SU608926A1 - Entry-driving machine set - Google Patents

Entry-driving machine set

Info

Publication number
SU608926A1
SU608926A1 SU741986082A SU1986082A SU608926A1 SU 608926 A1 SU608926 A1 SU 608926A1 SU 741986082 A SU741986082 A SU 741986082A SU 1986082 A SU1986082 A SU 1986082A SU 608926 A1 SU608926 A1 SU 608926A1
Authority
SU
USSR - Soviet Union
Prior art keywords
complex
hydraulic
support
frame
loading machine
Prior art date
Application number
SU741986082A
Other languages
Russian (ru)
Inventor
Николай Георгиевич Черных
Виктор Михайлович Ерпылев
Василий Сергеевич Евсеев
Original Assignee
Шахта "Нагорная" Комбината "Южкузбассуголь"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Шахта "Нагорная" Комбината "Южкузбассуголь" filed Critical Шахта "Нагорная" Комбината "Южкузбассуголь"
Priority to SU741986082A priority Critical patent/SU608926A1/en
Application granted granted Critical
Publication of SU608926A1 publication Critical patent/SU608926A1/en

Links

Description

(54) ПРОХОДЧЕСКИЙ КОМПЛЕКС(54) PASSAGE COMPLEX

1one

Изобретение отиоситс  к горному оборудованию .The invention of otosit to mining equipment.

Известны проходческие комплексы, включающие руко ть, погрузочный орган, крепь с опорными стойками 1.Known tunneling complexes are known, which include a handle, a loading body, and a support with support posts 1.

Недостатком такого комплекса  вл етс  его громоздкость, что преп тствует горной массы при проведении восстающих выработок, при проведении выработок с гидротранспортом или при выемке угл  в очистных забо х.The disadvantage of such a complex is its cumbersomeness, which prevents the rock mass during the carrying out of rising workings, when carrying out workings with hydrotransport or during coal mining in clearing holes.

Известен другой проходческий комплекс, включающий раму, руко ть с поворотным устройством, центральное и боковое перекрыти  временной крепи с опорными стойками и домкратами передвижки, погрузочную машину , гидропривод, пульт управлени  2.Another tunnel complex is known, including a frame, a handle with a turning device, a central and lateral overlap of a temporary support with support legs and shifters, a loading machine, a hydraulic actuator, and a control panel 2.

Недостатком этого комплекса  вл етс  иизка  производительность в разных горногеологических услови х.The disadvantage of this complex is its productivity in various geological conditions.

Цель изобретени  - повышение производительности комплекса в разных горногеологических услови х.The purpose of the invention is to increase the productivity of the complex in different geological conditions.

Это достигаетс  тем, что он онабл ен выполненной в виде коромысла с опорными гидростойками портальной опорой, на которой носредством поворотного механизма установлена рама, щарнирно св занна  с боковыми перекрыти ми.This is achieved by the fact that it is made of a rocker with a hydraulic support, a portal support, on which a frame hinged to the lateral overlaps is mounted on the rotary mechanism.

На фиг. 1 изобралсен комплекс с погрузочной мащиной, вид сбоку; на фиг. 2 - комплекс без погрузочной машины, вид сбоку; на фиг. 3 - то же, вид сзади.FIG. 1 shows a complex with a loading machine, side view; in fig. 2 - a complex without a loading machine, side view; in fig. 3 - the same, rear view.

