SU1247449A1 - Method of constructing a canal - Google Patents

Method of constructing a canal Download PDF

Info

Publication number
SU1247449A1
SU1247449A1 SU853860620A SU3860620A SU1247449A1 SU 1247449 A1 SU1247449 A1 SU 1247449A1 SU 853860620 A SU853860620 A SU 853860620A SU 3860620 A SU3860620 A SU 3860620A SU 1247449 A1 SU1247449 A1 SU 1247449A1
Authority
SU
USSR - Soviet Union
Prior art keywords
trench
soil
trenches
elevation
development
Prior art date
Application number
SU853860620A
Other languages
Russian (ru)
Inventor
Сергей Александрович Кубышкин
Николай Константинович Голубев
Давид Лазаревич Меламут
Виктор Борисович Купершинский
Original Assignee
Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Гидротехники И Мелиорации Им.А.Н.Костякова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Гидротехники И Мелиорации Им.А.Н.Костякова filed Critical Всесоюзный Ордена Трудового Красного Знамени Научно-Исследовательский Институт Гидротехники И Мелиорации Им.А.Н.Костякова
Priority to SU853860620A priority Critical patent/SU1247449A1/en
Application granted granted Critical
Publication of SU1247449A1 publication Critical patent/SU1247449A1/en

Links

Landscapes

  • Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)

Description

Изобретение относитс  к технологии производства земл ных работ землесосными снар дами при строительстве каналов в сильно пересеченной местности, проход щих через возвышени .The invention relates to the technology for the production of earthworks by suction dredgers during the construction of canals in highly rugged terrain, passing through elevations.

Целью изобретени   вл етс  повышение эффективности разработки грунта возвышени  и удешевление работ.The aim of the invention is to increase the efficiency of soil excavation and reduce the cost of work.

На фиг. 1 показана схема строительства канала, вид в плане; на фиг. 2 - сечение А-А на фиг. 1.FIG. 1 shows the construction of the channel, plan view; in fig. 2 is a section A-A in FIG. one.

Способ осуществл ют следующим образом .The method is carried out as follows.

От основного забо  земснар дом по пионерной траншее 1 подвод т воду к подножью возвышени  2, через, которое проходит трасса канала 3. Возвышение 2 дл  нормальной работы земснар дов необходимо разработать до отметки 4. Одновременно с этим по командным отметкам возвышени  2 бульдозерами 5 продольной разра- боткой на ширину ножа устраивают магистральную траншею 6. По склонам возвышени  2 в обе стороны от магистральной траншеи 6 нарезают смывные траншеи 7 глубиной 2 м, шириной по дну 3,0 м и ,7, соедин емые пульпо- сбросной траншеей 8, по которой разрабатываемый грунт транспортируетс  в пониженные места, которые со стороны какала ограждают дамбами обваловани  9. Между магистральной 6 и смывными 7 транше ми (кроме последней по направлению течени  потока) оставл ют перемычки 10. В пионерной траншее 1 устанавливают плавучую на5From the main dredger, pioneer trench 1 brings water to the foot of elevation 2 through which the channel 3 passes. Rise 2 for normal operation of dredgers needs to be developed to mark 4. Simultaneously with the elevation command marks 2 bulldozers 5 longitudinal - a trunk trench 6 is arranged with a knife to the width of the knife. On the slopes of elevation 2 on both sides of the trunk trench 6, flush trenches 7 are cut into 2 m deep and 3.0 m wide along the bottom, and 7, joined by pulp-dump trench 8, along which time It is activated primer is transported in reduced places from cocoa levee obvalovaniya 9. Between backbone 6 and 7 flush tranche E (except the last in the direction of stream flow) allowed jumpers 10. In pioneer trench 1 is set floating na5

0 5 0 5

сосную станцию 11, от которой подают воду по двум трубопроводам 12 и 13. По трубопроводу 12 воду подают в начало магистральной траншеи 6 расходом Q 1,0 и скоростью ,5 м/с. По трубопроводу 13 воду подают в точку 14, в которой происходит уменьшение транспортирующей способности потока, расходом 0,25 . При этом скорость потока в транше х 7 и 8 равна 1,5 м/с. С участков 15, примыкающих к работающей смывной траншее, грунт разрабатывают бульдозерами 5 с укладкой его в поток воды протекающей по траншее 7. В результате размыва этого грунта образуетс  пульпа, котора  транспортируетс  в положени  16. После разработки грунта на примыкающих к работающей траншее участках 15 до проектной отметки 4 производ т разработку грунта 1 , слагающего эту же траншею 7, периодической подачей его бульдозерами 5 в последнюю в процессе ее саморазмыва. Разработав грунт на участке последней (по направлению течени  потока) траншеи, бульдозером 5 разбирают перемычку 10 между магистральной 6 и предпоследней смывной 7 транше ми . За этой траншеей магистральную траншею пересыпают грунтом при помощи бульдозера 5, тем самым направл   воду в эту траншею. Оставшийс  от разработки последней смывной траншеи грунт 18 бульдозером 5 перемещают в поток воды, протекающий по предпоследней смывной траншее 7. Точно также производ т разработку грунта по остальным смывным транше м .pine station 11, from which water is supplied through two pipelines 12 and 13. Pipeline 12 supplies water to the beginning of trunk trench 6 with flow rate Q 1.0 and speed, 5 m / s. The pipeline 13 water is supplied to the point 14, in which there is a decrease in the transport capacity of the flow, flow rate of 0.25. The flow rate in the trench x 7 and 8 is equal to 1.5 m / s. From plots 15 adjacent to a working flush trench, the soil is developed with bulldozers 5 and laid in a stream of water flowing through trench 7. As a result of erosion of this soil, a slurry is formed, which is transported to positions 16. After the soil has been developed on areas 15 adjacent to the working trench, project mark 4, the development of soil 1, which forms the same trench 7, is carried out by periodically feeding it with bulldozers 5 to the latter in the process of its self-crushing. Having developed the soil at the site of the latter (in the direction of flow) of the trench, bulldozer 5 disassembles jumper 10 between trunk 6 and the penultimate flush 7 trenches. Behind this trench, the trunk trench is poured with soil using a bulldozer 5, thereby directing water into this trench. The remaining soil from the development of the last flush trench 18 by the bulldozer 5 is transferred to the stream of water flowing through the penultimate flush trench 7. Soil excavation is carried out along the remaining flush trenches.

