SU1765432A1 - Working support method - Google Patents

Working support method Download PDF

Info

Publication number
SU1765432A1
SU1765432A1 SU894711074A SU4711074A SU1765432A1 SU 1765432 A1 SU1765432 A1 SU 1765432A1 SU 894711074 A SU894711074 A SU 894711074A SU 4711074 A SU4711074 A SU 4711074A SU 1765432 A1 SU1765432 A1 SU 1765432A1
Authority
SU
USSR - Soviet Union
Prior art keywords
support
reinforcement
soil
zone
pressure
Prior art date
Application number
SU894711074A
Other languages
Russian (ru)
Inventor
Александр Александрович Вайгандт
Леонид Яковлевич Коффе
Борис Сергеевич Павлов
Original Assignee
Шахта "Северная" Производственного объединения по добыче угля "Воркутауголь"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Шахта "Северная" Производственного объединения по добыче угля "Воркутауголь" filed Critical Шахта "Северная" Производственного объединения по добыче угля "Воркутауголь"
Priority to SU894711074A priority Critical patent/SU1765432A1/en
Application granted granted Critical
Publication of SU1765432A1 publication Critical patent/SU1765432A1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

Изобретение относитс  к горному делу и м.б. использовано дл  поддержани  выработок (В). Цель - повышение эффективности поддержани  В путем снижени  пучени  пород почвы. Вдоль В под рамами посто нной крепи (К) устанавливают К усилени , состо щую из парных опорных элементов. Перед распорем элементов между их основанием и почвой В размещают общую демпфирующую прокладку. По мере подвигани  лавы К усилени  перенос т из зоны стабилизации горного-давлени  в зону сопр жени  В с лавой. Размещение К усилени  на общем демпфирующем основании позвол ет равномерно перераспредел ть горное давление на почву В. 4 ил.The invention relates to mining and m. used to support workings (B). The goal is to increase the efficiency of maintaining B by reducing the soil stump. Along B, under the frames of the permanent support (K), a K reinforcement consisting of paired supporting elements is installed. Before placing the elements between their base and soil B, a common damping gasket is placed. As lava moves, K gains are transferred from the zone of rock-pressure stabilization to the zone of junction B with lava. Placing K reinforcement on a common damping base allows the mountain pressure to be evenly redistributed to the soil B. 4 sludge.

Description

Изобретение относитс  к горной промышленности , а именно к способам поддержани , преимущественно конвейерных, вентил ционных горных выработок действующих лав.,The invention relates to the mining industry, and in particular to methods of maintaining, preferably conveyor, ventilation mine workings of operating lavas.

Известен способ поддержани  горной выработки, включающий последовательное размещение вдоль выработки под рамами посто нной арочной крепи усилени , состо щей из опорных элементов, установленных на одном основании под разными углами наклона к горизонту, при этом один из опорных элементов устанавливают вертикально, а отклонение другого от вертикали осуществл ют в сторону выработанного пространства с увеличением угла наклона вдоль выработки от очистного забо  до зоны стабилизации сдвижени  горных пород по мере уплотнени  обрушенных пород.There is a method of maintaining mine workings, which includes sequential placement of permanent arched reinforcement along the excavation under the frames, consisting of supporting elements mounted on the same base at different angles of inclination to the horizon, while one of the supporting elements is set vertically and the deviation of the other from the vertical carried out in the direction of the worked-out space with an increase in the angle of inclination along the working from the clearing slab to the stabilization zone of displacement of rocks as they collapse rocks.

Недостатком известного способа  вл етс  возможность повышени  концентраций напр жений на почву выработки, а это будет отрицательно сказыватьс  на проводимых меропри ти х по снижению пучени The disadvantage of this method is the possibility of increasing stress concentrations on the soil of generation, and this will adversely affect ongoing measures to reduce the heel

почвы в выработке. Кроме того, применение в качестветсрепи усилени  парных опорных элементов, один из которых устанавливают под углом к горизонтали, а другой - вертикально , исключает возможность установки крепи усилени  впереди очистного забо ,soil in the formulation. In addition, the use of reinforcement of paired support elements, one of which is set at an angle to the horizontal and the other vertically, eliminates the possibility of installing reinforcement in front of the clearing face,

Это св зано с тем, что на участке выработки до зоны опорного давлени  отсутствуют обрушенные породы, которые необходимо уплотн ть за счет поворота опорного элемента, установленного с наклоном к горизонтальной плоскости.This is due to the fact that in the section of the excavation up to the zone of the reference pressure there are no collapsed rocks that need to be compacted due to the rotation of the support element installed inclined to the horizontal plane.

