SU1129286A1 - Method of forming a water outflow ditch - Google Patents
Method of forming a water outflow ditch Download PDFInfo
- Publication number
- SU1129286A1 SU1129286A1 SU823446334A SU3446334A SU1129286A1 SU 1129286 A1 SU1129286 A1 SU 1129286A1 SU 823446334 A SU823446334 A SU 823446334A SU 3446334 A SU3446334 A SU 3446334A SU 1129286 A1 SU1129286 A1 SU 1129286A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- soil
- trench
- ditch
- forming
- surface layer
- Prior art date
Links
Landscapes
- Road Repair (AREA)
Abstract
СПОСОБ ОБРАЗОВАНИЯ ВОДООТ ВОДНОЙ КАНАВЫ НА МАРЯХ, состо щий из нарезани траншеи трапецеидальной формы и укреплени её поверхности путем отсыпки в траншею транспорт- . ными средствами скального грунта и образовани из него поверхностного сло канавы, отлич ающийс тем, что, с целью уменьшени трудоемкости работ, отсыпку грунта производ т по длине траншеи порци ми в общем-объеме , равном объему поверхностного сло канавы, который образуют путем разравнивани по дну траншеи бульдозерным отвалом с насадкой порционно отсыпного грунта и последующего рас- пределени отвальным профилером части этого грунта на откосах траншеи. JX / /y///7/////y /f /. 1A METHOD FOR FORMING WATER FROM AQUEOUS WATER ON MARYAH, consisting of cutting a trapezoidal trench and strengthening its surface by dumping it into a transport trench. means of rocky soil and the formation of a surface layer of the ditch from it, characterized in that, in order to reduce the laboriousness of the work, the soil is dumped along the length of the trench portions in a total volume equal to the volume of the surface layer of the ditch, which is formed by leveling along the bottom trenching with a bulldozer blade with a nozzle of portions of dumping soil and subsequent distribution by a waste profiler of a part of this soil on the slopes of the trench. Jx / / y /// 7 ///// y / f /. one
Description
Изобр -тение относитс к мелиоративному строительству и может быть использовано при образовании водоотводных канав. Наиболее близким к предлагаемому вл етс способ с оружени водоотводных канав на мар х с нарезкой траншеи трапецеидальной формы, заполнением ее на полное сечение скаль ным гравийно-галечниковым грунтом и вторичной выемкой части этого грун та из центральной зоны сечени с оставлением на дне и откосах сло укреплени fl. Недостатком этого способа вл етс больша трудоёмкость работ. Цель изобретени - уменьшение тру доемкости работ. Поставленна цель достигаетс тем что согласно способу образовани водоотводных канав на мар х, состо щему из нарезани траншеи трапецеидаль ной формы и укреплени .ее поверхности путем отсьтки в траншею транспорт ными средствами скального грунта и образовани из цего поверхностного сло канавы, отсьтку грунта производ т по длине траншеи порци ми в общем объеме, равном объему поверх- ностного сло канавы, который образу ют путем разравнивани по дну трав/леи бульдозерным откалом с насадкой порционно отсыпанного грунта и последующего распределени отвальным профилером части этого грунта на откосах траншеи. На фиг. 1 изображен нарезка канавы , вид сбоку; на фиг. 2 - разрез А-А на фиг. 1 -, на фиг. 3 - заполнение канавы скальньт грунтом, вид сб ку; на фиг. 4 - разрез Б-Б на фиг. на фиг. 5 - разравнивание скального грунта в канаве вид сбоку} на фиг.. 6 - разрез В-В на фиг. 5; на фиг. 7 - перераспределение скальног Грунта, вид сбоку; на фиг. 8 - разрез Г-Г на фиг. 7J на фиг. 9 - вид D на фиг. 7; на фиг. 10 - разрез Е-Е н& фиг. 9. Способ осуществл етс следующим образом. Торф ным экскаватором 1 на гусеничном ходу повышенной проходимости с профильным ковшом нарезают в летнее врем , когда де тельньй слой веч- ной мерзлоты находитс в талом состо нии , водоотводную канаву 2. Затем ее заполн ют в объеме укрепительных конструкций с помощью автосамосвалов 3 порци ми доставл емого из карьера скального грунта 4. При движении бульдозера 5 по канаве разравнивают профильной насадкой 6 в нижней части отвала 7 грунт 4 слоем 8, ширина которого обеспечивает размещение тракторного кода. Кромку отвала 7 при этом располагают выше бровок канавы 2. При повторном проходе отвал 7 устанавливают в транспортное положение и нарезают профилером 9 на зубе рыхлител 10 профиль укрепленной канавы в слое 8, причем вырезанный грунт накапливаетс перед профилером в виде призмь волочени 11, перемещаетс вверх до плоскости профилера 9 и за счет распора, создаваемого уплотненным каменным дром 12, выдавливаетс в зазор между краем профилера 9 и поверхностью верхней части откоса13, т.е. непрерывно перераспредел етс по профилю канавы 2, образу поверх-, костный .слой укреплений 14. При достаточной мощности базового трактора операции разравнивани и перераспределени камн по профилю канавы могут быть произведены за ог(кн проход трактора. Использование изобретени обеспечит уменьшение трудоемкости работы.The image refers to land reclamation construction and can be used in the formation of drainage ditches. The closest to the present invention is a method with weapons of drainage ditches on marks with cutting a trapezoidal trench, filling it with a rocky gravel-pebble soil and a secondary excavation of a portion of this soil from the central section of the section, leaving a layer of reinforcement at the bottom and slopes fl. The disadvantage of this method is the great complexity of the work. The purpose of the invention is to reduce labor costs. The goal is achieved by the fact that, according to the method of forming drainage