SU1055209A1 - Method of winning outburst-hazardous coal seam - Google Patents

Method of winning outburst-hazardous coal seam Download PDF

Info

Publication number
SU1055209A1
SU1055209A1 SU823405567A SU3405567A SU1055209A1 SU 1055209 A1 SU1055209 A1 SU 1055209A1 SU 823405567 A SU823405567 A SU 823405567A SU 3405567 A SU3405567 A SU 3405567A SU 1055209 A1 SU1055209 A1 SU 1055209A1
Authority
SU
USSR - Soviet Union
Prior art keywords
coal
charges
explosive
loosening
blasting
Prior art date
Application number
SU823405567A
Other languages
Russian (ru)
Inventor
М.И. Большинский
В.И. Стикачев
Г.А. Поляк
Н.А. Чуйков
А.А. Нахатович
Original Assignee
Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности filed Critical Государственный Макеевский Ордена Октябрьской Революции Научно-Исследовательский Институт По Безопасности Работ В Горной Промышленности
Priority to SU823405567A priority Critical patent/SU1055209A1/en
Application granted granted Critical
Publication of SU1055209A1 publication Critical patent/SU1055209A1/en

Links

Abstract

СПОСОБ ВЫЕМКИ ВЫБРОСООПАСНОГО УГОЛЬНОГО ПЛАСТА, включающий бурение шпуров в породах и угольном пласте, зар жение их взрывчатым веществом, взрывание зар дов взрывчатых веществ в режиме сотр сатель . s4l ..,.. / ;. П:й ного взрывани , отличающийс  тем, что, с целью повышени  эффективности предотвращени  внезапных выбросов угл  и газа путем проведени  впереди забо  выработки передового рыхлени  вмещающих пород, в породе бур т шпуры дл  производства передового рыхлени  пласта на рассто нии от пласта, не превьпиающем радиуса эффективного действи  взрыва зар да взрывчатого вещества на глубину, при которой отношение линии наименьшего сопротивлени  помещаемых в них зар дов взрывчатого вещества к линии наименьшего сопроS тивлени  зар дов дл  отбойки угл  (Л составл ет 1,8-2,7, взрывание зар дов в этих шпурах производ т короткозамедленно в один прием, при этом отношение разности замедлений между взрывами зар дов дл  отбойки угл  и передового рыхлени  ко времени затухани  упругих колебаний в угольном пласте составл ет не менее 2,5.A METHOD FOR EXTRACTING A CRUSHED COAL LAYER, including drilling holes in rocks and a coal seam, charging them with an explosive, blowing charges of explosives in the maker mode. s4l .., .. /;. P: blasted blasting, characterized in that, in order to increase the effectiveness of preventing sudden coal and gas emissions by holding ahead of the development of advanced loosening of host rocks, the hole has a hole in the rock to produce advanced loosening of the formation at a distance from the stratum effective action of an explosive charge explosion to a depth at which the ratio of the line of least resistance of the charges of explosive placed in them to the line of least resistance of charges for junk coal (L is 1.8-2.7, the blasting of charges in these boreholes is made shortly at one time, while the ratio of the deceleration difference between charge explosions for blasting coal and advanced loosening to the damping time of elastic vibrations in the coal seam is at least 2.5.

