SU1043296A1 - Method of selective working of storage of balance and over-balance mineral ores - Google Patents

Method of selective working of storage of balance and over-balance mineral ores Download PDF

Info

Publication number
SU1043296A1
SU1043296A1 SU823395578A SU3395578A SU1043296A1 SU 1043296 A1 SU1043296 A1 SU 1043296A1 SU 823395578 A SU823395578 A SU 823395578A SU 3395578 A SU3395578 A SU 3395578A SU 1043296 A1 SU1043296 A1 SU 1043296A1
Authority
SU
USSR - Soviet Union
Prior art keywords
balance
reserves
mining
ores
excavation
Prior art date
Application number
SU823395578A
Other languages
Russian (ru)
Inventor
Дмитрий Петрович Лобанов
Ильшат Гаязович Абдульманов
Анатолий Семенович Романченко
Виктор Фомич Саенко
Виктор Матвеевич Рудаков
Original Assignee
Московский Ордена Трудового Красного Знамени Геологоразведочный Институт Им.Серго Орджоникидзе
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Московский Ордена Трудового Красного Знамени Геологоразведочный Институт Им.Серго Орджоникидзе filed Critical Московский Ордена Трудового Красного Знамени Геологоразведочный Институт Им.Серго Орджоникидзе
Priority to SU823395578A priority Critical patent/SU1043296A1/en
Application granted granted Critical
Publication of SU1043296A1 publication Critical patent/SU1043296A1/en

