SU1032131A1 - Section of prefabricated knock-down building - Google Patents
Section of prefabricated knock-down building Download PDFInfo
- Publication number
- SU1032131A1 SU1032131A1 SU813393252A SU3393252A SU1032131A1 SU 1032131 A1 SU1032131 A1 SU 1032131A1 SU 813393252 A SU813393252 A SU 813393252A SU 3393252 A SU3393252 A SU 3393252A SU 1032131 A1 SU1032131 A1 SU 1032131A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- section
- vertical
- shields
- vertical slot
- finger
- Prior art date
Links
Landscapes
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
СЕКЦИЯ СБОРНО-РАЗБОРНОГО ЗДАНИЯ, включающа щиты покрыти и стенового ограждени , соединенные в .узлах шарнирно посредством закреплен ных под ПРЯ.МЫМ углом на -стойках щитов стенового ограждени и ригел х щитов покрыти проушин, одна из котсрых выполнена- с вертикальной прорезью , а друга .- с отверстием дл г-.пальца , и распоЛоженйые в узлах опирани ригелей на, стойки промежуточные элементы, воспринимающие нагрузку, от ли ч ающа с тем, что, с Целью обеспечени геометрической неизмен емости секции на врем производства монтажных работ, каждый промежуточный элемент выполнен в -виде . вертикального стержн , закрепленного, на стойке щита, причем на ригеле ,со стороны стыкуемой поверхности образовано гнездо дл пропуска стержн , высота которого соответствует длине вертикальной прорези.SECTION OF ASSEMBLY BUILDING, including shields and wall fencing, connected in hubs by means of fastened under a DIRECT angle on - racks of shields wall fencing and side panels shields of eyes, one of the cocks are made with a vertical slot, and another .- with a hole for the g-finger, and located in the nodes of the deadbolts on the rack, the intermediate elements that take the load, so that, in order to ensure the geometric stability of the section for the production time of the assembly works, each intermediate element is made in the form. a vertical rod fixed on the shield rack, and on the crossbar, on the side of the interfaced surface, a slot is formed for the passage of the rod, the height of which corresponds to the length of the vertical slot.
Description
Изобретение относитс к строител ству и предназначено дл использова ни в отрасл х народного хоз йства . нуждающихс во временных сборно-, разборных здани х многократной оборачиваемости .,. Известны сборно-разборные, здани монтируемые из отдельных секций. Кажда секци выполнена с двухскатным покрытием и шарнирно соединенны ми с ним стеновыми панел ми ij. Недостатком данного здани вл етс необходимость пpк cyтcтви ра бочего под стрелой при установке се ции.. Наиболее близкой к предлагаемой вл етс секци сборно-разборного здани , включающа щиты покрыти и стенового ограждени , которые соеди нены в узлах шарнирно посредством закрепленных под пр мым углом на стойках щитов стенового ограждени и ригел х ищтов покрыти проушин, одна из которых выполнена с прорезь а друга - с отверстием дл пальца и расположенные в узлах -опирани ригелей на стойки промежуточныеэлементы , воспринимающие нагрузку 2.. НедостйткоМ известной секции вл етс то, что пространственна жесткость секции .при монтаже обеспе чиваетс подкосом, до установки noc леднегЬ она отсутствует. Кроме того проушины выполн ют роль шарнира дл складывани секции в транспортное положение, а закладна деталь только роль центрирующей прокладки дл передачи вертикальных усилий. В св зи с этим в процессе установки на фундаг ент требуютс временные раскреплени секции до установки подкоса. Цель изобретени - обеспечение геометрической неизмен емости секци на врем производства монтажных работ посредством Образовани в карнизнбм узле реактивной пары сил. Указанна цель.достигаетс тем, .что в секции сборно-разборного здани , включающей щиты покрыти и сте нового ограждени , соединенные в узлах шарнирно посредством закрепленных под пр мым углом на стойках щитов стенового ограждени и ригел щитов покрыти - проушин, одна из которых выполнена с вертикальной npof резью, а друга - с отверстием дл пальца, и расположенные в узлах опира-ни ригелей на стойки промажуточные элементы, воспринимающие Har рузку, каждый промежуточный элемент выполнен в виде вертикального стерж н , закрепленного на стойке щита, причем на со, стороны стыкуемой поверхности образовано гнездо дл пропуска стержн , высота которо го соответствует днине вертикальной прорези. На фиг. 1 изображен фрагмент , ции сборно-раз.