SU676737A1 - Method of reducing inflow of water into mine workings - Google Patents
Method of reducing inflow of water into mine workingsInfo
- Publication number
- SU676737A1 SU676737A1 SU782633366A SU2633366A SU676737A1 SU 676737 A1 SU676737 A1 SU 676737A1 SU 782633366 A SU782633366 A SU 782633366A SU 2633366 A SU2633366 A SU 2633366A SU 676737 A1 SU676737 A1 SU 676737A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- water
- mine workings
- drainage
- rocks
- reducing inflow
- Prior art date
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
1one
Изобретение относитс к горной промышленности и может быть использовано при разработке свит угольных пластов дл уменьшени притока воды в горные выработки .The invention relates to the mining industry and can be used in the development of coal seam formations to reduce the flow of water into the mine workings.
Известен способ уменьшени притока воды в горные выработки при разработке угольных пластов, включаюший предварительное осушгние обводненных пород посредством проведени комплекса дренажных выработок 1.There is a method of reducing the inflow of water to the mine workings during the development of coal seams, including the preliminary drying of water-cut rocks by conducting a complex of drainage workings 1.
Известен также способ уменьшени притока воды в горные выработки при разработке свит угольных пластов, включаюший предварительное осушение обводненных пород , залегаюших в кровле подлежашего. отработке пласта 2.There is also known a method of reducing the inflow of water to the mine workings during the development of coal seam formations, including the preliminary drainage of watered rocks that lie in the roof of the subsoil. reservoir mining 2.
Однако известные способы характеризуютс значительными затратами на дренажные работы и недостаточной эффективностью .However, the known methods are characterized by significant drainage costs and lack of efficiency.
Цель изобретени - сокращение затрат на дренажные работы при эффективном осушении горных пород.The purpose of the invention is to reduce the cost of drainage work with effective drainage of rocks.
Поставленна цель достигаетс тем, что предварительно отрабатывают один из нижележаших пластов свиты, удаленный от обводненных пород на рассто ние L, удовлетвор ющее условию 0,, гдеThe goal is achieved by preliminarily working one of the lower strata of the suite, which is removed from the watered rocks by a distance L, satisfying condition 0, where
Ят - высота зоны водопровод ших трещин, образующейс над выработанным пространством нижележашего пласта.Yat is the height of the zone of water-borne cracks, which is formed above the developed space of the lower formation.
Способ заключаетс в следующем. При отработке свиты угольных пластов при наличии обводненных пород, залегаюших в кровле подлежащего отработке пласта, в первую очередь отрабатывают один из нижележащих пластов, удаленный от обводненпых пород на рассто ние L, удовлетвор ющее условию 0,, где Ят - высота зоны водопровод щих трещин, образующейс над . выработанным пространством нижележащего пласта. Такое удаление обеспечивает поступление воды в выработанное пространство нижележащего пласта при его отработке без опасности дл очистного забо , при этом происходит одновременное осушение обводненных пород.The method is as follows. When mining coal formations in the presence of watered rocks that lie in the roof of the formation to be tested, first of all work out one of the underlying layers that is removed from the watering rocks by the distance L, satisfying condition 0, where Yat is the height of the water conducting cracks zone, forming over. developed by the space of the underlying reservoir. Such removal ensures the entry of water into the developed space of the underlying reservoir during its development without danger to the clearing site, and simultaneous drainage of the watering rocks occurs.
Предлагаемый способ позволит сократить затраты на дренажные работы при эффективном осушении горных пород.The proposed method will reduce the cost of drainage work with effective drainage of rocks.
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782633366A SU676737A1 (en) | 1978-06-26 | 1978-06-26 | Method of reducing inflow of water into mine workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU782633366A SU676737A1 (en) | 1978-06-26 | 1978-06-26 | Method of reducing inflow of water into mine workings |
Publications (1)
Publication Number | Publication Date |
---|---|
SU676737A1 true SU676737A1 (en) | 1979-07-30 |
Family
ID=20772147
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU782633366A SU676737A1 (en) | 1978-06-26 | 1978-06-26 | Method of reducing inflow of water into mine workings |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU676737A1 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110568517A (en) * | 2019-09-10 | 2019-12-13 | 北京建筑大学 | Ground fracture activity analysis method and device based on SAA monitoring |
RU2729291C1 (en) * | 2017-04-19 | 2020-08-05 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Method for planning prevention and elimination of accidents associated with accumulation of water for mine containing coal bed in form of main water-bearing horizon |
-
1978
- 1978-06-26 SU SU782633366A patent/SU676737A1/en active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2729291C1 (en) * | 2017-04-19 | 2020-08-05 | Чайна Юниверсити Оф Майнинг Энд Текнолоджи | Method for planning prevention and elimination of accidents associated with accumulation of water for mine containing coal bed in form of main water-bearing horizon |
CN110568517A (en) * | 2019-09-10 | 2019-12-13 | 北京建筑大学 | Ground fracture activity analysis method and device based on SAA monitoring |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2284414C1 (en) | Gently sloping coal bed mining method | |
SU676737A1 (en) | Method of reducing inflow of water into mine workings | |
RU2083831C1 (en) | Method for treatment of impact-risky seams in difficult mining and geological conditions | |
RU2114307C1 (en) | Method for opencast mining of flooded mineral deposits | |
SU1751333A1 (en) | Method of combined mining of bed mineral deposits | |
SU1717840A1 (en) | Method for control of geofiltration state of rock mass | |
RU2107818C1 (en) | Method for development of flat and inclined seams of minerals | |
SU1677311A1 (en) | Method for working gently sloping and inclined seams of minerals | |
SU1613612A1 (en) | Method of protecting mine workings against breakthrough of water from flooded tectonic distruptions | |
SU956799A1 (en) | Method of limiting water inflow into excavation zone | |
SU1167332A1 (en) | Method of hydraulic winning of minerals through wells | |
SU1490282A1 (en) | Method of preventing floodings of undermined surfaces area with subsoil and surface water | |
SU949179A1 (en) | Method for underground working of seam deposits | |
SU1624159A1 (en) | Method of mining bed deposits | |
SU699185A1 (en) | Method of excavating extra-thin steep descending seams | |
SU1219807A1 (en) | Method of mining mineral deposits | |
RU2127361C1 (en) | Method for extracting liquid minerals from salt mines | |
SU787685A1 (en) | Method of filling-in excavated space | |
SU1763661A1 (en) | Method of hydraulic laying of worked space in mining coal beds | |
SU829991A1 (en) | Method of filling worked area | |
RU2083827C1 (en) | Method for development of mineral seam formations | |
SU1273560A1 (en) | Method of preventing inflow of water into stoping faces | |
SU1452992A1 (en) | Method of remining of mineral deposits | |
SU899953A1 (en) | Method of mining thick sloping coal beds in horizontal layers | |
SU1643719A1 (en) | Method for controlling geological filtering condition of rock mass |