CN107034906A - Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method - Google Patents

Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method Download PDF

Info

Publication number
CN107034906A
CN107034906A CN201710293740.2A CN201710293740A CN107034906A CN 107034906 A CN107034906 A CN 107034906A CN 201710293740 A CN201710293740 A CN 201710293740A CN 107034906 A CN107034906 A CN 107034906A
Authority
CN
China
Prior art keywords
excavation
foundation trench
steel cylinder
dredger
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710293740.2A
Other languages
Chinese (zh)
Inventor
周俊龙
徐新成
张洋
黄云峰
马杰
赵红阳
李晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Sixth Engineering Division Co Ltd
Original Assignee
China Construction Sixth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Sixth Engineering Division Co Ltd filed Critical China Construction Sixth Engineering Division Co Ltd
Priority to CN201710293740.2A priority Critical patent/CN107034906A/en
Publication of CN107034906A publication Critical patent/CN107034906A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/02Restraining of open water
    • E02D19/04Restraining of open water by coffer-dams, e.g. made of sheet piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/06Foundation trenches ditches or narrow shafts
    • E02D17/12Back-filling of foundation trenches or ditches

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

Altering fill method is excavated the invention discloses the shallow slotting formula steel cylinder foundation trench in sea, is comprised the following steps:(1) tugboat traction grab boat, is excavated near point into predetermined;(2) steel cylinder foundation trench is carried out to excavate:(a) first vertical shift dredger carries out longitudinal layered excavation, folded before and after grabbing bucket in the longitudinal digging process of dredger to struggle against;(b) it is when grooving width once digs width more than dredger, dredger is traversing, then repeat described step (a) and carry out next bar steel cylinder foundation trench excavation construction;(3) water surface in the range of foundation trench sets segmentation cursory, then belt blast ship Cast-in-situ Piles in Sand-filling into foundation trench is used in each segmentation successively, in each segmentation during Cast-in-situ Piles in Sand-filling, belt blast ship is constantly mobile to change throwing position, and belt blast ship ramming is being used close to after engineered fill absolute altitude to designed elevation.This method can realize the base property for changing offshore steel cylinder structure hard foundation trench, contribute to the heavy construction of shaking of steel cylinder bank protection structure subsequently.

