SU815298A2 - Method of conducting stripping work - Google Patents

Method of conducting stripping work Download PDF

Info

Publication number
SU815298A2
SU815298A2 SU782644507A SU2644507A SU815298A2 SU 815298 A2 SU815298 A2 SU 815298A2 SU 782644507 A SU782644507 A SU 782644507A SU 2644507 A SU2644507 A SU 2644507A SU 815298 A2 SU815298 A2 SU 815298A2
Authority
SU
USSR - Soviet Union
Prior art keywords
ledge
lower ledge
stripping work
rocks
conducting
Prior art date
Application number
SU782644507A
Other languages
Russian (ru)
Inventor
Эммануил Лютерович Галустьян
Original Assignee
Всесоюзный Научно-Исследовательскийинститут Горной Геомеханики И Mapk-Шейдерского Дела
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Научно-Исследовательскийинститут Горной Геомеханики И Mapk-Шейдерского Дела filed Critical Всесоюзный Научно-Исследовательскийинститут Горной Геомеханики И Mapk-Шейдерского Дела
Priority to SU782644507A priority Critical patent/SU815298A2/en
Application granted granted Critical
Publication of SU815298A2 publication Critical patent/SU815298A2/en

Links

Description

Изобретение относится к горной промышленности и может быть использовано при ведении вскрышных работ.The invention relates to the mining industry and can be used in stripping operations.

По основному авт.св. №630418 известен способ ведения вскрышных работ 5 при открытой разработке месторождений полезных ископаемых,включающий отработку пород двумя уступами с размещением породы верхнего уступа на площадке нижнего уступа с доведени- · ем нагрузки от веса размещенных на площадке нижнего уступа пород, превышающей предел устойчивости нижнего уступа и последующей подработкой нижнего уступа следующей заходки [1]. 15 Однако данный способ неэффективен при наличии крепких пропластков пород в массиве нижнего уступа.By main auto No. 630418 there is a known method of overburden work 5 in open pit mining of mineral deposits, which includes the development of rocks in two steps with the placement of the rock of the upper ledge on the site of the lower ledge to increase the load from the weight of the rocks located on the site of the lower ledge, exceeding the stability limit of the lower ledge and subsequent underworking of the lower ledge of the next run [1]. 15 However, this method is ineffective in the presence of strong layers of rocks in the massif of the lower ledge.

Цель изобретения - повышение обрушаемости нижнего уступа при нали- 20 чии в нем крепких пропластков пород.The purpose of the invention is to increase the breakability of the lower ledge with the presence of strong rock layers in it.

Поставленная цель достигается тем, что до начала вскрышных работ в массиве нижнего уступа размещают заряды ВВ и после отсыпки пород верхнего 25 уступа на площадку нижнего уступа производят взрывание указанных зарядов .This goal is achieved by the fact that before the start of stripping operations, explosive charges are placed in the lower ledge massif, and after dumping the rocks of the upper 25 ledge to the site of the lower ledge, these charges are blasted.

На чертеже представлена схема ведения вскрышных пород. 30The drawing shows a management scheme of overburden. thirty

Способ заключается в следующем.The method is as follows.

Перед началом вскрьняных работ с верхней площадки 1 уступа 2 бурят серию наклонных скважин 3 для разрушения крепких прослоев 4 пород в массиве нижнего уступа. Скважины могут бурить и вертикальными. После бурения производят заряжение скважин зарядами ВВ и осуществляют разработку верхнего уступа 5 с размещением горной массы на верхней площадке нижнего уступа, например драглайном, расположенным по оси б. После образования предельной призмы 7 горная масса скатывается по откосу нижнего уступа в выработанное пространство. Обрушение нижнего уступа под весом валегающей горной массы верхнего уступа стимулируют взрыванием зарядов ВВ в ранее пробуренных скважинах. После обрушения производят экскавацию горной массы и подсечку ниж-. него уступа новой заходки.Before the start of the drilling work, a series of deviated wells 3 are drilled from the upper platform 1 of the ledge 2 to destroy the strong interlayers of 4 rocks in the massif of the lower ledge. Wells can drill and vertical. After drilling, the wells are charged with explosive charges and the upper ledge 5 is developed with the rock mass placed on the upper platform of the lower ledge, for example, with a dragline located along the b axis. After the formation of the limiting prism 7, the rock mass slides along the slope of the lower ledge into the worked out space. The collapse of the lower ledge under the weight of the overlying rock mass of the upper ledge is stimulated by the explosion of explosive charges in previously drilled wells. After the collapse, excavation of the rock mass and cutting of the bottom. him a ledge of a new entry.

Claims (1)

1. Авторское свидетельство СССР 630418, кл. Е 21 С 41/02, 1977 (прототип).1. USSR author's certificate 630418, cl. E 21 C 41/02, 1977 (prototype). //
SU782644507A 1978-07-11 1978-07-11 Method of conducting stripping work SU815298A2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782644507A SU815298A2 (en) 1978-07-11 1978-07-11 Method of conducting stripping work

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782644507A SU815298A2 (en) 1978-07-11 1978-07-11 Method of conducting stripping work

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
SU630418 Addition

Publications (1)

Publication Number Publication Date
SU815298A2 true SU815298A2 (en) 1981-03-23

Family

ID=20777003

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782644507A SU815298A2 (en) 1978-07-11 1978-07-11 Method of conducting stripping work

Country Status (1)

Country Link
SU (1) SU815298A2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101644158B (en) * 2009-08-22 2011-05-18 张成梁 Heap storage method for preventing spontaneous combustion of coal gangue hill

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101644158B (en) * 2009-08-22 2011-05-18 张成梁 Heap storage method for preventing spontaneous combustion of coal gangue hill

Similar Documents

Publication Publication Date Title
SU815298A2 (en) Method of conducting stripping work
SU1263868A1 (en) Method of controlling the strained state of rock about mine working
SU1645553A1 (en) Method of mining outburst-prone coal seams
RU2114994C1 (en) Method for winning minerals in quarry side
RU2077674C1 (en) Method for finishing open-pits
SU1323716A1 (en) Method of remining mineral deposits
SU1314066A1 (en) Method of mining ore bodies
RU2068094C1 (en) Method for sloping of benches
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
SU783472A1 (en) Method of solid rood control
SU1694897A1 (en) Method of complete pillar drawing
SU581282A1 (en) Method of mining thick ore bodies
SU1666710A1 (en) Method for development of mineral deposits
SU1701917A1 (en) Method of combined mining of deposits
SU1317127A1 (en) Method of mining mineral deposits
SU1446311A1 (en) Method of mining steep ore bodies
SU1125373A1 (en) Method of mining unstable ores
SU898080A1 (en) Mine shaft sinking method
SU1401131A1 (en) Method of mining mineral deposits
SU752001A1 (en) Method of making slopes
SU898074A1 (en) Method of working gently sloping ore deposits
SU827791A1 (en) Method of working thick mineral deposits
SU768983A1 (en) Method of working steep coal seams
SU1456575A1 (en) Method of excavating ore pillars in combination mining of ore bodies
SU595507A1 (en) Method of deepening open steep trenches in quarries