SU393095A1 - CONVEYOR INSTALLATION FOR THE MANUFACTURE OF CONSTRUCTION PRODUCTS - Google Patents
CONVEYOR INSTALLATION FOR THE MANUFACTURE OF CONSTRUCTION PRODUCTSInfo
- Publication number
- SU393095A1 SU393095A1 SU1668633A SU1668633A SU393095A1 SU 393095 A1 SU393095 A1 SU 393095A1 SU 1668633 A SU1668633 A SU 1668633A SU 1668633 A SU1668633 A SU 1668633A SU 393095 A1 SU393095 A1 SU 393095A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- chamber
- conveyor
- manufacture
- molding line
- conveyor installation
- Prior art date
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
1one
Известна конвейерна установка дл изготовлени строительных изделий, например железобетонных , включающа линию формовани с технологическим оборудованием, щелевую камеру, подъемпики-снижатели и толкатели дл передачи форм-вагонеток.A known conveyor system for the manufacture of building products, such as reinforced concrete, includes a molding line with manufacturing equipment, a slit chamber, elevators-depressors and pushers for transferring mold cars.
Цель изобретени - повышение производительности конвейерной установки и сокращение производственной площади.The purpose of the invention is to increase the productivity of a conveyor installation and reduce the production area.
Это достигаетс тем, что установка выполнена с резервной много русной камерой, смонтированной в конце линии формовани над щелевой камерой.This is achieved in that the installation is performed with a backup multi-light camera mounted at the end of the molding line above the slit chamber.
На фиг. 1 показана схема конвейерной линии; на фиг. 2-схема конвейерной установки с тупиковой камерой; на фиг. 3 и 4 -- разрезы по А-А и Б-Б на фиг. 2.FIG. 1 shows a diagram of a conveyor line; in fig. 2-diagram of a conveyor system with a dead-end camera; in fig. 3 and 4 - sections along A-A and BB in FIG. 2
Подъемник-снижатель 1, смонтированный в начале конвейерной установки дл изготовлени железобетонных изделий в формах-вагонетках 2, обеспечивает св зь линии формовани 3 со щелевой камерой Л, расноложенной под линией формовани . В конце конвейерной установки смонтирован нодъемник-снижатель 5, обеспечивающий св зь щелевой камеры с много русной резервной камерой 6, котора снабжена подъемником-снижателем 7 дл св зи русов камеры с линией формовани . Эта камера с подъемником смонтированаThe elevator-descender 1, mounted at the beginning of the conveyor installation for the manufacture of concrete products in the form-trolleys 2, provides a link between the molding line 3 and the slotted chamber L, which is located below the molding line. At the end of the conveyor installation, a descender-descender 5 is mounted, which provides a connection between the slit-chamber and the multi-light backup chamber 6, which is equipped with an elevator-descender 7 for communicating the tors of the chamber with the forming line. This camera with a lift is mounted
в конце линии формовани над щелевой камерой .at the end of the molding line above the slit chamber.
Компоновка узлов конвейерной установки но такой схеме обеспечивает возможность перемещени форм-вагонеток по вертикально-замкнутой схеме как по часовой, так и против часовой стрелки.The layout of the conveyor system units but such a scheme provides the possibility of moving the form-trolleys in a vertically closed circuit both clockwise and counterclockwise.
Дл организации посменной работы конвейерной установки соответственно по часовой иTo organize shift work of the conveyor installation, respectively, clockwise and
против часовой стрелки, установка может быть оборудована двум резервными много русными камерами, одну из которых монтируют в начале, а другую в конце конвейера. Много русна камера может быть выполнена тупиковой 8. При этом подъемник-снижатель 7 монтируют между щелевой камерой, длина которой определ етс длиной линии формовани и много русной тупиковой камерой , смонтированной в конце конвейернойcounterclockwise, the installation can be equipped with two backup multi-light cameras, one of which is mounted at the beginning and the other at the end of the conveyor. The multi-bay camera can be made dead-end 8. In this case, the elevator-descender 7 is mounted between the slit chamber, the length of which is determined by the length of the molding line and the multi-broken deadlock chamber mounted at the end of the conveyor belt.
установки.installation.
Конвейерна установка работает следующим образом.Conveyor installation works as follows.
