SU1087672A1 SU823422909A SU3422909A SU1087672A1 SU 1087672 A1 SU1087672 A1 SU 1087672A1 SU 823422909 A SU823422909 A SU 823422909A SU 3422909 A SU3422909 A SU 3422909A SU 1087672 A1 SU1087672 A1 SU 1087672A1
Authority
SU
USSR - Soviet Union
Prior art keywords
racks
flanges
profile
nodes
lying
Prior art date
Application number
SU823422909A
Other languages
Russian (ru)
Inventor
Валерий Григорьевич Горельцев
Владимир Сергеевич Давыдов
Борис Васильевич Цыплаков
Юрий Федорович Бусаров
Владимир Яковлевич Логвинов
Вячеслав Алексеевич Лепехин
Original Assignee
Goreltsev Valerij G
Davydov Vladimir S
Tsyplakov Boris V
Busarov Yurij F
Logvinov Vladimir Ya
Lepekhin Vyacheslav A
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Goreltsev Valerij G, Davydov Vladimir S, Tsyplakov Boris V, Busarov Yurij F, Logvinov Vladimir Ya, Lepekhin Vyacheslav A filed Critical Goreltsev Valerij G
Priority to SU823422909A priority Critical patent/SU1087672A1/en
Application granted granted Critical
Publication of SU1087672A1 publication Critical patent/SU1087672A1/en

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

ЖТАЛЛИЧЕСКАЯ АРОЧНАЯ ЗАМКНУТАЯ КРЕПЬ, включающа  верхн к, f; стойки,лежень,узлы податливости и узлы соединени  лежн  со стойками, выполненные в виде податливых упоров, :;О т л и ч а ш щ а   с   т.ем, что, с целью; снижени  трудоемкости возведени  лежн  и повышени  темпов проведени  горноподготовительной выработки , податливые упоры выполнены в виде резцов, установленных с обеих сторон профил  лежн  на его фланцах параллельно его продольной оси, и взаимодействуют с фланцами профил  наклонных стоек, которые установлены наклонно. . Фиг. /ZHTALLICHESKAYA ARCHNAYA CLOSED FASTENER, including upper k, f; racks, legs, yielding knots and knots of a junction with racks, made in the form of flexible stops,:; O tl and h and sh with that, with a view; reducing the laboriousness of erecting and increasing the pace of mining preparatory development; flexible stops are made in the form of cutters installed on both sides of the profile lying on its flanges parallel to its longitudinal axis, and interact with the flanges of the profile of inclined struts that are installed obliquely. . FIG. /

