SU1247449A1 - Method of constructing a canal - Google Patents
Method of constructing a canal Download PDFInfo
- Publication number
- SU1247449A1 SU1247449A1 SU853860620A SU3860620A SU1247449A1 SU 1247449 A1 SU1247449 A1 SU 1247449A1 SU 853860620 A SU853860620 A SU 853860620A SU 3860620 A SU3860620 A SU 3860620A SU 1247449 A1 SU1247449 A1 SU 1247449A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- trench
- soil
- trenches
- elevation
- development
- Prior art date
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Description
Изобретение относитс к технологии производства земл ных работ землесосными снар дами при строительстве каналов в сильно пересеченной местности, проход щих через возвышени .The invention relates to the technology for the production of earthworks by suction dredgers during the construction of canals in highly rugged terrain, passing through elevations.
Целью изобретени вл етс повышение эффективности разработки грунта возвышени и удешевление работ.The aim of the invention is to increase the efficiency of soil excavation and reduce the cost of work.
На фиг. 1 показана схема строительства канала, вид в плане; на фиг. 2 - сечение А-А на фиг. 1.FIG. 1 shows the construction of the channel, plan view; in fig. 2 is a section A-A in FIG. one.
Способ осуществл ют следующим образом .The method is carried out as follows.
От основного забо земснар дом по пионерной траншее 1 подвод т воду к подножью возвышени 2, через, которое проходит трасса канала 3. Возвышение 2 дл нормальной работы земснар дов необходимо разработать до отметки 4. Одновременно с этим по командным отметкам возвышени 2 бульдозерами 5 продольной разра- боткой на ширину ножа устраивают магистральную траншею 6. По склонам возвышени 2 в обе стороны от магистральной траншеи 6 нарезают смывные траншеи 7 глубиной 2 м, шириной по дну 3,0 м и ,7, соедин емые пульпо- сбросной траншеей 8, по которой разрабатываемый грунт транспортируетс в пониженные места, которые со стороны какала ограждают дамбами обваловани 9. Между магистральной 6 и смывными 7 транше ми (кроме последней по направлению течени потока) оставл ют перемычки 10. В пионерной траншее 1 устанавливают плавучую на5From the main dredger, pioneer trench 1 brings water to the foot of elevation 2 through which the channel 3 passes. Rise 2 for normal operation of dredgers needs to be developed to mark 4. Simultaneously with the elevation command marks 2 bulldozers 5 longitudinal - a trunk trench 6 is arranged with a knife to the width of the knife. On the slopes of elevation 2 on both sides of the trunk trench 6, flush trenches 7 are cut into 2 m deep and 3.0 m wide along the bottom, and 7, joined by pulp-dump trench 8, along which time It is activated primer is transported in reduced places from cocoa levee obvalovaniya 9. Between backbone 6 and 7 flush tranche E (except the last in the direction of stream flow) allowed jumpers 10. In pioneer trench 1 is set floating na5
0 5 0 5
сосную станцию 11, от которой подают воду по двум трубопроводам 12 и 13. По трубопроводу 12 воду подают в начало магистральной траншеи 6 расходом Q 1,0 и скоростью ,5 м/с. По трубопроводу 13 воду подают в точку 14, в которой происходит уменьшение транспортирующей способности потока, расходом 0,25 . При этом скорость потока в транше х 7 и 8 равна 1,5 м/с. С участков 15, примыкающих к работающей смывной траншее, грунт разрабатывают бульдозерами 5 с укладкой его в поток воды протекающей по траншее 7. В результате размыва этого грунта образуетс пульпа, котора транспортируетс в положени 16. После разработки грунта на примыкающих к работающей траншее участках 15 до проектной отметки 4 производ т разработку грунта 1 , слагающего эту же траншею 7, периодической подачей его бульдозерами 5 в последнюю в процессе ее саморазмыва. Разработав грунт на участке последней (по направлению течени потока) траншеи, бульдозером 5 разбирают перемычку 10 между магистральной 6 и предпоследней смывной 7 транше ми . За этой траншеей магистральную траншею пересыпают грунтом при помощи бульдозера 5, тем самым направл воду в эту траншею. Оставшийс от разработки последней смывной