SU1076579A1 - Method of producing natural stone blocks - Google Patents

Method of producing natural stone blocks Download PDF

Info

Publication number
SU1076579A1
SU1076579A1 SU833554797A SU3554797A SU1076579A1 SU 1076579 A1 SU1076579 A1 SU 1076579A1 SU 833554797 A SU833554797 A SU 833554797A SU 3554797 A SU3554797 A SU 3554797A SU 1076579 A1 SU1076579 A1 SU 1076579A1
Authority
SU
USSR - Soviet Union
Prior art keywords
plane
monolith
natural
holes
adjacent
Prior art date
Application number
SU833554797A
Other languages
Russian (ru)
Inventor
Юлиан Абрамович Векслер
Мурат Николаевич Тлеугалиев
Original Assignee
Карагандинский политехнический институт
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Карагандинский политехнический институт filed Critical Карагандинский политехнический институт
Priority to SU833554797A priority Critical patent/SU1076579A1/en
Application granted granted Critical
Publication of SU1076579A1 publication Critical patent/SU1076579A1/en

Links

Abstract

СПОСОБ ДОБЫЧИ БЛОКОВ ПРИРОДНОГО КАМНЯ, включающий бурение взрывных шпуров в плоскости, пересекающей плоскость естественной оконтуривающей отдельности монолита, их зар  жание и взрывание, отличающийс  тем, что, с целью повышени  качества добываемых блоков путем предотвращени  заколообра .зовани  смежного монолита, в смежном монолите за плоскостью естественной оконтуривающей отдельности бур т дополнительные шпуры перпендикул рно плоскости расположени  взрывных шпуров с перебуром относительно этой плоскости, размешают в них анкеры и закрепл рот анкерами смежный монолит. СЛ О5 СЛ СОA method of producing a natural stone block, including drilling blast holes in a plane intersecting the plane of the natural contour of the monolith, charging and blasting them, which in order to improve the quality of the mined blocks by preventing the pinpole of the adjacent monolith, in the adjacent monolith, the cost of mined blocks should be increased by preventing the blocking of the adjacent monolith. bore holes perpendicular to the plane of the location of the blast holes with re-holes relative to this plane, the natural kera and secured the mouth with anchors adjacent monolith. SL O5 SL SO