борного здани в мон-. тажном положенииJ на фиг. 2 - то же, в рабочем положении; на фиг. 3 .схема монтажа секций сборно-раз бор ного здани . Секци сборно-разборного здани содержит щиты 1 .двухскатного покрцти и щиты 2 стенового ограждени , раскосы 3 и ригели 4, шарнирно coe.i диненные.со стойками 5.На стойках 5 щитов 2 ограждени укреплены проушины- б, расположенные под пр мым углом относительно проушин 7; укрепленных, в свою очередь, на ригел х-4. Пр рушины 7 выполнены с вертикальными прорез ми 8. Кажда проушина 6 имеет круглое отверстие дл пальца 9, жестко св занного с ней и свободно перемещаемого пг прорези 8 в период монтажа. На стойках 5 у-креплены промежуточные менты, выполненые в виде вертикальных стержнрй 10, заводимых в гнезда 11, образованные на стыкуемых поверхност х ригелей. Высота стержн 10 соответствует длине вертикаль- , ной прорези 8 с учет.ом монтажного допуска. Причем-стержен Ь расположен параллельно прорези. Шарнирный узел, образуемый проу- шинами 6 и 7, и вертикальный стержень 10 расположены относительно i друг друга на рассто нии, равном плёчу реактивной пары сил. Монтаж секций ведут следующим образом . I - . Секции доставл ют на строительную площадку в виде пакетов. С помощью грузоподъемного механизма их устанавливают на горизонтальную площадку. После сн ти : транспортных св зей раскрывают поворотом полусекции вокруг шарнира 12. Приподнимают секцию до установки щитов покрыти под требуемым ухлом и фиксируют их. Далее секцию поднимают, стеновые щиты 2 зависают на щитах 1 покрыти . В это врем пальцы 9 занимают крайнее нижнее положение в прорез х 8. Секцию устанавливают на фундамент с добедением покрыти до рабочего положени . Ригели 4 при этом гнездами 11 насаживаютс на стержни 10. Пальцы 9 скольз т по прорез м 8, переход т крайнее верхнее положение, по.сле чего их жестко закреп.л ют. Секци мЬжет быть выполнена с-подкосами . В отдельных случа х при малых пролетах и незначительных нагрузках подкос л отсутствуют. Пространственна жесткость секции обеспечиваетс включением в работу шарнирных узлов и стержней 10, которые при этом жестко фиксируют.The invention relates to construction and is intended to be used in industries of national ownership. needing temporary collapsible, collapsible buildings of multiple turnover. Known collapsible, buildings mounted from separate sections. Each section is made with a double-slope coating and the wall panels ij hinged to it. The disadvantage of this building is the need to install the working equipment under the boom during installation of the section. Closest to the proposed one is the section of the collapsible building, which includes shields and wall fencing, which are connected at the right angle at the hinge points. racks of wall fencing shields and bolts of eyelets for covering the eyes, one of which is made with a slot and the other with a hole for a finger and located in the nodes of the transoms on the racks, are intermediate elements that perceive Loading the 2 .. NedostytkoM sections is known that the spatial stiffness section .If secu chivaets strut assembly, prior to installation noc ledneg it offline. In addition, the lugs perform the role of a hinge for folding the section into the transport position, and the insertion part only acts as a centering gasket for transmitting vertical forces. In this connection, during the installation on the foundation, temporary detachments of the section are required before the installation of the brace. The purpose of the invention is to ensure the geometrical immutability of the section at the time of the installation work through the formation of a reactive couple of forces in the curtain node. This goal is achieved by the fact that in the section of a collapsible building, including shields, and a new fence, connected at the hinge assemblies by means of wall panels and deadbolt panels — lugs fixed at right angles, vertical npof cut, and the other - with a hole for the finger, and located in the nodes of the support-bolts on the rack intermediate elements, perceiving Har ruzku, each intermediate