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Description

Изобретение относитс  к горному делу и может быть использовано при разработке залежей полезных ископаемых , представленных рудами разных технологических сортов. Известен способ разработки залежи руд разных технологических сортов с выемкой руд одного сорта очис.тной выемкой, принудительным обрушением руд другого сорта и последующим их выщелачиванием l . . Недостатками способа  вл ютс  большие затраты на подготовку запасо забалансовых руд, деконцентраци  горных работ и длительные сроки отработки блоков. Наиболее близким к изобретению по технической сущности и достигаемому результату  вл етс  способ селективной разработки запасов балансовых и забалансовых руд полезных ископаемых, включающий вскрытие рудной залежи горными выработками, очистную выемку запасов балансовых руд с закладкой очистного пространст ва твердеющим материалом, последующую подготовку запасов балансовых ру к подземному выщелачиванию путем разделывани  в центре и по контуру блока нагнетательных и дренажных щелей, подачу выщелачивающих к запасам забалансовых руд и техноло гическим потер м очистной выемки и откачку продукционных растворов 2 Недостатками известного способа также  вл ютс  деконцентраци  горных работ и увеличение сроков отработки блока при пocлeд6Faтeльнoм выполнении подготовительных меропри тий, большие затраты на создание нагнетательных и дренажных щелей и на эксплуатацию Д/1Я выщелачивани  выработок очистной выемки. Целью изобретени   вл етс  повышение эффективности отработки залежи за счет снижени  затрат на подготовку запасов забалансовых руд к выщела чиванию. Поставленна  цель достигаетс  тем, что согласно способу селективно разработки запасов балансовых и забалансовых руд полезных ископаемых, включающему вскрытие рудной залежи горными выработками, очистную выемку запасов балансовых руд с закладко очистного пространства твердеющим материалом, подготовку запасов забал совых руд к подземному выщелачиванию подачу выщелачивающих растворов к запасам забалансовых руд и технологическим потер м очистной выемки и откачку продукционных растворов, указанную подготовку производ т одновременно с очистной выемкой запасов балансовых руд, при этом из подготовительных и основных выработок бур т вертикальные дренажные скважины-, из подготовительных выработок очистной выемки проход т восстающие до границы. Запасов забалансовых руд и бур т в плоскости пласта веера оросительных скважин, через которые подают выщелачивающие растворы в момент окончани  очистной выемки. На фиг. .1 и 2 показан блок (вкрест простирани ), разрез; на , фиг. 3 - разрез А-А на фиг. 1. Способ осуществл ют следующим образом. Отрабатываемую пластообразную залежь, представленную балансовыми 1 и забалансовыми 2 рудами, разбивают на блоки системой подготовительных горизонтальных и вертикальных выработок . Горизонтальные выработки 3 проход т по простиранию.залежи так, чтобы кажда  втора  из них располагалась над основным транспортным штреком k. Основной транспортный штрек k соедин ют с выработками 3 восстающими 5. Из выработок 3 по падению залежи проход т транспортновентил ционные выработки 6, рассто ние между которыми определ ет ширину блока в зависимости от примен емого погрузочно-доставочного оборудовани  на очистных работах. При подготовке и отработке запасов балансовых руд 1 очистной выемкой из выработок 3 и 6 до границы запасов забалансовых руд проход т восстающие 7 с буровыми камерами 8. Из буровых камер 8 бур т веера скважин 9 системы подачи растворов дл  вь,1щелачивани  металла из забалансовых руд 2 и технологических потерь очистной выемки, одновременно с этим из выработок 3 и 6 бур т вертикальные скважины 10 дл  приема и дренажа продуктивных растворов. Очистную выемку запасов балансовых руд 1 ведут из выработок 6 заходками 11 с последующим заполнением их твердещими смес ми 12. После ; завершени  очистной выемки запасов балансовых руд 1 подачу растворов реагента дл  выщелачивани  металла из забалансовых руд 2, а также дренаж продуктивных растворов осуществл ют) по заранеее пробуренным и оборудован ным скважинам 9 и 10.. Пример. Отрабатываемую плас тообразную залежь, представленную балансоЕ ыми 1 и забалансовыми 2 руда ми мощностью, например, соответствен но 2,,0 м, разбивают системой подготовительных горизонтальных 3, и вертикальных 7 выработок на блоки размерами, .например 80ХбО. Горизонтальные выработки 3 сечением 12м. проход т по простиранию с расположением каждой второй из них над основным откаточным штреком k сечением 3,0X2,5 м и соедин ют с ним восстающими 5сечением 2x2 м. Из выработок 3 по падению проход т выработки 6 сечением 4,ОЛ2,5 м, из которых осуще ствл ют очистную выемку балансовых руд заходками 11 сечением +,,5 м с последующим заполнением их твердеющей смесью 12. Из выработок 3 и 6 в процессе или по завершению их проход ки или во врем  очистной выемки проход т восстающие 7 сечением А,Ом с буровыми камерами 8 размерами, 1например, 3x3x8 м, из котрых бур т веера скважин 9 диаметром 105 мм и длиной м. После завершени  очистной выемки по скважинам 9 подают раствор реагента дл  выщелачивани металла из забалансовых руд 2 и технологических потерь очистной выемки. В процессе ведени  очистной выемки одновременно с бурением оросительных скважин 9 осуществл ют также подготовку системы дренажа и улавливани  продуктивных растворов путем бурени  скважин 10 диаметром 105 мм из выработок 3 и i. Дл  этих целей также частично используют подготовительные выработки 3 и 6 очистной выемки. Предлагаемый способ разработки полезных ископаемых обладает следующими преимуществами: сокращаютс  объем горных выработокiH затраты на их проведение за счет использовани  выработок очистной выемки дл  создани  систем подачи и дренажа растворов, повышаетс  концентраци  горных работ путем совмещени  процессов очистной выемки и подготовки к подземному выщелачиванию; исключаютс  дополнительные затраты на реконструкцию , поддержание и проветривание выработок, сокращаетс  срок отработки, запасов забалансовых руд за счет совмещени  процессов подготовки к очистной выемке и выщелачиванию улучшаетс  организаци труда за счет расширени  фронта работ; сокращаютс  объемы монтажно-демонтажных работ при оснастке блоков к подземному выщелачиванию} повышаетс  надежность изол ции подземных сооружений и участков очистнойвыемки от выщелачивающих растворов.The invention relates to mining and can be used in the development of mineral deposits, represented