Проходческий комплекс включает рабочий орган 1 на руко ти с новоротным устройством 2, закрепленный снизу к раме - центральному перекрытию 3 временной крепи. Рама - центральное перекрытие с помощью шарнирных направл ющих 4 соединено с боковыми перекрыти ми 5, 6 временной крепи. Домкраты 7, 8 горизонтального поворота рабочего оргаиа (они же и домкраты передвижки комплекса) упираютс  с одной стороны в турель поворотного устройства, а с другой - в упоры 9, 10, расположенные на боковых перекрыти х. Через вертикальную ось поворотного устройства сверху вставлен гидроцилиндр И с опорной п той 12, снизу закреплен фланец со сферой 13 и коромысло 14 с опорпымп гидростойкамн 15, 16, которые вместе составл ют портальную опору. Боковые перекрыти  опираютс  па гидростойкн 17, 18 и укосины 19. В части расноложена ногрузочна  машина 20, котора  взанмосв зана сзади через опорную подушку 21, гидроцилиндр 22 с рамой - центральным иерекрытием и спереди через переднюю опорную нодущку 23 с коромыслом 14 с помощью гидроцилиндров 24, 25, которые жестко соединены с рамой погрузочной машины и с коромыслом . Пульт 26 управлени  комплексом расположен на гидростойке и совмещен с пультом 27 управлени  погрузочной машины. Гидростойки 15, 16 взаимосв заны с гидростойками 17, 18 домкратами 28 передвил ки. Комплекс оборудован автономной гидростанцией 29, котора  при работе с погрузочной машиной снимаетс .The tunneling complex includes a working body 1 on the arm with a rotating device 2, fixed from the bottom to the frame - central overlap 3 of the temporary support. Frame - central overlap by means of hinged guides 4 is connected with lateral overlaps 5, 6 of temporary support. The jacks 7, 8 of the horizontal rotation of the working organ (they are also the jacks of the advancing of the complex) abut on one side against the turret of the rotator, and on the other on the stops 9, 10 located on the side slabs. Through the vertical axis of the swivel device, a hydraulic cylinder I is inserted from the top with a support point 12, a flange with a sphere 13 and a rocker arm 14 with an anvil hydrostack 15, 16, which together constitute a portal support, are fixed below. The side ceilings are supported by hydro-resistors 17, 18 and sticks 19. In part, a loader 20 is laid, which is placed behind the back cushion 21, the hydraulic cylinder 22 with the frame is centrally covered and the front through the front support noduschku 23 with the yoke 14 by means of hydraulic cylinders 24, 25, which are rigidly connected to the frame of the loading machine and the rocker. The control panel 26 of the complex is located on a hydrorack and is combined with the control panel 27 of the control of the loading machine. Hydraulics 15, 16 are interconnected with hydraulics 17, 18 with jacks 28 transfer wheels. The complex is equipped with an autonomous hydraulic station 29, which is removed during operation of the loading machine.

Комплекс при проведении восстающих выработок с углом наклона от 25° и выше или при проведении выработок с гидротранспортом работает следующим образом.The complex when carrying out rising workings with an angle of inclination from 25 ° and above or when carrying out workings with hydrotransport works as follows.

Все гидростойки расперты, рабочий орган производит разрушение горной массы, котора  самотеком или гидросмывом транспортируетс  от забо  по выработке. После сн ти  полосы рабочий орга  с вт иутым телескопом ставитс  домкратами 7, 8 вдоль оси выработки , гидростойка 15 снимаетс  с распора до зависани  рамы-центрального перекрыти  3 в шарнирных направл ющих на боковых перекрыти х 5, 6. Домкратами 7, 8 рамацентральное перекрытие вместе с рабочим органом, поворотным устройством и гидростойкой 15 передвигаютс  к забою на величину вынимаемой полосы. По окончании передвижки гидростойкой 15 распирают раму-цеитральное перекрытие, рабочим орга ом с помощью телескопа производитс  зарубка новой иолосы и одновременно боковые перекрыти  сиимаютс  с распора до зависани  в шарнирных направл ющих и домкратами 7, 8 подт гиваютс  в исходное положение, после чего гидростойками 17, 18 распирают перекрыти  к кровле, и процесс работы повтор етс . Управление комплексом производитс  с пульта 26 управлени  от автономной гидростанции 29.All hydraulic rigs are open, the working body produces the destruction of the rock mass, which is transported by gravity or water wash from the slab. After the strip is removed, the working body with the telescope and the telescope is jacked 7, 8 along the axis of the working, the hydraulic post 15 is removed from the thrust until the frame-central overlap 3 hangs in the articulated guides on the lateral overlaps 5, 6. Jacks 7, 8 ramacentral overlap with the implement, the rotator and the hydraulically secured 15, they are moved to the bottom by the amount of the strip to be removed. At the end of the movement with hydroresistant 15, the frame-zeitral overlap is opened, the working organ is teamed with a telescope, and the lateral overlaps are squeezed from the thrust until hanging in the articulated guides and jacks 7, 8 are pulled back to their original position, after which the hydraulic posts 17 18, the ceiling is pulled apart to the roof, and the work process is repeated. The complex is controlled from the control panel 26 from the autonomous hydro station 29.