element is made in the form of a vertical rod fixed on the stand A ke shield, with a socket for the passage of the rod, the height of which corresponds to the bottom of the vertical slot, is formed on the side of the joined surface. FIG. Figure 1 shows a fragment of the prefab building in mon-. position in fig. 2 - the same in the working position; in fig. 3. Scheme of assembly of prefabricated sections of a boron building. The section of the collapsible building contains shields 1. Dvukhskatnogo pokrtsti and shields 2 wall fences, braces 3 and crossbars 4, hinged coe.i dininee. eyes 7; fortified, in turn, on the bolt x-4. The shoulders 7 are made with vertical slots 8. Each eyelet 6 has a circular opening for a finger 9, rigidly connected with it and freely movable by the slit 8 during the installation period. On the uprights 5, the intermediate cops, made in the form of vertical rods 10, threaded into the sockets 11, formed on the mating surfaces of crossbars, are fastened. The height of the rod 10 corresponds to the length of the vertical slot 8, taking into account the mounting tolerance. Moreover, the rod b is parallel to the slot. The hinge assembly formed by the lugs 6 and 7 and the vertical rod 10 are located relative to i each other at a distance equal to the braiding of the reactive pair of forces. Installation of sections are as follows. I -. The sections are delivered to the construction site in packages. With the help of a lifting mechanism they are placed on a horizontal platform. After removal: the transport links are opened by rotating the half-section around the hinge 12. Lift the section up to the installation of the covering panels under the required ear and fix them. Next, the section is raised, the wall boards 2 hang on the boards 1 of the floor. At this time, the fingers 9 occupy the lowest position in the slots 8. The section is placed on the foundation with the coating extended to the working position. The bolts 4 are then mounted on the rods 10 with the sockets 11. The fingers 9 slide along the slots 8, go to the uppermost position, after which they are firmly fixed. Section can be executed with struts. In some cases, with small spans and minor loads, the strut is missing. The spatial rigidity of the section is provided by the inclusion of the hinge assemblies and rods 10, which are rigidly fixed.
В рг бочем состо нии пространственна жесткость секции обеспечиваетс до установки усиливаюпщх элементов: подкосов, стопорных гаек. Возникающие в узле опорные моменты от собственного веса покрыти и ветровой нагрузки раскладываютс на пару сил, приложенную с плечом, равным рассто нию между точками соприкосновени покрыти и станового ограждени как в вертикальном, так и в горизонтальном направлении. Вертикальна нагрузка передаетс через площадку опирани ригел покрыти на стойку, горизонтальна воспринимаетс работой промежуточного элемента - стержн пальца на срез.In the pilot state, the spatial rigidity of the section is provided prior to the installation of reinforcing elements: braces, lock nuts. The supporting moments due to its own weight of the coating and the wind load in the node are decomposed into a pair of forces applied with a shoulder equal to the distance between the points of contact between the coating and the fence in both the vertical and horizontal directions. The vertical load is transmitted through the platform of the supporting bolt of the coating on the stand, which is horizontally perceived by the work of the intermediate element — the pin of the finger — on the cut.
Возможный угол поворота вокруг шарнира - пальца в месте взаимодействи вертикального стержн и гнездаPossible angle of rotation around the hinge - finger in the place of the interaction of the vertical rod and socket
гаситс за счет фрикционного трени при взаимодействии последних.extinguishes due to friction friction in the interaction of the latter.
В эксплуа тационных услови х карнизный узел усиливаетс установкой подкоса или стопорной гайкой на вертикальный стержень и зат жкой гайки пальиа в шарнире.In operating conditions, the eaves assembly is enhanced by installing a strut or locking nut on a vertical rod and tightening the finger nut in a hinge.
