CN203247606U - Construction structure for sewage pipe and utility tunnel of deep sludge foundation to penetrate through center trench - Google Patents

Construction structure for sewage pipe and utility tunnel of deep sludge foundation to penetrate through center trench Download PDF

Info

Publication number
CN203247606U
CN203247606U CN 201320153479 CN201320153479U CN203247606U CN 203247606 U CN203247606 U CN 203247606U CN 201320153479 CN201320153479 CN 201320153479 CN 201320153479 U CN201320153479 U CN 201320153479U CN 203247606 U CN203247606 U CN 203247606U
Authority
CN
China
Prior art keywords
construction
sewage pipe
utility tunnel
pipe
soil pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN 201320153479
Other languages
Chinese (zh)
Inventor
肖策
蒋伟
张磊
朱忠来
李剑
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianjin MCC20 Construction Co Ltd
Original Assignee
Tianjin MCC20 Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianjin MCC20 Construction Co Ltd filed Critical Tianjin MCC20 Construction Co Ltd
Priority to CN 201320153479 priority Critical patent/CN203247606U/en
Application granted granted Critical
Publication of CN203247606U publication Critical patent/CN203247606U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a construction structure for a sewage pipe and a utility tunnel of a deep sludge foundation to penetrate through a center trench. The sewage pipe and the utility tunnel are arranged in the same underwater groove. The construction structure for the sewage pipe and the utility tunnel of the deep sludge foundation to penetrate through the center trench has the advantages that 1) due to the fact that the sewage pipe and the utility tunnel are arranged in the same groove, the shoring and protecting cost of a foundation pit is reduced, and the construction speed is high; 2) the sewage pipe and the utility tunnel are arranged in the same groove so that the width of the cross section of backfill sand can be shortened, the using amount of the sand is reduced, and construction cost is lowered; 3) backfill sand treatment is conducted on the constriction region, and compared with erecting of a temporary steel bridge, construction cost is reduced; 4) over-water construction is changed to be land construction, efficiency is improved, and safety and quality are guaranteed.

