SU732533A1 - Method for mining ore deposits - Google Patents

Method for mining ore deposits Download PDF

Info

Publication number
SU732533A1
SU732533A1 SU782677066A SU2677066A SU732533A1 SU 732533 A1 SU732533 A1 SU 732533A1 SU 782677066 A SU782677066 A SU 782677066A SU 2677066 A SU2677066 A SU 2677066A SU 732533 A1 SU732533 A1 SU 732533A1
Authority
SU
USSR - Soviet Union
Prior art keywords
ore
ore deposits
scarp
excavation
mining ore
Prior art date
Application number
SU782677066A
Other languages
Russian (ru)
Inventor
Ираклий Иванович Зурабишвили
Михаил Платонович Апакидзе
Арчил Пименович Хобуа
Каленике Григорьевич Мчедлишвили
Гурам Галактионович Квантидзе
Владимир Алексеевич Каландадзе
Тамара Алексеевна Гуро-Аразашвили
Полио Парменович Рамишвили
Джамбул Георгиевич Капанадзе
Гиви Семенович Джапаридзе
Original Assignee
Институт Горной Механики Им. Г.А.Цулукидзе Ан Грузинской Сср
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт Горной Механики Им. Г.А.Цулукидзе Ан Грузинской Сср filed Critical Институт Горной Механики Им. Г.А.Цулукидзе Ан Грузинской Сср
Priority to SU782677066A priority Critical patent/SU732533A1/en
Application granted granted Critical
Publication of SU732533A1 publication Critical patent/SU732533A1/en

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Description

1one

Изобретение относитс  к горной промышленности и может быть использовано при отработке пластовых месторождений с раздельной выемкой разновидностей полезного ископаемого. The invention relates to the mining industry and can be used in the mining of reservoir deposits with separate excavation of minerals.

Известен способ разработки с раздельной выемкой угл  и пород, при котором первоначально провод т на всю длину выработку по породе с анкерованием к кровле временно оставл емого угольного пласта , по мере выемки которого возвод т посто нную крепь 1.There is a known development method with a separate excavation of coal and rocks, in which initially the full-length excavation of the rock is carried out with anchoring to the roof of the temporarily left coal seam, as it is excavated, permanent support 1 is erected.

Однако временна  установка крепи дл  поддержани  угл , затем по мере выемки угл  извлечени  крепи сопр жена с дополнительными затратами времени, что снижает коэффициент использовани  забойных механизмов и их сменную производительность .However, the temporary installation of the support to maintain the coal, then as the coal is removed, the extraction of the support is associated with additional time, which reduces the utilization rate of the downhole mechanisms and their replaceable performance.

Кроме того, длительное сто ние подработанного угл  может привести к отслоению его от кровли и самопроизвольному обрушению в процессе отработки.In addition, the long standing of the undermined coal can lead to its detachment from the roof and spontaneous collapse during the mining process.

Известен также способ разработки рудных залежей, включающий раздельную выемку разновидностей руды потолкоуступнымThere is also known a method of developing ore deposits, including the separate excavation of ore varieties from the ceiling.

забоем в заходках и временное поддержание верхнего уступа 2.slaughtering the stoppers and temporarily maintaining the upper ledge 2.

При потолкоуступном забое отстающий верхний уступ временно поддерживаетс  крепежными рамами, которые извлекаютс  по мере обработки верхнего уступа. Отставание забо  по верхнему уступу здесь незначительно . Поэтому в сравнении с предыдущим способом меньше опасность отслоени  и самообрушени  руды верхнего уступа при его отработке.In the case of a ceiling-accessible bottom, a lagging upper scarp is temporarily supported by fastening frames that are removed as the upper scarp is processed. The gap between the upper ledge here is insignificant. Therefore, in comparison with the previous method, there is less danger of detachment and self-destruction of the ore of the upper scarp during its mining.

Недостатком этого способа выемки  в10 л етс  необходимость выполнени  работ по возведению крепи дл  временного поддерживани  верхнего уступа и опасность самообрушени  руды из него. Все это неблагопри тно сказываетс  также на технико15 экономических показател х по забою.The disadvantage of this method of excavation is the need to perform work on the construction of lining for the temporary support of the upper ledge and the danger of self-destruction of ore from it. All this adversely affects the technical and economic indicators for slaughter.

При почвоуступной выемке отпадает необходимость в возведении временной крепи, исключаетс  опасность самообрушени  руды верхнего сло . Недостатком ее  вл етс  20 невозможность применени  комбайнов, так как отставание забо  по нижнему уступу создает большие затруднени  и даже исключает осуществление раздельной выемки руды верхнего сло . Цель изобретени  - снижение затрат на возведение крепи и повышение безопасности работ. Поставленна  цель достигаетс  тем, что выемку нижнего уступа производ т путем образовани  ниш с оставлением между смеж ными нишами и между нишей и выработанным пространством отработанной полосы целиков, поддерживающих верхний уступ, после чего отбивают руду верхнего уступа вначале над нишами, а затем над указанными целиками, а оставшиес  целики погашают . На фиг. 1 изображено рудное поле, вертикальный разрез; на фиг. 2 - разрез А-А на фиг. 1. Дл  обеспечени  безопасных условий труда и повышени  эффективности применени  комбайна при раздельной комбайновой выемке двух разновидностей руды, работы в забое начинают с создани  ниш 1 по нижнему слою 2. Полустолбы 3 оставл ют дл  временного поддержани  верхней части забо . Далее извлекают руду верхнего сло  4 сначала в пределах ширины ниш, а затем над полустолбами. После этого отбивают руду из полустолбов и устанавливают забойную крепь.With a soil excavation, the need for erecting a temporary support is no longer necessary, and the danger of self-destruction of the ore of the upper layer is eliminated. Its disadvantage is that it is impossible to use combines, since the lagging behind the bottom ledge creates great difficulties and even excludes the implementation of separate excavation of the ore of the upper layer. The purpose of the invention is to reduce the cost of the erection of lining and increase safety of work. The goal is achieved by excavating the lower ledge by forming niches, leaving between adjacent niches and between the niche and the worked out space of the waste band, supporting the upper ledge, after which they beat the ore of the upper ledge above the niches, and then and the remaining ones repay. FIG. 1 shows the ore field, vertical section; in fig. 2 shows section A-A in FIG. 1. In order to ensure safe working conditions and increase the efficiency of the combine when separate combine excavation of two types of ore, work in the face begins with the creation of niche 1 on the bottom layer 2. The semi-columns 3 are left to temporarily maintain the top of the bottom. Next, remove the ore of the upper layer 4, first within the niche width, and then over the half posts. After that, beat off the ore from the semi-columns and install bottomhole support.

