SU1246899A3 - Tunnel shield - Google Patents

Tunnel shield Download PDF

Info

Publication number
SU1246899A3
SU1246899A3 SU823413400A SU3413400A SU1246899A3 SU 1246899 A3 SU1246899 A3 SU 1246899A3 SU 823413400 A SU823413400 A SU 823413400A SU 3413400 A SU3413400 A SU 3413400A SU 1246899 A3 SU1246899 A3 SU 1246899A3
Authority
SU
USSR - Soviet Union
Prior art keywords
panel
shield
panels
tunnel
head
Prior art date
Application number
SU823413400A
Other languages
Russian (ru)
Inventor
Монтаси Марсель
Original Assignee
Буйг (Фирма)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Буйг (Фирма) filed Critical Буйг (Фирма)
Application granted granted Critical
Publication of SU1246899A3 publication Critical patent/SU1246899A3/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/40Devices or apparatus specially adapted for handling or placing units of linings or supporting units for tunnels or galleries

Abstract

1. A tunneling machine provided with a rotary tool-carrying head (4) and with a lifting device (7, 8) for positioning lining panels (1-5) in the tunnel, characterized in that said lifting device is incorporated with said head.

Description

Изобретение относитс  К проходческому щиту с П01ВОРОТНЫМ держателем инструмента, оборудованному устройством дл  установки панелей креплени стенок туннел ,The invention relates to a tunneling shield with a P01-GATE tool holder, equipped with a device for mounting tunnel wall fastening panels,

Цель изобретени  упрощение обслуживани  устройства.The purpose of the invention is to simplify the maintenance of the device.

На фиг.1 изображен поворотш й держатель инструмента во врем  установки последней панели креплени  кругло секции туннел , вид спереди| на фиг„2 - проходческий щит в начальной фазе установки боковой панели крепле Гни , продольный разрез; на фиг .3 - то же ВО врем  установки последней панели секции креплени ; на фиг.4 - поворот ньй держатель инструмента проходческого щита во врем  установки последней панели креплени  круглой секции туннел  по одному из вариантов проходческого щита, вид спереди.Figure 1 shows the rotating tool holder during the installation of the last fastening panel of the round tunnel section, front view | in Fig „2 - a driving shield in the initial phase of the installation of the side panel attached to the Rot, longitudinal section; FIG. 3 shows the same BO during the installation of the last panel of the fastening section; Fig. 4 shows the rotation of the tool holder of the tunnel shield during the installation of the last fastening panel of the round section of the tunnel in one embodiment of the tunnel shield, front view.

Проходческий щит в процессе работы устанавливает панели 1-5 и со- (Держит конвейер б и устройство дл  установки крепи (подъемник), выпол- ненное.в виде домкрата радиального действи , шток 7 которого оборудован каким-либо соответствуюдщм средством дл  креплени  панели на конце штока, например шаровой цапфой или другим шарнирным устройством, магнитным элементом, зажимным элементом и т.д. На внутренней стороне панели при необходимости предусматриваетс  средство, способное взаимодействовать со средством креплени  штока дл  временного удержани  панели штоком 7. Цилиндр 8 домкрата укреплен на поворотной головке 9 проходческого щита мелоду рычагами 10, на которых укреплены инструменты, в той же поперечной плоскости, что и шарниры рычагов, несущих инструменты .The tunneling shield in the course of operation installs panels 1-5 and con- tains (Holds the conveyor b and the device for installation of supports (hoist), made in the form of a radial action jack, the rod 7 of which is equipped with some appropriate means for fastening the panel at the end a rod, e.g. a ball pin or other articulated device, a magnetic element, a clamping element, etc. On the inside of the panel, if necessary, means are provided that can interact with the means of fastening the rod for temporary Jani panel 7. The cylinder rod of the jack 8 is fixed to the rotary head 9 tunnel shield ringtone levers 10 on which the tools are reinforced in the same transverse plane as the hinges and the arms carrying the tools.