Description

Deep muck foundation soil pipe and integrated pipe canal pass through the constructing structure of center ditch
Technical field
The utility model relates to the constructing structure that a kind of inverted-siphon soil pipe and integrated pipe canal pass through the center ditch, particularly relates to a kind of deep muck foundation soil pipe and integrated pipe canal and wears the center ditch and get over the subsea construction structure.
Background technology
At present, the job practices of submerged tunnel mainly contains: cofferdam cut and cover method, pneumatic caisson method, shield method and immersed tunnelling method, using more is shield method and immersed tunnelling method.Wherein, shield method adopts shield machine as the constructing tunnel facility.The shield machine shell is generally cylindrical shape, and its front portion is the otch ring of device excavation equipment, and the middle part is the supporting ring of device puopulsion equipment, and afterbody is the shield tail of shielding assembly unit lining cutting work.Advantage with shield construction is construction safety, does not affect water transportation.Shortcoming is that the tunnel length of leading the way is larger, and seam is more, and seepage easily occurs; When constructing in the section on the coast, surface settlement may occur, work the mischief.This method is used for the submerged tunnel construction of broken ground more.Immersed tunnelling method be submerged tunnel by designing requirement, prefabricate becomes pipeline section in the dock on the coast, then puts in place with the towboat transportation by driving, sinking is to dredging in advance in the groove that digs, and successively pipeline section coupled together under water, builds up the tunnel that passes through the waters.Its advantage is the tunnel good integrity of building up, good waterproof performance, lead the way shorter or the gradient more slow, can be used for the construction in large-sized rectangular cross section tunnel.Shortcoming is to affect water transportation.
Submarine pipeline generally has two kinds of paving modes: one) be laid on the bottom; Two) be embedded in the water-bed lower groove.
The mucky soil layer thickness is darker in the coastal area, need to consider simultaneously that integrated pipe canal and inverted-siphon soil pipe pass through the seabed, considers from construction technology and engineering cost two aspects, need to explore the integrated construction technology.
Summary of the invention
The utility model provides a kind of deep muck foundation soil pipe and integrated pipe canal to pass through the constructing structure of center ditch for solving the technical problem that exists in the known technology.
The technical scheme that the utility model is taked for the technical problem that exists in the solution known technology is: a kind of deep muck foundation soil pipe and integrated pipe canal pass through center ditch construction structure, and described soil pipe and described integrated pipe canal are arranged in the same groove under water.
In the build of the described center ditch outside passage of drainning off floodwaters is arranged, at the construction area formation hydraulic fill sand land of described groove under water, construct in described hydraulic fill sand land described soil pipe and described integrated pipe canal.
Described soil pipe is inverted-siphon formula soil pipe.
Advantage and the good effect that the utlity model has are: 1) soil pipe and integrated pipe canal have reduced the supporting expense of foundation ditch with the groove setting, and speed of application is fast; 2) soil pipe and integrated pipe canal reduce hydraulic fill sand cross section width with groove, and sand using amount reduces, and construction cost reduces; 3) construction area is carried out hydraulic fill sand and process, compare with setting up the steel suspension bridge, reduce the operating expenses expenditure; 4) change the land construction into by over-water construction, efficient improves, and safety and quality are guaranteed.
Description of drawings
Fig. 1 is plan view of the present utility model;
Fig. 2 is profile of the present utility model;
Fig. 3 is the profile after the center ditch recovers navigation.
Among the figure: 1, integrated pipe canal, 2, soil pipe, 3, bridge, 4, groove under water, 5, hydraulic fill sand land.
The specific embodiment
For further understanding summary of the invention of the present utility model, Characteristic, hereby exemplify following examples, and cooperate accompanying drawing to be described in detail as follows:
See also Fig. 1~Fig. 3, a kind of deep muck foundation soil pipe and integrated pipe canal pass through the constructing structure of center ditch, and described soil pipe 2 and described integrated pipe canal 1 are arranged in the same groove under water.
In the build of the described center ditch outside passage of drainning off floodwaters is arranged, at the construction area formation hydraulic fill sand land 5 of described groove under water 4, construct in the hydraulic fill sand land described soil pipe 2 and described integrated pipe canal 1.
Described soil pipe 2 is inverted-siphon formula soil pipe.
Job practices of the present utility model:
One) soil pipe 2 and integrated pipe canal 1 are put in order in same groove under water
Center ditch width 180m, the average 5m of the depth of water, the inverted-siphon soil pipe 2 that two initial plannings is positioned at bridge 3 east sides is relocated to bridge 3 west sides, makes itself and integrated pipe canal 1 in same groove under water 4, and pattern foundation pit supporting structure is only done once;
Two) form the land-based area works area
1) builds the passage that drains off floodwaters in the center ditch outside, discharge the center ditch for the water that guarantees the present situation sluice, establish in addition the wide passage that drains off floodwaters of 70m in the center ditch outside, adopt the gabion bank protection behind the irrigation canals and ditches excavation;
2) the center ditch in the road scope is carried out hydraulic fill sand and process the formation land-based area.The hydraulic fill sand scope also comprises the construction area of bridge 3, and its absolute altitude 1.7m identical with road, end face adopt cut into a mountain stone and 0.3m mud knot rubble of 0.5m to fill, and guarantee the current operation of big machinery;
Three) finish structure construction
Carry out the structure construction of bridge 3, soil pipe 2 and integrated pipe canal 1 at land-based area;
Four) rehabilitation center's ditch navigation
Structure construction is finished, and behind the pit backfill, and central excavation ditch hydraulic fill sand is to design navigation absolute altitude, rehabilitation center's ditch channel function that drains off floodwaters.
Although the above is described preferred embodiment of the present utility model by reference to the accompanying drawings; but the utility model is not limited to the above-mentioned specific embodiment; the above-mentioned specific embodiment only is schematic; be not restrictive; those of ordinary skill in the art is under enlightenment of the present utility model; not breaking away from the scope situation that the utility model aim and claim protect, can also make a lot of forms, these all belong within the protection domain of the present utility model.