Description

Изобретение относитс  к горной промьшшенности и может быть использовано в угольных шахтах при разработке пластов, склонных к выбро- сам угл  и газа. Известен способ проведени  подго товительных выработок на пластах, опасных по внезапным выбросам угл  и газа, включающий бурение шпуров, зар жание их взрывчатым веществом, короткозамедленное взрывание, при этом врубовые шпуры располагают во вмещающих породах, у кровли или почвы, отбойные шпуры - в угольном и породном массиве, а короткоза; медленное взрывание зар дов производ т по направлению к пласту и последними взрывают зар ды, размещенные в пласте. Недостаткрм способа  вл етс  то, что он не исключает возникновени  выбросов угл  и газа в процессе взрывани  и в технологических операци х , так как взрывание зар дов производитс  в месте концентрации напр жений в угольном пласте, в результате чего напр женный угольный массив при взрыве зар дов получает дополнительный импульс, способствую щий разв зыванию выбросу угл  и газ Наиболее близким по технической сущности и получаемому результату к за вленному  вл етс  способ выемки выбросоопасного угольного пласта включающий бурение шпуров в порода и в угольном пласте, зар жание их взрывчатым веществом, взрывание зар дов взрывчатых веществ в режиме сотр сательного взрывани , Недостатком способа  вл етс  наличие факторов, способствующих про в лению выбросоопасности пласта, которыми  вл етс  выбор интервалов замед лений короткозамедленного взрывани  групп зар дов, при котором не учитываетс  врем  затухани  упругих колебаний в массиве угл . В этом случае при короткозамедленном взрывании зар дов взрывчатых веществ во вмещающих породах и в пласте угл  происходит наложение упругих колебаний при взрыве соседних шпуровых зар дов в породе и в пласте угл , в результате чего при проведении выработок по выб росоопасным пластам,по вл етс  опасность возникновени  выброса угл  и газа. Цель изобретени  - повьш1ение эффективности предотвращени  внезапных выбросов угл  и газа путем проведени  впереди забо  выработки передового рыхлени  вмещающих пород. Цель достигаетс  тем, что в известном способе, включающем бурение шпуров в породах и угольном пласте, зар жение их взрывчатым веществом, взрьшание зар дов взрывчатых веществ в режиме сотр сательного взрывани , в породе бур т шпуры дл  производства передового рыхлени  пласта на рассто нии от пласта, не превьш1ающем радиуса зффективного действи  взрыва зар да взрывчатого вещества на глубину , при которой отношение линии наименьшего сопротивлени  помещаемых в них зар дов взрывчатого вещества к линии наименьшего сопротивлени  зар дов дл  отбойки угл  составл ет 1,8-2,7, взрывание зар дов в этих шпурах производ т короткозамедленно в один прием, при этом отношение разности замедлений между взрывами зар дов дл  отбойки угл  и передового рыхлени  ко времени затухани  упругих колебаний в угольном пласте составл ет не менее 2,5. Способ осуществл етс  следующим образом: во вмещающих породах на рассто нии от пласта, не превьшающем радиуса эффективного действи  взрыва зар да взрывчатого вещества , дополнительно к комплекту шпуров, предусмотренных паспортом буровзрывных работ, бур т р д шпуров на глубину , превьш1ающую глубину естественной зоны разгрузки в угольном пласте впереди забо . В этих шпурах в один прием короткозамедленного взрывани  взрывают зар ды взрывчатых веществ вместе с зар дами дл  отбойки угл  и породы по всему сечению забо . Зона трещинообразовани , достига  угольного пласта, частично разгружает его от сил горного давлени , т.е. снимаетс  одна из составл ющих сложного напр женного состо ни  угольного пласта, способствующа  про влению выбросоопасности, а затем по Истечении некоторого времени угольный пласт дегазируетс . При взрывании зар дов передового рыхлени  и смежных зар дов дл  отбойки угл  интервал замедлений между ними принимают таким образом, чтобы его отношение к времени затухани  упругих колебаний в угольном пласте составл ло 2,3 и более. Установленное экспериментально врем  затухани  упругих волновых колебаний от взрыва зар дов взрывчатого вещества в угольном пласте равно 10-11 мс. Если прин ть, например, номинальное значение времени замедлени  электродетонатора короткозамедленного действи , помещаемого в зар д дл  отбойки угл , равным 30 мс, а электродетонатора в смежном зар де передового рыхлени  породы 15 мс, то интервал замедлени  между ними получаетс  как разность 30-15 15 мс и отношение 15 мс : 10 мс « , 1,5 2,5, т.е. в данном случае может произойти наложение упругий колебаний породного массива на колебани  угольного пласта и последний получит дополнительный импульс, в результате чего может увеличитьс  веро тность возникновени  выброса угл  и газа. Если же указанное отношение принимать равным 2,5 и более, то короткозамедленное взрьшание зар дов дл  рыхлени  породы и отбойки угл  осуществл етс  как разновременное , т.