При наличии крепких руд комбайн может эффективно работать после предварительного ослаблени  массива взрывным способом, например, с помощью взрывных скважин, пробуренных со штрека.In the presence of strong ores, the harvester can work effectively after preliminarily weakening the massif by an explosive method, for example, by using explosive wells drilled from a drift.

НИШ с оставлением между смежными нишами и между нишей и выработанным пространством отработанной полосы целиков, поддерживающих верхний уступ, после чего отбивают руду верхнего уступа вначале над нишами, а затем над указанными целиками , а оставшиес  целики погашают.NIS with remaining between adjacent niches and between the niche and the worked-out space of the spent band of pillars supporting the upper scarp, after which they beat off the ore of the upper scarp first over the niches and then over the indicated columns, and the remaining pillars are repaid.

Источники информации, прин тые во внимание при экспертизеSources of information taken into account in the examination

1.Авторское свидетельство СССР № 235693, кл. Е 21 D 13/02, 11.04.67.1. USSR author's certificate No. 235693, cl. E 21 D 13/02, 11.04.67.

2.Зарубашвили И. И. Подземна  разработка марганцевых- месторождений, Тбилиси , 1963, с. 95-97 (прототип). При таком способе раздельной выемки отпадает необходимость в возведении временной крепи дл  поддержани  верхнего сло  руды и ее последуюш,ём извлечении, исключаютс  самопроизвольные вывалы руды верхнего сло , обеспечиваетс  эффективна  работа комбайна.2. Zarubashvili I. I. Underground exploration of manganese deposits, Tbilisi, 1963, p. 95-97 (prototype). With this method of separate excavation, the need for erecting a temporary support to support the upper layer of ore and its subsequent extraction, eliminates spontaneous ore fallouts of the upper layer ore, and ensures efficient operation of the combine.

Claims (1)

Формула изобретени  Способ разработки рудных залежей, включаюш,ий раздельную выемку разновидностей руды потолкоуступным забоем в заходках и временное поддержание верхнего уступа, отличающийс  тем, что, с целью снижени  затрат на возведение крепи и повышени  безопасности работ, выемку нижнего уступа производ т путем образовани  The invention The method of developing ore deposits, including separate seizure of ore varieties by a ceiling access face in the stopovers and temporary maintenance of the upper scarp, characterized in that, in order to reduce the cost of erection and increase the safety of work, the lower scarp is made by forming
SU782677066A 1978-10-23 1978-10-23 Method for mining ore deposits SU732533A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782677066A SU732533A1 (en) 1978-10-23 1978-10-23 Method for mining ore deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782677066A SU732533A1 (en) 1978-10-23 1978-10-23 Method for mining ore deposits

Publications (1)

Publication Number Publication Date
SU732533A1 true SU732533A1 (en) 1980-05-05

Family

ID=20790526

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782677066A SU732533A1 (en) 1978-10-23 1978-10-23 Method for mining ore deposits

Country Status (1)

Country Link
SU (1) SU732533A1 (en)

Similar Documents

Publication Publication Date Title
CN108661646A (en) A kind of false top house column type shrink afterwards filling mining method
CN1982649A (en) Mining method
RU2344291C2 (en) System of deposit development
US4799738A (en) Mining method for working large-scale mineral deposits by the caving system
US4878712A (en) Hydraulic method of mining coal
SU732533A1 (en) Method for mining ore deposits
RU2498065C1 (en) Method to mine mineral beds
RU2384708C2 (en) Removal method of powered mining face complexes
RU2176734C2 (en) Method of mining medium-thickness gently sloping and inclined coal seams
RU2194858C2 (en) Method of combined mining of bedded mineral deposits
RU2295037C1 (en) Method for extracting thick inclined coal formation by column-chambers
SU1337517A1 (en) Method of combined underground/open mining of coal beds
SU754064A1 (en) Method of mining thick ore bodies
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU1344906A1 (en) Method of driving reserved-dome mine workings
SU1032187A1 (en) Method of working neighrour coal seams
SU1707200A1 (en) Method of mining flat stratified deposits
RU2107818C1 (en) Method for development of flat and inclined seams of minerals
RU2327036C2 (en) Excavation method of thick formations of mineral resources
SU715798A1 (en) Method of mining gently sloping ore bodies
RU2069754C1 (en) Method for development of mine field in mining mineral beds at large depths
RU2083833C1 (en) Method for development of steep coal seams with backing worked-out area
SU883441A1 (en) Pillar excavating method
SU631657A1 (en) Method of excavating thick orebodies