SU397464A1 - METHOD OF INSTALLATION OF TRUCK TROLLEYES OF BRIDGES TYPE CRANES - Google Patents

METHOD OF INSTALLATION OF TRUCK TROLLEYES OF BRIDGES TYPE CRANES

Info

Publication number
SU397464A1
SU397464A1 SU1435808A SU1435808A SU397464A1 SU 397464 A1 SU397464 A1 SU 397464A1 SU 1435808 A SU1435808 A SU 1435808A SU 1435808 A SU1435808 A SU 1435808A SU 397464 A1 SU397464 A1 SU 397464A1
Authority
SU
USSR - Soviet Union
Prior art keywords
tracks
installation
section
trolley
lifting
Prior art date
Application number
SU1435808A
Other languages
Russian (ru)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to SU1435808A priority Critical patent/SU397464A1/en
Application granted granted Critical
Publication of SU397464A1 publication Critical patent/SU397464A1/en

Links

Description

1one

Известные способы .монтажа грузовых тележек кранов мостового типа, преимущественно мостовых перегружателей с подвесными грузовыми тележкам.и и консольным расположением подтележечных путей, осуществл емые путем подъема грузовой тележки до уро.вн  секционированных подтележечных путей установле-ниого в проектное положение крана, св заны с больщой трудоемкостью монтажных работ.Known methods of assembling truck trolleys of bridge-type cranes, mainly bridge cranes with overhead trolleys and a cantilever arrangement of loading tracks, carried out by lifting the load trolley to the level of the sectioned running tracks, are set to the design position of the crane. the complexity of the installation work.

С целью устранени  указанного недостатка по предлагаемому способу собранную на нижнем уровне грузовую тележку поднимают на участке временно неустановленной секции подтележечных путей, а затем смещают ее в гор .изонтальном направлении вдоль пролетного строени , устанавливают на подтележечные пути, после чего секцию креп т в рабочее положение .In order to eliminate this drawback, according to the proposed method, a freight trolley assembled at a lower level is lifted on a site of a temporarily unidentified section of underbog paths, and then displaced in a horizontal direction along the span, then mounted on an upright track.

Дл  подъема и последующего горизонтального смещени  -грузовой тележки целесообразно использ0.вать грузоподъемное приспособление , установленное непосредственно на пролетном строении крана.For lifting and subsequent horizontal displacement of the cargo trolley, it is advisable to use a lifting device mounted directly on the crane span.

На фиг. 1 изображена схема осуществлени  предлагаемого способа; на фиг. 2 - мостовой перегружатель, вид спереди; иа фиг. 3 - то же, аид сбоку.FIG. 1 shows a scheme for the implementation of the proposed method; in fig. 2 - bridge loader, front view; FIG. 3 - the same, Hades from the side.

На пролетном строении / установленного в проектное положение мостового перегружател  с проектными оцора.м.и 2 монтируют грузоподъемное приспособление 3 с грузовы.ми полиспастами 4 и подъемными балками 5, на которых устанавливают собранную на н 1жнемOn the span structure / installed in the design position of the bridge loader with the design stsoram.i 2 mount load-lifting device 3 with cargo polyspasts 4 and lifting beams 5, on which set assembled on n 1

уровне подлежащую монтажу подвесную грузовую тележку 6 крана .мостового типа. Консольно расположенные подтележечные пути 7 «а участке 8 пролетного строени , где производитс  подъем грузовой тележки, до подъемаthe level of the suspended cargo trolley 6 of the bridge type to be installed. The cantilevered underfloor tracks 7 "in section 8 of the superstructure, where the lifting of the cargo trolley is carried out, before lifting

последней временно не устанавливают. Подн тую до уровн  секционированных подтележечных путей на участке 8 грузовую тележку с.мещают в горизонтальном направлении вдоль пролетного строени  до положени  III. ПриThe latter is temporarily not installed. Raised to the level of partitioned undersized railways in section 8, a freight trolley is displaced horizontally along the span to position III. With

монтаже грузова  тележка занимает различные положени , например I, II и III.When mounting the truck, the truck occupies various positions, for example, I, II and III.

Грузоподъемное приспособление, установленное непосредственно на пролетном строении крана, может включать опорные ролики 9, поперечные балки 10 с консольными част ми и продольные балки 11.A lifting device mounted directly on the crane span may include supporting rollers 9, transverse beams 10 with cantilever parts and longitudinal beams 11.

Монтаж грузовой тележки может производитьс  различными грузоподъемными средствами , обеспечивающими ее подъем после установки в проектное положение пролетного строени  крана до уровн  подтележечных путей и последующее смещен.ие в горизонтальном направлении вдоль пролетного строени  крана до ее установки на подтележечные пути.The installation of the trolley can be carried out using various lifting means, which ensure its lifting after the crane span is installed in the design position to the level of underbody paths and subsequent displacement in the horizontal direction along the span of the crane until it is installed on the underrun tracks.