На держателе укреплены также дефлекторы 11, которые.во врем  работы проходческого 1дита отвод т сн тую инструментами породу к транспортеру , (фиг.2), которьй известным способом транспортирует эту породу назадThe holder also strengthens the deflectors 11, which, during the work of the tunnel 1dita, retract the rock removed from the tools to the conveyor, (FIG. 2), which transports this rock back in a known manner

за щит. ifor the shield. i

Если подъемник установлен не вертикально , поворачивают Держатель так, чтобы подъемник зан л вертикальное положение. Когда проходческий щит оборудован специальными средствами и в сл5гчае ограниченного поворота держател  с целью получить досIf the lift is not installed vertically, turn the Holder so that the lift is in a vertical position. When the tunneling shield is equipped with special means and in the case of a limited rotation of the holder in order to get a dos

00

туп, напримерJ к одному рычагу креп- лени инструмента с целью замены этого последнего, дл  управлени  поворотом подъемника используют эти средства ограниченного поворота.blunt, for example, to one lever of the instrument for the purpose of replacing this latter, to control the rotation of the elevator use these means of limited rotation.

На фиг,4 представлен вариант проходческого itpTa, в котором подъемное уст1 ойство содержит двойной ра- диальньш домкрат, цилиндры 8 которого укреплены на одном из рычагов креплеш-   инструментов.Fig. 4 shows a variant of the tunneling itpTa, in which the lifting device contains a double radial jack, the cylinders 8 of which are fixed on one of the levers of the tools.

Предположим,, что крепь должна состо ть из п ти арочных панелей 1-5 из бетона, чугуна или стали, ..Эти панели имеют, например, толщину 20- 30 см и длину (измеренную параллельно оси выработки) 70-80 см. Четьфе панели идентичны, а п та  (панель 2 на фиг.1) имеет меньшую ширину.Suppose, that the lining should consist of five arched panels 1-5 of concrete, cast iron or steel, .. These panels are, for example, 20-30 cm thick and 70-80 cm long (measured parallel to the production axis). the panels are identical, and the fifth (panel 2 in FIG. 1) has a smaller width.

Технологи  установки состоит в том, что сначала устанавливают на место большую нижнюю панель 1, затем малую нижнюю панель 2, затем одну из боковых панелей 3 и 4, другую 5 из этих боковых панелей и, наконец, верхнюю панель 5.The installation technology is to first install the large bottom panel 1, then the small bottom panel 2, then one of the side panels 3 and 4, the other 5 of these side panels, and finally the top panel 5.

При установке панелей 1-4 вьшол- н ютс  одни и те же операции. На фиг,2 показано положение, когда нижние панели 1 и 2 уже установлены на место и идет установка одной из боковых панелей.When installing panels 1-4, the same operations are performed. FIG. 2 shows the position when the bottom panels 1 and 2 are already in place and one of the side panels is being installed.

Эту панель укладывают на транспортер 6 (фиг.2), представл ющий собой, например, ленточный транспортер , который подает панель к радиальному подъемнику, схематично представленному в виде домкрата.This panel is placed on the conveyor 6 (Fig. 2), which is, for example, a belt conveyor, which feeds the panel to a radial elevator, schematically represented in the form of a jack.

На фиг,2 арочна  панель 3 находитс  на штоке 7 подъемника , а панели 4 и 5 ожидают своей очереди на трансгЕортере . Затем транспортер отводитс  назад. На фиг.З показан транспортер в отведенном назад по- g. ложенни,In FIG. 2, the arched panel 3 is located on the rod 7 of the elevator, and panels 4 and 5 are waiting for their turn on the trans-Eorter. The conveyor is then retracted. Fig. 3 shows the conveyor in the retracted g-back. lodenny

Пос:ле отведени  транспортера назад привод т в действие домкрат дл  подъема панели 3, как это показано стрелкой 13 на фиг.2, до ее прижати  к своду выработки. После этого пово- рачивзЕот держатель 9 при выдвинутом штоке домкрата, передвига  панель по стенке туннел  и устанавлива  ее на предназначенное дл  нее место 5 (фиг.1) Затем разьедин ют шток и панель, вдвигают шток внутрь домкрата и поворачивают держатель дл  установки в первоначальное вертикаль0After the conveyor retracts, the jack is actuated to raise panel 3, as shown by arrow 13 in Fig. 2, before it is pressed against the roof of the working. After that, turn the holder 9 with the jack stem extended, move the panel along the tunnel wall and place it in its intended place 5 (Fig. 1).

5five

00

00

ное .положение. После этого подают вперед транспортер б, подвод  к домкрату следующую панель 4, и цикл повтор етс  .new position. Thereafter, conveyor b is fed forward, the next panel 4 is approached to the jack, and the cycle is repeated.

При этом, скольз  по стенке туннел , панель очищает эту стенку, что  вл етс  преимуществом предлагаемого щита.At the same time, sliding along the wall of the tunnel, the panel cleans this wall, which is an advantage of the proposed shield.