На линии формовани 3, перемеща сь но часовой стрелке, формы-вагонетки 2 и издели проход т все посты от подготовки форм до отделки свежеотформованных изделий. При этом бетон уплотн ют с помощью виброплощадки 9, расположенной, например, на бетоноукладчике 10. В начале конвейера подъемник-снижатель 1 опускает формы с издеЛИЯМИ до уровн рельсовых путей, щелевой камеры. С помощью шагового толкател , смонтированного в камере, формы-вагонетки подают в нее дл подогрева изделий. При этом с помощью того же толкател крайнюю переднюю форму с подогретым до 90°С изделием выталкивают на платформу подъемникаснижател 5, который подает форму на заданный рус резервной камеры 6 дл продолжени цикла термообработки. После охлажде- 10 НИН изделий формы-вагонетки поочередно подают из камеры 6 па платформу подъемникаснижател 7 дл передачи на пост распалубки , расположенный на линии формовани . При перемещении форм-вагонеток но часо-15 вой стрелке подъемник-снижатель 7 используют дл загрузки резервной камеры, в которой подогревают и выдерживают издели . Подъемник-снижатель 5 предпазначен дл выгрузки много русной камеры и подачи форм20 On the molding line 3, moving clockwise, the trolley mold 2 and the product, all posts pass from the preparation of the molds to the finishing of freshly molded products. At the same time, the concrete is compacted with the help of a vibrating plate 9 located, for example, on the paver 10. At the beginning of the conveyor, the elevator-descender 1 lowers the forms with articles to the level of the rail tracks, the slit chamber. Using a stepper pusher mounted in the chamber, the trolley forms are fed into it for heating products. At the same time, using the same pusher, an extreme front form with a product heated to 90 ° C is pushed onto a lift platform 5, which delivers the mold to a given target chamber of the backup chamber 6 to continue the heat treatment cycle. After cooling, 10 NIN products of the trolley form are alternately fed from chamber 6 to the lift platform of the lower 7 for transfer to the demolition station located on the molding line. When moving the car forms but the time-15 arrow, the lift-sinker 7 is used to load a backup chamber in which the product is heated and maintained. Lift descender 5 is preassigned for unloading a multi-light camera and submitting forms20
с издели ми в щелевую камеру на охлажде5 with the products in the slit chamber on the cooling5
рои. ние, а подъемник-снижатель 1 - дл йодачи форм-вагонеток из щелевой камеры на линию формовани дл распалубки изделий. На посту распалубки издели снимают крапом п подают на конвейер отделки, а формы-вагонетки передают на последующий пост линии формовани . Предмет изобретени Конвейерна установка дл изготовлени строительных изделий, например железобетоппых , включающа линию формовани с технологическим оборудованием, щелевую камеру, подъемники-снижатели и толкатели дл передачи форм-вагонеток, отличающ а с тем, что, с целью повышени производительности и сокращени производственпой площади, установка выполнена с резервной много русной камерой, смонтированной в конце линии формовани над щелевой камеswarm. and lift-descendant 1 - for iodachi form carriages from the slit chamber to the molding line for the dismantling of products. At the post, the stripping of the product is removed by the speckler n fed to the finishing conveyor, and the trolley molds are transferred to the subsequent post of the molding line. The subject matter of the invention is a conveyor plant for the manufacture of building products, such as reinforced concrete, including a molding line with manufacturing equipment, a slit chamber, elevators-depressors and pushers for transferring form trolleys, which, in order to increase productivity and reduce production space, install made with a backup multi-light camera mounted at the end of the molding line above the slit chamber
S- 6S- 6
фf
Фиг.FIG.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1668633A SU393095A1 (en) | 1971-06-04 | 1971-06-04 | CONVEYOR INSTALLATION FOR THE MANUFACTURE OF CONSTRUCTION PRODUCTS |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU1668633A SU393095A1 (en) | 1971-06-04 | 1971-06-04 | CONVEYOR INSTALLATION FOR THE MANUFACTURE OF CONSTRUCTION PRODUCTS |
Publications (1)
Publication Number | Publication Date |
---|---|
SU393095A1 true SU393095A1 (en) | 1973-08-10 |
Family
ID=20478875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU1668633A SU393095A1 (en) | 1971-06-04 | 1971-06-04 | CONVEYOR INSTALLATION FOR THE MANUFACTURE OF CONSTRUCTION PRODUCTS |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU393095A1 (en) |
-
1971
- 1971-06-04 SU SU1668633A patent/SU393095A1/en active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB1131957A (en) | Apparatus for premoulding walls, panels and wall slabs, and method of use | |
SU393095A1 (en) | CONVEYOR INSTALLATION FOR THE MANUFACTURE OF CONSTRUCTION PRODUCTS | |
US2575092A (en) | Machine for continuous molding | |
GB1292286A (en) | Improvements in or relating to the manufacture of building elements | |
KR880006129A (en) | High Capacity Glass Plate Bending Device and Method | |
US2590768A (en) | Apparatus for continuously producing corrugated glass sheets | |
GB918647A (en) | Process and apparatus for the manufacture of agglomerated bodies from mineral fibres, particularly glass fibres | |
SU1742051A1 (en) | Conveyer line for manufacturing concrete products | |
RU2655860C1 (en) | Technological line for manufacture of concrete products using technical sulfur as a binder and the method of manufacture of such equipment | |
SU982277A1 (en) | Conveyer line for manufacturing building articles of autoclave hardening | |
SU362693A1 (en) | CONVEYOR INSTALLATION FOR THE PRODUCTION OF REINFORCED CONCRETE PRODUCTS | |
SU411996A1 (en) | ||
SU407738A1 (en) | INSTALLATION FOR THE PRODUCTION OF REINFORCED CONCRETE | |
SU1740172A1 (en) | Production line for manufacturing construction products | |
SU1689075A1 (en) | Production line to manufacture three-dimensional blocks | |
SU897517A1 (en) | Conveyer line for producing construction articles | |
SU1694379A1 (en) | Complex of equipment for production of reinforced concrete articles | |
SU1733242A1 (en) | Production line for fabricating reinforced concrete structures | |
GB1139011A (en) | Process for the production of moulding cores and automatic apparatus for carrying itout | |
RU1779594C (en) | Device for opening and closing heat chambers in lines with transfer trolleys for manufacture of building products | |
GB508154A (en) | Improvements in apparatus for manufacturing pottery ware | |
US1704502A (en) | Method of and apparatus for annealing glassware | |
SU461835A1 (en) | Method of making building products | |
GB563138A (en) | Improvements in or relating to the manufacture of tempered glass | |
SU893538A1 (en) | Production line for producing building articles |