Description

Изобретение относитс  к горнодобывающей промьшшенностй и может быть использовано при креплении гор ноподготовительных выработок. Известна металлическа  крепь, со то ща  из верхн ка, двух стоек и двух податливых узлов ij . Недостатком известной конструкции , крепи  вл етс  отсутствие лежн  со стороны подошвы выработки, поэтому п зимен ть эту крепь дл  поддержани  горноподготовительных выработок при наличии пучащих пород в почве неэффективно, так как дл  безопасного содержани  выработок необходимо производить в значительных объемах поддирку пород почвы. Известна металлическа  арочна  замкнута  крепь, включающа  верхн к стойки, лежень, узлы податливости и УЗЛЫ соединени  лежн  со стойками, выполненные в виде податливых упо-. ров 2 . -. . Недостатком известной крепи  вл етс  относительно высока  трудоемкость установки лежн , так какв узлах соединени .лежн  со стойками установлены болтовые податливые упоры , дл  монтажа которых на стойках, крепи необходимо закручивать четыре гайки, а это снижает темпы проведет ки  выработки. , ; Целью изобретени   вл етс  снижени  трудоемкости возведени  лежн  и повышение темпов прО ведени  горно-подготовительной выработки. Эта цель достигаетс  тем, что в металлической прочной замкнутой кре пи, включающей верхн к,.стойки, лежень , узлы податливости и узлы соед нени  лежн  со стойками, выполненны в виде податливых упоров, податливы упоры выполнены в виде резцов, уста новленных с обеих сторон профил  лежн  на его фланцах параллельно ег продольной оси, и взаимодействуют с фланцами профил  наклонных стоек, к торые установлены наклонно. На фиг. 1 изображена металличеека  арочна  замкнута  крепь, общий вид; на фиг.2 - узел на фиг.1; на фиг.З - разрез А-А на фиГ.2. . Устройство содержит верхн к 1, стойки 2 и 3, звень  4 и 5 лежн , резцы 6 и 7. Возведение крепи осуществл ют сле дующим образом. Устанавливают в требуемое положе ние в кровле выработки) верхн к I крепи и распирают его временной крепью типа ВК-7 .или ГСК. Затем накладывают внахлест на конец верхн ка 1 стойку 2 крепи и соедин ют ее с верхн ком I при помощи хомутов, планок и гаек (не обозначены). Аналогично устанавливают стойку 3 крепи. Возведение лежн  осуществл ют на любом этапе эксплуатации выработки, т.е. или одновременно с установкой крепи илипозже. Лежень собирают из отдельных звеньей 4 и 5 путем их нахлестки друг на друга и соединени  также при помощи хомутов,планок и гаек . Звень 4 и 5 лежн  по концам снабжены резцами 6 и 7, которые установле- ны при помощи сварки на фланцах профил  с обеих сторон параллельно продольной оси лежн . Работа крепи за:ключаетс  в воспри тии нагрузок со стороны окружающих пород и в обеспечении требуемого дл  безопасной эксплуатации сечени  выработки. При вертикальных нагрузках , действующих на верхн к 1 крепи, свьш1е допустимых срабатывают узлы податливости, т.е. верхн к | проскаг льзывает с усилием трени  относительно стоек 2 и 3. При этом нагрузка, действующа  на верхн к, уменьшаетс . Далее при возрастании нагрузки до критической величины происходит аналогичное проскальзывание верхн ка I крепи в податливых узлах. При наличии в почве выработки пород нагрузка с их стороны передаетс  на лежень крепи. При Движении лежн  вверх резцы, установленные на концах звеньев 4 и 5, врезаютс  во фланцы стоек 2 и 3 с усилием, равным усилию сдвига звеньев 4 и 5 в их податливом узле. Это происходит потому, что стойки 2 и 3 крепи у тановлены с раз носом, т.е. наклонешл внутрь выработки , и длина лежн  при его движении (податливости при нагрузках, превыша ющих допустимые) относительно стоек 2 и 3 должна конструктивно уменьшить-с  за счет проскальзывани  звеньев 4 и 5 в узле податливости с усилием трени . Резцы 6 и 7, установленнные на,концах звеньев 4 и 5, о&разуют податливый упор, обеспечивающий сидовое перемещение лежн  относительно стоек 2 и 3 за счет сн ти  некоторой величины металла с их фланцев. Кроме того, резцы 6 и 7 выполн ют монтаж )1ые функции,  вл  сь направл ющими устройствами, обеспечивающими направленное движение лежн  по стойкам 2 и 3. Резцы 6 и 7 предотвращаютвозможное выворачиваение лежн  и опреде- л ют его устойчивое положение. Соединение лежн  со стойками безболтовое - это снижает продолжительность его установки и в итоге новышает темпы проведени  выработок. Усилие проскальзывани  лежн  относитель но стоек 2 и 3 стабильно, так как О1Ш определ етс  усилием проскальзывани  звеньев 4 и 5 в податливом узг ле, которое тоже стабильно. Дополнительной зат жкой гаек в податливых узлах соединени  звеньев 4 и 5 лежн  возможно регулировать усилие проскальзывани  силие врезани  резцов во фланцы стоек) лежн  относительно стоек 2 и 3. При проскальзывании лежн  нагрузка, действу1Ш1а  на звень  4 и 5, снижаетс  и затем при дальнейшем возрастании вызывает проскальзывание лежн  относительно стоек 2 и 3. The invention relates to the mining industry and can