Известен способ поддержани  горной выработки, включающий последовательное размещение вдоль выработки под рамами посто нной крепи крепи усилени ; состо щей из парных опорных элементов, осуществл ющих распор посто нной крепи до входа крепи усилени  в зону стабилизации горного давлени , где снимают распор крепи усилени  дл  последующего переноса и установки ее до подхода зоны опорного давлени  очистного забо , при этом в зоне сопр жени  с лавой парные опорные элеСОThere is a known method for maintaining a mine working, which includes the sequential placement along the excavation under the frames of the permanent lining of reinforcement; consisting of paired supporting elements, carrying out a constant support, before the reinforcement enters the stabilization zone of the rock pressure, where they reinforce the reinforcement for subsequent transfer and install it until the reference pressure zone of the clearing face is reached paired support eleso

сwith

XI о елXi o ate

со ю with y

менты убирают и после прохода лавы дл  поддержани  выработки в зоне интенсивных сдвижений обрушенных пород кровли вторично устанавливают парные опорные элементы, причем в обоих случа х парные опорные элементы крепи усилени  располагают по противоположным сторонам щели, которую нарезают в почве выработки до подхода зоны опорного давлени  очистного забо .The cops are removed and after the lava passes to maintain generation in the zone of intensive displacement of the collapsed roof rocks, paired support elements are again installed, and in both cases the paired support elements of the reinforcement are located on opposite sides of the slot, which are cut in the soil of the mine before the reference pressure zone .

Недостатком известного способа, как и в первом случае,  вл етс  создание условий дл  концентрации напр жений в почве под индивидуальными п тами опорных элементов , а это вызывает преждевременное раз- рушение почвы в выработке, особенно, если в ней прорезана щель. Кроме того, наличие щели в почве выработки создает затруднение в эксплуатации крепи сопр жени , так как держать ось симметрии щели в направ- лении оси симметрии крепи сопр жени  в производственных услови х довольно сложно. В противном случае, когда одна из рам крепи будет находитьс  в зоне щели, потребуютс  дополнительные работы по со- зданию опорных поверхностей в почве выработки , по которым смогла бы перемещатьс  крепь сопр жени .The disadvantage of the known method, as in the first case, is the creation of conditions for the concentration of stresses in the soil under the individual heels of the supporting elements, and this causes premature destruction of the soil in development, especially if a slot is cut in it. In addition, the presence of a gap in the soil of the mine creates a difficulty in the operation of the support mating, since it is rather difficult to keep the axis of symmetry of the gap in the direction of the axis of symmetry of the support mate under production conditions. Otherwise, when one of the support frames will be located in the gap area, additional work will be required to create support surfaces in the soil of the excavation, along which the support support could move.

Цель изобретени  - повышение эффективности поддержани  выработки путем снижени  пучени  пород почвы.The purpose of the invention is to increase the efficiency of sustaining production by reducing the soil heap.

Это достигаетс  тем, что в способе поддержани  горной выработки, включающем установку вдоль выработки под рамами посто нной крепи крепи усилени , состо щей из парных опорных элементов, их распор между почвой выработки и верхн ками посто нной крепи с последующим переносом и установкой крепи усилени  от начала границы зоны стабилизации горного давлени  в зону сопр жени  выработки с лавой, пе- ред распором крепи усилени  ее парные опорные элементы устанавливают на общую демпфирующую прокладку.This is achieved by the fact that in the method of maintaining mine workings, including the installation along the workings under the frames of permanent lining reinforcement, consisting of paired supporting elements, they spread between the working soil and the top permanent lining with subsequent transfer and installation of reinforcement lining from the beginning The boundaries of the zone of stabilization of the rock pressure in the zone of interface of the mine with the lava, before the thrust support of the reinforcement, its paired supporting elements are mounted on a common damping gasket.

