- SU1167332A1 SU1167332A1 SU843704553A SU3704553A SU1167332A1 SU 1167332 A1 SU1167332 A1 SU 1167332A1 SU 843704553 A SU843704553 A SU 843704553A SU 3704553 A SU3704553 A SU 3704553A SU 1167332 A1 SU1167332 A1 SU 1167332A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- minerals
- chamber
- production
- wells
- erosion
- Prior art date
Links
Abstract
СПОСОБ СКВАЖИННОЙ ГИДРОДОБЫЧИ ПОЛЕЗНЫХ ИСКОПАЕМЫХ, включающий бурение скважин, размыв полезного ископаемого в камере и откачку гидросмеси на поверхность, отличающийс тем, что, с целью повьппени эффективности добычи путем снижени разубоживани , перед размывом полезного ископаемого в породах непосредственной кровли формируют выработку в форме свода ycтoйчивo o равновеси , удал ют из вьфаботки породы, а максимальный радиус камеры размьгаа устанавливают не превышающим горизонталь кого полупролета сводообразной выработки .A METHOD FOR BOTTOM HYDROCARNING OF USEFUL MINERALS, including drilling wells, washing out minerals in the chamber and pumping out the slurry to the surface, characterized in that, in order to improve production efficiency by reducing dilution, before applying them, you will have to put them in the same way, you would have to put them, you will have to put them, you will have to put them, you will have to put them, you will have to put them, you will have to put them, you will be able to use it. equilibria are removed from the rock formation, and the maximum radius of the chamber is set not to exceed the horizontal half-span of the arch-shaped excavation.
Description
1 Изобретение относитс к горному делу и может быть использовано при разработке полезных ископаемых чере скважины путем гидромониторного раз мыва пород на месте залегани и откачки в виде гидросмеси на поверхность . Целью изобретени вл етс повышение эффективности добычи путем он жени разубоживанн . Выработка в кровле с устойчивым сводом образуетс до начала добычны работ и предохран ет рудный пласт от разубоживани и случайных вывалов кровли. Добычные работы при этом ведутс под охраной устойчивог свода, причем радиус камеры в рудном пласте не больше максимального пролета свободообразной выработки. На чертеже представлена схема осуществлени способа. В покрывающих породах непосредственной кровли продуктивного пласта 1 проход т скважину 2, обсаживают трубой 3 и цементируют 4. Над разрабатываемым пластом 5 в покрывающих породах 1 образуют выработку 6 со сводом 7 устойчивой формы. Отработка пласта ведетс обычным добычным оборудованием 8, причем радиус 2 камеры 9 не больше максимального полупролета свободообразной выработки 10. Добычную скважину 2 бур т до кровли обрабатьгааемого пласта 5. Затем ведетс размыв пород неустойчивой кровли в объеме контура устойчивого свода 7. Предварительно крепление скважины осуществл етс до верхней -части свода, высота которого определ етс расчетом. После выемки пород 6 ведут отработку пласта 5, причем, радиус г камеры 9 должен быть не больше полупролета свода 10 естественного равновеси т . При этом исключаетс разубоживание добываемого полезного ископаемого и увепигчиваетс обща добыча из камеры. Предложенный способ повышает эффективность добычи рыхлых и слабоцементированных полезных ископаемых методом гидродобычи, когда отсутствие прочных покрывающих пород в кровле затрудн ет отработку нижележащего рудного пласта без разубоживани его покрывающими породами и приводит к забиванию всаса выдачных механизмов этими же породами, в частности, в услови х добычи строительных песков в Тюменской области.1 The invention relates to mining and can be used in the development of mineral resources in a well borehole by jetting the rocks at the place of occurrence and pumping in the form of slurry to the surface. The aim of the invention is to increase the efficiency of production by reducing its yield. Production in a roof with a stable arch is formed prior to the commencement of mining operations and protects the ore layer from dilution and accidental roof falls. At the same time, mining operations are guarded by a stable arch, and the chamber radius in the ore formation is not larger than the maximum span of the free-form mine. The drawing shows the implementation of the method. In the overburden of the immediate roof of the reservoir 1, a borehole 2 is passed, surrounded by pipe 3 and cemented 4. Above the reservoir 