be used for fastening mining preparatory workings. Known metal lining, from the top of the top, two racks and two compliant nodes ij. A disadvantage of the known construction, the lining is the absence of the ground from the side of the working surface, therefore, it is inefficient to winter this lining to maintain the mining mine workings in the presence of pulling rocks in the soil, since it is necessary to make significant amounts of soil formations in a safe place. Known metal arched closed lining, including the upper to the rack, the bed, the nodes of ductility and the nodes of the connection lying with racks, made in the form of pliable. ditch 2. -. . A disadvantage of the known lining is the relatively high labor intensity of the installation, because bolted flexible supports are installed in the joint nodes with racks, for mounting of which four racks are mounted on racks, which reduces the rate of output development. ,; The aim of the invention is to reduce the laboriousness of the construction of the bedrock and increase the pace of mining development. This goal is achieved by the fact that in a solid metal closed kryi, including the upper, racks, floor, the nodes of compliance and joints lying with racks, made in the form of pliable lugs, pliable lugs made in the form of incisors mounted on both sides The profile is laid on its flanges parallel to its longitudinal axis, and interacts with the flanges of the profile of inclined struts, which are set obliquely. FIG. 1 depicts a metalloche arched lining, general view; figure 2 - the node in figure 1; on fig.Z - section aa on fig.2. . The device comprises top to 1, pillars 2 and 3, links 4 and 5 of the hollow, incisors 6 and 7. The erection of the lining is carried out as follows. The excavation is placed in the required position in the roof (top) to the I support, and it is supported by a temporary fixture of the type VK-7 ... or GSK. Then they overlap the end of the top 1 rack 2 of the lining and connect it to the top I with the help of clamps, slats and nuts (not indicated). Similarly, install the rack 3 support. The erection of the bedrock is carried out at any stage of the production operation, i.e. or simultaneously with the installation of support or later. Legs are assembled from individual links 4 and 5 by overlapping each other and joining them also with clamps, slats and nuts. Link 4 and 5 at the ends are equipped with cutters 6 and 7, which are installed by welding on the flanges of the profile on both sides parallel to the longitudinal axis of the bed. The work of the support for: is in the perception of loads from the surrounding rocks and in providing the cross section of the output required for safe operation. With vertical loads acting on the top to one support, the nodes of compliance, i.e. top to | propels with friction against racks 2 and 3. At the same time, the load acting on the upper frame is reduced. Further, with an increase in the load to a critical value, a similar slippage of the top I of the support in compliant nodes occurs. In the presence of rock production in the soil, the load from their side is transferred to the ground support. In the upward motion, the incisors mounted at the ends of the links 4 and 5 cut into the flanges of the pillars 2 and 3 with a force equal to the shear force of the links 4 and 5 in their compliant knot. This is because the pillars 2 and 3 are fixed with a single nose, i.e. leaning inward, and the length of the bed when it moves (compliance at loads exceeding permissible) relative to racks 2 and 3 should be structurally reduced by slippage of links 4 and 5 in the node of compliance with friction force. The incisors 6 and 7, mounted on the ends of the links 4 and 5, o & a flexible stop, providing cushioning of the bed relative to the uprights 2 and 3 by removing a certain amount of metal from their flanges. In addition, the cutters 6 and 7 carry out the installation of the first functions, being guiding devices that provide directional movement of the bed along the uprights 2 and 3. The cutters 6 and 7 prevent the possible reversal of the bed and determine its stable position. The connection to the racks is bolt-free - this reduces the duration of its installation and, as a result, increases the pace of excavation. The slip force is relative to the pillars 2 and 3 is stable, since O1Sh is determined by the slip force of the links 4 and 5 in a flexible node, which is also stable. By additional tightening of the nuts in the flexible joints of the links 4 and 5, it is possible to adjust the slip force the cutting force of the incisors into the flanges of the uprights relative to the uprights 2 and 3. When sliding down the load, the action of 1-1 on the links 4 and 5 decreases and then with a further increase causes slip is relative to racks 2 and 3.