е. взрывание зар дов в угольном массиве произойдет только после того, как затухнут колебани  в породе, вызванные взрывом зар дов взрывчатого вещества дл  передовогоThe invention relates to the mining industry and can be used in coal mines in the development of seams prone to coal and gas emissions. There is a known method of conducting preparatory workings on seams hazardous from sudden coal and gas emissions, including drilling holes, charging them with an explosive, short-delay blasting, while cut holes are located in the host rocks, near the roof or the soil, and the drilling holes in the coal and rock mass, and short; slow blasting of charges is produced in the direction of the reservoir and the latter explode charges placed in the reservoir. The disadvantage of the method is that it does not exclude the occurrence of coal and gas emissions during the blasting process and in technological operations, since the blasting of charges occurs at a place of stress concentration in the coal seam, resulting in a stressed coal mass during the explosion of charges. Receives an additional impetus to promote the release of coal and gas. The closest to the technical essence and the result obtained to the claimed is a method of extracting an outburst coal seam, including drilling a hole. s in the rock and coal seam, charging them with an explosive, exploding explosives charges in a mode of explosive blasting. The disadvantage of this method is the presence of factors contributing to the outburst of the reservoir, which is the choice of delay intervals of the slow-blown charge groups. It does not take into account the damping time of elastic vibrations in an array of coal. In this case, with short-delay blasting of explosives in the host rocks and in the coal seam, elastic oscillations are imposed when the adjacent blast-hole charges in the rock and in the coal seam explode, which results in the occurrence of excavations in hazardous formations. emission of coal and gas. The purpose of the invention is to increase the effectiveness of preventing sudden coal and gas emissions by leading to the development of advanced loosening of host rocks ahead of the slaughter. The goal is achieved by the fact that in a known method, including drilling holes in rocks and a coal seam, charging them with an explosive substance, clearing charges of explosives in a rocket blasting mode, in the rock a hole is drilled to produce an advanced loosening of the formation at a distance from the seam that does not exceed the effective effect radius of an explosive charge explosion to a depth at which the ratio of the line of least resistance of the explosive charges placed in them to the line of least resistance of charges for coal blasting is 1.8-2.7, the blasting of charges in these boreholes is made shortly in one step, while the ratio of the deceleration difference between charge explosions for blasting coal and advanced loosening to the time of damping of elastic oscillations in the coal seam em no less than 2.5. The method is carried out as follows: in the host rocks at a distance from the formation that does not exceed the effective range of the blast of the explosive charge, in addition to the set of holes provided by the blasting passport, the number of holes is greater than the depth of the natural unloading zone coal seam in front of the slab. In these holes, explosive blasts together with charges for striking coal and rock all over the bottom section section are blown up in one shot of a short-delay blasting. The zone of cracking, reaching the coal seam, partially unloads it from the forces of rock pressure, i.e. One of the components of the complex stress state of the coal seam, which contributes to the outburst hazard, is removed, and then after some time the coal seam is degassed. When blasting the charges of advanced loosening and adjacent charges for coal blasting, the interval of decelerations between them is taken in such a way that its ratio to the decay time of elastic oscillations in the coal seam is 2.3 and more. The experimentally determined damping time of elastic wave oscillations due to the explosion of explosive charges in a coal seam is 10-11 ms. If, for example, a nominal value of the time of deceleration of a short-delayed electric detonator placed in the charge for coal stripping is 30 ms, and the detonator in the adjacent charge of the advanced loosening of the rock is 15 ms, the delay time between them is obtained as a difference of 30-15 ms and a ratio of 15 ms: 10 ms, 1.5 2.5, i.e. in this case, the elastic oscillations of the rock mass may be superimposed on the vibrations of the coal seam, and the latter will receive an additional impulse, as a result of which the probability of the emission of coal and gas may increase. If this ratio is assumed to be equal to 2.5 or more, then the slow-delay charging of charges for loosening the rock and cutting coal is carried out as multi-temporal, i.e. Charging of charges in the coal mass will occur only after oscillations in the rock, caused by the explosion of explosive charges for advanced

