SU1010923A1 - Method for conducting explosion operations in boundary zone - Google Patents

Method for conducting explosion operations in boundary zone Download PDF

Info

Publication number
SU1010923A1
SU1010923A1 SU803210182A SU3210182A SU1010923A1 SU 1010923 A1 SU1010923 A1 SU 1010923A1 SU 803210182 A SU803210182 A SU 803210182A SU 3210182 A SU3210182 A SU 3210182A SU 1010923 A1 SU1010923 A1 SU 1010923A1
Authority
SU
USSR - Soviet Union
Prior art keywords
explosive
explosive charges
cut
explosion
screen gap
Prior art date
Application number
SU803210182A
Other languages
Russian (ru)
Inventor
В.К. Бызеев
В.Д. Мороз
Ю.С. Лунев
А.Н. Матыцин
В.А. Муромцев
Original Assignee
Среднеазиатский Научно-Исследовательский И Проектный Институт Цветной Металлургии
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Среднеазиатский Научно-Исследовательский И Проектный Институт Цветной Металлургии filed Critical Среднеазиатский Научно-Исследовательский И Проектный Институт Цветной Металлургии
Priority to SU803210182A priority Critical patent/SU1010923A1/en
Application granted granted Critical
Publication of SU1010923A1 publication Critical patent/SU1010923A1/en

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Drilling And Exploitation, And Mining Machines And Methods (AREA)
  • Working Measures On Existing Buildindgs (AREA)

Abstract

СПОСОБ ПРОИЗВОДСТВА ВЗРЫВНЫХ РАБОТ В ПРИКОНТУРНОЙ ЗОНЕ, основанный на многор дном . гчэнальном короткозамедленном варывании с предварительным образованием экранной щели в предельном контуре борта карьера путем мгновенного взрыва р$зда зар дов взрывчатого вещества, расположенного параллельно борту карьера, отличающийс  тем, что, с целью снижени  сейсмического воздействи  на оставл емый массив и охран51емые объекты, взрывом зар дов взрывчатого вещества со стороны забо  около экранной щели создают вруб а затем короткоi замедленно взрывают диагональные р ды зар дов ВВ в направлении от начального (Л вруба во фланг взрывнс  о блока.METHOD OF MANUFACTURE OF EXPLOSIVE WORKS IN THE CROC-CIRCUIT ZONE, based on multi-bottom. short-delayed boiling with the preliminary formation of a screen gap in the marginal contour of the pit wall by instantaneous explosion of explosive charges placed parallel to the pit board, characterized in that, in order to reduce the seismic effect on the array and protected objects, an explosive charge explosives on the side of the bottom near the screen gap create a cut and then briefly slowly detonate diagonal rows of explosive charges in the direction from the initial (L cut into the flan vzryvns of the unit.

