SU1701917A1 - Method of combined mining of deposits - Google Patents

Method of combined mining of deposits Download PDF

Info

Publication number
SU1701917A1
SU1701917A1 SU904804507A SU4804507A SU1701917A1 SU 1701917 A1 SU1701917 A1 SU 1701917A1 SU 904804507 A SU904804507 A SU 904804507A SU 4804507 A SU4804507 A SU 4804507A SU 1701917 A1 SU1701917 A1 SU 1701917A1
Authority
SU
USSR - Soviet Union
Prior art keywords
quarry
chambers
wells
reserves
blasting
Prior art date
Application number
SU904804507A
Other languages
Russian (ru)
Inventor
Давид Родионович Каплунов
Владимир Иванович Шубодеров
Дмитрий Владимирович Гордин
Original Assignee
Институт проблем комплексного освоения недр АН СССР
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Институт проблем комплексного освоения недр АН СССР filed Critical Институт проблем комплексного освоения недр АН СССР
Priority to SU904804507A priority Critical patent/SU1701917A1/en
Application granted granted Critical
Publication of SU1701917A1 publication Critical patent/SU1701917A1/en

Links

Landscapes

  • Drilling And Exploitation, And Mining Machines And Methods (AREA)

Abstract

Изобретение относитс  к разработке крутопадающих месторождений ценных руд. Цель - повышение произв-сти труда на буровзрывных работах, улучшение условий вентил ции подземных выработок и снижение потерь полезного ископаемого. В границах карьера полезное ископаемое отрабатывают уступами, а поддном карьер i в границах подземных рзЬот - э ахами, ко торые разрабатывают камергми первой и второй очередей. Проход т подготовитель ные и нарезные выработки. Бур т naps i- лельные скважины и производ т их отбс.и , Выемку запасов уступами ведут до глубин, меньшей проектной глубины карьера на высоту одного уступа. Одновременно осуществл ют выемку запасов под дном карьера камерами первой очереди с закладкой. В процессе отработки предпоследнего уступа производ т разбуривание запасов вторичных камер с дна карьера. Затем отбьваот запасы вторичных камер сло ми в восхолч- щем пор дке взрыванием скважин участю- ми и заполн ют выработанное пространство твердеющей смегмо через невзорванные участки скважин в ни г;нем уступе карьера После затвердевани  згклз км производ т взрывание запасов нижнего уступа карьера отбойкой невзорванных участков скважин. 6 ил. ч The invention relates to the development of steeply dipping deposits of valuable ores. The goal is to increase the productivity of drilling and blasting operations, improve the ventilation conditions of underground workings and reduce the loss of mineral resources. Within the boundaries of the quarry, the minerals are worked out with ledges, and the bottom of the quarry i within the boundaries of underground mines is developed by chambers of the first and second stages. Preparatory and rifled workings are made. Drilling naps of i-wells and making them offs. And, the removal of reserves by ledges lead to depths less than the design depth of the quarry to the height of one ledge. At the same time, the stocks under the bottom of the quarry were dredged with the first stage chambers with a bookmark. In the process of working out the penultimate step, the reserves of secondary chambers are drilled from the bottom of the pit. Then, the secondary chambers are recovered in layers in an exalted order by blasting the wells with parts and filling the developed space with hardening smilgm through the unexploded sections of the wells in the bottom of the open pit, after the solidification of the lower ledge of the open pit, blasting off the unexploded areas wells. 6 Il. h

Description

Изобретение относитс  к горной промышленности и может быть использовано при разработке крутопадающих месторождений ценных руд, верхн   граница которых расположена вблизи поверхности, а нижн   - на значительной глубине.The invention relates to the mining industry and can be used in the development of steeply dipping deposits of valuable ores, the upper boundary of which is located near the surface, and the lower limit is located at a considerable depth.

Цель изобретени  - повышение производительности труда на буровзрывных работах , улучшение условий вентил ции подземных выработок и снижение потерь полезного ископаемогоThe purpose of the invention is to increase labor productivity in drilling and blasting operations, to improve the ventilation conditions of underground workings and to reduce mineral losses.

