SU690186A1 - Mineral excavating method - Google Patents

Mineral excavating method

Info

Publication number
SU690186A1
SU690186A1 SU721830874A SU1830874A SU690186A1 SU 690186 A1 SU690186 A1 SU 690186A1 SU 721830874 A SU721830874 A SU 721830874A SU 1830874 A SU1830874 A SU 1830874A SU 690186 A1 SU690186 A1 SU 690186A1
Authority
SU
USSR - Soviet Union
Prior art keywords
chamber
fan
wells
cross
section
Prior art date
Application number
SU721830874A
Other languages
Russian (ru)
Inventor
Владилен Иванович Попов
Original Assignee
Научно-исследовательский институт по проблемам Курской магнитной аномалии им. Л.Д.Шевякова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Научно-исследовательский институт по проблемам Курской магнитной аномалии им. Л.Д.Шевякова filed Critical Научно-исследовательский институт по проблемам Курской магнитной аномалии им. Л.Д.Шевякова
Priority to SU721830874A priority Critical patent/SU690186A1/en
Application granted granted Critical
Publication of SU690186A1 publication Critical patent/SU690186A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Earth Drilling (AREA)

Description

(54) СПОСОБ ОТБОЙКИ ПОЛЕЗНЫХ ИСКСЯ1АЕМЫХ(54) METHOD FOR DISPOSING OF USEFUL ELIMINATED

Claims (2)