После смещени  грузовой тележки на нодтележечные пути креп т в рабочее полол ение временно неустановленную секцию подтележечных путей.After the load trolley has been moved, the cart tracks are secured to the working position of the temporarily unspecified section of the underboard tracks.

Предмет :изобретени Subject: Invention

Claims (2)

1. Способ монтажа rpyaoiBbix тележек кранов мостового типа, преимущественно люсто|Вых перегружателей с подвесными грузовыми тележками и консольным расположением подтележечных путей, осуществл емый путем подъема грузовой тележки до уровн  секц.ионированных подтележечных путей установленного в проектное положение крана, отличающийс  тем, что, с целью уменьшени  трудоемкости монтажных работ, собранную на нижнем уровне грузовую тележку поднимают на участке временно неустановленной секции подтележечных путей, а затем смещают ее в горизонтальном направлении вдоль лролетного строени , устанавливают на подтележечные пути, после чего секцию креп т в рабочее положение .1. Method of installation of rpyaoiBbix trolleys of bridge-type cranes, mainly luster | Outlets for loading cranes with overhead trolleys and a cantilever arrangement of loading tracks, carried out by raising the load trolley to in order to reduce the labor-intensiveness of the installation work, the cargo trolley assembled at the lower level lifts the section of the temporarily undetermined section of the underboard tracks, and then displaces it into the horizon The tallest direction along the flying structure is installed on the undersurface tracks, after which the section is fastened to the working position. 2. Способ по п. 1, отличающийс  тем, что. с целью тгодъема и последующего горизонтального смещени  грузовой тележки, используют грузоподъемное приспособление, установленное непосредственно на пролетном строении2. A method according to claim 1, characterized in that. for the purpose of lifting and subsequent horizontal displacement of the load trolley, use a lifting device mounted directly on the superstructure крана.the crane. Риг. 1Rig. one / i1/ i1 I /I / Ж.G. Фи 3Phi 3
SU1435808A 1970-05-12 1970-05-12 METHOD OF INSTALLATION OF TRUCK TROLLEYES OF BRIDGES TYPE CRANES SU397464A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU1435808A SU397464A1 (en) 1970-05-12 1970-05-12 METHOD OF INSTALLATION OF TRUCK TROLLEYES OF BRIDGES TYPE CRANES

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU1435808A SU397464A1 (en) 1970-05-12 1970-05-12 METHOD OF INSTALLATION OF TRUCK TROLLEYES OF BRIDGES TYPE CRANES

Publications (1)

Publication Number Publication Date
SU397464A1 true SU397464A1 (en) 1973-09-17

Family

ID=20452684

Family Applications (1)

Application Number Title Priority Date Filing Date
SU1435808A SU397464A1 (en) 1970-05-12 1970-05-12 METHOD OF INSTALLATION OF TRUCK TROLLEYES OF BRIDGES TYPE CRANES

Country Status (1)

Country Link
SU (1) SU397464A1 (en)

Similar Documents

Publication Publication Date Title
CN200971292Y (en) Raiway channel rescue crane
SU397464A1 (en) METHOD OF INSTALLATION OF TRUCK TROLLEYES OF BRIDGES TYPE CRANES
NO783940L (en) TRANSHIPMENT DEVICE FOR PRODUCTS OF GOODS
SU372163A1 (en) METHOD OF INSTALLATION OF THE TOWER CRANE
SU449875A1 (en) Lock Crane for Bridge Construction
GB1355507A (en) Telescopic jib for a crane
SU1183449A2 (en) Crane
SU398496A1 (en)
RU194068U1 (en) PNEUMATIC Dismountable CONSOLE CRANE (PK SRK)
SU688413A1 (en) Gantry crane load-supporting carriage
SU473834A1 (en) Suspended mine crane
SU676536A1 (en) Method and apparatus for erecting a gantry crane
SU408897A1 (en) TRUCK CRANE
SU503811A1 (en) Bridge crane
SU612894A1 (en) Bridge-type crane
SU1263610A1 (en) Method for switching crane supporting-swivelling frame from transportation position to working position
SU1181981A1 (en) Method of moving conveying car of tower crane during its transportation in assembly
SU988748A1 (en) Travelling bridge
SU922047A1 (en) Apparatus for mounting cargo truck of travelling crane
JPS5989108U (en) Mobile formwork support device for bridge construction
JP2002145578A (en) Bridge type crane
SU1055723A2 (en) Device for lifting elongated structure
US1766589A (en) Apparatus for transferring freight
SU527366A1 (en) Mounting attachment to the bridge crane
SU401632A1 (en) MOBILE LIFT FOR SERVICE OF VEHICLES