SU1240889A1 - Cutter-loader for selective excavation of coal and rock - Google Patents

Cutter-loader for selective excavation of coal and rock Download PDF

Info

Publication number
SU1240889A1
SU1240889A1 SU843834935A SU3834935A SU1240889A1 SU 1240889 A1 SU1240889 A1 SU 1240889A1 SU 843834935 A SU843834935 A SU 843834935A SU 3834935 A SU3834935 A SU 3834935A SU 1240889 A1 SU1240889 A1 SU 1240889A1
Authority
SU
USSR - Soviet Union
Prior art keywords
coal
rock
rocking
conveyor
height
Prior art date
Application number
SU843834935A
Other languages
Russian (ru)
Inventor
Владимир Николаевич Брилинг
Марк Михайлович Красносельский
Original Assignee
Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Институт Горного Дела Им.А.А.Скочинского
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Институт Горного Дела Им.А.А.Скочинского filed Critical Ордена Октябрьской Революции И Ордена Трудового Красного Знамени Институт Горного Дела Им.А.А.Скочинского
Priority to SU843834935A priority Critical patent/SU1240889A1/en
Application granted granted Critical
Publication of SU1240889A1 publication Critical patent/SU1240889A1/en

Links

Landscapes

  • Excavating Of Shafts Or Tunnels (AREA)

Description

« . ".

Изобретение относитс  к горной . ромьшшенности в частности к очистным комбайнам дл  селективной выемки угл  и породы.The invention relates to mining. in particular, for shearers for the selective extraction of coal and rock.

Целью изобретени   вл етс  повыение полноты выемки и улучшение качества добываемого угл  и одновременного транспортировани  из забо  угл  и породы параллельными потоками . -. . . : The aim of the invention is to increase the completeness of the excavation and to improve the quality of coal mined and simultaneously transport from the coal and rock in parallel streams. -. . . :

На фиг. 1-изображен предлагаемый комбайн, вид со стороны завала; на фиг. 2 - то же, вид в плане; на фиг. 3 - вид А на фиг. 1; на фиг.4 - вид Б на фиг. 1. FIG. 1 shows the proposed combine, view from the side of the dam; in fig. 2 - the same plan view; in fig. 3 is a view A of FIG. one; FIG. 4 is a view B in FIG. one.

Комбайн включает электродвига-. тель 1, механизм 2 подачи, редукторы режущих частей 3 и 4, поворотные редукторы - качалки 5 и 6, шнеко- вые рабочие органы 7 и 8. Дл  переачи угл  от опережающего шнека на завальчую ветвь конвейера или на второй конвейер каждьй рабочий орган имеет шнековые перегр атели 9 и 10, которые привод тс  во вращение через редукторы-качалки 11 и 12, располо- женные с завальной стороны режущих частей комбайна. Шнеки перегружателей помещевд в открытые желоба 13  . 14 с разгрузочными окнами снизу у качалки, они имеют подвижные жело- бы 15 и 16, перекрывающие мертвое пространство под поворотными редук- торами-качалками рабочих щиеков. Дп . управлени  подвижными желобами предусмотрены гидродомкраты 17 и 18. Редукторы-качалки рабочих органов, регулируютс  по высоте гидродомкра- т.ами 19 и 20, а редукторы-качалки йнековых перегружателей - гидродомкратами 21 и 22. Дп  полноты погрузки как угл , так и породы шнековые рабочие органы имеют перекидные, погрузочные щитки 23 и 24. Комбайн имеет опоры с лыжами 25 vs 2, перемещающиес  по подборщику со .стороны забо , и опоры с лыжами 27 и 28, перемещающиес  по круглой Направл ю- щей .со стороны выработанного пространства . Лыжи 27 и 28 имеют обратные захваты. The combine includes an electric motor-. Tel 1, feed mechanism 2, gear units of cutting parts 3 and 4, swing gears - rockers 5 and 6, screw working bodies 7 and 8. For transferring coal from the advancing screw to the staggered branch of the conveyor or to the second conveyor, each working body has screw screws. superheaters 9 and 10, which are driven in rotation through rocking gears 11 and 12, located on the dam side of the cutting parts of the combine. Screw conveyors placed in open gutters 13. 14 with discharge windows at the bottom of the rocking chair, they have movable channels 15 and 16, which cover the dead space under the swing rocking gears of the workers. Dp. the hydraulic troughs 17 and 18 are provided for controlling the movable troughs. The rocking gears of the working bodies are adjustable in height by the hydraulic claws 19 and 20, and the rocking gears of the miner loaders are controlled by the hydraulic jacks 21 and 22. Dp complete loading of both coal and rock auger workers The bodies have throw-over, loading plates 23 and 24. The harvester has supports with skis 25 vs 2 moving along the pick-up from the side of the bottom, and supports with skis 27 and 28 moving along a round Direction. Skis 27 and 28 have reverse grabs.

