SU1682572A1 - Method of working water-bearing deposits - Google Patents
Method of working water-bearing deposits Download PDFInfo
- Publication number
- SU1682572A1 SU1682572A1 SU894725040A SU4725040A SU1682572A1 SU 1682572 A1 SU1682572 A1 SU 1682572A1 SU 894725040 A SU894725040 A SU 894725040A SU 4725040 A SU4725040 A SU 4725040A SU 1682572 A1 SU1682572 A1 SU 1682572A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- pond
- ridge
- working area
- mining
- water
- Prior art date
Links
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Изобретение относитс к горной промышленности и может быть использовано приоткрытой разработке обводненных месторождений полезных ископаемых. Цель изобретени снижение вли ни на экологическое равновесие прилегающих земель за счет уменьшени осушаемых площадей и их загр знени при снижении затрат на экологию . Вскрышные породы отсыпают в выработанное пространство гребн ми, Формируют между гребн ми прудки. Гребни формируют многослойными. В ближнюю к рабочей зоне карьера часть гребн отсыпают прочные породы, а на дальний склон - водоупорные породы. По мере отработки пород формируют новый прудок. На каждый гребень устанавливают насос, которым соедин ют смежные прудки. Ближний к рабочей зоне прудок соедин ют дополнительно с рабочей зоной. Откачивают воду из рабочей зоны в указанный прудок. Уровень воды в каждом прудке поддерживают меньше уровн воды в предыдущем посредст вом перекачивани воды. 3 з.п. ф-лы.The invention relates to the mining industry and can be used in ajar mining of watered mineral deposits. The purpose of the invention is to reduce the impact on the ecological balance of adjacent lands by reducing drained areas and their pollution while reducing environmental costs. The overburden rocks are poured into the developed space by crests, ponds are formed between crests. Combs form multi-layered. Into the ridge closest to the working zone of the ridge, solid rocks are poured, and waterproof rocks are deposited on the far slope. As the rocks develop, a new pond is formed. A pump is installed on each ridge, with which adjacent ponds are connected. The pond nearest to the working area is additionally connected to the working area. Pumped water from the working area in the specified pond. The water level in each pond is kept below the water level in the previous one by pumping water. 3 hp f-ly.
Description
Изобретение относитс к горной промышленности и может быть использовано при открытой разработке обводненных месторождений полезных ископаемыхThe invention relates to the mining industry and can be used in the open pit mining of mineral deposits.
Цель изобретени - снижение вли ни на экологическое равновесие прилегающих земель за счет уменьшени осушаемых площадей и их загр знени при снижении затрат на экологию.The purpose of the invention is to reduce the impact on the ecological balance of adjacent lands by reducing drained areas and their pollution while reducing environmental costs.
Способ осуществл етс следующим образом .The method is carried out as follows.
Отработку вскрышных породи полезного ископаемого ведут уступами. Вскрышные породы отсыпают в выработанное пространство , вдоль уступов гребн ми, формиру замкнутые прудки. Гре&ни формируют многослойными. В ближнюю к рабочей зоне часть гребн отсыпают наиболее прочные вскрышные породы, образу основную несущую призму. На дальний , . от рабочей зоны склон отсыпают водоупорные разности вскрышных пород, что ведет к экранированию пород гребн . Водоупорную часть покрывают слабыми разност ми вскрышных пород. После того, как сформирован гре- бень, устанавливают на него насос, соедин ют вновь сформированный прудок с рабочей зоной карьера посредством насоса и перекачивают воду из рабочей зоны карьера в прудок. По мере удалени горных работ отсыпают очередной гребень, формиру очередной прудок. Причем насосы на гребн х располагают в шахматном пор дке относительно ранее установленных на предыдущих гребн х. Дл откачки воды используют низконапорные насосы малой мощности. Уровень воды в каждом прудкеThe mining of overburden minerals lead ledges. The overburden rocks are poured into the developed space, along the ledges of the ridges, to form closed ponds. Gre & nor form multi-layered. The strongest overburden is poured into the ridge closest to the working area to form the main prism carrier. On the far,. impermeable differences of overburden rocks are poured from the working area to the slope, which leads to shielding of the ridge rocks. The waterproof part is covered with weak differences of overburden. After the bead is formed, a pump is placed on it, the newly formed pond is connected to the working area of the pit by means of a pump, and water is pumped from the working area of the pit to the pond. As the mining operations are removed, another ridge is poured, forming another pond. Moreover, the pumps on the ridges are arranged in a staggered order relatively earlier installed on the previous ridges. Low-pressure low-pressure pumps are used to pump water. Water level in each pond
loblob
jhOjhO
(Л X(Lx
ЮYU
Claims (4)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894725040A SU1682572A1 (en) | 1989-07-27 | 1989-07-27 | Method of working water-bearing deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU894725040A SU1682572A1 (en) | 1989-07-27 | 1989-07-27 | Method of working water-bearing deposits |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1682572A1 true SU1682572A1 (en) | 1991-10-07 |
Family
ID=21463860
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU894725040A SU1682572A1 (en) | 1989-07-27 | 1989-07-27 | Method of working water-bearing deposits |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1682572A1 (en) |
-
1989
- 1989-07-27 SU SU894725040A patent/SU1682572A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР IVfe 1122824, кл. Е 21 С 41/04, 1983. Арсентьев А.И. и др. Устойчивость бортов и осушение карьеров.- М.: Недра, 1982, с. 106-109. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SU1682572A1 (en) | Method of working water-bearing deposits | |
SU1507230A1 (en) | Method of recultivation in opencast mining of deposits of mineral resources | |
RU2459082C2 (en) | Method for extraction of hard mineral resources from deep-lying water-flooded deposit | |
RU94031931A (en) | Method for opencast mining of flat water-bearing mineral deposits | |
SU676737A1 (en) | Method of reducing inflow of water into mine workings | |
SU1266987A1 (en) | Method of recultivation in open-cast mining of minerals | |
RU1768754C (en) | Method for opencast mining of water-bearing deposits | |
SU1666713A1 (en) | Method for opening and development of mineral deposits | |
RU2023789C1 (en) | Water reservoir counter filtration screen formation method | |
SU1010259A1 (en) | Method of producing brines through wells | |
SU1532703A1 (en) | Method of strip mining of salt deposits | |
SU1291672A1 (en) | Method of constructing drainage system | |
SU1497356A1 (en) | Method of drying water-bearing rock | |
SU1714027A1 (en) | Circular hydraulic-fill dump | |
RU2126085C1 (en) | Method for underground lixiviation of metals from waterless rock | |
SU1432247A1 (en) | Method of protecting sulfide ore pile against self-inflammation | |
RU1788251C (en) | Method for finishing opencast in mining steeply dipping mineral deposits | |
SU806810A1 (en) | Method of constructing anti-filtration curtains | |
SU1444520A1 (en) | Method of mining thick sloping seams | |
SU756015A1 (en) | Method of mining mineral deposits | |
SU1399469A1 (en) | Method of recovering peat from flooded peat fields | |
RU1662166C (en) | Method for mineral opencast mining | |
SU1740672A1 (en) | Ore storage for hydraulic production | |
RU2060367C1 (en) | Method for development of oil deposit | |
SU1550145A1 (en) | Method of mining mineral deposits |