Демонтаж крепи осуществл ют путем разборки податливых узлов крепи (при раскручивании гаек и сн тии хогмутов с.планками).Disassembly of the lining is carried out by disassembling the compliant lining assemblies (when unscrewing the nuts and removing the hogmuts from the planks).

Экономический эффект образуетс  за счет снижени  трудоемкости установки лежней в креп х, что снижает продолжительность установки лежн  и способствует повышению темпов прогведени  выработки.The economic effect is formed by reducing the labor intensity of the installation of the bench in the supports, which reduces the duration of the installation of the bench and contributes to an increase in the rate of progress of development.

- А повернуто- A turned

Фifг.5Fifg.5

Claims (1)

МЕТАЛЛИЧЕСКАЯ АРОЧНАЯ ЗАМКНУТАЯ КРЕПЬ, включающая верхняк, t; , стойки,лежень,узлы податливости и узлы . соединения лежня со стойками, выполненные в виде податливых упоров, о т л и ч а ю щ а я с я т.ем, что, с целью: снижения трудоемкости возведения лежня и повышения темпов проведения горноподготовительной выработки, податливые упоры выполнены в виде резцов, установленных с обеих сторон профиля лежня на его фланцах параллельно его продольной оси, и ' взаимодействуют с фланцами профиля наклонных стоек, которые установлены наклонно. .METAL ARCH CLOSED FASTENER, including the upper, t; , racks, lying, malleability nodes and nodes. joints lying with racks, made in the form of malleable stops, so that with the aim that: to reduce the complexity of erecting the lodge and increase the pace of mining development, malleable stops are made in the form of cutters, mounted on both sides of the profile lying on its flanges parallel to its longitudinal axis, and 'interact with the profile flanges of the inclined racks, which are installed obliquely. . Фиг. /FIG. /
SU823422909A 1982-02-22 1982-02-22 Closed metal arcuate roof support SU1087672A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823422909A SU1087672A1 (en) 1982-02-22 1982-02-22 Closed metal arcuate roof support

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823422909A SU1087672A1 (en) 1982-02-22 1982-02-22 Closed metal arcuate roof support

Publications (1)

Publication Number Publication Date
SU1087672A1 true SU1087672A1 (en) 1984-04-23

Family

ID=21006548

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823422909A SU1087672A1 (en) 1982-02-22 1982-02-22 Closed metal arcuate roof support

Country Status (1)

Country Link
SU (1) SU1087672A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Гелескул М.Н. Справочник по применению горных выработок. М. Недра, 1972, с.47-49, рис.18. 2. Авторское свидетельство СССР К 644954, .КП.Е 21 D 11/24 1975. *

Similar Documents

Publication Publication Date Title
EP3489459B1 (en) Non-uniform support structure for gob-side entry driving under deep unstable overburden rock and construction method
CN109026049A (en) A kind of anchor combined unit of step type pick branch and its an application method
US4621951A (en) Modular reusable overcast
SU1087672A1 (en) Closed metal arcuate roof support
EP0795680B1 (en) Shortwall mining equipment for extraction of pillars in underground coal mines
KR100688620B1 (en) Pile driver for structural walls having inducement rail-unit ? catch-unit
RU2026982C1 (en) Shaft-sinking set
RU2384708C2 (en) Removal method of powered mining face complexes
CN208777997U (en) A kind of anchor combined unit of step type pick branch
RU2370652C1 (en) Circular support of excavation and method for its setting
RU2021520C1 (en) Aggregate roadway support
RU2144138C1 (en) Shaft-sinking set
RU2144139C1 (en) System for tunneling machines
RU2724816C1 (en) Method for preparatory mine working and mechanized support for its implementation
SU1040184A1 (en) Portable pneumatic stowage web
SU1084448A1 (en) Mine working support
RU2141032C1 (en) Junction powered support
RU2172410C2 (en) Powered tunneling and stoping complex (unit)
SU1703824A1 (en) Support for workings
RU2760269C1 (en) Method for preparatory mining and mechanised support for implementation thereof
SU929858A1 (en) Framework roof support erecting method
SU962628A1 (en) Enclosing timbering for mine workings
SU1460305A1 (en) Combination support for mine working
SU742598A1 (en) Inter-level roof support
SU817271A1 (en) Fence of isolating fill-in strip