Комбайн работает следующим образом ..Combine works as follows ..

.В конце лавы комбайн зарубывает- с  на новую, полосу. Затем против переднего шнека, диаметр которого авен вынимаемой мощности пласта, станавливаетс  шнековый перегружа408892At the end of the lava, the harvester hacks into a new strip. Then, a screw overload 408892 is set against the front auger, the diameter of which is Aven of the removable reservoir thickness.

тель 9 на редукторе-качалке 11с помощью гидродомкрата 21 на высоте, обеспечивающей нормальную перегрузку угл  от рабочего шнека шнеку перегру- . 5 жател . С помощью гидродомкрата 17 подвижный жело б выдвигаетс  под редуктор-качалку 5 рабочего шнека до забо . Отстающий рабочий шнек опущен к почве и подготовлен к выемке поро 0 ды почвы. Редуктор-качалка 12 перегружател  10 с вдвинутым подвижным I .желобом 16 с помощью гидродомкрата 2 устанавливаетс  в удобное по высоте з положение, не преп тствующее nponyci Tel 9 on the rocking gear 11 using the hydraulic jack 21 at a height that provides normal overload of the coal from the working auger to the overload screw. 5 zhatel. Using the jack 17, the movable chute b is advanced under the rocking gear 5 of the working auger to the bottom. The lagging auger is lowered to the soil and prepared for excavation of the soil rock. The rocking gearbox 12 of the reloader 10 with the movable I. Rail 16 pushed in with the help of the hydraulic jack 2 is set to a convenient height 3 position that does not interfere with

15 угл  и породы под койбайном, и откл1Й чаетс . Комбайн подготовлен к сн ти1( очередной полосы угл  и породы. При работе комбайна уголь, отбиваемый опережающим шнеком, перегружаетс 15 coal and rocks under the coybain and off. The harvester is prepared for sni1 (the next strip of coal and rock. When the combine is operated, the coal that is beaten off by the auger is overloaded

0 через выдвинутый желоб под качалкой в перегружатель, по которому шнеком транспортируетс  и разгружаетс  че- рез окно на завальнзпо ветвь конвейера с горизонтально замкнутой цепью0 through the extended chute under the rocking chair into the material handler through which the screw is transported and unloaded through the window to the branch of the conveyor with a horizontally closed chain

25 или на второй (завальный) конвейер, а порода от отстающего шнека грузитс  Непосредственно на забойную ветвь конвейера или на первый ( забойньй) конвейер. -В первом случае уголь и25 or to the second (loose) conveyor, and the rock from the lagging auger is loaded Directly to the downhole branch of the conveyor or to the first (downhole) conveyor. -In the first case, coal and

30 порода транспортируютс  в разных30 breeds are transported in different

Направлени х: уголь к транспортерному штреку, по уоца к вентил ционному, во | втором случае - в любом направлении, в зависимости от расположени  закла ,, дочного хоз йства, через которое порода закладываетс  в вырабоТанное пространство. После выемки полосы угл  и зарубки комбайна на новую полосу рабочие шнеки мен ютс  места Directions: coal to the conveyor drift, along the shaft to the vent, in | in the second case, in any direction, depending on the location of the pledge, through which the rock is laid into the developed space. After excavating the coal strip and notching the combine to a new strip, the working augers change places.

40 ми,, также мен ютс  положени ми и перегружатели,- и цикл повтор етс .40 mi, the positions and loading cranes also change, and the cycle repeats.

При подрыве породы кровли опережающий щнек вынимает уголь у почвы пласта и грузит его непосредственно на забойную часть конвейера или на первьй конвейер (перегружатель отключен ). Отстающий шнек отбивает породу кровли, котора  попадает на зачистной лемех, расположенньй в этом случае под шнеком, и транспортируетс  по нему к выдвинутому подвижному желобу, через него - к шнеку перегружател  и далее через окно разгружаетс  на завальную сторону 5S конвейера или на второй конвейер. В этом случае уголь транспортируетс  первым конвейером, а порода - вторым .When a roof rock is blown up, the advance cheek pulls the coal from the soil of the formation and loads it directly onto the downhole part of the conveyor or onto the first conveyor (the loader is switched off). A lagging auger beats off the roof rock, which falls on the sweeper, located in this case under the auger, and is transported through it to the extended movable chute, through it to the reloading screw and then through the window to the second conveyor or the second conveyor. In this case, the coal is transported by the first conveyor, and the rock by the second.

4545

5050

СоWith

«м"M

иand

-.-.

«N"N

мm

со esjco esj

лl

:э &: uh

Вид 5View 5

фиг.Зfig.Z

.:Л/.:;V...;.:.vV -чЛ:: - /JvлC;« .: L /.:; V ...;.:. VV -pL :: - / JvlC; "

18 26 8 фиг. fy .18 26 8 of FIG. fy.