На фиг.1 изображена схема поддержа- ни  горной выработки, вид в плане; на фиг.2 - разрез А-А на фиг. 1; на фиг.З - то же, что на фиг.1 - отдельный участок выработки в увеличенном виде за крепью сопр жени ; на фиг.4 - график смещений почвы и кровли: А,В - на участках выработки с предлагаемой крепью усилени , Б,Г - с известной крепью.FIG. 1 is a diagram of the support of a mine working, a plan view; FIG. 2 is a section A-A in FIG. one; in FIG. 3, the same as in FIG. 1, a separate section of generation in an enlarged form behind the support of the mating; Fig. 4 is a graph of the displacements of the soil and roof: A, B — in areas of production with the proposed reinforcement, reinforcements; B, D — with known lining.

Способ осуществл етс  следующим образом .The method is carried out as follows.

По мере подвигани  очистного забо  1 в транспортной выработке 2 под рамами посто нной арочной крепи 3 устанавливаютAs the clearing blade 1 moves in the transport excavation 2 under the frames of the permanent arch support 3,

крепь усилени , состо щую из опорных элементов 4,5. Каждый опорный элемент 4,5 имеет верхнюю опору 6,7 и основание в виде общей демпфирующей прокладки 8. В качестве материала демпфирующей прокладки 8 может быть использован любой упруго-податливый материал (например, древесина, резина в сочетании с металлом, деревом, железобетонными блоками и т.д.).reinforcement support consisting of supporting elements 4.5. Each supporting element 4.5 has an upper support 6.7 and a base in the form of a common damping strip 8. As the material of the damping strip 8, any elastically malleable material can be used (for example, wood, rubber in combination with metal, wood, reinforced concrete blocks etc.).

Крепь усилени  устанавливают позади крепи сопр жени  9 и ее сохран ют в зоне активных смещений боковых пород до начала зоны стабилизации 10. На участке 11 сопр жени  лавы с выработкой 2 роль крепи усилени  выполн ет крепь сопр жени  9. В зоне стабилизации 10 крепь усилени  демонтируют и перенос т на очередной участок выработки 2 за крепью сопр жени  9.The reinforcement support is installed behind the interface support 9 and is retained in the zone of active displacement of lateral rocks until the stabilization zone 10 begins. In the section 11 of the interface of the lava with generation 2, the support support 9 performs the role of reinforcement support. In the stabilization zone 10, the support reinforcement is dismantled and transferred to the next production site 2 for support mating 9.

Благодар  размещению опорных элементов 4,5 на общей демпфирующей прокладке 8 решаетс  вопрос равномерного перераспределени  сил горного давлени  на почву выработки в пределах длины демпфирующего основани . Кроме того, демпфирующа  прокладка 8 выполн ет роль амортизатора. Действительно, в случае труднообрушаемой основной кровли крепь усилени  выполн ет роль обрезной крепи.By placing the support elements 4.5 on the common damping gasket 8, the issue of uniform redistribution of the forces of rock pressure on the working soil within the length of the damping base is solved. In addition, the damping gasket 8 serves as a shock absorber. Indeed, in the case of a hard-to-tear main roof, the reinforcement lining serves as a trim support.

Поэтому при обрушении зависших консолей кровли возникающие удары на крепь 3 амортизируютс  демпфирующей прокладкой 8.Therefore, when the hanging roof consoles collapse, the impacts on the lining 3 are absorbed by the damping gasket 8.

Наблюдени  за смещени ми боковых пород на участках выработки с предлагаемой и известной креп ми усилени  (фиг.4) показали, что подн тие пород почвы А по сравнению с прежним способом Б удалось снизить на 25-28%, опускание пород кровли уменьшить на 37-40%.Observations of lateral rocks displacements at work sites with the proposed and known reinforcement braces (Fig. 4) showed that the lifting of soil rocks A compared to the previous method B was reduced by 25-28%, the lowering of roof rocks decreased by 37- 40%.