На фиг. 1-6 показаны этапы выемки запасов уступами и камерами двух очередей.FIG. Figures 1-6 show the stages of excavation of stocks with ledges and chambers of two lines.

Способ предусматривает наличие открытых горных работ 1 (выемку запасов в границах карьера уступами), подземны горных работ (этажами) и подземного транспортного горизонта 2 под ними а та к,с: камер 3 и 4, отрабатываемых с закладкой твердеющей смесью.The method involves the presence of open-cast mining 1 (excavation of reserves within the quarry with ledges), underground mining (floors) and underground transport horizon 2 below them, as well as, from: chambers 3 and 4, worked out with a hardening mixture.

Способ реализуетс  в несколько этзчов Проход т подготовительные и нарезные выработки . На первом этапе (фиг 1) производ т открытую добычу полезного ископаемого до глубины, меньшей проектной глубины карьера на высоту одного усThe method is implemented in several etzchov Pass through preparatory and rifled workings. At the first stage (Fig. 1), open-pit mining of minerals is carried out to a depth less than the design depth of the quarry at a height of one.

ISIS

XIXi

«-.“-.

V /V /

ОABOUT

VjVj

IV- IV-

тупа, с одновременной выемкой под дном карьера первичных камер 3 с помощью подземной буровой техники и их закладку твердеющими смес ми. На следующем этапе в процессе отработки предпоследнего уступа после достижени  карьером уровн  5. расположенного выше проектного дна на высоту одного уступа, и после твердени  закладки первичных камер осуществл ют обуривание параллельными скважинами вторичных камер 4 со дна карьера 5 карьерными станками 6. Глубина скважин 7 равна сумме высоты камеры и добычного уступа (фиг. 2 и 3). Далее производ т отбойку запасов вторичных камер 4 сло ми в восход щем пор дке путем зар жани  и взрывани  скважин участками и выдачу руды через подземные выработки (фиг. 4). На следующем этапе отработанные вторичные камеры 4 заполн ют твердеющим раствором, который подают через невзорванные верхние участки скважин 7 (фиг. 5). Четвертый этап включает отработку открытым способом нижнего уступа карьера 8 после затвердевани  закладки с использованием дл  взрывного дроблени  невзорванных верхних участков скважин 7.blunt, with simultaneous excavation under the pit of the quarry of primary chambers 3 using underground drilling equipment and their laying with hardening mixtures. At the next stage in the process of working out the penultimate ledge after the quarry reaches the level of 5. above the project floor to the height of one ledge, and after the primary chambers are solidified, parallel wells of secondary chambers 4 are drilled from the bottom of the quarry with 5 quarry machines 6. Depth of wells 7 is equal to the sum the height of the chamber and the mining ledge (Fig. 2 and 3). Next, stockpiling of secondary chambers with 4 layers is carried out in an upward order by charging and blasting wells with areas and discharging ore through underground workings (Fig. 4). At the next stage, the spent secondary chambers 4 are filled with a hardening solution, which is fed through the unexploded upper sections of the wells 7 (Fig. 5). The fourth stage involves the open pit mining of the lower ledge of the open pit 8 after the bookmark has hardened, using unexploded upper sections of the wells 7 for explosive crushing.

Claims (1)