фиг. гFIG. g

Claims (2)

1. СПОСОБ СТРОИТЕЛЬСТВА КАНАЛА, включающий разработку возвышения пропуском максимального расхода воды по магистральной и смывным траншеям, поочередную разработку участков возвышения путем переключения подачи воды за счет последовательного перекрытия ее перемычками и раскрытия перемычек смывных траншей, транспортирование размытого грунта за пределы русла канала по пульпосбросной траншее, отличающийся тем, что, с целью повышения эффективности разработки грунта возвышения и удешевления работ, в работающую смывную траншею рассредоточенно подают грунт с примыкающих к ней участков в количестве, равном или превышающем транспортирующую способность потока в данной траншее, а в место уменьшения транспортирующей способности работающей смывной или пульпосбросной траншей дополнительно подают воду для транспортирования поступающего грунта.1. METHOD OF CONSTRUCTION OF A CHANNEL, including the development of an elevation by passing the maximum water flow through the main and flush trenches, the alternate development of the elevation sections by switching the water supply by sequentially blocking it with jumpers and opening the lintels of the flushing trenches, transporting the washed out soil outside the channel channel through a pulp-dump trench, characterized in that, in order to increase the efficiency of excavation of the elevation and cost reduction of work, in the working flushing trench dispersal soil is supplied from adjoining sections in an amount equal to or greater than the transporting ability of the flow in a given trench, and water is additionally supplied to the place of decreasing transporting ability of the working flushing or pulp-discharge trenches. 2. Способ по п. 1, отличающийся тем, что после разработки грунта на примыкающих к работающей траншее участках до проектной отметки производят разработку грунта, слагающего эту же траншею, периодической подачей его в последнюю в процессе ее саморазмыва.2. The method according to p. 1, characterized in that after the development of the soil in areas adjacent to the working trench until the design mark, they develop the soil composing the same trench by periodically feeding it to the latter in the process of its self-erosion. 1247449 А11247449 A1 Фиг. 1FIG. 1
SU853860620A 1985-02-27 1985-02-27 Method of constructing a canal SU1247449A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU853860620A SU1247449A1 (en) 1985-02-27 1985-02-27 Method of constructing a canal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU853860620A SU1247449A1 (en) 1985-02-27 1985-02-27 Method of constructing a canal

Publications (1)

Publication Number Publication Date
SU1247449A1 true SU1247449A1 (en) 1986-07-30

Family

ID=21164591

Family Applications (1)

Application Number Title Priority Date Filing Date
SU853860620A SU1247449A1 (en) 1985-02-27 1985-02-27 Method of constructing a canal

Country Status (1)

Country Link
SU (1) SU1247449A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Юфин А. П. Гидромеханизаци . М., Стройиздат, 1965, с. 68. Авторское свидетельство СССР № 625042, кл. Е 02 F 3/88, 1973. *

Similar Documents

Publication Publication Date Title
RU2067138C1 (en) Plant for prevention of seepage of contaminated water from waste storage and method for construction of device for trapping seeped water from waste storage
SU1247449A1 (en) Method of constructing a canal
Olami et al. The water supply system of Caesarea Maritima
JP3250709B2 (en) Open shield method
KR200386573Y1 (en) Natural block
SU1217980A1 (en) Canal construction method
RU2393293C1 (en) Arrangement method of drying system with narrow enclosure ploughing of drained soils
CN214194427U (en) Farmland irrigation ditch
US374378A (en) Dam and reservoir construction
SU1055809A1 (en) Method of constructing canals
SU1723233A1 (en) Method of maintaining river waterway in operating condition
SU1377324A1 (en) Method of working the bottom of river or basin
SU1117364A1 (en) Method of working a canal bed
SU889784A1 (en) Method of erecting hydraulically filled structures in water ducts
SU1291672A1 (en) Method of constructing drainage system
RU2256742C1 (en) Hydraulic structure spillaway
SU1335623A1 (en) Method of constructing a canal
SU953104A1 (en) Method of preventing flooding of territory adjoining water ducts
RU2219310C2 (en) Drain
SU540959A1 (en) Way to develop the channel
SU1687708A1 (en) Pioneer section for straightening open stream bed
SU1444462A1 (en) Method of straightening river path
RU2088723C1 (en) Method for controlling unstable river channels
SU1762768A1 (en) Counter-erosion relief protection method
JP3448769B2 (en) Upstream waterway