.же агрегатом по падению заходками 7. Каждую заходку отрабатывают в направлении от почвы плас3 та к его'кровле с Ъерепуском угля по скважине в транспортный штрек. Очередную скважину проводят в каждой полосе одновременно с отработкой смежной полосы. После полной выемки угля в полосе с вентиляционного штрека в нее подают твердеющую закладку 8.When practicing powerful cool. coal seam on the ventilation horizon, cut 1, which is laid with a hardening mixture. Under the bookmark spend generation 2, which is ventilation. On the main horizon spend transport drift'3. After contouring the excavation column along the strike of the formation, they begin to develop it in strips 4 along the dip. To do this, a well 6 is drawn from the drift into the soil of the formation from the drift drift to the ventilation drift ... The strip is drilled by the same drift unit by penetrations 7. Each run is drilled in the direction from the layer soil to its roof with coal transfer through the well to the transport drift . The next well is carried out in each strip simultaneously with the development of an adjacent strip. After the complete extraction of coal in the strip from the ventilation drift, a hardening tab 8 is fed into it.
Предлагаемый способ позволит повысить эффективность отработки мощных Крутых угольных пластов.The proposed method will improve the efficiency of mining powerful steep coal seams.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802874260A SU877015A1 (en) | 1980-01-24 | 1980-01-24 | Method of mining thick sloping coal beds |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU802874260A SU877015A1 (en) | 1980-01-24 | 1980-01-24 | Method of mining thick sloping coal beds |
Publications (1)
Publication Number | Publication Date |
---|---|
SU877015A1 true SU877015A1 (en) | 1981-10-30 |
Family
ID=20874186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU802874260A SU877015A1 (en) | 1980-01-24 | 1980-01-24 | Method of mining thick sloping coal beds |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU877015A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110685692A (en) * | 2019-11-06 | 2020-01-14 | 内蒙古金陶股份有限公司 | Frame mining method |
CN110700834A (en) * | 2019-11-06 | 2020-01-17 | 内蒙古金陶股份有限公司 | Mining method of thin vein |
-
1980
- 1980-01-24 SU SU802874260A patent/SU877015A1/en active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110685692A (en) * | 2019-11-06 | 2020-01-14 | 内蒙古金陶股份有限公司 | Frame mining method |
CN110700834A (en) * | 2019-11-06 | 2020-01-17 | 内蒙古金陶股份有限公司 | Mining method of thin vein |
CN110700834B (en) * | 2019-11-06 | 2021-04-30 | 内蒙古金陶股份有限公司 | Mining method of thin vein |
CN110685692B (en) * | 2019-11-06 | 2021-05-04 | 内蒙古金陶股份有限公司 | Frame mining method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU877015A1 (en) | Method of mining thick sloping coal beds | |
RU2176734C2 (en) | Method of mining medium-thickness gently sloping and inclined coal seams | |
RU2123109C1 (en) | Method for mining of coal series in marginal zones of opencast | |
SU783472A1 (en) | Method of solid rood control | |
SU831975A1 (en) | Method of working thick gently sloping coal beds | |
SU907251A1 (en) | Method of working coal beds | |
SU589399A1 (en) | Method of working thick steep coal-bearing seams | |
SU702170A1 (en) | Method of mining thick steep coal seams | |
SU1717823A1 (en) | Method of ore mining under complicated mining and geological conditions | |
SU787657A1 (en) | Method of working thick sloping coal beds | |
SU827790A1 (en) | Method of working thick gently sloping mineral deposits | |
SU855209A1 (en) | Method of caving overlapping rocks | |
SU912935A1 (en) | Method of mining thick sloping coal beds | |
RU2038476C1 (en) | Coal deposit exploitation method | |
SU723146A1 (en) | Method of working gently sloping mineral seams | |
SU737627A1 (en) | Method of mining thick sloping coal beds | |
SU1180506A1 (en) | Method of excavating the roof-underlying layer in layer-wise mining of ore | |
SU956793A1 (en) | Method of working thick ore deposits | |
SU899953A1 (en) | Method of mining thick sloping coal beds in horizontal layers | |
SU768985A1 (en) | Method of working seam formations of minerals | |
SU827789A1 (en) | Method of working thick sloping coal seams | |
SU596714A1 (en) | Method of mining thick slightly inclined orebodies | |
SU1578335A1 (en) | Method of mining seams of useful mineral with poorly caving roof | |
SU1624161A1 (en) | Method of developing thick sloping coal seams | |
SU787685A1 (en) | Method of filling-in excavated space |