by ores of different technological grades. There is a method of developing deposits of ores of different technological varieties with the excavation of ores of one grade with a clean excavation, forced collapse of ores of another grade and their subsequent leaching l. . The disadvantages of the method are the high costs of preparing the reserve of off-balance ores, deconcentrating the mining operations and the long periods of mining blocks. The closest to the invention to the technical essence and the achieved result is a method of selective development of reserves of balance and off-balance ores of minerals, including the opening of ore deposits by mining workings, clearing excavation of reserves of balance ores with the laying of the cleaning space with hardening material, the subsequent preparation of reserves of balance to underground leaching by butchering in the center and along the contour of the block of injection and drainage slits, the supply of leaching to off-balance sheet stocks beats and technological losses of the cleansing excavation and pumping of the production solutions 2 The disadvantages of this method are also deconcentration of mining operations and an increase in the time required for the block to be completed during the 6F production of preparatory measures, the high costs of creating injection and drainage slots and the operation of D / 1 I leaching clearing recess. The aim of the invention is to increase the efficiency of mining at the expense of reducing the cost of preparing reserves of off-balance ores for leaching. The goal is achieved by the fact that according to the method of selectively developing reserves of balance and off-balance ores of minerals, including the opening of ore deposits by mine workings, clearing excavation of reserves of balance ores with a hardening material, the preparation of stocks of burnt ores for underground leaching and leaching off-balance ores and technological losses of the clearing excavation and pumping of the production solutions, this preparation is carried out simultaneously About with the clearing dredging of reserves of balance ores, while vertical drainage wells are drilled from the preparatory and main workings, from the preparatory workings of the clearing notch, rising to the border. Stocks of off-balance ores and drills in the formation plane of the fan of irrigation wells, through which leach solutions are supplied at the time of completion of the clearing recess. FIG. .1 and 2 shows a block (across the strike), a section; in FIG. 3 shows section A-A in FIG. 1. The method is carried out as follows. The developed reservoir deposit, represented by balance 1 and off-balance 2 ores, is divided into blocks by a system of preparatory horizontal and vertical workings. The horizontal workings 3 run along the strike. The halls are such that each of them is located above the main traffic drift k. The main transport drift k is connected to the workings of 3 rebels 5. Of the workings 3, along the fall of the deposit, there are transport and ventilation workings 6, the distance between which determines the width of the block depending on the loading and hauling equipment used in the cleaning works. In the preparation and mining of reserves of balance ores 1, cleansing 7 with drilling chambers 8 are passed to the border of reserves of off-balance ores, and drilling chambers 8 are supplied from the drilling chambers 8 to the well supply system for metal leaching from off-balance ores 2 and technological losses of the clearing recess; at the same time, vertical wells 10 are drilled from the workings 3 and 6 to receive and drain productive solutions. The clearing excavation of reserves of balance ores 1 is carried out from the workings 6 by stoppers 11 and then filled with hardening mixtures 12. After; completion of the clearing excavation of reserves of balance ores; 1 supply of reagent solutions for leaching metal from off-balance ores 2, as well as drainage of productive solutions is carried out through pre-drilled and equipped wells 9 and 10. Example. The developed reservoir, represented by balances 1 and off-balance 2 ores with a thickness of, for example, 2,, 0 m, is divided by a system of preparatory horizontal 3, and vertical 7 workings into blocks of size, for example, 80ХбО. Horizontal workings of 3 section 12m. pass along the strike with the location of each second of them over the main haulage drift k with a section of 3.0 x 2.5 m and is connected to it with a revolving 5 section of 2x2 m. From workings 3 along the dip, workings of 6 with section 4, OL2.5 m, which carry out a clearing recess of balance ores with bores 11 with a cross section +, 5 m and then filling them with a hardening mixture 12. Outflows 3 and 6 in the process or at the end of their passage or during the clearing notch, rebel 7 with section A, Ohm with drilling chambers of 8 sizes, 1 for example, 3x3x8 m, from which the fans are drilled kvazhin diameter of 9 mm and a length of 105 m. After completion of the cleaning wells recess 9 serves reagent solution for leaching metal from discarded ore 2 and the cleaning process losses recesses. In the course of maintaining the clearing notch, simultaneously with the drilling of the irrigation wells 9, the drainage system and the recovery of productive solutions are also prepared by drilling wells 10 with a diameter of 105 mm from wells 3 and i. For these purposes, preparatory workings 3 and 6 of the clearing recess are also partially used. The proposed method of developing mineral resources has the following advantages: the volume of mine workings is reduced; their costs are reduced by using clearing excavations to create supply systems and drainage of solutions; mining concentration is increased by combining the clearing processes and preparing for in-situ leaching; additional costs for the reconstruction, maintenance and ventilation of workings are eliminated, the period of mining, the reserves of off-balance ores are reduced by combining the processes of preparation for the clearing excavation and leaching, the organization of labor is improved by expanding the scope of work; the volume of installation and dismantling works is reduced when equipping the blocks to the underground leaching} the reliability of isolation of underground structures and sections of the sewage disposal plant from leaching solutions is increased.