рыхлени .loosening.

Преимущество способа состоит в том, что его , применение обеспечивает создание зоны разгрузки угольного пласта на такую глубину, когда взрывание шпуровых зар дов дл  отбойки угл  осуществл етс  в безопасной .зоне без выбросов угл  и газа, при зтом при отсутствии выбросов угл  иThe advantage of this method is that its use ensures the creation of a coal bed unloading zone to such a depth that blasting blast-hole charges for coal blasting is carried out in a safe zone without emissions of coal and gas, while in the absence of coal emissions and

газа и при выбросах менее 100 т угл  скорость проведени  выработки практически не отличаетс  от скорости проведени  выработок в невыбросоопасных зонах.gas and with emissions of less than 100 tons of coal, the rate of production is practically no different from the rate of excavations in non-hazardous areas.

Claims (1)

СПОСОБ ВЫЕМКИ ВЫБРОСООПАСНОГО УГОЛЬНОГО ПЛАСТА, включающий бурение шпуров в породах и угольном пласте, заряжение их взрывчатым веществом, взрывание зарядов взрывчатых веществ в режиме сотрясатель- ного взрывания, отличающийся тем, что, с целью повышения эффективности предотвращения внезапных выбросов угля и газа путем проведения впереди забоя выработки передового рыхления вмещающих пород, в породе бурят шпуры для производства передового рыхления пласта на расстоянии от пласта, не превышающем радиуса эффективного действия взрыва заряда взрывчатого вещества на глубину, при которой отношение линии наименьшего сопротивления помещаемых в них зарядов взрывчатого вещества к линии наименьшего сопро- § тивления зарядов для отбойки угля составляет 1,8-2,7, взрывание зарядов в этих шпурах производят короткозамедленно в один прием, при этом отношение разности замедлений между взрывами зарядов для отбойки угля и передового рыхления ко времени затухания упругих колебаний в угольном пласте составляет не менее 2,5.METHOD FOR EXTRACTION OF AN EMISSIBLE COAL LAYER, including drilling holes in rocks and a coal seam, charging them with explosive, blasting explosive charges in a shock-blowing mode, characterized in that, in order to increase the efficiency of preventing sudden emissions of coal and gas by conducting a face ahead development of advanced loosening of the host rocks, bore holes are drilled in the rock to produce advanced loosening of the formation at a distance from the formation not exceeding the radius of the effective action of the blast charge and explosive to a depth at which the ratio of the line of least resistance of the explosive charges placed in them to the line of least resistance of charges for breaking off coal is 1.8-2.7, the explosions of the charges in these bore holes are made shortly in one go, In this case, the ratio of the difference between decelerations between explosions of charges for breaking off coal and forward loosening to the time of attenuation of elastic vibrations in the coal seam is at least 2.5. TlSTlS
SU823405567A 1982-03-10 1982-03-10 Method of winning outburst-hazardous coal seam SU1055209A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823405567A SU1055209A1 (en) 1982-03-10 1982-03-10 Method of winning outburst-hazardous coal seam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823405567A SU1055209A1 (en) 1982-03-10 1982-03-10 Method of winning outburst-hazardous coal seam

Publications (1)

Publication Number Publication Date
SU1055209A1 true SU1055209A1 (en) 1985-10-15

Family

ID=21000510

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823405567A SU1055209A1 (en) 1982-03-10 1982-03-10 Method of winning outburst-hazardous coal seam

Country Status (1)

Country Link
SU (1) SU1055209A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 791975, кл. Е 21 F 5/00, 1981. Нормативные документы по применению сотр сательного взрывани . Макеевка-Донбасс, 1980, с. 59-81. *

Similar Documents

Publication Publication Date Title
RU2081313C1 (en) Method and device for crushing hard rock and materials
JPH11510575A (en) A method for controlled fragmentation of hard rock and concrete by using a combination of impact hammer and low charge blasting
US4451088A (en) Gaining access to very deep coal seams by carrying explosive in density controlled fluid
US20120017792A1 (en) Method of blasting
US4244624A (en) Method for reclaiming highwalls at mining sites with partially mined ore veins
SU1055209A1 (en) Method of winning outburst-hazardous coal seam
RU2634597C1 (en) Method for developing mine workings and conducting stoping operations
US4522448A (en) Method and apparatus for reclamation by reducing highwalls to gradable rubble at augered or longwalled mining sites
SU791975A1 (en) Method of driving preparatory working in beds prezenting coal and gas outburst hazard
RU2784839C1 (en) Method for carrying out explosive operations in the circuit zone of quarry
RU2017960C1 (en) Method for rock breaking by blasting
RU2203419C2 (en) Process of underground development of thick ore deposits
SU1461930A1 (en) Method of combined mining of mineral deposits
RU122476U1 (en) CUTTING FOR DESTRUCTION OF STRONG BREEDS
SU1076579A1 (en) Method of producing natural stone blocks
SU1689643A1 (en) Method for prevention of rock bursts
RU2047769C1 (en) Method for working steeply dipping ore bodies
RU2023877C1 (en) Method of screened explosions
RU2646152C2 (en) System for explosive blasting of bump hazard rocks
RU2078211C1 (en) Method of mining thick steep coal seams
SU662714A1 (en) Method of sloping
SU1010923A1 (en) Method for conducting explosion operations in boundary zone
SU1751310A1 (en) Method of driving a horizontal mine working
SU1106902A1 (en) Method of mining useful minerals
RU2060388C1 (en) Method for driving a working