SU1377324A1 - Method of working the bottom of river or basin - Google Patents

Method of working the bottom of river or basin Download PDF

Info

Publication number
SU1377324A1
SU1377324A1 SU853968424A SU3968424A SU1377324A1 SU 1377324 A1 SU1377324 A1 SU 1377324A1 SU 853968424 A SU853968424 A SU 853968424A SU 3968424 A SU3968424 A SU 3968424A SU 1377324 A1 SU1377324 A1 SU 1377324A1
Authority
SU
USSR - Soviet Union
Prior art keywords
island
soil
dredging
movement
slope
Prior art date
Application number
SU853968424A
Other languages
Russian (ru)
Inventor
Владимир Иванович Астафичев
Original Assignee
Куйбышевский Филиал Всесоюзного Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Куйбышевский Филиал Всесоюзного Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука filed Critical Куйбышевский Филиал Всесоюзного Проектно-Изыскательского И Научно-Исследовательского Института "Гидропроект" Им.С.Я.Жука
Priority to SU853968424A priority Critical patent/SU1377324A1/en
Application granted granted Critical
Publication of SU1377324A1 publication Critical patent/SU1377324A1/en

Links

Landscapes

  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

Изобретение относитс  к гидротехнике и водному транспорту..Цель изобретени  - снижение трудозатрат. Способ дноуглублени  осуществл ют путем ведени  работ сухопутной землеройной машиной, расположенной на естественном или искусственном острове . Остров перемещают: по траектории вдоль контура дноуглублени  или измен ют его контур в соответствии с необходимым перемещением землеройной машины дл  обеспечени  разработки грунта до проектлой отметки . Перемещение острова производ т разработкой грунта на откосе, расположенном со стороны, обратной направлению необходимого перемещени , и укладкой его на откос, расположенный со стороны по направлению движени  острова. Дл  обеспечени  - вызова грунта на берег остров соедин ют с берегом насыпью Излишний дл  возведени  острова грунт, забираемый при дноуглубительных работах , транспортируют в отвал 2з.п. ф-лы, 4 ил„ с S (ЛThe invention relates to hydraulic engineering and water transport. The purpose of the invention is to reduce labor costs. The dredging method is carried out by conducting work with a land digging machine located on a natural or artificial island. The island is moved: along a path along a dredging contour or its contour is changed in accordance with the necessary movement of the earthmoving machine to ensure excavation to the design elevation. The island is moved by excavating on the slope located on the side opposite to the direction of the required movement and laying it on the slope located on the side in the direction of the island movement. In order to ensure that the soil is brought to shore, the island is connected to the shore by an embankment. Excess soil for the construction of the island, which is picked up during dredging works, is transported to the dump 2ZP. f-ly, 4 silt "with S (L

Description

113113

Изобретение относитс  к гидротехнике и может быть применено при строительстве электростанций, каналов j при организации судоходства на реках и водоемахThe invention relates to hydraulic engineering and can be applied in the construction of power plants, channels j in the organization of navigation on rivers and reservoirs.

Цель изобретени  - снижение трудозатрат ,The purpose of the invention is to reduce labor costs,

На фиг. 1 показана ситуаци  перед началом дноуглублени ; на фиг. 2 - разрез А-А на фиг. 1; на фиг. 3 - схема организации дноуглублени  предлагаемым способом; на фиг. 4 - разрез Б-В на фиг. 3.FIG. 1 shows the situation before the start of dredging; in fig. 2 shows section A-A in FIG. one; in fig. 3 is a diagram of the organization of dredging by the proposed method; in fig. 4 shows a section B-B in FIG. 3

Сущность способа состоит в следую щеМа .The essence of the method is as follows.