Последн   панель  вл етс  ключевой панелью свода. Б известных конструкци х эта панель должна об зательно иметь вьфез особой формы, необходимый дл  ее установки между уже установленными на месте панел ми путем ее перемещени  снизу вверх.The last panel is a key vault panel. In the known constructions, this panel must necessarily have a special shape, necessary for its installation between the panels already installed in place by moving it from bottom to top.

Одна из особенностей изобретени  состоит в том, что дл  использовани  панели без специального выреза пользуютс  возможност ми движени  щита. Двигают вперед (стрелка 14) головку проходческого щита (фиг.З) из- вестньм способом с тем, чтобы под2468994One of the features of the invention is that, to use the panel without a special cut, use the possibilities of the movement of the shield. Move forward (arrow 14) the head of the tunneling shield (FIG. 3) in a known manner so that

нить (стрелка 15) панель 5 к верхнему своду выработки. Таким образом, панель подн та и пргшата к сводз выработки несколько впереди закреп- 5 л емого участка и достаточно подать назад головку щита вместе с панелью (стрелка 16), чтобы вдвинуть панель между боковыми панел ми 3 и 4.thread (arrow 15) panel 5 to the upper arch of production. Thus, the elevated panel and the gateway to the excavation are slightly in front of the fixed section and it is sufficient to feed back the shield head together with the panel (arrow 16) in order to slide the panel between the side panels 3 and 4.

Предлагаемый проходческий щит подходит дл  установки на место па- нелей креплени , а также в более общем плане дл  установки на место сводов. The proposed tunneling shield is suitable for installation in the place of the fastening panels, and more generally for installation in the place of the arches.

Кроме того, можно изменить число инструментов проходческого щита,число рычагов или структуру устройства дл  установки панелей. Это устройство может включать в себ  какой-либоIn addition, you can change the number of tools of the tunnel shield, the number of levers, or the structure of the device for installing the panels. This device may include

механизм, смонтированный домкратом или другим приводным устройством и устанавливаемой панелью.mechanism mounted by a jack or other actuating device and installed panel.

ЮYU

ЮYU

8eight

юYu

Фиг.FIG.

W К ЧW K H

.-/ .- /

f Jf J

Фиг.33

. Редактор А.Козориз. Editor A. Kozoriz

Составиталь Л.ПономареваComposer L.Ponomareva

Техред Г.Гербер Корректор Г.Решетник/Tehred G.Gerber Proofreader G.Reshetnik /

Заказ. 4030/60Тираж 470ПодписноеOrder. 4030/60 Circulation 470 Subscription

ВШПШИ Государственного комитета СССРVShPSHI USSR State Committee

по делам изобретений и открытий 113035, Москва, Ж-35, Раушска  наб,, д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab, 4/5

Производственно-полиграфическое предпри тие, г.Ужгород, ул. Проектна , 4Production and printing company, Uzhgorod, st. Project, 4

Claims (2)

1. ПРОХОДЧЕСКИЙ ЩИТ, содержащий исполнительный орган, режущий инструмент которого закреплен на поворотной головке и рычагах, смонтированных с возможностью кача ния на поворотной головке, устройство для установки панелей крепления стенки туннеля, отличающийся тем, что, с целью упрощения обслуживания, устройство для установки панелей крепления установлено на поворотной головке и выполнено с радиально расположенным гид родомкратом.1. PASSING SHIELD, comprising an actuator, the cutting tool of which is mounted on a pivoting head and levers mounted to swing on a pivoting head, a device for installing tunnel wall mounting panels, characterized in that, for the purpose of simplifying maintenance, a panel mounting device the fasteners are mounted on a rotary head and are made with a radially located hydraulic jack. 2. Щит по п.1, отличающийся тем, что устройство для установки панелей крепления закреплено на рычагах поворотной головки.2. The shield according to claim 1, characterized in that the device for installing the mounting panels is mounted on the levers of the rotary head. _3. Щит по п. 1, о т л и ч а_ю щ и й с я тем, что.· к рычагу поворотной головки прикреплен цилиндр гидродомкрата устройства для установки панелей крепления._3. The shield according to Claim 1, with the exception of the fact that. · A cylinder of the hydraulic jack of the device for mounting the mounting panels is attached to the lever of the rotary head.
SU823413400A 1981-03-26 1982-03-25 Tunnel shield SU1246899A3 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR8106087A FR2502687A1 (en) 1981-03-26 1981-03-26 DEVICE FOR THE ADVANCED INSTALLATION OF SUPPORT PANELS IN A GALLERY, METHOD FOR IMPLEMENTING THE DEVICE AND APPLICATION