5 under development in the overburden 1 a production 6 is formed with a stable form of roof 7. The reservoir is tested by conventional mining equipment 8, with a radius 2 of chamber 9 not exceeding the maximum half-span of a free-form mine 10. The production well 2 is drilled to the top of the reservoir 5. Then the erosion of the unstable roof in the contour of the stable arch is ejected. to the upper part of the arch, whose height is determined by calculation. After excavation of rocks 6, mining 5 is being worked out, moreover, the radius g of chamber 9 should be no more than a half-span of the set 10 of natural equilibrium t. This eliminates the dilution of the mineral being mined and increases the total production from the chamber. The proposed method improves the efficiency of extraction of loose and weakly cemented minerals by the method of hydro mining, when the absence of durable overburden in the roof makes it difficult to work the underlying ore formation without diluting it with overburden and leads to the intake mechanism of the same rocks, in particular, under conditions of mining sands in the Tyumen region.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843704553A SU1167332A1 (en) | 1984-02-23 | 1984-02-23 | Method of hydraulic winning of minerals through wells |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU843704553A SU1167332A1 (en) | 1984-02-23 | 1984-02-23 | Method of hydraulic winning of minerals through wells |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1167332A1 true SU1167332A1 (en) | 1985-07-15 |
Family
ID=21105003
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU843704553A SU1167332A1 (en) | 1984-02-23 | 1984-02-23 | Method of hydraulic winning of minerals through wells |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1167332A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5127710A (en) * | 1990-01-23 | 1992-07-07 | Babichev Nikolai I | Method of borehole hydraulicking of soluble minerals |
-
1984
- 1984-02-23 SU SU843704553A patent/SU1167332A1/en active
Non-Patent Citations (1)
Title |
---|
Авторское свидетельство СССР № 877026, кл. Е 21 С 45/00, 1980. Авторское свидетельство СССР № 630421, кл. Е 21 С 45/00, 1977 (прототип). * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5127710A (en) * | 1990-01-23 | 1992-07-07 | Babichev Nikolai I | Method of borehole hydraulicking of soluble minerals |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105626071A (en) | Mining method for gently inclined thin ore body | |
CN106640080A (en) | Deep part high-stress environment self-stabilizing arched stope arrangement mining method | |
US4458947A (en) | Mining method | |
SU1167332A1 (en) | Method of hydraulic winning of minerals through wells | |
CN104763423B (en) | Technology for mining powder ore by inverse well rock drilling | |
RU2114307C1 (en) | Method for opencast mining of flooded mineral deposits | |
SU711292A1 (en) | Method of working thick gently sloping coal beds | |
RU2193659C2 (en) | Method of mineral deposits mining | |
RU1810549C (en) | Method for hole hydraulic mining of minerals from deeply seated deposits | |
SU1167329A1 (en) | Method of mining bed deposits of minerals | |
RU2097560C1 (en) | Process of well hydraulic mining | |
SU898075A2 (en) | Method of working ore deposits | |
SU676737A1 (en) | Method of reducing inflow of water into mine workings | |
SU1278446A1 (en) | Method of constructing geotechnological wells | |
SU662715A1 (en) | Method of excavating thick slightly inclined seams of minerals with hard rock | |
SU1343021A1 (en) | Method of winning from production levels | |
SU1317133A1 (en) | Method of hydraulic winning of minerals through wells from horizontal and gently-sloping production levels | |
SU1444523A1 (en) | Method of mining steep thin ore bodies | |
SU1649096A1 (en) | Method of recovery of safety pillar under a hole | |
RU2107165C1 (en) | Method of bore-hole hydraulic recovery of minerals | |
SU1120749A1 (en) | Method of underground leaching of minerals | |
SU1456581A1 (en) | Method of recovering mineral from inclined ore bodies | |
SU1763661A1 (en) | Method of hydraulic laying of worked space in mining coal beds | |
SU1270340A1 (en) | Method of recovering materials from thick subterranean formations | |
SU1219807A1 (en) | Method of mining mineral deposits |