SU620524A1 - Method of constructing short tunnel - Google Patents

Method of constructing short tunnel

Info

Publication number
SU620524A1
SU620524A1 SU762311915A SU2311915A SU620524A1 SU 620524 A1 SU620524 A1 SU 620524A1 SU 762311915 A SU762311915 A SU 762311915A SU 2311915 A SU2311915 A SU 2311915A SU 620524 A1 SU620524 A1 SU 620524A1
Authority
SU
USSR - Soviet Union
Prior art keywords
tunnel
short tunnel
constructing
constructing short
formwork
Prior art date
Application number
SU762311915A
Other languages
Russian (ru)
Inventor
Надежда Владимировна Ефимова
Владимир Андреевич Квитко
Владимир Алексеевич Кузьмин
Original Assignee
Трест "Леноргинжстрой" Главленинградинжстроя При Ленгорисполкоме
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Трест "Леноргинжстрой" Главленинградинжстроя При Ленгорисполкоме filed Critical Трест "Леноргинжстрой" Главленинградинжстроя При Ленгорисполкоме
Priority to SU762311915A priority Critical patent/SU620524A1/en
Application granted granted Critical
Publication of SU620524A1 publication Critical patent/SU620524A1/en

Links

Landscapes

  • Lining And Supports For Tunnels (AREA)

Description

Изобретение относитс  к инженерно му строительству, а именно к способу сооружени  тоннелей. Известен способ бестраншейной про ладки, который заключаетс  в том, чт с помощью пневмопробойников проход т скважины,а затем в них укладывают тр бы flj .. Такой способ может быть использован лишь при проходке тоннелей сравнительно небольших диаметров. Наиболее близким техническим решением из известных  вл етс  способ сооружени  тоннел - небольшой прот женности , включающий создание замкну той стены из металлических труб,ннъе тированне строительного раствора по металлическим трубам и последующую грунта С23. К недостаткам тонелл , сооруженного по такому способу, следует от-т нести его сравнительную недолговечность , Ьпредел € 4ую сроком потери прочности труб за счет их коррозии, а также невозможность использовани  его в водонасыченных грунтах без спе циальных мер по гидроизол ции. Целью изобретени   вл етс  повыиенне срока службы тоннел  и улу1шение его (эксплуатационных характеристик . Достигаетс  это тем, что один Из торцов металлических труб омоноличивают , инъектирование строительного раствора осуществл ют после выемки грунта н установки опалубки, а выемку грунта осуществл ют параллельно с продвижением опалубки. При этом инъектирование при каждой перестановке отталубки осуществл ют одновременно участками , одна часть из которых располагаетс  ниже , а друга  - выше диаметра тоннел  по горизонтали. На фиг.4 дана схема сооружаемого тоннел ; на фиг.2 - поперечный разрез тоннел . После образовани  одним из известных способов замкнутой стены из стальных Труб 1 один из ее торцов смоноличивают бетонным монолитным кольцом 2. При этом грунт удал ют йе из всего тоннел , а только на определенном участке, определ ет см в зависимости от диаметра самого тоннел  и примен емых труб, устанавливают ребра жест кости, на которые затем устанавливают опалубку. В заопалубочное пространство т.е. пространство между стеной изThe invention relates to engineering construction, in particular to a method for constructing tunnels. The known method of trenchless tracing, which consists in passing holes with the help of pneumatic punches, then trj flj is placed in them. Such a method can only be used when tunneling relatively small diameters. The closest technical solution known is the method of constructing a tunnel - a small extension, including the creation of a closed wall of metal pipes, the introduction of mortar along metal pipes and the subsequent C23 soil. The disadvantages of tunnels built by this method should be its comparative fragility, that is, the 4th term of pipe strength loss due to their corrosion, as well as the impossibility of using it in water-accumulated soils without special waterproofing measures. The aim of the invention is to increase the service life of the tunnel and to improve it (performance. This is achieved by having one of the ends of the metal pipes monolithic, the injection of mortar is carried out after excavation and installation of the formwork, and the excavation is carried out in parallel with the promotion of the formwork. In this case, the injection at each rearrangement of the formwork is carried out simultaneously in sections, one part of which is located lower and the other part above the diameter of the tunnel horizontally. Figure 2 shows a tunnel cross-section after one of the known methods forms a closed wall of steel pipes 1, one of its ends is grinded with a monolithic concrete ring 2. At the same time, soil is removed from the entire tunnel, but only on a certain cm, depending on the diameter of the tunnel itself and the pipes used, install stiffening ribs, on which the formwork is then installed. the space between the wall of

SU762311915A 1976-01-05 1976-01-05 Method of constructing short tunnel SU620524A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU762311915A SU620524A1 (en) 1976-01-05 1976-01-05 Method of constructing short tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU762311915A SU620524A1 (en) 1976-01-05 1976-01-05 Method of constructing short tunnel

Publications (1)

Publication Number Publication Date
SU620524A1 true SU620524A1 (en) 1978-08-25

Family

ID=20644811

Family Applications (1)

Application Number Title Priority Date Filing Date
SU762311915A SU620524A1 (en) 1976-01-05 1976-01-05 Method of constructing short tunnel

Country Status (1)

Country Link
SU (1) SU620524A1 (en)

Similar Documents

Publication Publication Date Title
CN104790964A (en) Construction method for shield tunneling machine moving-out on condition of tunnel portal deviation
SU620524A1 (en) Method of constructing short tunnel
CN205778882U (en) Inside opening increases the Super-large-section tunnel enlarging constructing structure in situ of the scope of operation
CN87100318B (en) Secretly digging method with predisposed roof
CN207761645U (en) Shield piping lane system
GB1420945A (en) Submarine piping sections
SU1281632A1 (en) Method of mounting the metal lining of water duct in tunnel
SU969900A1 (en) Method of erecting prestressed tunnel lining
JPH03244799A (en) Large sectional tunnel structure and constucting method thereof
SU1211414A1 (en) Method of erecting mine support
JPS61186623A (en) Method of building foundation of building
SU796431A1 (en) Method of securing a well
SU943401A1 (en) Method of consolidating mine working with monolithic concrete
SU861614A1 (en) Method of erecting steel-concrete lining
GB1415663A (en) Jacking pipes
SU823588A1 (en) Method of erecting roof support in durable mine workings
SU898083A1 (en) Method of constructing mine roof support
RU93029409A (en) METHOD FOR CONSTRUCTING TUNNELS IN WEAK WATER-SOUNDED SOILS
SU669061A1 (en) Method of supporting mine working with monolithic concrete
JPH01284699A (en) Fixing of thin pipe for shield secondary construction
SU863867A1 (en) Method of sinking a vertical mine working
SU769000A2 (en) Ferroconcrete anchor-type roof support
JPS6224596B2 (en)
SU926201A1 (en) Structure reinforcement girdle
Calin et al. TARP- Torrence Avenue Tunnel.