При проведении восстающих выработок с углом иаклона до 25° и горизонтальных, где требуютс  активные средства погрузки, комплекс компонуетс  погрузочной машиной и работает следующим образом.When carrying out rising workings with an angle of up to 25 ° and horizontal, where active loading means are required, the complex is assembled by a loading machine and operates as follows.

После сн ти  полосы телескоп вт гиваетс , рабочий орган устанавливаетс  вдоль оси выработки , гидростойки 15, 16 снимаютс  с распора , гпдроцилиндры 22, 24, 25 выполн ют роль демпфера, т. е. имеют свободное перемещение штоков, рама-центральное перекрытие с рабочим органом, поворотным устройством, портальной опорой зависают в щарнирных направл ющих иа боковых перекрыти х. Домкратами 7, 8 и 28 ироизводитс  передвижка комплекса и погрузочной машины на величину вынимаемой полосы, после чего гидростойками 15, 16 распираетс  рама-це тральпое перекрытие. При зарубке новой полосы боковые перекрыти  снимаютс  с распора, домкратами 7, 8 и 28 подт гиваютс  в исходное положение, распираютс  гидростойками 17, 18 к кровле, и процесс работы повтор етс . Управление комплексом и погрузочной машиной производитс  с пультов 26, 27 управлени  от гидростанции погрузочной машины. Отбита  горна  масса грузитс  и транспортируетс  погрузочной машиной до транспортных средств выработки.After the strip has been removed, the telescope is retracted, the working member is installed along the axis of the working, the hydraulic legs 15, 16 are removed from the thrust, the hydraulic cylinders 22, 24, 25 act as a damper, i.e., have free movement of the rods, the frame has a central overlap with the operating member , a pivoting device, a portal support hang in the hinged guides and lateral overlaps. The jacks 7, 8, and 28 produce the movement of the complex and the loading machine by the amount of the strips to be removed, after which the frame supports the hydraulic rails 15, 16. When a notch is cut, the side overlaps are removed from the thrust, jacks 7, 8 and 28 are pulled back to their original position, pushed by the hydraulic posts 17, 18 to the roof, and the process is repeated. The control of the complex and the loading machine is carried out from the consoles 26, 27 of the control from the hydraulic station of the loading machine. The beaten off of the forge mass is loaded and transported by the loader to the production vehicles.

При перегоне из одной выработки в другую комплекс сниметс  с распора и зависнет с помощью гидроцилпндров 22, 24, 25 на погрузочной машине, котора  в данном случае служит как транспортна , при этом демонтаж комплекса ие производитс .When moving from one production to another, the complex is removed from the thrust and hangs with the help of hydro-cylinders 22, 24, 25 on the loading machine, which in this case serves as a transport, while dismantling the complex is not performed.

Разворот комплекса без погрузочной машины производитс  следующим образом.The unfolding of the complex without a loader is carried out as follows.