Claims (1)

Формула изобретени  Способ поддержани  горной выработки , включающий установку вдоль выработки под рамами посто нной крепи крепи усилени , состо щей из парных опорных элементов , их распор между почвой выработки и верхн ками посто нной крепи с последующим переносом и установкой крепи усилени  от начала границы зоны стабилизации горного давлени  в зону сопр жени  выработки с лавой, отличающийс  тем, что, с целью повышени  эффективности поддержани  выработки путем снижени  пучени  пород почвы, перед распором крепи усилени  ее парные опорные элементы устанавливают на общую демпфирующую прокладку.Claim Method A method of maintaining a mine working, including installation along a frame under a frame of permanent support, reinforcement, consisting of paired supporting elements, between the working soil and permanent support roofs, followed by transfer and installation of support reinforcement from the beginning of the stabilization zone of the mountain pressure in the interface of generation with lava, characterized in that, in order to increase the efficiency of maintaining production by reducing the heave of the soil rocks, before thrusting it strengthens its doubles ornye elements mounted on a common damping strip. DDODOSOOQ feDDODOSOOQ fe П Л Г/P L Y / 1 7 Л 3 д1 7 L 3 d - I 1 f - - 1 Т- I 1 f - - 1 T П rtnnnn riAr/ П П НП P rtnnnn riAr / P P NP II Ill HlhHITIH-lrilH H lillllflM II Ill HlhHITIH-lrilH H lillllflM DOSOOQ feDOSOOQ fe 1 7 Л 3 д г f - V f1 7 L 3 d g f - V f - I 1 f - - 1 Т - - TII t J- I 1 f - - 1 T - - TII t J П rtnnnn riAr/ П П НП АПP rtnnnn riAr / P P NP NP AP II Ill HlhHITIH-lrilH H lillllflMI rS II Ill HlhHITIH-lril H H lillllflMI rS n rn r ЗонаZone стабилизации смещенийoffset stabilization Зона активных смещений боковых породArea of active lateral displacements Характерные зоны про влени  горного давлени Characteristic zones of occurrence of rock pressure Фиг.1 Д-ДFigure 1 DD . jk.. jk -1Г-1G AA ЗонаZone опорного давлени reference pressure ВAT Л. Л. Л. Л Л. Л. ЛL. L. L. L. L. L. L. Редактор З.ХодаковаEditor Z. Khodakova Фиг. 4FIG. four Составитель Л.БерезкинаCompiled by L. Berezkina Техред М.МоргенталКорректор Н.ГунькоTehred M.MorgentalKorrektor N.Gunko Фиг. 3FIG. 3
SU894711074A 1989-06-27 1989-06-27 Working support method SU1765432A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894711074A SU1765432A1 (en) 1989-06-27 1989-06-27 Working support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894711074A SU1765432A1 (en) 1989-06-27 1989-06-27 Working support method

Publications (1)

Publication Number Publication Date
SU1765432A1 true SU1765432A1 (en) 1992-09-30

Family

ID=21457004

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894711074A SU1765432A1 (en) 1989-06-27 1989-06-27 Working support method

Country Status (1)

Country Link
SU (1) SU1765432A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР Ms 1382965, кл. Е 21 D 11/14, 1986. Авторское свидетельство СССР № 1567786, кл. Е 21 D 11/00, 1988. *

Similar Documents

Publication Publication Date Title
CN101372891A (en) Strip filling integral stoping coal mining method
EP0332799B1 (en) Method for building large span tunnels by means of a cellular arch
SU1765432A1 (en) Working support method
US4174135A (en) Underground formed wall single-entry mining method
RU2101501C1 (en) Method of preservation of mine working
RU2709904C1 (en) Method for development of a thick gently sloping bed with release of coal of underburden thickness
RU2021520C1 (en) Aggregate roadway support
SU1472673A1 (en) Method of mining a thick steep mineral bed with goaf-filling
RU2083828C1 (en) Method for development of flat potassium seams in chambers
SU1671870A1 (en) Drift reinforcing method
RU2069754C1 (en) Method for development of mine field in mining mineral beds at large depths
RU2144139C1 (en) System for tunneling machines
SU1017778A1 (en) Single-vault station for deep underground electric railway
SU1008459A1 (en) Method for supporting preparation working with yilding mining roof support
SU1668681A1 (en) Support for mine working
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
RU2079660C1 (en) Method of support of development workings
RU2082883C1 (en) Method of construction of deep-seated subway station
SU989083A1 (en) Method of driving large-section workings
SU949189A1 (en) Method for supporting horizontal preparatory workings
SU563499A1 (en) Bearing row of logs for upright pits timbering
RU2026494C1 (en) Method for driving horizontal mine workings
SU901545A1 (en) Mine working roof support
SU840381A1 (en) Method and apparatus for erecting rubblestone strips when working gently sloping seams
SU1670153A1 (en) Method for preparing dynamically hazardous outlined extraction fields