I Изобретение относитс  к горнодобывающей промышленности и может быть использовано при подземной разработке руд камерными системами. Известен способ отбойки полезных кокопаемых из подземных горных выработок при камерной системе разра.ботки с вееро образным расположением взрывных скважин ll. Недостатки такогЪ способа: слозкность создави  эллиптической формы, необходи,мостъ проведени  значительного количес-р ва подготовительных выработок, потери полезного ископаемого в оставл емых «впнках Наиболее близким по технической сущности  влнетсаа способ отбойки полезных ископаемых из подземньхх горных вырабо:ТОК нри камерной системе ра аботки с веерообразным расположением взрывных скважин, которые располагают в плоскост х , параллельных поперечному сечению камеры 2. Этот способ не нашел широкого расп(х странени  в св зи с тем, что все скважинь1 имеют различные длины и углы между соседними скважинами. Забуривание, бурение и зар жание требуют контрол  и высокой квалификации обслуживающего персонала. Цель изобретени  - повысить устойчивость камеры за счет выполнени  ее эллиптической формы, сократить количество подготовительных выработок и потерь полезного ископаемого в целиках. Цель достигаетс  за счет того, что в способе отбойки полезньхх ископаемых из подземных горных выработок при камерной системе разработки с веерообразным расположением взрывных скважин скважины каждого веера проход т одинаковой длины в плоскост х, образующих с поперечным сечением камеры равные острые углы. Сущность способа по сн етс  чертежом . Он заключаетс  в следующем. Проход т подготовительные и нарезные выработки: этажные штреки 1, восстающие 369 2, орт бурового горизонта 3, откаточные орты 4, горизонтальные сбойки 5, рассечки 6 и воронки выпуска 7. Вь1емка ведетс  камерами 8 эллиптической формы, которые могут быть расположены как горизонтально, так вертикально и наклонно, В данном случае рассматриваетс  горизонтальное расположение камер. Отбойка руды осуществл етс  с помощью Взрывных скважин 9, забуриваемых из ортов 3 в виде круговых вееров . Круговые вееры располагаютс  в плоскост х, образующих с поперечным сечением камеры острые углы (с ) и линию пересечени  10,  вл ющуюс  одновременно осью эллипса 11 поперечного сечени  камеры. Взрывные скважины забуриваютс  ИЗ ОДНОЙ точки и имеют одинаковые длины, поэтому лини , соедин юща  их кониы, есть окружность. Известно, что параллельной проекцией окружности  вл етс  эллипс. Больша  ось эллипса попереч ного сечени  камеры равна диаметру окружности кругового веера скважины, а ма ла  ось равна диаметру окружности круrdBOro Веера скважин, умноженному на косинус угла, который образуетс  между плоскостью кругового веера скважин и поперечным сечением камеры. Таким образом, бурение кругового веера взрывных скважин равной длины из одной точки при равенстве углов между соседними скважинами обеспечивает элли тическую форму камеры за счет размещени  плоскостей вееров скважин под ост рьШй 5 ЯэМи к поперечному сечению очис ной камеры. Применение предлагаемого способа поз волит значительно уменьшить трудоемкост буровзрывных . Уступ 12 взрываетс  после сооружени  ксилпенсаиионной щели . 6 4 Междукамерные целики при камерах эплипсовеерной формы будут более устойчивы , чем целики другой формы. Поэтому их поперечные размеры можно уменьшить на 15-20%. В результате этого количество руды, оставл емой в целиках сократитс  на 15-20%. Дл  бурени  взрывных скважин по предлагаемому способу проход т только одну выработку, в то врем  как при известных внутри будущей камеры или по ее контуру необходимо проходить несколько выработок. При этом суммарна  длина скважин при описываемом способе всегда будет мень- ше суммарной длины скважин, забуриваемых из нескольких выработок, Опериру  скважинами равной длины. легче осуществл ть многостаночное бурение , проще механизировать зар дку и дозировку ВВ. Формула изобретени  Способ отбойки полезных ископаемых из подземных горных выработок при камерной системе разработки с веерообразным расположением взрывных скважин, отличающийс  тем, что, с целью повышени  устойчивости камеры за счет выполнени  ее эллиптической формьх, сокращени  количества подготовительнь1х выработок и потерь полезного ископаемого в целиках, скважины каждого веера проход т одинаковой длины в плоскост х, образующих с поперечным сечением камеры равные острые углы. Источники информации, прин тые во. . внимание при экспертизе 1.Справочнйк по горно-рудному делу. Том Ш, М., 1961, с. 3, табл. 1. I The invention relates to the mining industry and can be used in underground mining of ores by chamber systems. There is a method of blasting useful kokopaem from underground mine workings with a chamber system of razrabotki with fan-shaped arrangement of explosive wells ll. The disadvantages of such a method: sloznost create an elliptical shape, you need a bridge to carry out a significant number of preparatory workings, the loss of mineral in the remaining vodnakh Most close to the technical essence of the method of mining minerals from underground mining systems: a fan-shaped arrangement of blastholes which are located in planes parallel to the cross section of chamber 2. This method did not find a wide spread (x countries due to the fact that all wells1 have different lengths and angles between adjacent wells.Surging, drilling and charging require control and high qualification of service personnel.The purpose of the invention is to increase the stability of the chamber due to its elliptical shape, to reduce the number of development workings and mineral losses in the pillars. The goal is achieved due to the fact that in the method of blasting minerals from underground mine workings with a chamber development system with a fan-shaped arrangement of explosive wells The holes of the borehole of each fan are of the same length in planes, which form equal acute angles with the cross section of the chamber. The essence of the method is illustrated in the drawing. It is as follows. Preparatory and rifled workings pass through: flooded drifts 1, rising 369 2, ort drilling horizon 3, haul dies 4, horizontal connections 5, cuts 6 and outlet 7 funnels. The camera is elliptical in shape 8, which can be arranged both horizontally and vertically and obliquely. In this case, the horizontal arrangement of the cameras is considered. The breaking of ore is carried out with the help of Blastholes 9, drilled from Vortex 3 in the form of circular fans. Circular fans are located in planes forming acute angles (c) and intersection line 10, which are simultaneously the axis of the cross section of the chamber ellipse 11, with the cross section of the chamber. Explosive wells are drilled from a single point and have the same length, so the line connecting their horses is a circle. It is known that a parallel projection of a circle is an ellipse. The major axis of the chamber cross section ellipse is equal to the diameter of the circumference of the circular fan of the borehole, and the small axis is equal to the diameter of the circle CircdBOro of the Fan of boreholes multiplied by the cosine of the angle that forms between the plane of the circular fan of the boreholes and the cross section of the chamber. Thus, drilling a circular fan of explosive wells of equal length from one point, with equal angles between adjacent wells, provides an elliptical shape of the chamber by placing the planes of the fan wells under the sharp 5 Nm to the cross section of the clearing chamber. The application of the proposed method allows to significantly reduce the labor-intensiveness of drilling and blasting. The ledge 12 explodes after the construction of the xilpensiion gap. 6 4 Inter-chamber pillars with cameras of an ellipse form will be more stable than pillars of another form. Therefore, their transverse dimensions can be reduced by 15-20%. As a result, the amount of ore left in the pillars will be reduced by 15-20%. In order to drill blastholes, according to the proposed method, only one excavation is made, while with known inside the future chamber or along its contour, several openings are required. In this case, the total length of wells with the described method will always be less than the total length of wells, drilled from several openings, with the operation of wells of equal length. it is easier to carry out multi-drilling, easier to mechanize the charging and metering of explosives. Claim method A method of blasting minerals from underground mines with a chamber development system with a fan-shaped arrangement of blast holes, characterized in that, in order to increase the stability of the chamber by performing its elliptical form, reducing the number of preparatory mine workings and losses of mineral in pillars, each well the fans are of the same length in planes forming equal acute angles with the cross-section of the chamber. Sources of information taken in. . attention in the examination 1. Help for mining business. Tom III, M., 1961, p. 3, tab. one. 2.Авторское свидетельство СССР № 134242, кл. Е 21 С 41/06, 1966.2. USSR author's certificate number 134242, cl. E 21 C 41/06, 1966.
SU721830874A 1972-09-25 1972-09-25 Mineral excavating method SU690186A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU721830874A SU690186A1 (en) 1972-09-25 1972-09-25 Mineral excavating method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU721830874A SU690186A1 (en) 1972-09-25 1972-09-25 Mineral excavating method