Сухопутную землеройную машину - экскаватор с ковшом обратна  лопата или с грейферным ковшом, или драглайн располагают на естественном или специально образованном острове. Перемещают остров по траектории или измен ют его конфигурацию в соответствии с необходимым перемещением землеройной машины дл  обеспечени  разработки грунта до проектной отметки в пределах требуемог о участка дноуглублени .A land excavator - an excavator with a shovel backhoe or a grab bucket, or dragline is located on a natural or specially formed island. The island is moved along a trajectory or its configuration is changed in accordance with the necessary movement of the earthmoving machine to ensure excavation to the design mark within the required dredging area.

Перемещение острова или изменение его конфигурации производ т путем выемки грунта до проектной отметкиMoving the island or changing its configuration is done by excavating up to the design mark.

стороны, обратной направлению движени  острова, и укладки его на откос , расположенный со стороны по направлению движени  острова. Излишний дл  обеспечени  перемещени  острова или дл  необходимого изменени  его конфигурации грунт перемещают в русло за пределы участка расчистки или вывоз т на берег, дл  чего остров соедин ют с берегом насыпью дл  устройства проезда.side, the opposite direction of the island, and laying it on the slope, located on the side in the direction of the island. Unnecessary to allow the island to move, or to change its configuration, the soil is moved into the channel beyond the clearing area or taken ashore, for which the island is connected to the coast with an embankment for driving arrangements.

Пример. С берега 1 устраивают проезд 2 к зоне 3 углублени  и отсыпают остров 4. На последнем располагают экскаватор 5 и при необходимости бульдозер 6, Начинают разработку острова 4 и грунта 7, наход щегос  под ним, до проектной отметки 8. При этом грунт берут с откоса 9, наход щегос  со стороны, обратной направлению 10 движени  острова 4, и укладывают на откос 11, расположенный со стороны направлени  движени  острова 4. Укладку грунта на откос 11 производ т непосредственно экскаватором 5 или путем сталкивани  бульдозером 6. При производстве дноуглублени  часть грунта укладывают на откос 11 острова, а другую - в отвал 12 или устраивают проезд 13 и автосамосвалами 14 вывоз т грунт на берег 1.Example. From the coast 1 arrange a passage 2 to the zone 3 recesses and pour island 4. The latter have an excavator 5 and, if necessary, a bulldozer 6, Start the development of island 4 and the soil 7, which is under it, to the design mark 8. At the same time, the soil is taken from the slope 9, located on the side opposite to the direction 10 of the movement of the island 4, and placed on the slope 11, located on the side of the direction of the movement of the island 4. The laying of the soil on the slope 11 is carried out directly by the excavator 5 or by pitting the bulldozer 6. During the dredging part of the soil is laid on the slope 11 of the island, and the other - in the dump 12 or arrange a passage 13 and dump trucks 14 export t soil to the coast 1.

Форму-ла изобретени Invention Form

0 5 0 5

0 0

5five

00

5five

Claims (3)

1.Способ дноуглублени  реки или водоема, преимущественно несудоходных , путем перемещени  грунта землеройной машиной, разрабатывающей грунт до проектных отметок в пределах требуемого контура дНбуглубле- ни , отличающийс  тем, что, с целью снижени  трудозатрат, землеройную машину располагают на естественном или специально образованном острове из неразмываемого грунта, перемещаемом по траектории вдоль контура дноуглублени , или измен ющем контур в соответствии с необходимым перемещением землеройной машины.1. A method of dredging a river or a reservoir, preferably non-navigable, by moving the soil with a digging machine that mines the soil to the design marks within the required depth of the reservoir, characterized in that, in order to reduce labor costs, the digger is located on a natural or specially formed island from unbreakable soil moving along a path along a dredging contour or changing contour in accordance with the necessary movement of the earthmoving machine. 2.Способ по п. 1, отличающийс  тем, что перемещение острова производ т путем выемки грунта с откоса острова, расположенного со стороны, обратной направлению необходимого перемещени  острова, и укладки его на откос, расположенньй со стороны по направлению движени  острова.2. A method according to claim 1, characterized in that the island is moved by excavating a slope of the island located on the side opposite to the direction required for moving the island and laying it on a slope located on the side in the direction of movement of the island. 3.Способ по п. 1, отличающийс  тем, что, с целью обеспечени  вывоза на берег грунта, разрабатываемого при дноуглублении, остров соедин ют с берегом насьшью.3. The method according to claim 1, characterized in that, in order to ensure that the soil excavated during dredging is brought to shore, the island is connected to the coast in full. гзг:gzg: f f frf /Tff f frf / Tf УHave Ю и 1ZYu and 1Z // . L,. L, Фиг. 2FIG. 2 7/ 7 / - - х О о о jj- JJJ J. .S-r-TV- - x O o o o jj- JJJ J. .S-r-TV -- ..fr - /JV УЛГ- ..fr - / JV ULG . . -- -TV- -TV ГR ЩU  /AND
SU853968424A 1985-10-18 1985-10-18 Method of working the bottom of river or basin SU1377324A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853968424A SU1377324A1 (en) 1985-10-18 1985-10-18 Method of working the bottom of river or basin