ditches on the stamps, consisting of cutting a trapezoidal trench and reinforcing its surface by pulling rock into the trench and forming a surface layer of the ditch, the extraction of the soil takes place trenches in portions in a total volume equal to the volume of the surface layer of the ditch, which is formed by leveling grasses / lei on the bottom of the grass / lei with dozer slug with a nozzle in portions filled with soil and then On the distribution side of the profiler dumping soil on the slopes of the trench. FIG. 1 shows a ditching, side view; in fig. 2 shows section A-A in FIG. 1 -, in FIG. 3 - filling of a ditch with rocky soil, type of boom; in fig. 4 shows a section BB in FIG. in fig. 5 - leveling of rocky soil in a ditch side view} in FIG. 6 - section B-B in FIG. five; in fig. 7 - redistribution of the cliff Soil, side view; in fig. 8 - section G-Y in FIG. 7J in FIG. 9 is a view D of FIG. 7; in fig. 10 - section EE & FIG. 9. The method is carried out as follows. Peat excavator 1 on a track terrain with a profile bucket is cut in the summer, when the permafrost layer is thawed, drainage ditch 2. Then it is filled in the volume of fortifications using dump trucks in 3 portions rocky soil from the quarry 4. When the bulldozer 5 is moving, they level the ditch 5 with a profile nozzle 6 in the lower part of the blade 7, the soil 4 with a layer 8, the width of which provides for placement of the tractor code. The edge of the blade 7 is located above the edges of the ditch 2. When re-passing, the blade 7 is set to the transport position and cut with the profiler 9 on the ripper tooth 10 the profile of the reinforced ditch in layer 8, the cut soil accumulates in front of the profiler in the form of a prism 11, moves up the plane of the profiler 9 and, due to the spread created by the compacted stone core 12, is squeezed out into the gap between the edge of the profiler 9 and the surface of the upper part of the slope, i.e. continuously redistributed along the profile of ditch 2, forming a surface and bone layer of fortifications 14. With sufficient power of the base tractor, leveling and redistribution of stones along the ditch profile can be performed behind the tractor (use of the invention will reduce the labor intensity of the work.
Фиг,- гFIG - g
i;i;
. . . .
(//7//// / y//((// 7 //// / y // (
/f7/ffr/ Af/ //7/f / ///i / ff / f7 / ffr / Af / // 7 / f / /// i / ff
tPug.S Y Air /////// //// 7/К /У/ ЛУtPug.S Y Air /////// //// 7 / K / U / LU
ГR
иг.5 //////////а /// ///////// / WA / /iy/ / Фи1.7ig.5 ////////// and /// ///////// / WA / / iy / / Fi1.7
B-fBf
кчkch
//
On 0/On 0 /
тt
fpuf.fyfpuf.fy
fPue.ff ЛУ//У/ Фиг.8fPue.ff LU // U / Fig. 8
В ид ЛIn id
|ТТ1|ЧТТ п И| TT1 | CHT p I
- .-А.; ..Л ,-: . - .-BUT.; ..L, -:.
ж- А. .-Д:/-. ..Well- A.. -D: / -. ..
гггshhhhh
1212
Фаг JOPhage jo
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823446334A SU1129286A1 (en) | 1982-05-31 | 1982-05-31 | Method of forming a water outflow ditch |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU823446334A SU1129286A1 (en) | 1982-05-31 | 1982-05-31 | Method of forming a water outflow ditch |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1129286A1 true SU1129286A1 (en) | 1984-12-15 |
Family
ID=21014495
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU823446334A SU1129286A1 (en) | 1982-05-31 | 1982-05-31 | Method of forming a water outflow ditch |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1129286A1 (en) |
-
1982
- 1982-05-31 SU SU823446334A patent/SU1129286A1/en active
Non-Patent Citations (1)
Title |
---|
1. Карандин А.В. и др. Устройство водоотводных канав. Транспортное строительство, 1978, № 5, с. 50 (прототип).. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN210395607U (en) | Side slope buried drainage structure | |
CN210827635U (en) | Dual-purpose bulldozing and carrying working device | |
SU1129286A1 (en) | Method of forming a water outflow ditch | |
AU2019280036A1 (en) | Narrow Trencher Bucket | |
CN211257122U (en) | Quick excavation device of escape canal slot | |
US3182460A (en) | Apparatus for making permeable conduits in subterranean lines of drainage | |
CN210712996U (en) | Bull-dozer for municipal construction | |
US4365428A (en) | Bucket mounted footing tool | |
CN114658079B (en) | Method for stacking waste soil in dumping site based on rain intensity | |
SU1765400A1 (en) | Method at sail mass reclamation during preparation of quarry sanitary-protection zone | |
SU1767091A1 (en) | Method for constructing embankment of second track in permafrost | |
CN215948067U (en) | Hydrophobic type concrete retaining wall structure | |
US941051A (en) | Dike-building apparatus and process. | |
SU1025898A1 (en) | Method of burying waste in natural cavities | |
JPS6239146Y2 (en) | ||
US3191387A (en) | Method for making permeable conduits in subterranean lines of drainage | |
SU1724814A1 (en) | Embankment filling method | |
SU1377324A1 (en) | Method of working the bottom of river or basin | |
SU1691458A1 (en) | Method for combined storage of stripping muck and concentration wastes | |
Width | Forest Road Construction 6 | |
SU1645515A1 (en) | Method for constructing canal | |
Spennemann | Of wheels and tracks: Experiences with heavy excavating equipment | |
SU829791A1 (en) | Method of making an underground profile working | |
RU1772316C (en) | Method for construction of drain in water-bearing ground | |
SU139487A1 (en) | Cranking machine |