Description

Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method
Technical field
The present invention relates to marine man-made island construction field, relate in particular to a kind of marine shallow slotting formula steel cylinder foundation trench and excavate Altering fill method.
Background technology
Using steel cylinder as bank protection structure, it is during marine man-made island is constructed to be formed and carry out internal Tian Haizao islands after shore protection again Emerging technology.The features such as construction method has quick construction, batch production manufacture, effect on environment is small.Currently known field In, the steel cylinder as port Zhuhai and Macao bridge man-made island bank protection structure is used is deep insertion steel cylinder bank protection structure, deep insertion steel Cylinder inserts bedding depth dependent on cylinder, keeps integrally-built stability, it is adaptable to muck soil or mollisol thickness Area.
For hard soil layer area, it is more suitable for using shallow slotting formula steel cylinder bank protection structure.Shallow slotting formula steel cylinder utilizes it Action of Gravity Field plays earth-retaining to back filled region in island and goes along with sb. to guard him effect, is the key technology that future development man-made island is built.However, hard Matter soil layer area is due to the particularity of soil property, it is impossible to ensure that effectively shaking for steel cylinder bank protection structure is heavy, therefore need to be to hard foundation trench Pre-processed and sink to construction to carry out follow-up steel cylinder.
But current steel cylinder bank protection construction technology is deep insertion steel cylinder, for shallow slotting formula steel cylinder construction technology still Beyond example, does not have correlative study even more to shallow slotting formula steel cylinder foundation trench treatment technology.
The content of the invention
It is an object of the invention to overcome the shortcomings of that prior art is excavated there is provided a kind of marine shallow slotting formula steel cylinder foundation trench to change Construction method is filled out, to realize that marine shallow slotting formula steel cylinder foundation trench handles the breakthrough of construction technology and perfect.
To reach above-mentioned purpose, the present invention uses following technical proposals:
Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method, comprises the following steps:
(1) tugboat traction grab boat, is excavated near point, grab boat ship center line is parallel to grooving into predetermined Axis, stem casts anchor according to construction water area condition towards the direction for advance of dredging and fixes accommodation, scoop dredger construction is used DGPS is positioned;
(2) carry out steel cylinder foundation trench to excavate, concretely comprise the following steps:
(a) first vertical shift dredger carries out longitudinal layered excavation, folded before and after grabbing bucket in the longitudinal digging process of dredger to struggle against, when Foundation trench excavation length more than grab boat once cast anchor the length that can be excavated when, excavated using longitudinal divisionses and section and section it Between overlapping excavation 1.5-2m;
In longitudinal layered digging process, opened at steel cylinder foundation trench side slope position using from top to bottom stepped layering Dig, backbreak at downstairs interior angle, owe to dig at upper ladder exterior angle, design side slope, the level of each ladder are reached using slope of collapsing naturally Width measures control using DGPS, and reads waterlevel data by water gauge of constructing, and then controls every layer of side according to waterlevel data Grab bucket decentralization depth when slope is excavated, the side slope of adjacent levels has the region of overlapping excavation during excavation;
(b) it is when grooving width once digs width more than dredger, dredger is traversing, then repeat described step (a) Next bar steel cylinder foundation trench excavation construction is carried out, the excavation width of every is no more than the dredger grab bucket effective radius of clean-up of loop wheel machine 2 times, when deep water grooving is constructed, the excavation of every dig it is wide be not more than between the beam, adjacent two overlapping excavation 0.5-1m and The side slope of adjacent strip has the region of overlapping excavation during excavation;
(3) water surface in the range of foundation trench sets segmentation cursory, then uses belt blast ship in each segmentation successively The Cast-in-situ Piles in Sand-filling into foundation trench, in each segmentation during Cast-in-situ Piles in Sand-filling, belt blast ship is constantly mobile to change throwing position, close Using belt blast ship ramming to designed elevation after engineered fill absolute altitude.
The beneficial effects of the invention are as follows:
(1) construction method can realize the base property for changing offshore steel cylinder structure hard foundation trench, contribute to steel to justify The heavy construction of shaking of cylinder bank protection structure subsequently;
(2) using DGPS be located and positioned beneficial to foundation trench excavation position, it is ensured that excavate the correct of position;
(3) grab boat accommodation is arranged parallel to grooving axis, and stem is conducive to grab bucket towards the direction for advance of dredging Movement of the dredger in work progress;
(4) every every layer during excavation, it is ensured that have the region of overlapping excavation, can prevent owe dig or leakage dig Phenomenon, improves construction quality;
(5) constructed using grab boat, both can guarantee that construction demand, operating expenses can be effectively reduced again;
(6) foundation trench Cast-in-situ Piles in Sand-filling before backfill the water surface set segmentation it is cursory, it may be determined that construction area, it is ensured that backfill it is accurate Property.
Brief description of the drawings
Fig. 1 is to excavate altering fill method foundation trench using the marine shallow slotting formula steel cylinder foundation trench of the present invention to excavate schematic diagram;