Description

Изобретение относитс  к способам добычи блоков природного камн  и может быть использовано в горном деле и строи тельстве. Известен способ добычи блоков, включающий бурение шпуров в плоскост х предполагаемого раскола, их зар жание и взрывание .- Данный способ обеспечивает высокое качество откола блоков по всем плоскост м (1). Недостатком способа  вл етс  повышенный объем бурени  и расход взрывчатых веществ. Наиболее близким к изобретению по технической сущности и достигаемому результату  вл етс  способ добычи блоков природного камн , включающий бурение взрывных шпуров в плоскости, пересекающей плоскость естественной оконтуривающей отдельности монолита, их зар жание и взрывание 2. Наличие естественной оконтуривающей отдельности (трещины, контакты и т. д.) позвол ет значительно сократить объем бурени  и расход ВВ. Вместе с тем, практика показывает, что при подсечке монолита шпурами, кроме раскрыти  оконтуривающих трещин, происходит образование параболических заколов на смежных монолитах (впереди или сбоку). При этом значительно увеличиваютс  потери блочного камн , ухудшаетс  качество продукции, а также снижаетс  производительность предпри ти  за счет доработки (пассировки) добытых блоков. Цель изобретени  - повышение качества добываемых блоков путем предотвращени  заколообразованн  смежного монолита . Дл  достижени  указанной цели в способе добычи блоков природного камн , включающем бурение взрывных щпуров в плоскости , пересекающей плоскость естественной оконтуривающей отдельности монолита , их зар жание и взрывание, в смежном монолите за плоскостью естественной оконтуривающей отдельности бур т дополнительные шпуры перпендикул рно плоскости расположени  взрывных щпуров с перебуром относительно этой плоскости, размешают в них анкеры и закрепл ют анкерами смежный монолит. На чертеже представлен отбиваемый блок, поперечный разрез. В подошве монолита 1 бур т взрывные шпуры 2, в которых размешают за р д ВВ с забойкой 4, шпур бур т с небольшим недобуром до естественной оконтуривающей отдельности (трещины) 5. Дл  предотвращени  заколообразовани  на небольшом рассто нии от трещины бур т вертикальные шпуры 6, на большем (по сравнению с взрывными шпурами) рассто нии друг от друга по всей длине отбиваемого монолита, в которые вставл ютс  анкеры в виде металлического стержн  7 с зат гивающими гайками 8 и распирающими устройствами 9. При этом шпуры с анкерами должны быть с перебуром относительно плоскости горизонтальных шпуров. После взрыва, по данным экспериментов, трещина развиваетс  по горизонтальным шпурам до контакта (прослойки) с последующим раскрытием последнего. При отсутствии анкера откол может произойти по линии 10. Таким образом, использование изобретени  позволит эффективнее разрабатывать месторождени  блочного камн , значительно увеличить выход товарных блоков иэ массива, увеличить производительность труда за счет сохранени  смежных (по ходу забо  или боковых) монолитов.The invention relates to methods for extracting blocks of natural stone and can be used in mining and construction. A known method of extracting blocks, including drilling holes in the planes of the proposed split, their charging and blasting. - This method ensures high quality of spalling blocks in all planes (1). The disadvantage of the method is an increased amount of drilling and consumption of explosives. The closest to the invention to the technical essence and the achieved result is a method of extracting blocks of natural stone, including drilling blast holes in a plane intersecting the plane of the natural monolith, separating them, loading and blasting 2. The presence of natural contouring (cracks, contacts, etc.) e.) allows a significant reduction in drilling and explosive consumption. At the same time, practice shows that when the monolith is cut by the holes, besides opening the contouring cracks, parabolic stabbing on adjacent monoliths occurs (in front or side). This significantly increases the loss of block stones, deteriorates product quality, and also reduces the productivity of the enterprise due to refinement (passaging) of mined blocks. The purpose of the invention is to improve the quality of the mined blocks by preventing stacked adjacent monolith. To achieve this goal, in the method of extracting blocks of natural stone, including drilling of explosive shpruv in the plane intersecting the plane of the natural contour of the monolith, their loading and blasting, in the adjacent monolith behind the plane of the natural contouring of the individual drill holes perpendicular to the plane of the explosive creepers with aperture relative to this plane, anchors are stirred in them and an anchor monolith is fixed by anchors. The drawing shows the block, transverse section. In the sole of the monolith 1 drill explosive bore holes 2, in which they mix for a series of explosives with a tamping 4, the borehole drills down to a natural contour separation (cracks) 5. To prevent stabbing at a short distance from the crack, vertical boreholes 6 , at a greater (compared to the blast holes) distance from each other along the entire length of the monolith, into which the anchors are inserted in the form of a metal rod 7 with tightening nuts 8 and retaining devices 9. At the same time, the holes with the anchors must be with drill holes relative to the plane of the horizontal. After the explosion, according to experimental data, the crack develops along horizontal holes before contact (interlayer) with the subsequent disclosure of the latter. In the absence of an anchor, spalling can occur along line 10. Thus, the use of the invention will make it possible to more efficiently develop block stone deposits, significantly increase the output of commodity blocks in an array, and increase labor productivity by maintaining adjacent (slagging or side) monoliths.