Description

Изобретение относитс  к взрывным работам и может быть использовано на открытых разработках при отработке при контурных лент бортов карьеров. Известен способ производства взрывных работ в приконтурной зоне, основгшный на использовании клиновых и пор дных схем короткозамедленного взрывани  С1 3 . Недостатком этого способа  вл етс  то, что он не обеспечивает охраноспособности объектов вблизи места производства без специальных защит ных средств. . Наиболее близким техническим рбшением к предлагаемому  вл етс  способ производства взрывных работ в приконтурной зоне, основанный на многор5Шном диагональном короткозамедленном взрывании с предварительным образованием экранной щели в предельном контуре борта карьера путем мгновенного взрыва р да зар дов взрывчатого вещества (ВВ), расположенного параллель но борту карьера 2 . Недостаток указанного способа заклю чаетс  в том, что в глубь массива об . зательно проникают, хот  и существенно уменьшенные, о ® мощные уда ные волны, которые способны ощутимо снизить прочность и устойчивость оставл емых породных уступов, а также и охран емых объектов вблизи места производства взрыва. Цель изобретени  - снижение сейсмического воздействи  на оставл емый ма сив и охран емые объекты. Цель дости1 аетс  тем, что взрывом зар дов взрывчатого вещества со сторо ны забо  около экранной щели создают вруб, а затем короткоаамедленно взрывают диагональные р ды зар дов ВВ в направлении от начального вруба во фланг взрывного блока. На чертеже приведена последователь- ность операций по предлагаемому способу производства взрывных работ в приконтурной зоне. Сначала образуют экранную щель путем мгновенного взрыва О-го р да зар дов ВВ, расположенного параллельно борту карьера, затем взрывом зар да ВВ 1-го р да, двух зар дов ВВ 2-го р да со стороны забо  около экранной щели создают вруб и потом с корот КИМ замедлением последовательно взрывают диагональные р ды ВВ 3-12 в направлении от начального вруба фо фланг взрываемого блока с обеспечением качественного дроблени  массива. При этом ударные волны, направленные в сторону оставл емого массива (экранной щели), гас тс  во взорванной горной массе, а ударные волны, направленные в сторону выработанного пространства, способствуют дополнительному дроблению породнь1Х кусков. Опытные взрывы, выполненные на Кальмакырском карьере, полностью под-рвердили ожи/7.аемые результаты предлагаемого способа производства взрывных работ на уступах. Предлагаемый способ позвол ет улучщить качество дроблени  горной ассы; сохранить компактность развала взорванной горной массы за счет локальности полосы блока в пределах каждого взрываемого р да скважин; снизить эффект сейсмического действи  взрыва в сторону оставл емого массива и охран емых объектов. Данна  технологи  может дать экономию О, 2-О, 3 руб. на 1 м взорваниой массы.The invention relates to blasting operations and can be used in open cast mining for the development of contour ribbons of pit walls. A known method of blasting operations in the marginal zone, based on the use of wedge and perimeter schemes of short-delay blasting C1 3. The disadvantage of this method is that it does not ensure the protection of objects near the production site without special protective equipment. . The closest technical solution to the present invention is a method of blasting operations in the marginal zone, based on multi-angle diagonal short-delay blasting with preliminary formation of a screen gap in the marginal edge of the pit wall by instantaneously exploding a series of explosive charges (BB) located parallel to the pit wall 2 The disadvantage of this method lies in the fact that deep into the array about. The powerful, successful waves, which are capable of significantly reducing the strength and stability of the remaining rock ledges, as well as the protected objects near the site of the explosion, penetrate them, albeit significantly reduced. The purpose of the invention is to reduce the seismic impact on the array and protected objects. The goal is achieved by blasting explosive charges from the side of the bottom near the screen gap to create a cut, and then briefly immediately explode diagonal rows of explosive charges in the direction from the initial cut to the flank of the explosive block. The drawing shows the sequence of operations for the proposed method of blasting operations in the marginal zone. First, a screen gap is formed by an instantaneous explosion of an O-th row of explosive charges located parallel to the pit wall, then an explosion of an explosive charge of the 1st row, two explosive charges of the 2nd row from the bottom side near the screen gap creates then, with a short CMM deceleration, the diagonal rows of explosives 3–12 are successively exploded in the direction from the initial cut to the flank of the exploding block, ensuring high-quality crushing of the array. At the same time, shock waves directed toward the array to be left (screen gap) are extinguished in the blasted rock mass, and shock waves directed toward the developed space contribute to additional crushing of rock pieces. Experimental explosions carried out at Kalmakyr quarry, fully confirmed ozhi / 7.shee results of the proposed method of blasting operations on the ledges. The proposed method allows to improve the quality of the crushing of the mountain asy; to maintain the compactness of the collapse of the blasted rock mass due to the locality of the block strip within each exploded series of wells; reduce the effect of seismic explosion in the direction of the array and protected objects. This technology can save O, 2-O, 3 rubles. on 1 m of explosive mass.

Claims (1)