Fig. 2 is to excavate altering fill method grab boat and hopper using the marine shallow slotting formula steel cylinder foundation trench of the present invention Accommodation schematic diagram;
Fig. 3 is to excavate altering fill method slope excavating layering ladder using the marine shallow slotting formula steel cylinder foundation trench of the present invention Excavating load schematic diagram;
Fig. 4 is the hydraulic fill sand schematic diagram that altering fill method is excavated using the marine shallow slotting formula steel cylinder foundation trench of the present invention.
Embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.
The marine shallow slotting formula steel cylinder foundation trench of the present invention excavates altering fill method, including following step as shown in drawings Suddenly:
(1) tugboat traction grab boat 1, preferred use, which is tied up, drags mode, is excavated into predetermined near point, grab bucket is dredged The ship center line of ship 1 casts anchor and stationary boat parallel to grooving axis, stem towards the direction for advance of dredging according to construction water area condition Position, the construction of grab boat 1 is positioned using DGPS;
(2) carry out steel cylinder foundation trench to excavate, concretely comprise the following steps:
(a) first vertical shift dredger carries out longitudinal layered excavation, folded before and after grabbing bucket in the longitudinal digging process of dredger 1 to struggle against, When foundation trench excavation length once casts anchor the length that can be excavated more than grab boat 1, using longitudinal divisionses excavate and section with Overlapping excavation 1.5-2m between section.So can anti-leak-stopping dig, stay the ridge and make bottom land smooth.The length of segmentation depends on positioning side Cable length and flow direction, the length of following current construction segmentation preferably take the 75% of bow side cable initial length.Point of stage excavation Layer number is divided according to actual cutting depth, in favor of Slope than stabilization and changeover portion slope ratio formation.
In longitudinal layered digging process, opened at steel cylinder foundation trench side slope position using from top to bottom stepped layering Dig, 4 backbreak at downstairs interior angle, 5 are owed to dig at upper ladder exterior angle, and design side slope is reached using slope of collapsing naturally.The water of each ladder Flat width measures control using DGPS.Due to the high change of tidal level wave, by constructing, water gauge reads waterlevel data, then according to water Grab bucket decentralization depth when position data control every layer of slope excavating, the side slope of adjacent levels has overlapping during excavation The region of excavation, controls construction quality.
(b) it is when grooving width once digs width more than dredger, dredger is traversing, then repeat described step (Ah) Next bar steel cylinder foundation trench excavation construction is carried out, the excavation width of every is no more than the dredger grab bucket effective radius of clean-up of loop wheel machine 2 times, when deep water grooving is constructed, the excavation of every digs the wide no more than beam;To prevent shallow point, phase occur between adjacent two The side slope of overlapping excavation 0.5-1m and adjacent strip has the region of overlapping excavation during excavation between adjacent two.
(3) water surface in the range of foundation trench sets segmentation cursory, then successively in each segmentation using belt blast ship 3 The Cast-in-situ Piles in Sand-filling into foundation trench, in each segmentation during Cast-in-situ Piles in Sand-filling, belt blast ship 3 is constantly mobile to change throwing position, is connecing Using the ramming of belt blast ship 3 to designed elevation after nearly engineered fill absolute altitude.The once throwing in same scope is controlled with strict Thickness is blocked up, causes to produce disturbance to former sea bed face mud and forms the mud bag of thickness larger (more than 2m).
Embodiment 1
(1) tugboat, which uses to tie up, drags mode traction grab boat 1, is excavated into predetermined near point, the ship of grab boat 1 Center line casts anchor according to construction water area condition towards the direction for advance of dredging parallel to grooving axis, stem and fixes accommodation, grab bucket The construction of dredger 1 is positioned using DGPS;
(2) carry out steel cylinder foundation trench to excavate, concretely comprise the following steps:
(a) first longitudinal point of 3 layers of excavation of vertical shift dredger progress, grab bucket front and rear folded bucket in the digging process of the longitudinal direction of dredger 1, Once cast anchor the length that can excavate by foundation trench excavation length exceedes grab boat 1, using longitudinal divisionses excavation and section and Overlapping excavation 1.5m between section.The length of following current construction segmentation takes the 75% of bow side cable initial length.
In longitudinal layered digging process, opened at steel cylinder foundation trench side slope position using from top to bottom stepped layering Dig, 4 backbreak at downstairs interior angle, 5 are owed to dig at upper ladder exterior angle, and design side slope is reached using slope of collapsing naturally.The water of each ladder Flat width measures control using DGPS.Due to the high change of tidal level wave, by constructing, water gauge reads waterlevel data, then according to water Grab bucket decentralization depth when position data control every layer of slope excavating, the side slope of adjacent levels has overlapping during excavation The region of excavation, controls construction quality.
(b) it is when once digging width more than dredger due to grooving width, dredger is traversing, then repeat described step (Ah) carries out next bar steel cylinder foundation trench excavation construction, and the excavation width of every is no more than the effectively work half of dredger grab bucket loop wheel machine 2 times of footpath, when deep water grooving is constructed, the excavation of every digs the wide no more than beam;Overlapping excavation 0.5m between adjacent two And the side slope of adjacent strip has the region of overlapping excavation during excavation.