Publications (1)

Publication Number Publication Date
SU690186A1 true SU690186A1 (en) 1979-10-05

Family

ID=20527698

Family Applications (1)

Application Number Title Priority Date Filing Date
SU721830874A SU690186A1 (en) 1972-09-25 1972-09-25 Mineral excavating method

Country Status (1)

Country Link
SU (1) SU690186A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640080A (en) * 2017-02-17 2017-05-10 中南大学 Deep part high-stress environment self-stabilizing arched stope arrangement mining method

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106640080A (en) * 2017-02-17 2017-05-10 中南大学 Deep part high-stress environment self-stabilizing arched stope arrangement mining method

Similar Documents

Publication Publication Date Title
Golik et al. Improving the effectiveness of explosive breaking on the bade of new methods of borehole charges initiation in quarries
SU690186A1 (en) Mineral excavating method
Shamaev et al. Wall control and contour blasting to ensure the stability of the quarry boards when operating drilling and blasting works
Tolqin CONSTRUCTION OF LOG CABINS AND SCHEMES OF DEVELOPMENT OF THE LOG STRIP
RU2001120175A (en) The method of selective extraction of high-quality minerals in the quarry
SU922280A1 (en) Solid roof control method
SU496365A1 (en) The way to develop powerful mineral deposits in the chamber system development
RU2198293C2 (en) Method of ore deposits mining
RU2642193C1 (en) Method for developing horizontal and lower ore bodies of average capacity
CN205577993U (en) Mining system is synthesized by gradual anxious shallow bore hole to extremely thin complicated quartz reef
SU863862A1 (en) Method of mining thick ore bodies
Lunarzewski Gas drainage practices
SU1461930A1 (en) Method of combined mining of mineral deposits
CN108643908B (en) A kind of barnyard mining methods of digging middle thickness orebody introversion inclined seam
SU901535A1 (en) Method for driving mine shafts
SU798303A1 (en) Method of mining thick ore deposits
RU2203419C2 (en) Process of underground development of thick ore deposits
SU1071773A1 (en) Method of forming a partition in mine working
SU1745930A1 (en) Chambered resources blasting method
SU907257A1 (en) Method of mining horizontal and sloping mineral deposits
SU1076579A1 (en) Method of producing natural stone blocks
RU2103509C1 (en) Block working method
SU881322A1 (en) Method of working pillars at chamber-and-pillar excavating routine
SU768985A1 (en) Method of working seam formations of minerals
RU2153073C2 (en) Method of mining of tubular kimberlite deposits by powered mining complex