SU117733A1 - The way to develop powerful flat and inclined falling seams - Google Patents

The way to develop powerful flat and inclined falling seams

Info

Publication number
SU117733A1
SU117733A1 SU602168A SU602168A SU117733A1 SU 117733 A1 SU117733 A1 SU 117733A1 SU 602168 A SU602168 A SU 602168A SU 602168 A SU602168 A SU 602168A SU 117733 A1 SU117733 A1 SU 117733A1
Authority
SU
USSR - Soviet Union
Prior art keywords
cut
way
coal
seams
layers
Prior art date
Application number
SU602168A
Other languages
Russian (ru)
Inventor
Н.И. Линденау
Original Assignee
Н.И. Линденау
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Н.И. Линденау filed Critical Н.И. Линденау
Priority to SU602168A priority Critical patent/SU117733A1/en
Application granted granted Critical
Publication of SU117733A1 publication Critical patent/SU117733A1/en

Links

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Description

До насто щего времени разработка мощных нологих и наклонно-падающих пластов осуществл лась разделением их на слои и обрушением кровли. Однако такой способ не обеспечивает создани  щироксго фронта очистных и подготовительных работ.Until now, the development of powerful nologi and inclined-falling layers was carried out by dividing them into layers and collapsing the roof. However, this method does not provide for the creation of a wide front for cleaning and preparatory work.

Дл  устранени  этого недостатка предлагаетс  выемочпое поле по простиранию раздел ть на блоки, в которых выелчка угл  производитс  последовательно, а направление выемки измен ть в каждом слое.In order to eliminate this drawback, it is proposed to cut a field along the strike into blocks, in which the casting of the coal is carried out sequentially and the direction of the notch is changed in each layer.

На чертеже изображены схемы разработки пласта по предлагаемому способу в разрезе.The drawing shows a diagram of the development of the reservoir according to the proposed method in the section.

Предлагаемый способ основан на разделении пластов на слои и применении металлического перекрыт 1  рабочего пространства, вместо примен емого стоечного креплени . По этому способу пласт разрабатываетс  наклонными сло ми 1 толщиной 2,5-3,0 ж в нисход щем пор дке с о брушепием кровли. Первый слой толщиной 2 м отрабатываетс  обычной лавой с укладкой на ее почве металлического перекрыти  2 специальной конструкции, а на горизонте вентил ционного щтрека 5- поперечно-наклонным слоем. Остальные слои калсдый толщиной по 2,5 м, отрабатываютс  без креплени  призабойного пространства под защитой металлического перекрыти  2. Отработка выемочного пол  производитс  блоками 4 шириной по простиранию 50 м.The proposed method is based on the separation of layers into layers and the use of metal overlapped 1 working space, instead of the rack mount used. According to this method, the formation is developed by inclined layers 1 with a thickness of 2.5-3.0 m in descending order with roof bruzhepy. The first layer, 2 m thick, is processed by a conventional lava with a metal overlay of 2 special designs on its soil, and a 5-transversely inclined layer on the horizon of the ventilation tongue. The remaining layers, each 2.5 m thick, are processed without fixing the bottomhole space under the protection of the metal overlap 2. The excavation floor is worked out in blocks 4 of a 50 m strike width.

Металлическое перекрытие 2 состоит т стальных щвеллерных балок и полос, укладываемых по простиранию через 1,5-2 ж и соединенных между собой канатами (стыки щвеллерных балок располагаютс  в шахматном пор дке) и проволочной сеткой, укладываемой поверх щвеллерных балок и стальных полос в два сло .The metal overlap 2 consists of steel steel bar beams and strips laid along strike across 1.5-2 l and interconnected by ropes (the joints of the iron bar beams are arranged in a checkerboard pattern) and wire mesh laid over the steel bar beams and steel strips .

Кроме того, в первом слое на обеих границах панелей по простиранию монтируютс  дерев нные щиты 5 по всей длине лавы и поперечно наклонного сло . Эти щиты выполнены из бревен длиной 3-3,5 л которые укладываютс  по простиранию и прикрепл ютс  к перекрытию при помощи хомутов и канатов.In addition, in the first layer, on both borders of the panels, wooden shields 5 are mounted along the entire length of the lava and transversely inclined layer along the strike. These shields are made of logs of 3-3.5 liters in length which are laid along the strike and attached to the overlap with clamps and ropes.