(3) water surface in the range of foundation trench sets segmentation cursory, then successively in each segmentation using belt blast ship 3 The Cast-in-situ Piles in Sand-filling into foundation trench, in each segmentation during Cast-in-situ Piles in Sand-filling, belt blast ship 3 is constantly mobile to change throwing position, is connecing Using the ramming of belt blast ship 3 to designed elevation after nearly engineered fill absolute altitude.
The accuracy of foundation trench excavation has been effectively ensured using this method, guarantee is provided for successive projects construction.
Embodiment 2
(1) tugboat, which uses to tie up, drags mode traction grab boat 1, is excavated into predetermined near point, the ship of grab boat 1 Center line casts anchor according to construction water area condition towards the direction for advance of dredging parallel to grooving axis, stem and fixes accommodation, grab bucket The construction of dredger 1 is positioned using DGPS;
(2) carry out steel cylinder foundation trench to excavate, concretely comprise the following steps:
(a) first longitudinal point of 3 layers of excavation of vertical shift dredger progress, grab bucket front and rear folded bucket in the digging process of the longitudinal direction of dredger 1, Once cast anchor the length that can excavate by foundation trench excavation length exceedes grab boat 1, using longitudinal divisionses excavation and section and Overlapping excavation 2m between section.The length of following current construction segmentation takes the 75% of bow side cable initial length.
In longitudinal layered digging process, opened at steel cylinder foundation trench side slope position using from top to bottom stepped layering Dig, 4 backbreak at downstairs interior angle, 5 are owed to dig at upper ladder exterior angle, and design side slope is reached using slope of collapsing naturally.The water of each ladder Flat width measures control using DGPS.Due to the high change of tidal level wave, by constructing, water gauge reads waterlevel data, then according to water Grab bucket decentralization depth when position data control every layer of slope excavating, the side slope of adjacent levels has overlapping during excavation The region of excavation, controls construction quality.
(b) it is when once digging width more than dredger due to grooving width, dredger is traversing, then repeat described step (Ah) carries out next bar steel cylinder foundation trench excavation construction, and the excavation width of every is no more than the effectively work half of dredger grab bucket loop wheel machine 2 times of footpath, when deep water grooving is constructed, the excavation of every digs the wide no more than beam;Between adjacent two overlapping excavation 1m and The side slope of adjacent strip has the region of overlapping excavation during excavation.
(3) water surface in the range of foundation trench sets segmentation cursory, then successively in each segmentation using belt blast ship 3 The Cast-in-situ Piles in Sand-filling into foundation trench, in each segmentation during Cast-in-situ Piles in Sand-filling, belt blast ship 3 is constantly mobile to change throwing position, is connecing Using the ramming of belt blast ship 3 to designed elevation after nearly engineered fill absolute altitude.
The accuracy of foundation trench excavation has been effectively ensured using this method, guarantee is provided for successive projects construction.
Embodiment 3
(1) tugboat, which uses to tie up, drags mode traction grab boat 1, is excavated into predetermined near point, the ship of grab boat 1 Center line casts anchor according to construction water area condition towards the direction for advance of dredging parallel to grooving axis, stem and fixes accommodation, grab bucket The construction of dredger 1 is positioned using DGPS;
(2) carry out steel cylinder foundation trench to excavate, concretely comprise the following steps:
(a) first longitudinal point of 3 layers of excavation of vertical shift dredger progress, grab bucket front and rear folded bucket in the digging process of the longitudinal direction of dredger 1, Once cast anchor the length that can excavate by foundation trench excavation length exceedes grab boat 1, using longitudinal divisionses excavation and section and Overlapping excavation 1.8m between section.The length of following current construction segmentation takes the 75% of bow side cable initial length.
In longitudinal layered digging process, opened at steel cylinder foundation trench side slope position using from top to bottom stepped layering Dig, 4 backbreak at downstairs interior angle, 5 are owed to dig at upper ladder exterior angle, and design side slope is reached using slope of collapsing naturally.The water of each ladder Flat width measures control using DGPS.Due to the high change of tidal level wave, by constructing, water gauge reads waterlevel data, then according to water Grab bucket decentralization depth when position data control every layer of slope excavating, the side slope of adjacent levels has overlapping during excavation The region of excavation, controls construction quality.
(b) it is when once digging width more than dredger due to grooving width, dredger is traversing, then repeat described step (Ah) carries out next bar steel cylinder foundation trench excavation construction, and the excavation width of every is no more than the effectively work half of dredger grab bucket loop wheel machine 2 times of footpath, when deep water grooving is constructed, the excavation of every digs the wide no more than beam;Overlapping excavation 0.7m between adjacent two And the side slope of adjacent strip has the region of overlapping excavation during excavation.
(3) water surface in the range of foundation trench sets segmentation cursory, then successively in each segmentation using belt blast ship 3 The Cast-in-situ Piles in Sand-filling into foundation trench, in each segmentation during Cast-in-situ Piles in Sand-filling, belt blast ship 3 is constantly mobile to change throwing position, is connecing Using the ramming of belt blast ship 3 to designed elevation after nearly engineered fill absolute altitude.
The accuracy of foundation trench excavation has been effectively ensured using this method, guarantee is provided for successive projects construction.