траншеи грунт 18 бульдозером 5 перемещают в поток воды, протекающий по предпоследней смывной траншее 7. Точно также производ т разработку грунта по остальным смывным транше м .pine station 11, from which water is supplied through two pipelines 12 and 13. Pipeline 12 supplies water to the beginning of trunk trench 6 with flow rate Q 1.0 and speed, 5 m / s. The pipeline 13 water is supplied to the point 14, in which there is a decrease in the transport capacity of the flow, flow rate of 0.25. The flow rate in the trench x 7 and 8 is equal to 1.5 m / s. From plots 15 adjacent to a working flush trench, the soil is developed with bulldozers 5 and laid in a stream of water flowing through trench 7. As a result of erosion of this soil, a slurry is formed, which is transported to positions 16. After the soil has been developed on areas 15 adjacent to the working trench, project mark 4, the development of soil 1, which forms the same trench 7, is carried out by periodically feeding it with bulldozers 5 to the latter in the process of its self-crushing. Having developed the soil at the site of the latter (in the direction of flow) of the trench, bulldozer 5 disassembles jumper 10 between trunk 6 and the penultimate flush 7 trenches. Behind this trench, the trunk trench is poured with soil using a bulldozer 5, thereby directing water into this trench. The remaining soil from the development of the last flush trench 18 by the bulldozer 5 is transferred to the stream of water flowing through the penultimate flush trench 7. Soil excavation is carried out along the remaining flush trenches.
фиг. гFIG. g
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU853860620A SU1247449A1 (en) | 1985-02-27 | 1985-02-27 | Method of constructing a canal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU853860620A SU1247449A1 (en) | 1985-02-27 | 1985-02-27 | Method of constructing a canal |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1247449A1 true SU1247449A1 (en) | 1986-07-30 |
Family
ID=21164591
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU853860620A SU1247449A1 (en) | 1985-02-27 | 1985-02-27 | Method of constructing a canal |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1247449A1 (en) |
-
1985
- 1985-02-27 SU SU853860620A patent/SU1247449A1/en active
Non-Patent Citations (1)
Title |
---|
Юфин А. П. Гидромеханизаци . М., Стройиздат, 1965, с. 68. Авторское свидетельство СССР № 625042, кл. Е 02 F 3/88, 1973. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2067138C1 (en) | Plant for prevention of seepage of contaminated water from waste storage and method for construction of device for trapping seeped water from waste storage | |
SU1247449A1 (en) | Method of constructing a canal | |
Olami et al. | The water supply system of Caesarea Maritima | |
JP3250709B2 (en) | Open shield method | |
KR200386573Y1 (en) | Natural block | |
SU1217980A1 (en) | Canal construction method | |
RU2393293C1 (en) | Arrangement method of drying system with narrow enclosure ploughing of drained soils | |
CN214194427U (en) | Farmland irrigation ditch | |
US374378A (en) | Dam and reservoir construction | |
SU1055809A1 (en) | Method of constructing canals | |
SU1723233A1 (en) | Method of maintaining river waterway in operating condition | |
SU1377324A1 (en) | Method of working the bottom of river or basin | |
SU1117364A1 (en) | Method of working a canal bed | |
SU889784A1 (en) | Method of erecting hydraulically filled structures in water ducts | |
SU1291672A1 (en) | Method of constructing drainage system | |
RU2256742C1 (en) | Hydraulic structure spillaway | |
SU1335623A1 (en) | Method of constructing a canal | |
SU953104A1 (en) | Method of preventing flooding of territory adjoining water ducts | |
RU2219310C2 (en) | Drain | |
SU540959A1 (en) | Way to develop the channel | |
SU1687708A1 (en) | Pioneer section for straightening open stream bed | |
SU1444462A1 (en) | Method of straightening river path | |
RU2088723C1 (en) | Method for controlling unstable river channels | |
SU1762768A1 (en) | Counter-erosion relief protection method | |
JP3448769B2 (en) | Upstream waterway |