Предлагаема конструкци сборноразборного здани обеспечивает полнуюThe proposed collapsible building provides a complete
заводскую готовность, удобство при транспортировке и сохранность секций при этом, а также перевалках и эксплуатации, упрощение Монтажных и демонтажных работ и ускорение процессов их ведени , надежность работы жесткого рамного узла, повышенную безопасность монтажных и демонтажных работ, отсутствие временных креплений.factory readiness, ease of transportation and safety of sections at the same time, as well as transshipment and operation, simplification of installation and dismantling works and acceleration of their maintenance, reliability of the rigid frame assembly, increased safety of installation and dismantling works, lack of temporary fixings.
/V/ V
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813393252A SU1032131A1 (en) | 1981-12-28 | 1981-12-28 | Section of prefabricated knock-down building |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU813393252A SU1032131A1 (en) | 1981-12-28 | 1981-12-28 | Section of prefabricated knock-down building |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1032131A1 true SU1032131A1 (en) | 1983-07-30 |
Family
ID=20996315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU813393252A SU1032131A1 (en) | 1981-12-28 | 1981-12-28 | Section of prefabricated knock-down building |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1032131A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042863A (en) * | 2019-04-29 | 2019-07-23 | 中铁第四勘察设计院集团有限公司 | Complete combined assembled subway station subterranean wall and prefabricated middle plate node and construction method |
-
1981
- 1981-12-28 SU SU813393252A patent/SU1032131A1/en active
Non-Patent Citations (1)
Title |
---|
1. Патент Ф анции 2312610, кл. Е.04 В 1/343, 1976. 2. Авторское свидетельство СССР № 655804, кл. Е 04 В 1/343, 1976 (прототип). 1 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110042863A (en) * | 2019-04-29 | 2019-07-23 | 中铁第四勘察设计院集团有限公司 | Complete combined assembled subway station subterranean wall and prefabricated middle plate node and construction method |
CN110042863B (en) * | 2019-04-29 | 2024-05-03 | 中铁第四勘察设计院集团有限公司 | Full-composite assembled subway station underground wall and prefabricated middle plate node and construction method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5522186A (en) | Tree supported structure | |
EP2909476B1 (en) | Supply frame for a tower, tower with a supply frame and method for erecting a supply frame in the interior of a tower | |
US9803384B2 (en) | Safety barrier netting system | |
US9528285B2 (en) | Safety barrier netting system with rigid panel net supports and stopper mechanisms | |
KR100841240B1 (en) | Built-up scaffold for construction field | |
CN109235861B (en) | Be applied to small high-rise building's assembled scaffold frame | |
US4253549A (en) | Method and a system for the erection of high buildings | |
DE102010000472A1 (en) | Scaffolding and method for mounting or dismounting such scaffolding | |
DE3750572T2 (en) | MODULAR SCAFFOLDING SYSTEM AND CONNECTING ELEMENTS THEREFOR. | |
US4602470A (en) | Dismountable framework | |
US20080264725A1 (en) | Hook-On Scaffold | |
SU1032131A1 (en) | Section of prefabricated knock-down building | |
CN212103679U (en) | A construction platform for installation of assembled tower | |
EP2698486B1 (en) | Vertical support structure for roofing safety fence system | |
CN111527302B (en) | Method for building a tower, tower segment, supply structure and tower | |
CN109653484B (en) | Roofing superelevation faces external hanging flower basket mounting structure of empty curtain engineering | |
CN211229470U (en) | Multi-point suspension scaffold | |
RU47410U1 (en) | SYSTEM FOR FLOORING ESTABLISHMENT OF THE EXTERNAL WALL OF THE BUILDING FROM MONOLITHIC REINFORCED CONCRETE AND SYSTEM HINGED SITE | |
CN211369478U (en) | Door type structural hanging basket suspension structure mounting system | |
US11680418B2 (en) | Assembly for erecting and dismantling a common tower adjacent a building structure and a method of erecting and dismantling the same | |
CN215671309U (en) | Prefabricated temporary stair of going up people | |
CN218623258U (en) | Climbing structure of attached scaffold | |
JP2690822B2 (en) | Steel construction method for low-rise buildings | |
WO2007012107A1 (en) | Hook-on scaffold | |
CN212642081U (en) | Special-shaped multifunctional scaffold |