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853968424A SU1377324A1 (en) 1985-10-18 1985-10-18 Method of working the bottom of river or basin

Publications (1)

Publication Number Publication Date
SU1377324A1 true SU1377324A1 (en) 1988-02-28

Family

ID=21202368

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853968424A SU1377324A1 (en) 1985-10-18 1985-10-18 Method of working the bottom of river or basin

Country Status (1)

Country Link
SU (1) SU1377324A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2793515C1 (en) * 2022-06-06 2023-04-04 Федеральное государственное казённое военное образовательное учреждение высшего образования "Военная академия материально-технического обеспечения имени генерала армии А.В. Хрулева" Министерства обороны Российской Федерации Dredging method

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Николаев Ю.Г. и др. Пропуск расходов реки при гидротехническом строительстве. М.; Энерги , 1978, с. 163-169, рис. 6-6. Доманевский Н.А. Дноуглубление. М.: Транспорт, 1971, с. 55-59, ; . риср 39-40. *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2793515C1 (en) * 2022-06-06 2023-04-04 Федеральное государственное казённое военное образовательное учреждение высшего образования "Военная академия материально-технического обеспечения имени генерала армии А.В. Хрулева" Министерства обороны Российской Федерации Dredging method

Similar Documents

Publication Publication Date Title
RU2674452C1 (en) Reserves in the working sides dredging development method
SU1377324A1 (en) Method of working the bottom of river or basin
RU2750445C1 (en) Method for watered mineral deposits development
RU2011826C1 (en) Method for mining of inundated placers
RU2261331C2 (en) Open-cast mining method
JP3446186B2 (en) Pollution control caisson for dredging and dredging method
SU941481A1 (en) Apparatus for working flooded surface mines
SU1302774A1 (en) Method of mining hard-to-dredge placers
Welp Dredging and dredged material disposal overview
CN203247606U (en) Construction structure for sewage pipe and utility tunnel of deep sludge foundation to penetrate through center trench
RU2346158C1 (en) Method for dredging of hard-dredging thawed placers
SU1314177A1 (en) Method for securing pipeline in trench with anchor slabs
SU1723233A1 (en) Method of maintaining river waterway in operating condition
Cable Optimum dredging and disposal practices in estuaries
SU739236A1 (en) Method of making dissecting trenches
SU1247449A1 (en) Method of constructing a canal
Gawade Advanced construction equipements
CN86207943U (en) Amphibious ditching and tube laying machine
SU829791A1 (en) Method of making an underground profile working
SU1129286A1 (en) Method of forming a water outflow ditch
Ashford et al. ARAB POTASH SOLAR EVAPORATION SYSTEM: CONSTRUCTION.
SU1217980A1 (en) Canal construction method
Hamza Geotechnics of the Suez Canal Construction: 150 Years Old, but Nearly Four Millennia in the Making
Tsybenko Earthwork on construction of the Dnepr-Donbass canal
SU1244243A2 (en) Bulldozer