Выемка угл  в сло х производитс  на пластах с углом падени  15 буровзрывными работами, а на пластах с углом падени  менее 15°-комбайнами . Транспортирование угл  вдоль забо  производитс  на пластах с углом падени  15-20° по эмалированным решеткам, на пластах с углом падени  20-30°-но обычным решеткам и на пластах с углом падени  выше 30°-самотеком по почве сло .The excavation of coal in the layers is performed on seams with a dip angle by 15 drilling and blasting operations, and on seams with a dip angle of less than 15 ° with combines. Coal transportation along the bottom is carried out on formations with a dip angle of 15-20 ° along enameled grids, on formations with a dip angle of 20-30 ° but conventional grids and on formations with a dip angle above 30 ° with soil flowers of the layer.

Предлагаемый способ позвол ет также примен ть гидроотбонку с предварительным рыхлением угл  ВВ, а также гидротранспорт.The proposed method also makes it possible to apply a hydrotube with preliminary loosening of the explosive coal, as well as hydrotransport.

Предмет изобретени Subject invention

Claims (2)

1.Способ разработки мош,ных пологих и наклонно-падающих пластов с разделением их на слои и обрушением кровли, отличаюш;ийс   тем, что, с целью обеспечени  широкого фронта очистных и подготовительных работ, выемочное поле но простиранию раздел ют на блоки, Б которых выемка угл  производитс  последовательно, а направление выемки мен етс  в каждом слое.1. The method of developing mosh, gentle and sloping-falling seams with their division into layers and roof collapse is distinguished by the fact that, in order to ensure a wide front of clearing and preparatory work, the excavation field is divided into blocks the coal is cut out sequentially, and the direction of the cut varies in each layer. 2.Способ по п. 1, отличающийс  тем, что, с целью повышени  экономической его эффективности, применено, вместо дерев нного межслоевого настила, перекрытие из швеллерпых балок, металлических полос ц сеток, обеспечиваюш,ее выемку угл  без креплени  призабойного пространства. Разрез по Дй Разрез по ББ2. A method according to claim 1, characterized in that, in order to increase its economic efficiency, instead of wooden interlayer flooring, overlapping of channel beams, metal strips of meshes, securing, and removing it with coal, are used. Cut to Dy Cut to BB
SU602168A 1958-06-16 1958-06-16 The way to develop powerful flat and inclined falling seams SU117733A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU602168A SU117733A1 (en) 1958-06-16 1958-06-16 The way to develop powerful flat and inclined falling seams

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU602168A SU117733A1 (en) 1958-06-16 1958-06-16 The way to develop powerful flat and inclined falling seams

Publications (1)

Publication Number Publication Date
SU117733A1 true SU117733A1 (en) 1958-11-30

Family

ID=48389851

Family Applications (1)

Application Number Title Priority Date Filing Date
SU602168A SU117733A1 (en) 1958-06-16 1958-06-16 The way to develop powerful flat and inclined falling seams

Country Status (1)

Country Link
SU (1) SU117733A1 (en)

Similar Documents

Publication Publication Date Title
RU2326244C1 (en) Thick flat-seam coal mining method by irregular areas with limited resource and weak roof of seam
SU117733A1 (en) The way to develop powerful flat and inclined falling seams
SU143761A1 (en) The system for the development of heavy coal seams with pillars in the fall
RU2263213C1 (en) Method for thick steeply inclined fire-hazardous bed mining with caving
SU1751333A1 (en) Method of combined mining of bed mineral deposits
SU121750A1 (en) Arched shield
SU97031A1 (en) The method of construction of the overlap of wire mesh in the development of powerful, oblique coal seams
SU106952A1 (en) Block shield cover for steep dip coal seam development
RU2038476C1 (en) Coal deposit exploitation method
SU899956A1 (en) Method of mining sloping and steep fire-hazardous coal beds
SU676737A1 (en) Method of reducing inflow of water into mine workings
SU899955A1 (en) Method of mining thin and medium-thick coal beds
SU78741A1 (en) Subsurface system using a bonded mat
SU831974A1 (en) Method of working thick sloping beds by horizontal layers in descending order
SU1661424A1 (en) Method for working out closely contiguous disrupted coal seams
SU715796A1 (en) Method of mining thick sloping coal beds
SU690184A1 (en) Method of mining thick sloping coal seams
SU95914A1 (en) The method of excavation between chamber pillars in the development of steeply dipping ore deposits
SU109991A1 (en) The method of development of ore deposits by layer collapse
SU92852A1 (en) Metallic overlap for fencing workspace of the cleaning face from the collapsing side rocks
SU110998A1 (en) The method of excavation of thin steep and inclined seams
SU400704A1 (en) COMBINED SYSTEM FOR THE DEVELOPMENT OF POWERFUL RIGHT STRAAMS
SU71696A1 (en) The way to develop cleansing faces
SU139639A1 (en) A support to support mid-rise pillars with a shield system of development
SU1666727A1 (en) Method for thick deposit mining