г. year

Claims (1)

СПОСОБ СЕЛЕКТИВНОЙ РАЗРАБОТКИ ЗАПАСОВ БАЛАНСОВЫХ И ЗАВА Л АН СОВЫХ РУД ПОЛЕЗНЫХ ИСКОПАЕМЫХ, включающий вскрытие рудной залежи’горными выработками, очистную выемку запасов балансовых руд с закладкой очистного пространства твердеющим материалом, подготовку запасов балансовых руд к подземному выщелачиванию, подачу выщелачивающих растворов к запасам . забалансовых руд и технологическим потерям!очистной выемки и откачку продукционных растворов, отличающийся тем, что, с целью повышения эффективности отработки залежи за счет снижения 'затрат на подготовку запасов забалансовых руд к выщелачиванию, указанную подготовку производят одновременно с очистной выемкой запасов балансовых руд, при Ътом из подготовительных и основных выработок бурят вертикальные дренажные скважины, из подготовитель· ных выработок очистной выемки прохо-, дят восстающие до границы запасов Забалансовых руд и бурят в плоскости пласта веера оросительных скважин, через которые подают выщелачивающие растворы в момент окончания очистной выемки о METHOD FOR SELECTIVE DEVELOPMENT OF BALANCE AND STORAGE RESOURCES OF USEFUL MINING ORE, including opening of ore deposits by mining openings, cleaning excavation of balance ore reserves with filling of treatment space with hardening material, preparation of reserves of mining ore reserves to underground mining. off-balance ores and technological losses ! treatment excavation and pumping out of production solutions, characterized in that, in order to increase the efficiency of mining the deposit by reducing the cost of preparing the reserves of off-balance ores for leaching, the said preparation is carried out simultaneously with the cleaning mining of the reserves of balance ores, while vertical drainage wells, from the preparatory workings of the treatment excavation pass, are rising up to the boundary of the reserves of the Off-balance ores and are drilled in the plane of the formation of the fan of irrigation wells in, which is supplied through leach solutions at the moment of closure of the sewage extraction
SU823395578A 1982-02-15 1982-02-15 Method of selective working of storage of balance and over-balance mineral ores SU1043296A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU823395578A SU1043296A1 (en) 1982-02-15 1982-02-15 Method of selective working of storage of balance and over-balance mineral ores

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU823395578A SU1043296A1 (en) 1982-02-15 1982-02-15 Method of selective working of storage of balance and over-balance mineral ores

Publications (1)

Publication Number Publication Date
SU1043296A1 true SU1043296A1 (en) 1983-09-23

Family

ID=20997071

Family Applications (1)

Application Number Title Priority Date Filing Date
SU823395578A SU1043296A1 (en) 1982-02-15 1982-02-15 Method of selective working of storage of balance and over-balance mineral ores

Country Status (1)

Country Link
SU (1) SU1043296A1 (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
1. Патент DD № 97916, кл. Е 21 С ttS/OO, -опублик. 1972. 2.. Патент DD ff 379t8, кл. Е 21 С , опублик. 1973 *

Similar Documents

Publication Publication Date Title
CN215890020U (en) Sublevel open stope subsequent filling mining structure for inclined medium-thickness ore body
US2682396A (en) Method for mining soluble ores
SU1043296A1 (en) Method of selective working of storage of balance and over-balance mineral ores
SU1155757A1 (en) Method of mining mineral deposits
SU950916A1 (en) Method of working mineral deposits
SU1011861A1 (en) Method of working rich deposits of minerals
RU2193660C1 (en) Method of underground mining of steeply dipping vein deposits
RU2780415C1 (en) Method for developing seams with long pillars along the strike with the reverse order of development
SU1458574A1 (en) Method of mining ore bodies
SU1456572A1 (en) Method of mining mineral deposits
SU883447A1 (en) Method of working mineral deposits
SU1083662A1 (en) Method of mining steep-slope ore-bodies
SU934006A1 (en) Method of working gently-sloping mineral beds
RU2077673C1 (en) Method for excavating graphite from a thin steeply dipping sheet deposit
SU829950A1 (en) Method of working adjacent sloping beds of minerals
RU1810549C (en) Method for hole hydraulic mining of minerals from deeply seated deposits
SU1452992A1 (en) Method of remining of mineral deposits
SU949182A1 (en) Method for working gently sloping mineral seams
SU1097796A1 (en) Method of underground working of bed deposits of minerals
SU1162978A1 (en) Method of subterranean mining of minerals
SU1361328A1 (en) Method of excavating mineral beds
SU754067A1 (en) Method of mining thick ore bodies
SU1716136A1 (en) Method of mining beds
SU742589A1 (en) Method of mining super-thin sharply assending seams
SU825965A1 (en) Method of working mineral deposits by underground leaching