Claims (1)

СПОСОБ ДОБЫЧИ БЛОКОВ ПРИРОДНОГО КАМНЯ, включающий бу рение взрывных шпуров в плоскости, пересекающей плоскость естественной оконтуривающей отдельности монолита, их заря^ жание и взрывание, отличающийся тем, что, с целью повышения качества добываемых блоков путем предотвращения заколообразования смежного монолита, в смежном монолите за плоскостью естественной оконтуривающей Отдельности бурят дополнительные шпуры перпендикулярно плоскости расположения взрывных шпуров с перебуром относительно этой плоскости, размещают в них анкеры и закрепляют анкерами смежный монолит.METHOD FOR PRODUCING NATURAL STONE BLOCKS, including drilling blasting holes in a plane intersecting the plane of the natural contouring individual monolith, loading and blasting, characterized in that, in order to improve the quality of the mined blocks by preventing pitting of the adjacent monolith in the adjacent monolith behind the plane of the natural contouring Separation, additional bores are drilled perpendicular to the plane of the location of the blasting holes with an excess relative to this plane, anchors are placed in them and fasten with anchors an adjacent monolith.
SU833554797A 1983-02-21 1983-02-21 Method of producing natural stone blocks SU1076579A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU833554797A SU1076579A1 (en) 1983-02-21 1983-02-21 Method of producing natural stone blocks

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU833554797A SU1076579A1 (en) 1983-02-21 1983-02-21 Method of producing natural stone blocks

Publications (1)

Publication Number Publication Date
SU1076579A1 true SU1076579A1 (en) 1984-02-29

Family

ID=21050458

Family Applications (1)

Application Number Title Priority Date Filing Date
SU833554797A SU1076579A1 (en) 1983-02-21 1983-02-21 Method of producing natural stone blocks

Country Status (1)

Country Link
SU (1) SU1076579A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023292A (en) * 2017-05-27 2017-08-08 中国铁建重工集团有限公司 A kind of duct fracturing device and method
CN111236944A (en) * 2020-02-12 2020-06-05 长沙有色冶金设计研究院有限公司 Open-cast mining process suitable for multi-layer gentle-dip thin ore body

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Авторское свидетельство СССР № 689397, кл. Е 21 С 37/12, 1977 2. Авторскоое свидетельство СССР № 733348, кл. Е 21 С 37/12, 1978 (прототип). *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107023292A (en) * 2017-05-27 2017-08-08 中国铁建重工集团有限公司 A kind of duct fracturing device and method
CN107023292B (en) * 2017-05-27 2024-02-02 中国铁建重工集团股份有限公司 Pore canal fracturing device and method
CN111236944A (en) * 2020-02-12 2020-06-05 长沙有色冶金设计研究院有限公司 Open-cast mining process suitable for multi-layer gentle-dip thin ore body

Similar Documents

Publication Publication Date Title
SU1076579A1 (en) Method of producing natural stone blocks
RU2208221C2 (en) Method for selective mining extraction of qualitative mineral resource in open pit
RU2001120175A (en) The method of selective extraction of high-quality minerals in the quarry
RU1153628C (en) Method of stone quarry
SU1461930A1 (en) Method of combined mining of mineral deposits
RU2059809C1 (en) Method for formation of kerf hollow
RU2017960C1 (en) Method for rock breaking by blasting
Tsoutrelis et al. Use of notched boreholes for fracture controlled blasting in the ornamental stone quarries
SU863862A1 (en) Method of mining thick ore bodies
RU2029864C1 (en) Method to generate cutter cavity
SU591586A1 (en) Method of mining slightly inclined thin orebodies with filling mined-out space with blasted rock
SU1019075A1 (en) Method of conducting drilling and blasting jobs
RU2047769C1 (en) Method for working steeply dipping ore bodies
SU791975A1 (en) Method of driving preparatory working in beds prezenting coal and gas outburst hazard
RU2078211C1 (en) Method of mining thick steep coal seams
SU1055209A1 (en) Method of winning outburst-hazardous coal seam
RU2052103C1 (en) Process of separation of blocks of natural stone
RU2102601C1 (en) Method for driving underground working
SU1754901A1 (en) Method for rock mass blasting
RU2034988C1 (en) Method of unloading mountain massif from stresses upon cutting parallel drifts
RU2068958C1 (en) Method of formation of cutting hollow at sinking of mining workings
RU2047765C1 (en) Method for development of inclined ore body
SU1726750A2 (en) Method for setting anchor in rock
RU1775001C (en) Method of reducing shock hazard in sinking
SU1689643A1 (en) Method for prevention of rock bursts