Claims (3)

1. a deep muck foundation soil pipe and integrated pipe canal pass through the constructing structure of center ditch, it is characterized in that, described soil pipe and described integrated pipe canal are arranged in the same groove under water.
2. deep muck foundation soil pipe according to claim 1 and integrated pipe canal pass through the constructing structure of center ditch, it is characterized in that, in the build of the described center ditch outside passage of drainning off floodwaters is arranged, construction area at described groove under water forms hydraulic fill sand land, construct in described hydraulic fill sand land described soil pipe and described integrated pipe canal.
3. deep muck foundation soil pipe according to claim 1 and integrated pipe canal pass through the constructing structure of center ditch, it is characterized in that, described soil pipe is inverted-siphon formula soil pipe.
CN 201320153479 2013-03-29 2013-03-29 Construction structure for sewage pipe and utility tunnel of deep sludge foundation to penetrate through center trench Expired - Lifetime CN203247606U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320153479 CN203247606U (en) 2013-03-29 2013-03-29 Construction structure for sewage pipe and utility tunnel of deep sludge foundation to penetrate through center trench

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320153479 CN203247606U (en) 2013-03-29 2013-03-29 Construction structure for sewage pipe and utility tunnel of deep sludge foundation to penetrate through center trench

Publications (1)

Publication Number Publication Date
CN203247606U true CN203247606U (en) 2013-10-23

Family

ID=49374053

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320153479 Expired - Lifetime CN203247606U (en) 2013-03-29 2013-03-29 Construction structure for sewage pipe and utility tunnel of deep sludge foundation to penetrate through center trench

Country Status (1)

Country Link
CN (1) CN203247606U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179194A (en) * 2014-07-22 2014-12-03 中建五局土木工程有限公司 Integrated pipe trench in soft soil stratum and construction method of integrated pipe trench

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104179194A (en) * 2014-07-22 2014-12-03 中建五局土木工程有限公司 Integrated pipe trench in soft soil stratum and construction method of integrated pipe trench

Similar Documents

Publication Publication Date Title
CN103882881B (en) Go deep into rock construction method under water
CN103726495B (en) Coastal waters deep foundation pit supporting structure and construction method thereof
CN103225306B (en) Method of preventing foundation pit leakage during excavation of foundation pit close to water source
CN104790410B (en) A kind of Support of Foundation Pit Excavation method that is applicable to shallow water mud river course
CN109235474B (en) Structure of super-large cofferdam based on marine environment and construction process thereof
CN112663558B (en) Construction process for excavating weathered rock in inland river harbor pool
CN113006144B (en) Permeable structure tunnel structure
CN212336250U (en) Pipe jacking connection guide row structure
CN107190709B (en) Method for building river channel in newly dredged soil reclamation land-enclosed area
CN108755719A (en) Seabed municipal tunnel over strait cofferdam open cutting construction method
CN1063518C (en) Drainage cut-off (deep ditch high-building method) drainage and supplying optimization combination for preventing and harnessing groud water
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN104612128A (en) Vacuum preloading reinforcement construction method applicable to underwater silt environment
CN203247606U (en) Construction structure for sewage pipe and utility tunnel of deep sludge foundation to penetrate through center trench
CN107034906A (en) Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method
CN216305942U (en) Protection system for tunnel passing through debris flow channel downwards
CN104846837A (en) Construction method for ultra-deep well pit in surface drainage foundation pit
CN104727325A (en) Building method for sea wall for shoal reclamation
CN214363565U (en) A drainage structures and pipeline network fall fast in foundation ditch bottom for suspension type curtain
CN204435321U (en) A kind of steam power station water intaking open channel
KR20140092217A (en) Construction method of the pier with the working bardge
CN103806409A (en) Milling forming system of gravity wharf foundation bed and construction method for gravity wharf structure
CN209975545U (en) Earth-rock cofferdam adapting to high flow velocity
CN208815550U (en) A kind of rich water powder land floor precipitation and recharge construction system
CN103774698B (en) Drainage-free construction method for soil engineering

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20131023