СПОСОБ ПРОИЗВОДСТВА ВЗРЫВНЫХ РАБОТ В ПРИКОНТУРНОЙ ЭОНЕ, основанный на многорядном диа- . гональном короткозамедленном взрывании с предварительным образованием экранной шели в предельном контуре борта карьера путем мгновенного взрыва рада зарядов взрывчатого вещества, расположенного параллельно борту карьера, отличающийся тем, что, с целью снижения сейсмического воздействия на оставляемый массив и охраняемые объекты, взрывом зарядов взрывчатого вещества со стороны забоя около экранной щели создают вруб, а затем короткозамедленно взрывают диагональные ряды зарядов ВВ в направлении от начального вруба во фланг взрывного блока.METHOD FOR PRODUCING EXPLOSIVE WORKS IN THE CIRCULAR AEON, based on multi-row dia. short-lived gallon blasting with the preliminary formation of a screen shell in the limiting contour of the pit side by means of an instant explosion of a radar of explosive charges located parallel to the pit side, characterized in that, in order to reduce the seismic effect on the left massif and protected objects, an explosion of explosive charges from the face a cut is created near the screen slit, and then diagonal rows of explosive charges are blown up shortly in the direction from the initial cut to the flank of the explosive block. SU „„1010923SU „„ 1010923
SU803210182A 1980-11-28 1980-11-28 Method for conducting explosion operations in boundary zone SU1010923A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU803210182A SU1010923A1 (en) 1980-11-28 1980-11-28 Method for conducting explosion operations in boundary zone

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU803210182A SU1010923A1 (en) 1980-11-28 1980-11-28 Method for conducting explosion operations in boundary zone

Publications (1)

Publication Number Publication Date
SU1010923A1 true SU1010923A1 (en) 1983-10-07

Family

ID=20929035

Family Applications (1)

Application Number Title Priority Date Filing Date
SU803210182A SU1010923A1 (en) 1980-11-28 1980-11-28 Method for conducting explosion operations in boundary zone

Country Status (1)

Country Link
SU (1) SU1010923A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2723419C1 (en) * 2019-12-23 2020-06-11 Федеральное государственное бюджетное образовательное учреждение высшего образования "Тихоокеанский государственный университет" Method of development of local areas of mineralization in strong rocks
RU2784839C1 (en) * 2022-04-29 2022-11-30 Владимир Арнольдович Белин Method for carrying out explosive operations in the circuit zone of quarry

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Кутузов Б. Н. и др. Проектирование взрывных работ. М., Недра, 1974, с. 1О2. 2. Друкованный М. Ф. , Ефремов Э. И. ; Ильин В. И. Буровзрывные работы на карьерах. М,, Недра, 1969, с. (прототип). *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2723419C1 (en) * 2019-12-23 2020-06-11 Федеральное государственное бюджетное образовательное учреждение высшего образования "Тихоокеанский государственный университет" Method of development of local areas of mineralization in strong rocks
RU2784839C1 (en) * 2022-04-29 2022-11-30 Владимир Арнольдович Белин Method for carrying out explosive operations in the circuit zone of quarry

Similar Documents

Publication Publication Date Title
SU1010923A1 (en) Method for conducting explosion operations in boundary zone
SU1707201A1 (en) Method of bench working by blasting
RU2017960C1 (en) Method for rock breaking by blasting
RU2784839C1 (en) Method for carrying out explosive operations in the circuit zone of quarry
RU2023877C1 (en) Method of screened explosions
RU2150673C1 (en) Method for installation of blasting network for crushing of difficulty exploitable rocks
RU2059070C1 (en) Method for making kerf cavity
RU2225509C1 (en) Method for explosive breaking in pit-faces of underground purifying enclosures
SU1055209A1 (en) Method of winning outburst-hazardous coal seam
RU2200298C2 (en) Procedure of blast breaking of ore blocks cleaved by dike
RU2175434C2 (en) Process of destruction of pillars
SU863862A1 (en) Method of mining thick ore bodies
RU2725721C1 (en) Method for formation of charge in well combined open-underground mining
SU1523682A1 (en) Method of preventing rock bumps
RU2017959C1 (en) Method for rock blasting
RU2010969C1 (en) Method of opencast drilling and blasting works exercising
RU2046941C1 (en) Pillars demolition method
RU2184928C1 (en) Method for conducting of drilling and blasting operations
SU1091634A1 (en) Method of blast breaking of rock
EA014255B1 (en) A method for developing complex ore massifs with explosive-based ore-preparation
SU607018A1 (en) Method of combined mining of thick mineral deposits
SU1130003A1 (en) Method of conducting blating work
SU1113655A1 (en) Method of blasting mineral deposits
SU791975A1 (en) Method of driving preparatory working in beds prezenting coal and gas outburst hazard
RU2107890C1 (en) Method of blasting of mineral resources