Формула изобретени  Способ комбинированной разработки месторождений, включающий выемку запасов полезного ископаемого в границах карьера уступами, выемку запасов полезного ископаемого под дном карьера этажами, а этажей камерами первой и второй очередей , проведение подготовительных и нарезных выработок, бурение параллельных скважин и их отбойку, закладку выработанного пространства твердеющими смес ми, отличающийс  тем, что. с цельюFormula of the Invention Combined field development method, which includes excavation of mineral reserves within the quarry boundaries, excavation of mineral reserves under the quarry floor, floors and chambers of the first and second phases, preparation and rifling workings, drilling parallel wells and breaking them, laying the developed space hardening mixtures, characterized in that. with the aim of повышени  производительности труда на буровзрывных работах, улучшени  условий вентил ции подземных выработок и снижени  потерь полезного ископаемого, выемку запасов уступами ведут до глубины, меньшей проектной глубины карьера на высоту одного уступа, и одновременно осуществл ют выемку запасов под дном карьера камерами первой очереди с закладкой выработанного пространства твердеющей смесью, в процессе отработки предпоследнего уступа производ т разбуривание запасов вторичных камер со дна карьера, затем отбивают запасы вторичных камер сло ми в восход щем пор дке взрыванием участков скважин и заполнение их выработанногоincreasing labor productivity in drilling and blasting operations, improving the ventilation conditions of underground workings and reducing mineral losses, digging reserves with ledges to a depth less than the designed pit depth to the height of one ledge, and at the same time dredging reserves under the bottom of the open pit with first-stage chambers with laying out the space of hardening mixture, in the process of working out the penultimate step, the reserves of secondary chambers are drilled from the pit bottom, then the stocks of secondary chambers are repulsed Amer layers in ascending order blasting holes and filling them portions generated пространства т вердеющей смесью через невзорванные участки скважин в нижнем уступе карьера, а после затвердевани  закладки производ т взрывание запасов нижнего уступа карьера отбойкой невзорванных участ0 ков скважин.spaces with the trusting mixture through the unblown areas of the wells in the lower ledge of the open pit, and after solidification of the bedding, exploding of the stocks of the lower ledge of the open pit is carried out by blasting the unexploded boreholes. Щиг.1Schig.1 в 5йй--ААА Ш -А Фж 2in the 5th - AAA W-A FJ 2 ч h Фиг.ЗFig.Z ФигЛFy фиг.66
SU904804507A 1990-03-19 1990-03-19 Method of combined mining of deposits SU1701917A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU904804507A SU1701917A1 (en) 1990-03-19 1990-03-19 Method of combined mining of deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU904804507A SU1701917A1 (en) 1990-03-19 1990-03-19 Method of combined mining of deposits

Publications (1)

Publication Number Publication Date
SU1701917A1 true SU1701917A1 (en) 1991-12-30

Family

ID=21503037

Family Applications (1)

Application Number Title Priority Date Filing Date
SU904804507A SU1701917A1 (en) 1990-03-19 1990-03-19 Method of combined mining of deposits

Country Status (1)

Country Link
SU (1) SU1701917A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 690181. кл. Е21 С 41/02. 1973. Закладочные работы в шахтах: Справочник/Под ред. Д.М. Бронникова и др. - М,: Недра, 1989, с. 175-179. *

Similar Documents

Publication Publication Date Title
US3466094A (en) Blasting arrangement for oil shale mining
RU2524716C1 (en) Strip mining of minerals including working of ore bodies in contact between ore and capping in sub-benches
SU1701917A1 (en) Method of combined mining of deposits
SU1314060A1 (en) Method of combination mining of mineral deposits
RU2224891C2 (en) Method for extracting mined blocks during subterraneous extraction of blind ore bodies
RU1789700C (en) Method for mineral deposit opencast mining
RU2068092C1 (en) Method for mining of thin gently dipping and inclined ore deposits
RU2762170C1 (en) Method for developing thin and low-powered steel-falling ore bodies
SU1642001A1 (en) Method of mining ore deposits
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
SU717335A1 (en) Method of stripping mineral fields at open-cast mining
SU1125373A1 (en) Method of mining unstable ores
SU1666710A1 (en) Method for development of mineral deposits
RU2081324C1 (en) Method for hydraulic bore-hole mining of minerals
SU815298A2 (en) Method of conducting stripping work
SU1490419A1 (en) Method of moving rock by explosion
SU1314066A1 (en) Method of mining ore bodies
SU1344906A1 (en) Method of driving reserved-dome mine workings
SU1717821A1 (en) Method for mining mineral deposits
RU2215145C1 (en) Method of mineral deposit underground mining in strips
SU795077A1 (en) Method for working benches in quarry
SU1317127A1 (en) Method of mining mineral deposits
RU2077674C1 (en) Method for finishing open-pits
SU1460275A1 (en) Method of excavating sloping mineral deposits
SU1765402A1 (en) Ore block completion method