Снимаетс  с распора рама-центральное перекрытие до зависани  в щарнирных направл ющих , гидроцилиндром 11 выдиигаетс  опор а  п та 12 до контакта с кровлей. Окончательный распор между кровлей, опорной п той и почвой производитс  гидростойкой 15, зстановленной по вертикальной оси поворотного устройства. При сн тии с распора боковых перекрытий комплекс зависнет на гидростойке 15. Разворотом рабочего органа 1, домкратами 7, 8 комплекс разворачиваетс  вокруг одной точки в нужном направлении, при этом фланец со сферой 13 и сфера с опорной п той 12 выполн ют роль подшипника скольжени . Зона разворота предварительно подготавливаетс  рабочим органом.It is removed from the thrust frame-central overlap until it hangs in the hinged guides, the hydraulic cylinder 11 pulls out the supports a pt 12 before contact with the roof. The final thrust between the roof, support point and soil is produced by a hydraulically secured 15 mounted along the vertical axis of the rotator. When removed from the lateral overlap, the complex hangs on a hydrorack 15. By turning the working body 1, jacks 7, 8, the complex turns around one point in the right direction, while the flange with sphere 13 and the sphere with support spot 12 act as a sliding bearing. The reversal zone is pre-prepared by the working body.

Комплекс может примен тьс  как при проведении выработок, так и при очистной выемке .The complex can be used both when carrying out workings and during the clearing recess.

Claims (2)

1.Авторское свидетельство СССР №468003, кл. Е 21С 27/24, 1973.1. USSR author's certificate №468003, cl. E 21S 27/24, 1973. 2.Авторское свидетельство СССР №514097, кл. Е 21С 27/24, 1973.2. USSR author's certificate No. 514097, cl. E 21S 27/24, 1973. .,. ч- .п6h.p6 у /// //мтт // //Мт // //м//u /// // mtt // // Mt // // m // ЗЕZe 5five / E 1515 /7mm§mw// // / m //w//w/M //// 7mm§mw // // / m // w // w / M /// I ::LII :: LI и:and: It It 4848 фиг.Зfig.Z
SU741986082A 1974-01-11 1974-01-11 Entry-driving machine set SU608926A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU741986082A SU608926A1 (en) 1974-01-11 1974-01-11 Entry-driving machine set

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU741986082A SU608926A1 (en) 1974-01-11 1974-01-11 Entry-driving machine set

Publications (1)

Publication Number Publication Date
SU608926A1 true SU608926A1 (en) 1978-05-30

Family

ID=20572654

Family Applications (1)

Application Number Title Priority Date Filing Date
SU741986082A SU608926A1 (en) 1974-01-11 1974-01-11 Entry-driving machine set

Country Status (1)

Country Link
SU (1) SU608926A1 (en)

Similar Documents

Publication Publication Date Title
WO2022188500A1 (en) Six-arm tunneling and anchoring machine
US3861748A (en) Earth boring machine and method
US3556599A (en) Method of tunneling and tunneling shield with a drag loader
JPH0762430B2 (en) Tunnel excavation method and device
CN210370624U (en) Six-arm tunneling and anchoring machine integrating tunneling and anchoring
CN104632265B (en) Hanger rail type temporary support device
SU608926A1 (en) Entry-driving machine set
US3613383A (en) Tunneling shield with breasting doors
GB2028693A (en) Mining drill boom
US3711159A (en) Tunnelling machines
US1505060A (en) Apparatus for excavating tunnels
RU2709903C1 (en) Method for development of powerful steep bed with discharge of coal of overlying formation
JP6559374B1 (en) Low head excavator and its assembly method
RU2709904C1 (en) Method for development of a thick gently sloping bed with release of coal of underburden thickness
RU168978U1 (en) Roadheader
RU2131030C1 (en) Tunneling machine
SU1416702A1 (en) Drilling and loading machine for sinking vertical mine shafts
RU2205957C2 (en) Method of construction of middle tunnel of deep-seated column station in loose grounds
CN114673518B (en) Tunneling, anchoring and supporting integrated machine and roadway anchoring and supporting construction method
SU361278A1 (en) PORTAL DRILLING MACHINE
CN217028958U (en) All-round machine-mounted temporary support device of low tunnel for heading machine
SU1209886A1 (en) Apparatus for erecting arch part of prefabricated tunnel lining
RU2126888C1 (en) Heading machine
RU22185U1 (en) DEVICE FOR CONSTRUCTING THE MIDDLE TUNNEL OF A COLUMN STATION OF A DEEP LOADING IN A SUSTAINABLE SOIL BY THE METHOD OF AN EXCEPT MOUNT
JPS6241120Y2 (en)