Редактор М. КелемешEditor M. Kelemesh

Составитель Н. Ястребинска .Compiled by N. Yastrebinsk.

Техред Л.Олейник . Корректор Г.,РешетникTehred L.Oleynik. Proofreader G., Reshetnik

Заказ 3465/26Тираж 470 ПодписноеOrder 3465/26 Circulation 470 Subscription

ВНИИПИ Государственного комитета СССРVNIIPI USSR State Committee

по делам изобретений и открытий 113035, Москва, Ж-35, Раушска  наб., д. 4/5for inventions and discoveries 113035, Moscow, Zh-35, Raushsk nab., 4/5

Производственно-полиграфическое предпри тие, г. Ужгород, ул. Проектна , 4Production and printing company, Uzhgorod, st. Project, 4

Claims (1)

КОМБАЙН ДЛЯ СЕЛЕКТИВНОЙ ВЫЕМКИ УГЛЯ И ПОРОДЫ, включающий электродвигатель, редукторы режущих частей, регулируемые по высоте шне ковые рабочие органы, расположенные по концам корпуса, конвейер, механизм подачи, отличающийс я тем, что, с целью повышения полноты выемки и улучшения качества добываемого угля и одновременного транспортирования из забоя угля и породы параллельными потоками, он снабжен расположенными с завальной стороны режущей части и независимо перемещающимися по высоте редукторами-качалками, на концах которых установлены перегружатели, шнеки, которых размещены в открытых желобах с разгрузочными окнами у качалок и имеют подвижные желобы, соединенные с открытыми желобами и качалками направляющими и гидродомкратами.COMBINE FOR SELECTIVE COAL AND BREED EXTRACTION, including an electric motor, gear reducers of cutting parts, height-adjustable screw working elements located at the ends of the body, a conveyor, a feed mechanism, characterized in that, in order to increase the completeness of the extraction and improve the quality of coal mined and simultaneous transportation from the bottom of coal and rock in parallel flows, it is equipped with rocking gears located on the cutting side of the cutting part and independently moving in height, at the ends of which are installed loaders, augers, which are placed in open gutters with unloading windows at the rocking chairs and have movable gutters connected to the open grooves and rocking guides and hydraulic jacks. очист выем повьг ίclean the pug ί
SU843834935A 1984-11-01 1984-11-01 Cutter-loader for selective excavation of coal and rock SU1240889A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU843834935A SU1240889A1 (en) 1984-11-01 1984-11-01 Cutter-loader for selective excavation of coal and rock

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU843834935A SU1240889A1 (en) 1984-11-01 1984-11-01 Cutter-loader for selective excavation of coal and rock

Publications (1)

Publication Number Publication Date
SU1240889A1 true SU1240889A1 (en) 1986-06-30

Family

ID=21155231

Family Applications (1)

Application Number Title Priority Date Filing Date
SU843834935A SU1240889A1 (en) 1984-11-01 1984-11-01 Cutter-loader for selective excavation of coal and rock

Country Status (1)

Country Link
SU (1) SU1240889A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР 727848, кл.Е 21 С 27/02, 1980. Авторское свидетельство СССР 403850, кл, Е 21 С 27/02, 1972. *

Similar Documents

Publication Publication Date Title
US4014574A (en) Mining machine having rectangular thrust transmitting conveyor column
JPS6346808B2 (en)
US3897976A (en) Auger mining machine
SU1240889A1 (en) Cutter-loader for selective excavation of coal and rock
US4232904A (en) Method and apparatus for deep mining using chain driven in fixed direction
RU2532929C1 (en) Methods of mechanised steep bank excavation of medium power in bands down dip
US5769504A (en) Equipment for shortwall mining useful for extraction of pillars in underground coal mines
US4389072A (en) Longwall mineral mining installation
USRE31622E (en) Mining machine having rectangular thrust transmitting conveyor column
RU2044125C1 (en) Driving and mining machine
US4047761A (en) Mining machine
US4391470A (en) Method of, and apparatus for, winning mineral material
US3473846A (en) Shearer-loader supported against horizontally extending forces
RU2103507C1 (en) Method and cutter-loader machine for development of seam deposits of minerals
RU2182668C2 (en) Delivering plow unit, assembly of delivering plow unit, guides moving mechanism, unit support, hydraulic control system, device for catching-up of face roof, supporting base of circular plow
RU2138640C1 (en) Method for development of thick gently dipping coal seam
US796498A (en) Art of mining coal.
RU2528350C2 (en) Shaft-sinking and tunnelling mining unit (module)
SU1247567A1 (en) Filling-up unit
RU1834974C (en) Potassium salts mining extracting equipment
US3190699A (en) Material feeder means for continuous mining machine
US3190696A (en) Longwall mining system
RU2134785C1 (en) Method of mining thick steep coal seam
US3047279A (en) Scissors type continuous mining and loading machine
GB1574738A (en) Mining machine having thrust transmitting conveyor column