Publications (1)

Publication Number Publication Date
SU1246899A3 true SU1246899A3 (en) 1986-07-23

Family

ID=9256675

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823413400A SU1246899A3 (en) 1981-03-26 1982-03-25 Tunnel shield

Country Status (10)

Country Link
EP (1) EP0061969B1 (en)
JP (1) JPS58106100A (en)
AT (1) ATE18688T1 (en)
AU (1) AU557374B2 (en)
CA (1) CA1179383A (en)
DE (1) DE3269925D1 (en)
ES (1) ES510799A0 (en)
FR (1) FR2502687A1 (en)
SU (1) SU1246899A3 (en)
ZA (1) ZA821852B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2001075269A2 (en) * 2000-03-31 2001-10-11 Link Pipe, Inc. Tunnel lining apparatus and method
AT11365U1 (en) * 2006-01-26 2010-09-15 Florianer Bahn Forschungs & Errichtungsgesellschaft Mbh METHOD AND DEVICE FOR LAYING STABILIZATION OF TUNNEL ELEMENT ELEMENTS
CN102322278B (en) * 2011-07-23 2013-08-28 上海城建市政工程(集团)有限公司 Special machinery for constructing middle partition wall in tunnel

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2385251A (en) * 1943-02-22 1945-09-18 Ayers Frederick Percival Tunneling method
FR1197818A (en) * 1957-01-12 1959-12-03 Oesterreichisches Schacht U Ti Machine intended for tunnel boring
FR1401555A (en) * 1964-05-29 1965-06-04 Robbins & Assoc James S universally mounted segment erectors and conveyor tube for tunnel digging machine
JPS5438814A (en) * 1977-09-02 1979-03-24 Ricoh Kk Platen for printing
DE2909918C3 (en) * 1979-03-14 1985-06-05 Bochumer Eisenhütte Heintzmann GmbH & Co, 4630 Bochum Device for driving and expanding an underground route

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 393843, кл. Е 21 D 9/10, 1970. Патент FR № 1197818, кл. Е 21 D, опублик. 1959. *

Also Published As

Publication number Publication date
ATE18688T1 (en) 1986-04-15
JPS58106100A (en) 1983-06-24
EP0061969A2 (en) 1982-10-06
ES8306214A1 (en) 1983-06-01
ES510799A0 (en) 1983-06-01
EP0061969A3 (en) 1984-07-25
ZA821852B (en) 1983-01-26
DE3269925D1 (en) 1986-04-24
CA1179383A (en) 1984-12-11
FR2502687B1 (en) 1984-06-08
AU557374B2 (en) 1986-12-18
AU8191282A (en) 1982-09-30
FR2502687A1 (en) 1982-10-01
EP0061969B1 (en) 1986-03-19

Similar Documents

Publication Publication Date Title
CN108979688B (en) Full-automatic anchor rod trolley
RU2618815C2 (en) Shaft-sinking and tunnelling or winning machine
RU2643053C2 (en) Machine for fastening bolts of mining machine roof
CN111441805A (en) Hydraulic anchor rod drill carriage and double-rock drill propulsion beam thereof
US6302623B1 (en) Roof bolting apparatus
SU1246899A3 (en) Tunnel shield
TW527464B (en) Tunnel excavating machine
US4117894A (en) Drill steel guide for a mine drilling machine
JPH07127373A (en) Method and apparatus for constructing tunnel
US3377105A (en) Protective overhead shield for tunneling machine and method
CN212958687U (en) Hydraulic anchor rod drill carriage and propelling beam thereof
WO1996015353A1 (en) Tunnel drilling machine
GB1315966A (en) Extensible drilling machines
CN201121524Y (en) Light hydraulic support
SU831902A1 (en) Working equipment of hydraulic excavation machine
CN110529165B (en) Anchor rod/cable drilling and supporting integrated equipment
SU1010294A1 (en) Mining machine
JPH0352879Y2 (en)
CN212359817U (en) Hydraulic anchor rod drill carriage
SU1548445A1 (en) Entry-driving set
RU2126888C1 (en) Heading machine
RU2143050C1 (en) Drilling manipulator
CN217765567U (en) Coal mine geological drilling sampling device
RU2764881C2 (en) Drilling machine manipulator
SU723116A1 (en) Boring unit