Claims (2)

1. marine shallow slotting formula steel cylinder foundation trench excavates altering fill method, it is characterised in that comprise the following steps:
(1) tugboat traction grab boat, is excavated near point, grab boat ship center line is parallel to grooving axle into predetermined Line, stem casts anchor according to construction water area condition towards the direction for advance of dredging and fixes accommodation, scoop dredger construction is used DGPS is positioned;
(2) carry out steel cylinder foundation trench to excavate, concretely comprise the following steps:
(a) first vertical shift dredger carries out longitudinal layered excavation, folded before and after grabbing bucket in the longitudinal digging process of dredger to struggle against, and works as foundation trench Excavation length more than grab boat once cast anchor the length that can be excavated when, using longitudinal divisionses excavate and between section and section weight It is folded to excavate 1.5-2m;
In longitudinal layered digging process, from top to bottom stepped stage excavation is used at steel cylinder foundation trench side slope position, Backbreak at downstairs interior angle, owe to dig at upper ladder exterior angle, design side slope, the horizontal width of each ladder are reached using slope of collapsing naturally Measured and controlled using DGPS, and waterlevel data is read by water gauge of constructing, then control every layer of side slope to open according to waterlevel data Grab bucket decentralization depth during digging, the side slope of adjacent levels has the region of overlapping excavation during excavation;
(b) it is when grooving width once digs width more than dredger, dredger is traversing, then repeat described step (a) and carry out Next bar steel cylinder foundation trench excavation construction, 2 times of excavation width no more than the dredger grab bucket effective radius of clean-up of loop wheel machine of every, When deep water grooving is constructed, the excavation of every, which is dug, wide is not more than between the beam, adjacent two overlapping excavation 0.5-1m and adjacent The side slope of bar has the region of overlapping excavation during excavation;
(3) water surface in the range of foundation trench sets segmentation cursory, then uses belt blast ship to base in each segmentation successively Cast-in-situ Piles in Sand-filling in groove, in each segmentation during Cast-in-situ Piles in Sand-filling, belt blast ship is constantly mobile to change throwing position, in close design Backfill after absolute altitude using belt blast ship ramming to designed elevation.
2. the shallow slotting formula steel cylinder foundation trench in sea according to claim 1 excavates altering fill method, it is characterised in that:Following current The length of construction segmentation takes the 75% of bow side cable initial length.
CN201710293740.2A 2017-04-28 2017-04-28 Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method Pending CN107034906A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710293740.2A CN107034906A (en) 2017-04-28 2017-04-28 Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710293740.2A CN107034906A (en) 2017-04-28 2017-04-28 Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method

Publications (1)

Publication Number Publication Date
CN107034906A true CN107034906A (en) 2017-08-11

Family

ID=59538304

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710293740.2A Pending CN107034906A (en) 2017-04-28 2017-04-28 Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method

Country Status (1)

Country Link
CN (1) CN107034906A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350162A (en) * 2020-03-03 2020-06-30 河海大学 Grooving design method for restoring reservoir capacity in front of deep groove reservoir dam of high beach
CN112502658A (en) * 2020-10-19 2021-03-16 中海石油(中国)有限公司 Installation method of oil gas production wet type protection structure located under seabed mud surface
CN113585346A (en) * 2021-08-13 2021-11-02 中南大学 Immersed tube foundation tank treatment process and immersed tube installation process for offshore inland river junction area

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
周伟等: "基槽及后方挖泥与清淤工程", 《华南港工》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111350162A (en) * 2020-03-03 2020-06-30 河海大学 Grooving design method for restoring reservoir capacity in front of deep groove reservoir dam of high beach
CN111350162B (en) * 2020-03-03 2021-03-19 河海大学 Grooving design method for restoring reservoir capacity in front of deep groove reservoir dam of high beach
CN112502658A (en) * 2020-10-19 2021-03-16 中海石油(中国)有限公司 Installation method of oil gas production wet type protection structure located under seabed mud surface
CN113585346A (en) * 2021-08-13 2021-11-02 中南大学 Immersed tube foundation tank treatment process and immersed tube installation process for offshore inland river junction area

Similar Documents

Publication Publication Date Title
CN104846787B (en) Construction method for carrying out sand-blowing sea-filling land-making in shallow sea area by using cutter suction dredger
CN105672199B (en) A kind of dock structure and its construction method suitable for silt coast
CN103374900B (en) Build the gravity type quay on muddy foundation and construction method thereof
CN104790410B (en) A kind of Support of Foundation Pit Excavation method that is applicable to shallow water mud river course
CN107034906A (en) Marine shallow slotting formula steel cylinder foundation trench excavates altering fill method
CN109137943B (en) Earth filling construction process for sea reclamation
CN104314092A (en) Open caisson construction method based on substitution method
CN202626934U (en) Gravity wharf built on silty foundation
CN112663558B (en) Construction process for excavating weathered rock in inland river harbor pool
CN104612128B (en) Vacuum preloading reinforcement construction method applicable to underwater silt environment
CN109235474A (en) Structure and its construction technology based on the super large cofferdam under marine environment
CN107165121A (en) Shallow slotting formula steel cylinder bank protection structure construction method
CN105155421B (en) Complete embedding circular construction method in a kind of single pile Single column pier river course shallow water
CN104727325B (en) A kind of method of construction of polder sea wall
CN103806409A (en) Milling forming system of gravity wharf foundation bed and construction method for gravity wharf structure
CN106149624A (en) A kind of gravity type quay being applicable to roadbed of alluvial silt and construction method thereof
CN100582382C (en) Process for constructing quickly consolidated temperory horizontal platform by picking clay of lake bottom
CN85202494U (en) Interlocked reinforced concrete sheet pile
CN204875807U (en) Bridge main pier cushion cap foundation pit supporting structure on river channel abrupt slope basement rock
CN113417302A (en) Construction method of deep-water double-wall steel pouring jacket cofferdam on embankment slope surface
CN203729259U (en) Milling forming system of gravity wharf foundation bed
CN203247606U (en) Construction structure for sewage pipe and utility tunnel of deep sludge foundation to penetrate through center trench
Swatek Jr Cellular cofferdam design and practice
CN111197300B (en) Earth-rock cofferdam back slope type seepage-proofing dam and reverse construction method
CN114960890B (en) Construction method of offshore water outlet

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication