RU47410U1 - SYSTEM FOR FLOORING ESTABLISHMENT OF THE EXTERNAL WALL OF THE BUILDING FROM MONOLITHIC REINFORCED CONCRETE AND SYSTEM HINGED SITE - Google Patents

SYSTEM FOR FLOORING ESTABLISHMENT OF THE EXTERNAL WALL OF THE BUILDING FROM MONOLITHIC REINFORCED CONCRETE AND SYSTEM HINGED SITE Download PDF

Info

Publication number
RU47410U1
RU47410U1 RU2005113137/22U RU2005113137U RU47410U1 RU 47410 U1 RU47410 U1 RU 47410U1 RU 2005113137/22 U RU2005113137/22 U RU 2005113137/22U RU 2005113137 U RU2005113137 U RU 2005113137U RU 47410 U1 RU47410 U1 RU 47410U1
Authority
RU
Russia
Prior art keywords
wall
latch
hinged platform
levers
hinged
Prior art date
Application number
RU2005113137/22U
Other languages
Russian (ru)
Inventor
А.В. Алексеев
В.П. Беспалов
С.П. Кривошеев
А.И. Цуканов
Original Assignee
Закрытое Акционерное Общество "АлюмоСистем-Монолитстрой"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Закрытое Акционерное Общество "АлюмоСистем-Монолитстрой" filed Critical Закрытое Акционерное Общество "АлюмоСистем-Монолитстрой"
Priority to RU2005113137/22U priority Critical patent/RU47410U1/en
Application granted granted Critical
Publication of RU47410U1 publication Critical patent/RU47410U1/en

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

Система для поэтажного возведения внешней стены здания из монолитного железобетона, в которой опалубка содержит стяжные шпильки для взаимной фиксации щитов, удаляемые из готовой стены, система содержит навесную площадку для опоры щита, имеющую по меньшей мере, одну, закрепленную на каркасе палубу и захваты, навесная площадка содержит болты для зацепления захватов выполненные с возможностью прохождения в сквозные отверстия в стене, остающиеся после удаления стяжных шпилек, болт выполнен так, что, будучи введен с одной стороны стены в сквозное отверстие в стене, может быть закреплен, а также, освобожден и вытолкнут обратно из сквозного отверстия со стороны противоположной той, с которой введен. Навесная площадка содержит захваты и узлы для зацепления захватов, захваты имеют подвижные фиксаторы с возможностью установки в закрытое и в открытое положение, навесная площадка содержит рычаги, на одном конце каждого рычага выполнена такелажная проушина для зацепления стропы подъемного устройства, рычаги установлены на осях с возможностью поворота их в поднятое положение, которое они занимают под нагрузкой, и в опущенное положение, когда рычаги свободны от нагрузки, каждый захват содержит кинематическое соединение фиксатора с рычагом, обеспечивающее закрытое положение фиксатора при опущенном положении рычагов и открытое положение фиксатора при поднятом положении рычагов.A system for floor-by-floor erection of an external wall of a building made of reinforced concrete, in which the formwork contains tie rods for mutual fixation of the panels, removed from the finished wall, the system contains a hinged platform for supporting the shield, which has at least one deck fixed to the frame and grips, hinged the platform contains bolts for engaging the grippers made with the possibility of passing into the through holes in the wall, remaining after removing the tie rods, the bolt is made so that, being inserted from one side of the wall into the well heat of the wall opening, can be fixed, as well as released and pushed back out of the through hole on the side opposite the one with which introduced. The hinged platform contains grips and nodes for engaging the grippers, the grips have movable locks that can be installed in the closed and open positions, the hinged platform contains levers, a lifting eye is made at one end of each arm to engage the slings of the lifting device, the levers are mounted on the axles with the possibility of rotation them in the raised position, which they occupy under load, and in the lowered position, when the levers are free of load, each capture contains a kinematic connection of the latch with the lever m, providing a closed position when the latch lever lowered position and an open position when the latch lever raised position.

Description

Настоящее техническое решение относится к области строительства из монолитного железобетона, и в частности, к методам и оборудованию для поэтажного возведения внешних стен зданий.This technical solution relates to the field of construction of reinforced concrete, and in particular, to methods and equipment for the floor construction of external walls of buildings.

Технология строительства из монолитного железобетона признается в настоящее время наиболее прогрессивной и экономичной. В ее основе лежит принцип изготовления бетонных конструкций возводимого объекта непосредственно на месте их проектного расположения. Основную роль в этой технологии играет опалубка, так как от простоты и скорости ее монтажа и демонтажа непосредственно зависят темпы и стоимость строительства. Сложившейся практикой является продажа или поставка напрокат строительным организациям опалубки специализированными фирмами. Наиболее известными являются такие международные фирмы как Дока (Doka), ПЕРИ (PERI), MEBA (MEVA), Алума Системс (Aluma Systems).The technology of construction of reinforced concrete is currently recognized as the most progressive and economical. It is based on the principle of manufacturing concrete structures of an erected object directly at the place of their design location. Formwork plays the main role in this technology, since the pace and cost of construction directly depend on the simplicity and speed of its installation and dismantling. The established practice is the sale or rental of formwork by specialized firms to construction organizations. The most famous are such international companies as Doka (Doka), PERI (PERI), MEBA (MEVA), Aluma Systems (Aluma Systems).

Приемы и оборудование, используемые при возведении внешних стен здания в отличие от внутренних стен имеют особенности, вызванные расположением этих стен. Опорой для стеновой опалубки при возведении очередного этажа может служить межэтажное перекрытие, но в случае внешней стены здания такая естественная опора имеется только с одной стороны.The techniques and equipment used in the construction of the external walls of the building, unlike the internal walls, have features caused by the location of these walls. The support for wall formwork during the construction of the next floor can be an interfloor overlap, but in the case of an external wall of a building, such natural support is only on one side.

Задача закрепления щита опалубки с наружной стороны внешней стены строящегося здания решается фирмами Дока (Doka), ПЕРИ (PERI), MEBA (MEVA) с помощью навесных площадок, обеспечивающих опору для наружного щита. Конструкция большинства навесных площадок, известных из рекламных проспектов этих фирм практически одинакова.The task of securing the formwork shield on the outer side of the external wall of the building under construction is solved by the Doka, PERI, PERI, MEBA (MEVA) companies using hanging platforms that provide support for the outer shield. The design of most of the hanging platforms known from the brochures of these companies is almost the same.

На Фиг.1 показана навесная площадка 1, применяемая в системе опалубки фирмы "Дока" при поэтажном возведении внешних стен зданий по технологии монолитного строительства. Эта Figure 1 shows the hinged platform 1, used in the formwork system of the company "Doka" during the floor construction of the external walls of buildings using the technology of monolithic construction. This

навесная площадка является наиболее близкой к настоящему техническому решению навесной площадки.the hinged platform is the closest to the real technical solution of the hinged platform.

Навесная площадка 1 выполнена двухуровневой, и содержит верхнюю часть с верхней палубой 2, на которую устанавливают наружный щит опалубки, и вспомогательную нижнюю палубу 3 на нижней части навесной площадки, разъемно соединенной с верхней для регулировки расстояния между палубами 2 и 3. Навесная площадка 1 устанавливается с наружной стороны готовой части стены 4 с помощью предусмотренных для нее анкерных элементов 5. Анкерные элементы 5 закрепляют в заданных местах с внутренней стороны лицевого покрытия 6 щита опалубки, как показано на Фиг.2, с тем, чтобы они оказались в теле бетона при бетонировании стены очередного этажа. В дальнейшем, для бетонирования стены следующего этажа, в анкерные элементы 5, закрепленные таким образом в готовой стене очередного этажа, ввинчиваются болты 7 (Фиг.3), на которые устанавливается навесная площадка 1. Для закрепления на болтах 7 навесная площадка 1 снабжена захватами 8 (Фиг.4), выполненными в виде вилок, одевающихся сверху на головки болтов 7. Навесная площадка, когда она установлена на стене, подвержена ветровым нагрузкам. Для надежного закрепления навесной площадки 1 захваты 8 снабжены фиксаторами 9. Фиксаторы 9 выполнены в виде засовов, которые, после зацепления вилок захватов 8 за головки болтов 7, вдвигают в захваты 8 вдоль плоскостей вилок. В этом положении фиксаторы 8 препятствуют выходу захватов 8 из зацепления с болтами 7.The hinged platform 1 is made two-level, and contains the upper part with the upper deck 2, on which the outer formwork shield is installed, and the auxiliary lower deck 3 on the lower part of the hinged platform, detachably connected to the upper to adjust the distance between decks 2 and 3. The hinged platform 1 is installed from the outside of the finished part of the wall 4 using the anchor elements provided for it 5. The anchor elements 5 are fixed in predetermined places from the inside of the front cover 6 of the formwork shield, as shown in FIG. 2, so that they were in the body of the concrete during the concreting of the wall of the next floor. Further, for concreting the wall of the next floor, in the anchor elements 5, thus fixed in the finished wall of the next floor, the screws 7 are screwed (Fig. 3), on which the hinged platform 1 is installed. For fastening on the bolts 7, the hinged platform 1 is equipped with grippers 8 (Figure 4), made in the form of forks, dressing on top of the bolt heads 7. The hinged platform, when it is mounted on the wall, is subject to wind loads. For reliable fastening of the hinged platform 1, the grippers 8 are equipped with clamps 9. The clamps 9 are made in the form of bolts, which, after engaging the forks of the grippers 8 over the heads of the bolts 7, are pushed into the grippers 8 along the planes of the forks. In this position, the latches 8 prevent the claws 8 from coming out of engagement with the bolts 7.

Навесную площадку 1 перемещают с помощью подъемного устройства. Для зацепления строп подъемного устройства, по четырем углам навесной площадки выполнены жестко закрепленные такелажные проушины (не показаны).The pad 1 is moved using a lifting device. To engage the slings of the lifting device, rigidly fixed lifting eyes (not shown) are made at the four corners of the hinged platform.

С каждым новым этажом навесную площадку 1 переустанавливают на этаж выше. Выступающие из стены предыдущего этажа болты 7 удаляют, для этого монтажник спускается с верхней палубы 2 на нижнюю палубу 3, расстояние между которыми несколько превышает With each new floor, the landing pad 1 is reinstalled on the floor above. The bolts 7 protruding from the wall of the previous floor are removed, for this the installer descends from the upper deck 2 to the lower deck 3, the distance between which slightly exceeds

высоту этажа (Фиг.1) и вывинчивает болты 7 из анкерных элементов 5, которые сами не подлежат удалению.the height of the floor (Figure 1) and unscrews the bolts 7 from the anchor elements 5, which themselves cannot be removed.

Описанная навесная площадка имеет ряд недостатков. Закрепление анкерных элементов на наружных щитах опалубки требует значительной точности при проведении этой работы, так как расстояние между анкерными элементами должно соответствовать расстоянию между захватами, которые жестко закреплены на навесной площадке. Двухуровневая навесная площадка является громоздкой, кроме того, во многих из них конструкция усложняется тем, что в верхней палубе устраивается люк, чтобы облегчить переход монтажника на нижнюю палубу. В случае, если люка нет, переход монтажника с верхней на нижнюю палубу сопряжен с большой опасностью. Кроме того, удаление болтов из стены сопряжено с продолжительными работами на навесной площадке с наружной стороны стены здания, то есть работами в условиях повышенной опасности. Далее, ручное управление фиксаторами захватов в условиях работы на высоте и часто при неблагоприятных климатических условиях (мороз, дождь) повышает вероятность чрезвычайных происшествий из-за несоблюдения технологических правил, в частности, если захваты забыли зафиксировать, или пренебрегли этим. Наконец, оставляемые в стене каждого этажа анкерные элементы увеличивают стоимость строительства.The described hinged platform has several disadvantages. The fastening of the anchor elements on the outer formwork panels requires considerable accuracy during this work, since the distance between the anchor elements must correspond to the distance between the grippers, which are rigidly fixed on the hinged platform. The two-level hinged platform is cumbersome, in addition, in many of them the design is complicated by the fact that a hatch is arranged in the upper deck to facilitate the transition of the installer to the lower deck. If there is no hatch, the fitter's transition from the upper to the lower deck is fraught with great danger. In addition, the removal of bolts from the wall is associated with lengthy work on the hinged area on the outside of the wall of the building, that is, work in conditions of increased danger. Further, manual control of the gripper clamps in working conditions at altitude and often under adverse climatic conditions (frost, rain) increases the likelihood of emergencies due to non-compliance with technological rules, in particular, if the grippers forgot to fix, or neglected this. Finally, the anchor elements left in the wall of each floor increase the cost of construction.

Наиболее близкой к настоящему техническому решению является система для поэтажного возведения внешней стены здания, применяемая фирмой Алума Системс.Closest to the present technical solution is a system for floor-by-floor erection of the external wall of the building, used by Aluma Systems.

Задача закрепления щита опалубки с наружной стороны внешней стены строящегося здания решается, как показано на Фиг.5. В системе опалубки Алума Системс, используют щиты 11 облегченной конструкции. Чтобы избежать деформации под весом бетонного раствора, фиксацию щитов 11 на расстоянии равном толщине стены осуществляют с помощью стяжных шпилек 12, пропускаемых через ответные друг другу отверстия, выполненные в щитах 11 рядами с заданным шагом по ширине и высоте щитов 11. В ходе разборки опалубки после отвердевания бетонного раствора стяжные шпильки The task of securing the formwork shield on the outer side of the outer wall of the building under construction is solved, as shown in Figure 5. In the Aluma Systems formwork system, lightweight shields 11 are used. To avoid deformation under the weight of the concrete mortar, the panels 11 are fixed at a distance equal to the wall thickness using the tie rods 12, passed through the holes corresponding to each other, made in the panels 11 in rows with a given step along the width and height of the panels 11. During the dismantling of the formwork after hardening concrete mortar tie rods

12 удаляют из готовой стены. В системе Алума Системс для возведения внешней стены здания вместо навесной площадки для опоры наружного щита опалубки применяется щит 13 увеличенной высоты, который в нижней части закрепляется шпильками 14 к готовой стене 15 предыдущего этажа через оставшиеся в ней сквозные отверстия 16. Щит 13 содержит закрепленные на нем верхнюю площадку 17 и нижнюю площадку 18, используемые для отвинчивания гаек 19 стяжных шпилек с наружной стороны.12 is removed from the finished wall. In the Aluma Systems system, for the construction of the outer wall of the building, instead of a hinged platform for supporting the outer formwork shield, an increased height shield 13 is used, which is fastened in the lower part with pins 14 to the finished wall 15 of the previous floor through the through holes remaining in it 16. The shield 13 contains the upper platform 17 and the lower platform 18, used to unscrew the nuts 19 of the tie rods from the outside.

Этому техническому решению присущи, в основном, те же недостатки, а именно, необходимость использования площадок на двух уровнях и значительная трудоемкость работ с наружной стороны стены здания в условиях повышенной опасности. Кроме того, специализированные щиты 13 увеличенной высоты, пригодны только для применения с наружной стороны внешней стены, и не могут быть использованы при возведении, например, стен внутри здания.This technical solution has basically the same drawbacks, namely, the need to use sites at two levels and the considerable laboriousness of work from the outside of the building wall in conditions of increased danger. In addition, specialized panels 13 of increased height are suitable only for use on the outside of the external wall, and cannot be used in the construction of, for example, walls inside a building.

В основу настоящего технического решения положена задача создать систему для поэтажного возведения внешней стены здания из монолитного железобетона, а также навесную площадку, которые обеспечили бы снижение трудоемкости работ, выполняемых монтажником с наружной стороны внешней стены, повысили безопасность работ и, и вместе с тем позволили достичь удешевления системы.The basis of this technical solution is the task of creating a system for floor-by-floor erection of the building’s external wall from reinforced concrete, as well as a hinged platform that would reduce the complexity of the work performed by the installer on the outside of the external wall, increase the safety of work and, at the same time, achieve cheaper system.

Поставленная задача решается тем, что в системе для поэтажного возведения внешней стены здания из монолитного железобетона, включающей опалубку, содержащую два щита для заливки между ними бетонного раствора на высоту щитов при возведении стены очередного этажа, опалубка содержит стяжные шпильки, а щиты имеют ответные друг другу отверстия, расположенные рядами с заданным шагом вдоль ширины щита для прохождения сквозь них стяжных шпилек и взаимной фиксации щитов с помощью стяжных шпилек на расстоянии, равном толщине возводимой стены, шпильки выполнены удаляемыми из готовой стены после отвердевания бетонного раствора, согласно настоящему The problem is solved in that in the system for floor-by-floor construction of the external wall of the building from reinforced concrete, including a formwork containing two boards for pouring concrete mortar between them to the height of the boards during the construction of the wall of the next floor, the formwork contains tie rods, and the panels are reciprocal holes located in rows with a given step along the width of the shield for passing through the tie rods and mutual fixation of the shields with tie rods at a distance equal to the thickness of the wall being constructed the slats are made removable from the finished wall after the concrete mortar has hardened, according to this

техническому решению, система содержит навесную площадку для опоры щита, навесная площадка, включает корпус, содержащий каркас, по меньшей мере, одну, закрепленную на каркасе палубу и, по меньшей мере, два захвата, закрепленных на каркасе на расстоянии кратном шагу отверстий в ряду вдоль ширины щита, навесная площадка далее содержит болты для зацепления захватов, выполненные с возможностью прохождения в сквозные отверстия в стене, остающиеся после удаления шпилек, каждый болт содержит средство для закрепления болта в стене, болт выполнен так, что, будучи введен с одной стороны стены в сквозное отверстие в стене, может быть закреплен, а также, освобожден и вытолкнут обратно из сквозного отверстия со стороны противоположной той, с которой введен.the technical solution, the system comprises a hinged platform for supporting the shield, the hinged platform, includes a housing comprising a frame, at least one deck fixed to the frame and at least two grips fixed to the frame at a distance multiple of the pitch of the holes in a row along the width of the shield, the hinged platform further comprises bolts for engaging the grippers, made with the possibility of passing through the holes in the wall remaining after removing the studs, each bolt contains means for fixing the bolt in the wall, the bolt is made ak that being introduced from one side wall of the through hole in the wall, may be fixed, as well as released and pushed back out of the through hole on the side opposite that from which introduced.

Выполнение болтов для установки навесной площадки с возможностью закрепления, а затем, освобождения и удаления из стены со стороны, противоположной той с которой болты введены в сквозные отверстия в стене обеспечивает возможность выполнения этих работ с внутренней стороны стены, изнутри здания, а следовательно, уменьшает объем работы, выполняемой в условиях повышенной опасности с наружной стороны внешней стены здания.The implementation of the bolts for installing the hinged platform with the possibility of fixing, and then releasing and removing from the wall from the side opposite to the one from which the bolts are inserted into the through holes in the wall, allows these works to be performed from the inside of the wall, from the inside of the building, and therefore reduces the volume work performed in conditions of increased danger from the outside of the external wall of the building.

Целесообразно, чтобы навесная площадка была выполнена одноуровневой, содержащей одну палубу.It is advisable that the hinged platform was made single-level, containing one deck.

Установка навесной площадки на болтах, которые после возведения стены очередного этажа могут быть освобождены и удалены из стены с внутренней стороны стены устраняет необходимость спускаться для проведения этих работ с наружной стороны стены на уровень предыдущей установки навесной площадки и этим обеспечивает возможность использования одноуровневой навесной площадки, более дешевой по сравнению с известной двухуровневой.The installation of the hinged platform on the bolts, which after the erection of the wall of the next floor can be released and removed from the wall on the inner side of the wall, eliminates the need to go down to carry out these works from the outer side of the wall to the level of the previous installation of the hinged platform and this makes it possible to use a single-level hinged platform, more cheap compared to the well-known two-level.

Целесообразно, чтобы навесная площадка содержала болты для зацепления захватов в количестве вдвое превышающем количество захватов и тросы, соединяющие каждый болт с корпусом так, что It is advisable that the hinged platform contains bolts for engaging the grippers in an amount twice as large as the number of grippers and cables connecting each bolt to the housing so that

места закрепления тросов на корпусе были доступны монтажнику с палубы навесной площадки.the places where the cables were fixed on the hull were accessible to the installer from the deck of the outboard platform.

Поставленная задача решается также тем, что в навесной площадке для опоры щита опалубки, содержащая каркас и средство для ее установки на стене здания в заданном положении, при этом средство включает закрепленное на каркасе приспособление для зацепления строп внешнего подъемного устройства, по меньшей мере, два закрепленных на каркасе захвата и узлы для зацепления захватов, выполненные с возможностью закрепления в стене и зацепления за них захватов, когда узлы закреплены в стене, и, по меньшей мере, два захвата содержат каждый по подвижному фиксатору, выполненному с возможностью установки в закрытое положение, в котором, когда захват находится в зацеплении с указанным узлом, фиксатор препятствует их разъединению, и в открытое положение, обеспечивающее возможность зацепления и разъединения захвата с указанным узлом, согласно настоящему техническому решению, приспособление для зацепления строп содержит оси, закрепленные на каркасе, и рычаги, установленные по одному на каждой оси, на одном конце каждого рычага выполнена такелажная проушина для зацепления стропы подъемного устройства, рычаги установлены на осях с возможностью поворота их в поднятое положение, которое они занимают под нагрузкой, когда навесная площадка висит на стропах подъемного устройства, зацепленных за такелажные проушины в рычагах, и в опущенное положение, когда рычаги свободны от нагрузки, каждый захват, содержащий фиксатор, содержит кинематическое соединение фиксатора с рычагом, обеспечивающее закрытое положение фиксатора что при опущенном положении рычагов и открытое положение фиксатора при поднятом положении рычагов.The problem is also solved by the fact that in the hinged platform for supporting the formwork shield, containing a frame and means for its installation on the wall of the building in a predetermined position, the tool includes a device mounted on the frame for engaging the slings of an external lifting device, at least two fixed on the grip frame and nodes for engaging the grippers, made with the possibility of fastening in the wall and engaging for them grippers, when the nodes are fixed in the wall, and at least two grippers each are movably m latch, made with the possibility of installation in a closed position, in which, when the grip is engaged with the specified node, the latch prevents them from disconnecting, and in the open position, providing the possibility of meshing and disconnecting the grip with the specified node, according to this technical solution, a device for hooking of the sling contains axes fixed on the frame, and levers mounted one on each axis, a lifting eye is made at one end of each arm to engage the lifting slings On the device, the levers are mounted on the axles with the possibility of turning them into the raised position, which they occupy under load, when the hinged platform hangs on the slings of the lifting device, hooked to the lifting eyes in the levers, and in the lowered position, when the levers are free of load, each grip containing a latch, contains a kinematic connection of the latch with the lever, providing a closed position of the latch that with the lowered position of the levers and an open position of the latch with the raised position of the levers.

Отцепление строп после установки навесной площадки связано с совершением действий с рычагами, поэтому рычаги, оставшиеся в поднятом положении, практически, не могут остаться незамеченными. Опущенное положение рычагов обеспечивает The uncoupling of the slings after installing the hinged platform is associated with the execution of actions with levers, so the levers remaining in the raised position, practically can not go unnoticed. The lowered position of the levers provides

фиксацию захватов навесной площадки, а следовательно, безопасность работ на навесной площадке.fixing of captures of the hinged platform, and therefore, the safety of work on the hinged platform.

В предпочтительной реализации средство для установки навесной площадки на стене здания содержит два содержащих фиксаторы захвата, при этом каждый из соединенных с фиксаторами рычагов соединен с одним фиксатором. При этом целесообразно, чтобы кинематическое соединение фиксатора с рычагом содержало тягу, концы которой шарнирно соединены, соответственно, с фиксатором и рычагом.In a preferred embodiment, the means for installing the hinged area on the wall of the building comprises two gripping clamps, each of which is connected to the clamps of the levers connected to one clamp. In this case, it is advisable that the kinematic connection of the latch with the lever contains a rod, the ends of which are pivotally connected, respectively, with the latch and the lever.

Далее, целесообразно, чтобы узел для зацепления захвата содержал болт, имеющий на одном конце головку, а каждый захват содержал вилку, в головке болта была выполнена кольцевая канавка для прохождения в ней вилки, а захват, содержащий фиксатор, содержал закрепленную на вилке ось фиксатора, на которой фиксатор установлен с возможностью поворота между открытым и закрытым положением, и чтобы при этом фиксатор содержал зуб, который в закрытом положении фиксатора перегораживает устье вилки.Further, it is advisable that the node for engaging the gripper contains a bolt having a head at one end, and each gripper contains a fork, an annular groove is made in the head of the bolt for the passage of the fork in it, and the gripper containing the retainer contains an axis of the retainer fixed to the fork, on which the latch is mounted to rotate between the open and closed position, and so that the latch contains a tooth, which in the closed position of the latch blocks the mouth of the fork.

В предпочтительной реализации рычаги приспособления для зацепления строп выполнены с возможностью принимать, в отсутствие нагрузки, опущенное положение под действием собственного веса, когда навесная площадка установлена на стене здания в заданном положении. Это освобождает монтажника от необходимости помнить про фиксацию захватов, которая в такой реализации осуществляется автоматически.In a preferred embodiment, the levers of the device for engaging the slings are configured to accept, in the absence of load, a lowered position under the influence of its own weight when the hinged platform is mounted on the wall of the building in a predetermined position. This frees the installer from the need to remember about the fixation of the grippers, which in such an implementation is carried out automatically.

Далее настоящее техническое решение будет подробно рассмотрено на примерах предпочтительной реализации со ссылками на чертежи, на которых:Further, the present technical solution will be considered in detail on the examples of the preferred implementation with reference to the drawings, in which:

Фиг.1 изображает вид сбоку навесной площадки предшествующего уровня техники, установленной с наружной стороны внешней стены возводимого здания;Figure 1 depicts a side view of a curtain pad of the prior art installed on the outer side of the outer wall of the building being constructed;

Фиг.2 - 4 изображают элементы средства для установки навесной площадки предшествующего уровня техники;Figure 2 - 4 depict the elements of the means for installing the hinged pad of the prior art;

Фиг.5 иллюстрирует другую систему поэтажного возведения внешней стены здания предшествующего уровня техники;Figure 5 illustrates another system of floor construction of the outer wall of the building of the prior art;

Фиг.6 изображает вид сбоку корпуса навесной площадки системы, выполненной в соответствии с настоящим техническим решением;6 depicts a side view of the body of the hinged platform system, made in accordance with this technical solution;

Фиг.7 - вид 7 - 7 корпуса навесной площадки на Фиг.6;Fig.7 is a view 7 - 7 of the body of the outboard in Fig.6;

Фиг.8 изображает вид сбоку навесной площадки и опалубки системы по настоящему техническому решению, установленных в рабочее положение для бетонирования стены очередного этажа;Fig.8 depicts a side view of the hinged platform and formwork of the system according to the present technical solution, installed in the working position for concreting the walls of the next floor;

Фиг.9 - вид 9 - 9 опалубки на Фиг.8;Fig.9 is a view 9 to 9 of the formwork in Fig.8;

Фиг.10 иллюстрирует подготовку к установке навесной площадки системы по настоящему техническому решению на готовой стене очередного этажа;Figure 10 illustrates the preparation for installation of the hinged platform of the system according to the present technical solution on the finished wall of the next floor;

Фиг.11 изображает вид сбоку болта для зацепления захвата навесной площадки в системе, выполненной в соответствии с настоящим техническим решением;11 depicts a side view of a bolt for engaging the capture of the hinged pad in a system made in accordance with this technical solution;

Фиг.12 - вид 12-12 болта на Фиг.11;Fig.12 is a view of 12-12 bolts in Fig.11;

Фиг.13, 14 - элементы болта на Фиг.11;Fig.13, 14 - elements of the bolt in Fig.11;

Фиг.15 изображает навесную площадку, в виде сбоку, со средством для установки ее на стене, выполненную согласно настоящему техническому решению;Fig depicts a hinged platform, in side view, with means for installing it on the wall, made in accordance with the present technical solution;

Фиг.16 - вид 16-16 навесной площадки на Фиг.15.Fig. 16 is a view of the hinged pad in Fig. 15.

На Фиг.6, 7 показан корпус 20 навесной площадки для поэтажного возведения внешней стены здания из монолитного железобетона, осуществляемого согласно настоящему техническому решению.6, 7 show the housing 20 of the hinged platform for floor-wise erection of the external wall of the building from reinforced concrete, carried out according to this technical solution.

Каркас 21 навесной площадки, собран из металлических балок. Как показано на Фиг.6, две поперечные балки 22, одними концами, скреплены под прямым углом с вертикальными стойками 23 с помощью болтов 24, другие концы балок 22 и стоек 23, соответственно, соединены диагональными балками 25. На поперечных балках 22, на одном уровне, закреплены продольные балки 26, несущие единственную палубу 27, выполненную, например, из многослойной фанеры. В предпочтительной реализации навесная площадка системы Frame 21 hinged platform, assembled from metal beams. As shown in Fig.6, two transverse beams 22, at one end, are fastened at right angles to the vertical struts 23 using bolts 24, the other ends of the beams 22 and racks 23, respectively, are connected by diagonal beams 25. On the transverse beams 22, on one level, fixed longitudinal beams 26, bearing a single deck 27, made, for example, of multilayer plywood. In a preferred embodiment, a system hinged pad

выполнена одноуровневой и не имеет второй палубы, расположенной на уровне этажом ниже.made one-level and does not have a second deck, located at the level of a floor below.

На верхних концах каждой из балок 22 закреплены захваты 28, обеспечивающие зацепление за головки болтов навесной площадки, закрепляемых в стене здания.At the upper ends of each of the beams 22, grips 28 are fixed, providing engagement for the heads of the bolts of the hinged platform, fixed in the wall of the building.

Корпус 20 (Фиг.7) содержит два захвата. В случае значительной длины он может иметь более двух захватов, например, третий захват, закрепленный между двумя крайними. В настоящей реализации захват 28 содержит вилку 29, также как захват известной навесной площадки, изображенный на Фиг.4. Выбор взаимного расположения захватов 28, а также устройство болтов для зацепления захватов 28 поясняются ниже.The housing 20 (Fig.7) contains two grippers. In the case of a considerable length, it can have more than two grips, for example, a third gripper fixed between the two extreme ones. In the present implementation, the gripper 28 comprises a fork 29, as well as the gripper of a known landing pad depicted in FIG. 4. The choice of the relative position of the grippers 28, as well as the arrangement of bolts for engaging the grippers 28, are explained below.

К концам балок 22, противоположным захватам 28, закреплено ограждение 30. Для придания каркасу 21 жесткости вертикальные стойки 23 соединены диагональными планками 31.A guard 30 is fixed to the ends of the beams 22, opposite the grips 28. To give the frame 21 stiffness, the vertical posts 23 are connected by diagonal bars 31.

Для перемещения корпуса 20 навесной площадки с помощью внешнего подъемного устройства по четырем углам палубы 27 установлены соединенные с каркасом 21 рычаги 32. В рычагах 32 выполнены такелажные проушины 33 для зацепления строп подъемного устройства. Рычаги 32 установлены на закрепленных на каркасе 21 осях 34 с возможностью вращения. Рычаги 32 показаны на Фиг.6, 7 в поднятом положении, которое они занимают под нагрузкой, но могут быть повернуты в опущенное положение, когда они освобождены от строп, так, чтобы быть убранными в прорези в палубе 27, как показано на Фиг.15. На нижних концах каждой из балок 22 закреплены стеновые упоры 35.To move the hinge body 20 using an external lifting device at the four corners of deck 27, levers 32 are connected to the frame 21. Lifting eyes 33 are made in the levers 32 to engage the slings of the lifting device. The levers 32 are mounted on the axles 34 mounted on the frame 21 with the possibility of rotation. The levers 32 are shown in Fig.6, 7 in the raised position, which they occupy under load, but can be rotated to the lowered position when they are released from the slings, so as to be removed in the slots in the deck 27, as shown in Fig.15 . At the lower ends of each of the beams 22 fixed wall stops 35.

На Фиг.8, 9 изображена опалубка системы настоящего технического решения, установленная в рабочее положение для заливки стены очередного этажа.On Fig, 9 shows the formwork of the system of the present technical solution installed in the working position for filling the walls of the next floor.

Описание порядка работы системы настоящего технического решения ниже приводится вместе с дальнейшим описанием ее выполнения применительно к возведению стены очередного этажа с помощью опалубки на Фиг.8, 9. При этом подразумевается, что, A description of the operation of the system of the present technical solution is given below together with a further description of its implementation in relation to the construction of the wall of the next floor using the formwork in Figs. 8, 9. It is understood that,

изображенная на Фиг.8 стена 38 предыдущего этажа изготовлена точно также с помощью данной системы.the wall 38 of the previous floor shown in FIG. 8 is made in exactly the same way using this system.

Одинаковые щиты 40 опалубки установлены в рабочее положение для бетонирования стены очередного этажа. Каждый щит 40 содержит лицевое покрытие 41 из многослойной фанеры, закрепленное на горизонтальных балках 42. Горизонтальные балки 42 скреплены вертикальными балками 43. Количество вертикальных балок зависит от ширины щита, в данной реализации щит 40 содержит две балки 43. Щиты 40 имеют ответные друг другу отверстия, проходящие сквозь вертикальные балки 43 и лицевые покрытия 41. Положение отверстий в щитах 40 задано отверстиями 44 в накладках 45, закрепленных на балках 43 (Фиг.9). Расстояние между балками 43 задает шаг отверстий вдоль ширины щита. Отверстия 44 и соответствующие им отверстия в лицевых покрытиях 41 выполняются в процессе сборки щитов с точностью, обеспечивающей совпадение ответных отверстий в любой паре щитов.The same formwork panels 40 are installed in the working position for concreting the walls of the next floor. Each shield 40 contains a front cover 41 of multilayer plywood, mounted on horizontal beams 42. The horizontal beams 42 are fastened by vertical beams 43. The number of vertical beams depends on the width of the shield, in this implementation, the shield 40 contains two beams 43. The shields 40 have openings corresponding to each other passing through the vertical beams 43 and the front cover 41. The position of the holes in the shields 40 is defined by the holes 44 in the overlays 45, mounted on the beams 43 (Fig.9). The distance between the beams 43 defines the pitch of the holes along the width of the shield. Holes 44 and their corresponding holes in the front cover 41 are performed during the assembly of the boards with an accuracy that ensures matching of the counter holes in any pair of panels.

Количество горизонтальных рядов отверстий в щитах разных типоразмеров может быть различным в зависимости от высоты щита. В данной реализации щит 40 содержит два горизонтальных ряда отверстий вдоль ширины щита, проходящих на уровнях по высоте щита вблизи верхнего и нижнего концов вертикальных балок 43, соответственно. Через ответные отверстия в щитах 40 пропущены стяжные шпильки 46, обеспечивающие взаимную фиксацию щитов 40 на расстоянии толщины возводимой стены гайками 47.The number of horizontal rows of holes in the boards of different sizes may be different depending on the height of the shield. In this implementation, the shield 40 contains two horizontal rows of holes along the width of the shield, passing at levels along the height of the shield near the upper and lower ends of the vertical beams 43, respectively. Through the counter holes in the shields 40, tie rods 46 are passed, providing mutual fixation of the shields 40 at a distance of the thickness of the wall being erected by nuts 47.

Расстояние между захватами 28 навесной площадки (Фиг.7) выполняется кратным шагу отверстий 44 в горизонтальном ряду вдоль ширины щита 40 опалубки (Фиг.9). В данной реализации расстояние между захватами 28 равно расстоянию между отверстиями 44 в одном ряду вдоль ширины щита.The distance between the grippers 28 of the hinged platform (Fig.7) is a multiple of the pitch of the holes 44 in a horizontal row along the width of the shield 40 of the formwork (Fig.9). In this implementation, the distance between the grippers 28 is equal to the distance between the holes 44 in the same row along the width of the shield.

При строительстве стены первого этажа щиты опалубки устанавливают с опорой на фундамент строящегося здания. При возведении внешней стены каждого следующего этажа (Фиг.6) щит 40, установленный с внутренней стороны возводимой стены, опирается нижним краем на межэтажное перекрытие 48 и закреплен в During the construction of the wall of the first floor, the formwork panels are installed based on the foundation of the building under construction. When erecting the outer wall of each next floor (FIG. 6), the shield 40, mounted on the inside of the wall being erected, is supported by the lower edge on the floor level 48 and fixed in

вертикальном положении с помощью стоек 49. Положение наружного щита 40, установленного на деревянной прокладке 50 с опорой на корпус 20 навесной площадки фиксировано стяжными шпильками 46. Корпус 20 навесной площадки установлен с наружной стороны готовой внешней стены 38 предыдущего этажа.upright using racks 49. The position of the outer shield 40 mounted on a wooden spacer 50 supported by the body 20 of the hinged pad is fixed with tie rods 46. The body 20 of the hinged pad is mounted on the outside of the finished external wall 38 of the previous floor.

Бетонный раствор заливают в пространство между лицевыми покрытиями 41 щитов 40. После отвердевания бетонного раствора гайки 47 отвинчивают, отделяют щиты 40 от готовой стены очередного этажа и удаляют шпильки 46. После удаления стяжных шпилек 46 в стене остаются сквозные отверстия. Эти технологические отверстия впоследствии замуровываются в ходе отделочных работ в здании.Concrete mortar is poured into the space between the front coverings of 41 panels 40. After the concrete solution has hardened, the nuts 47 are unscrewed, the panels 40 are separated from the finished wall of the next floor and the studs 46 are removed. After removing the tie rods 46, through holes remain in the wall. These technological holes are subsequently walled up during the finishing work in the building.

Поверх стен очередного этажа, после их возведения, бетонируют межэтажное перекрытие, после чего приступают к строительству следующего этажа.After the walls of the next floor, after their construction, the concrete floor is concreted, after which they begin the construction of the next floor.

В предпочтительной реализации системы навесная площадка содержит два комплекта одинаковых болтов для зацепления захватов, количество болтов в каждом из которых равно количеству захватов навесной площадки. Навесная площадка настоящей реализации включает два комплекта болтов, первый комплект содержит два болта 52, второй - два болта 53. Болты обоих комплектов соединены тросами 54 с корпусом 20 навесной площадки. Место закрепления тросов 54 на корпусе 20 выбирается так, чтобы оно было доступно монтажнику с палубы 27 навесной площадки. Корпус 20 навесной площадки установлен на болтах 52, которые закреплены с внутренней стороны стены 38 с помощью шайб 55 и гаек 56.In a preferred implementation of the system, the outboard contains two sets of identical bolts for engaging the grippers, the number of bolts in each of which is equal to the number of grips in the outboard. The mounted platform of this implementation includes two sets of bolts, the first set contains two bolts 52, the second contains two bolts 53. The bolts of both sets are connected by cables 54 to the body 20 of the mounted platform. The place of fastening of the cables 54 on the housing 20 is selected so that it is accessible to the installer from deck 27 of the outboard platform. The body 20 of the hinged platform is mounted on bolts 52, which are fixed on the inside of the wall 38 using washers 55 and nuts 56.

Болты 53 второго комплекта используются для установки корпуса 20 на стене очередного этажа, и до их использования размещены так, чтобы они не создавали помех работе монтажника, например, так как показано на Фиг.8. Конструкция болтов 52, 53, соответствующая форме захватов 28 и детально описанная ниже, обеспечивает возможность устанавливать и снимать корпус 20 навесной площадки со стены когда болты, закреплены в стене.The bolts 53 of the second set are used to mount the housing 20 on the wall of the next floor, and prior to their use are placed so that they do not interfere with the work of the installer, for example, as shown in Fig. 8. The design of the bolts 52, 53, corresponding to the shape of the grippers 28 and described in detail below, provides the ability to install and remove the body 20 of the mounted platform from the wall when the bolts are fixed to the wall.

Фиг.10 иллюстрирует подготовку к установке опалубки для бетонирования стены следующего этажа.Figure 10 illustrates the preparation for installation of formwork for concrete wall of the next floor.

Сквозные отверстия 57 в стене 58 готового этажа, оставшиеся после удаления из нее шпилек 46, используют для установки навесной площадки. Для этого болты 53 из второго комплекта вводят с наружной стороны стены 58 в сквозные отверстия 57 верхнего горизонтального ряда. Расположение этих отверстий определяется расположением отверстий 44 (Фиг.9) в верхнем ряду вдоль ширины щита. Точность и повторяемость положений сквозных отверстий 57 от этажа к этажу, определяющаяся точным изготовлением щитов 40, не вызывает необходимости регулировки расстояния между захватами 28, что позволяет упростить конструкцию навесной площадки.The through holes 57 in the wall 58 of the finished floor, remaining after the removal of the studs 46 from it, are used to install the hinged platform. For this, the bolts 53 from the second set are inserted from the outside of the wall 58 into the through holes 57 of the upper horizontal row. The location of these holes is determined by the location of the holes 44 (Fig.9) in the upper row along the width of the shield. The accuracy and repeatability of the positions of the through holes 57 from floor to floor, determined by the precise manufacture of panels 40, does not necessitate the adjustment of the distance between the grippers 28, which simplifies the design of the hinged platform.

Болты 53 вводят в отверстия 57 с палубы 27 навесной площадки, установленной на стене 38 предыдущего этажа, в случае необходимости монтажник для установки болтов 53 использует лестницу 59, которую устанавливают на палубу 27. Далее болты 53 закрепляют с внутренней стороны стены 58, действуя с межэтажного перекрытия 48 изнутри здания, с помощью шайб 55 и гаек 56 аналогично тому, как закреплены болты 52 в стене 38.The bolts 53 are inserted into the holes 57 from the deck 27 of the outboard mounted on the wall 38 of the previous floor, if necessary, the installer uses a ladder 59 to install the bolts 53, which is installed on the deck 27. Next, the bolts 53 are fixed from the inside of the wall 58, acting from the floor overlapping 48 from the inside of the building, using washers 55 and nuts 56, similar to how bolts 52 are fixed to wall 38.

Затем, зацепляют стропы подъемного устройства за такелажные проушины 33 в рычагах 32 (Фиг.6) и, с помощью подъемного устройства (не показано), корпус 20 навесной площадки снимают со стены 38 предыдущего этажа, перемещают к месту установки на стене 58 очередного этажа и зацепляют захваты 28 за болты 53, закрепленные в стене 58. После ослабления натяжения строп упоры 35 входят в контакт со стеной 58 и корпус 20 занимает заданное положение на стене.Then, the slings of the lifting device are hooked to the lifting eyes 33 in the levers 32 (Fig. 6) and, using the lifting device (not shown), the hinged platform housing 20 is removed from the wall 38 of the previous floor, moved to the installation site on the wall 58 of the next floor, and the grips 28 are hooked to the bolts 53 fixed in the wall 58. After loosening the slings, the stops 35 come into contact with the wall 58 and the housing 20 occupies a predetermined position on the wall.

Болты 52, оставшиеся в стене 38, освобождают с внутренней стороны стены 38, для чего отвинчивают гайки 56, и выталкивают за наружную сторону стены 38, действуя с межэтажного перекрытия предыдущего этажа (не показано). Удаленные таким образом из стены 38 болты 52 повисают на тросах 54 под корпусом 20 навесной площадки, установленным этажом выше. Болты 52, действуя с палубы The bolts 52 remaining in the wall 38 are released from the inside of the wall 38, for which the nuts 56 are unscrewed and pushed out of the outside of the wall 38, acting from the floor of the previous floor (not shown). Thus removed from the wall 38, the bolts 52 hang on the cables 54 under the body 20 of the outboard installed above the floor. Bolts 52, acting from the deck

27, вытягивают за тросы 54 наверх и укладывают так как до этого были уложены болты 53.27, pulled up by cables 54 up and laid as bolts 53 had been laid before.

Фиг.11-14 изображают конструкцию болтов 52, 53. Головка 60 болта (Фиг.11) содержит кольцевую канавку 61, выполненную для прохождения в нее вилки захвата 28. К головке 60 приварено кольцо 62 для закрепления конца троса 54. Трос может крепиться к кольцу 62 с помощью карабина (не показан). Диаметр тела 63 болта выбирается так, чтобы обеспечить прохождение болта в отверстие 57, а длина тела 63 болта должна превышать толщину внешней стены строящегося здания, чтобы болт мог быть закреплен с внутренней стороны стены. На части тела 63 болта выполнена резьба 64. Болт содержит гайку 56 с внутренней резьбой, ответной резьбе 64 (Фиг.13) и шайбу 55 (Фиг.14). На конце болта, противоположном головке 60, выполнен четырехгранник 65, на торце которого нанесена риска 65, указывающая положение кольца 62 на головке 60 (Фиг.12). Когда болт закреплен в отверстии 57, кольцо 62 должно находиться снизу головки 60, чтобы оно не мешало зацеплению захвата 28.11-14 depict the construction of the bolts 52, 53. The head 60 of the bolt (11) contains an annular groove 61 made for the passage of the forks 28. A ring 62 is welded to the head 60 to secure the end of the cable 54. The cable can be attached to ring 62 with a carabiner (not shown). The diameter of the bolt body 63 is selected so that the bolt passes into the hole 57, and the length of the bolt body 63 must exceed the thickness of the outer wall of the building under construction, so that the bolt can be fixed on the inner side of the wall. A thread 64 is made on the part of the body 63 of the bolt. The bolt contains a nut 56 with an internal thread, a mating thread 64 (Fig. 13) and a washer 55 (Fig. 14). At the end of the bolt, opposite the head 60, a tetrahedron 65 is made, at the end of which a risk 65 is applied, indicating the position of the ring 62 on the head 60 (Fig. 12). When the bolt is fixed in the hole 57, the ring 62 should be located below the head 60 so that it does not interfere with the engagement of the gripper 28.

Наличие четырехгранника 65 и риски 66 позволяет с помощью ключа устанавливать болты 52, 53 в правильное положение с внутренней стороны стены. Конструкция головки 60 болта обеспечивает возможность зацепления за нее вилки 29.The presence of the tetrahedron 65 and risks 66 allows using the key to install the bolts 52, 53 in the correct position on the inside of the wall. The design of the head 60 of the bolt allows the engagement of the plug 29.

Использование облегченной экономичной опалубки, особенностью которой являются технологические сквозные отверстия в возведенной стене в сочетании с выполнением болтов для установки навесной площадки с возможностью закрепления, а затем, освобождения и удаления из стены со стороны, противоположной той, с которой болты введены в сквозные отверстия в стене обеспечивает возможность выполнения этих работ с внутренней стороны стены, изнутри здания. Установка навесной площадки на болтах, которые после возведения стены очередного этажа могут быть освобождены и удалены из стены с внутренней стороны стены устраняет необходимость спускаться для проведения этих работ с The use of lightweight, economical formwork, the feature of which is the technological through holes in the erected wall in combination with the execution of bolts for installing the hinged platform with the possibility of fixing, and then, releasing and removing from the wall from the side opposite to the one from which the bolts are inserted into the through holes in the wall provides the ability to perform these works from the inside of the wall, from the inside of the building. The installation of a hinged platform on bolts that, after the construction of the wall of the next floor can be released and removed from the wall from the inside of the wall, eliminates the need to go down to carry out these works with

наружной стороны стены на уровень предыдущей установки навесной площадки.the outside of the wall to the level of the previous installation of the outboard.

Таким образом, настоящее техническое решение системы для поэтажного возведения внешней стены здания обеспечивает повышение безопасности строительных работ вследствие уменьшения объема и сложности работ, выполняемых с наружной стороны внешней стены здания, а также возможность использования одноуровневой навесной площадки, более дешевой и удобной по сравнению с известной двухуровневой. Однако, система по настоящему техническому решению может быть применена также с двухуровневой навесной площадкой и обеспечит в этом случае все перечисленные преимущества за исключением последнего.Thus, the present technical solution of the system for floor-by-floor construction of the external wall of the building provides increased safety of construction work due to a decrease in the volume and complexity of work performed on the external side of the external wall of the building, as well as the possibility of using a single-level hinged platform, cheaper and more convenient than the well-known two-level . However, the system according to the present technical solution can also be applied with a two-level hinged platform and will provide in this case all the listed advantages except the last.

Фиг.15 изображает реализацию навесной площадки со средством для ее установки на стене. Техническое решение навесной площадки рассмотрено на том же примере реализации, что и техническое решение системы.Fig depicts the implementation of the hinged platform with means for its installation on the wall. The technical solution of the hinged platform is considered on the same implementation example as the technical solution of the system.

Навесная площадка показана установленной на стене 58 в заданном положении с помощью захватов 28, зацепленных за болты 53. В этом положении навесной площадки палуба 27 расположена горизонтально над каркасом 21 навесной площадки.The hinged platform is shown mounted on the wall 58 in a predetermined position by means of grippers 28 engaged on the bolts 53. In this position of the hinged platform, deck 27 is located horizontally above the frame 21 of the hinged platform.

В данной реализации средство для установки навесной площадки на стене включает приспособление для зацепления строп подъемного устройства, выполненное в виде четырех рычагов 32, расположенных по углам палубы 27, два захвата 28, показанные на Фиг.6, 7, и узлы для зацепления захватов. Узлы для зацепления захватов выполнены в данной реализации в виде болтов 53 (Фиг.11), приспособленных для зацепления за них захватов в виде вилок 29. Каждый захват 28 снабжен фиксатором 70, установленным с возможностью поворота на оси 71, закрепленной на захвате 28. Рычаг 32, изображен в опущенном положении. Фиксатор 70 изображен в закрытом положении, в котором зуб 72 фиксатора находится в устье 73 вилки 29 захвата. В этом положении фиксатор 70 препятствует вилке 29 захвата выйти из зацепления с головкой 60 болта. Рычаг 32 имеет кинематическое соединение с фиксатором 70. In this implementation, the means for installing the hinged platform on the wall includes a device for engaging the slings of the lifting device, made in the form of four levers 32 located at the corners of the deck 27, two grips 28, shown in Fig.6, 7, and nodes for engaging the grippers. The nodes for engaging the grippers are made in this embodiment in the form of bolts 53 (Fig. 11), adapted to engage the grippers in the form of forks 29. Each gripper 28 is equipped with a latch 70 mounted for rotation on the axis 71, mounted on the gripper 28. The lever 32 is shown in the lowered position. The latch 70 is depicted in the closed position in which the latch tooth 72 is located at the mouth 73 of the grip fork 29. In this position, the latch 70 prevents the grip fork 29 from engaging with the bolt head 60. The lever 32 has a kinematic connection with a latch 70.

В данной реализации фиксаторы 70 обоих захватов 28 соединены каждый с ближайшим к нему рычагом 32, два других рычага 32, установленных со стороны, противоположной захватам 28 не имеют соединения с фиксаторами 70. Кинематическое соединение фиксатора 70 с рычагом 32 обеспечивает закрытое положение фиксатора 70 при опущенном положении рычага 32. В данной реализации кинематическое соединение выполнено в виде шарнирной тяги 74, соединяющей фиксатор 70 с рычагом 32. Тяга 74 шарнирно соединена с консолью 75, жестко закрепленной на рычаге 32. Ось 71 фиксатора параллельна оси 34 рычага, когда рычаг 32 устанавливают в поднятое положение 76 (показано пунктирной линией), шарнирная тяга 74, увлекаемая рычагом 32, заставляет фиксатор 70 повернуться против часовой стрелки (применительно к Фиг.15) и занять открытое положение, при котором возможно разъединение захвата 28 с болтом 53. Рычаг 32 перемещается из поднятого в опущенное положение в прорези 77 в палубе 27.In this implementation, the latches 70 of both grips 28 are connected each to the lever 32 closest to it, the other two levers 32 mounted on the opposite side of the grippers 28 are not connected to the latches 70. The kinematic connection of the retainer 70 with the lever 32 provides a closed position of the retainer 70 with the lower the position of the lever 32. In this implementation, the kinematic connection is made in the form of an articulated rod 74 connecting the latch 70 to the lever 32. The rod 74 is pivotally connected to the console 75, rigidly mounted on the lever 32. The axis 71 of the pair lock llena axis of the lever 34, when the lever 32 is installed in the raised position 76 (shown by the dashed line), the hinged rod 74, carried by the lever 32, causes the latch 70 to rotate counterclockwise (with respect to Fig.15) and take an open position in which it is possible to disconnect gripper 28 with a bolt 53. The lever 32 is moved from the raised to the lowered position in the slot 77 in the deck 27.

В другой реализации фиксатор захвата, содержащего вилку может быть выполнен иначе, например, в виде стержня, установленного в закрепленной на захвате направляющей, обеспечивающей возвратно-поступательное движение стержня вдоль плоскости вилки, аналогично фиксатору, показанному на Фиг.4. При этом рычаг может быть установлен на оси, закрепленной на захвате поперечно плоскости вилки, а кинематическое соединение фиксатора с рычагом может не содержать шарнирной тяги, а быть выполнено в виде кулачкового соединения.In another implementation, the latch of the gripper containing the fork can be made differently, for example, in the form of a rod mounted in a guide fixed to the gripper, providing a reciprocating movement of the rod along the plane of the fork, similar to the latch shown in Fig. 4. In this case, the lever can be mounted on an axis fixed to the grip transverse to the plane of the fork, and the kinematic connection of the latch with the lever may not contain articulated traction, but can be made in the form of a cam connection.

В предпочтительной реализации рычаги выполнены так, что их установка в опущенное положение на навесной площадке, установленной в заданном положении на стене, происходит под действием собственного веса. При достаточном весе рычага установка рычага в опущенное положение будет происходить под действием его веса, если поднятое положение рычага, определяемое направлением натянутой стропы, не является вертикальным.In a preferred embodiment, the levers are designed so that their installation in a lowered position on a hinged platform installed in a predetermined position on the wall occurs under the influence of its own weight. With sufficient weight of the lever, the installation of the lever in the lowered position will occur under the influence of its weight if the raised position of the lever, determined by the direction of the tensioned slings, is not vertical.

Для надежной установки в опущенное положение центр тяжести рычага должен быть смещен (в направлении поворота в опущенное For reliable installation in the lowered position, the center of gravity of the lever should be shifted (in the direction of rotation to the lowered

положение) относительно линии, соединяющей ось рычага с центром такелажной проушины на его конце. Такое смещение центра тяжести рычага может быть выполнение такелажной проушины со смещением относительно продольной оси симметрии рычага.position) relative to the line connecting the axis of the lever with the center of the lifting eye at its end. Such a shift of the center of gravity of the lever can be a lifting eye with a displacement relative to the longitudinal axis of symmetry of the lever.

Следует понимать, что в другой реализации навесной площадки настоящего технического решения узлы для зацепления захватов могут быть выполнены также, как известные из уровня техники болты 7 и анкерные элементы 5, изображенные на Фиг.3. Другой альтернативой может быть выполнение захватов, например, в виде крюков. Узлы для зацепления таких захватов должны содержать петли, приспособленные для зацепления крюков.It should be understood that in another implementation of the hinged pad of the present technical solution, the nodes for engaging the grippers can be made in the same way as the bolts 7 and anchor elements 5 shown in FIG. 3, known from the prior art. Another alternative may be the implementation of grips, for example, in the form of hooks. Units for engaging such grips should include loops adapted to engage hooks.

Использование подъемного устройства в качестве привода для управления фиксаторами захватов навесной площадки, в котором передаточным механизмом является приспособление для зацепления строп подъемного устройства, выполненное в виде рычагов, возвращающихся в исходное опущенное положение под действием собственного веса, обеспечивает автоматическую фиксацию захватов, и тем самым, снижение трудоемкости и повышение безопасности работ, выполняемых на высоте, с наружной стороны стены строящегося здания.The use of a lifting device as a drive for controlling the clamps of the grips of the hinged platform, in which the transmission mechanism is a device for engaging the slings of the lifting device, made in the form of levers returning to their initial lowered position under the influence of their own weight, provides automatic fixation of the grippers, and thereby, reduction labor intensity and improving the safety of work performed at a height on the outside of the wall of a building under construction.

Claims (8)

1. Система для поэтажного возведения внешней стены здания из монолитного железобетона, включающая опалубку, содержащую два щита для заливки между ними бетонного раствора на высоту щитов при возведении стены очередного этажа, опалубка содержит стяжные шпильки, а щиты имеют ответные друг другу отверстия, расположенные рядами с заданным шагом вдоль ширины щита для прохождения сквозь них стяжных шпилек и взаимной фиксации щитов с помощью стяжных шпилек на расстоянии, равном толщине возводимой стены, стяжные шпильки выполнены удаляемыми из готовой стены после отвердевания бетонного раствора, отличающаяся тем, что содержит навесную площадку для опоры щита, навесная площадка, включает корпус, содержащий каркас, по меньшей мере, одну, закрепленную на каркасе палубу и, по меньшей мере, два захвата, закрепленных на каркасе на расстоянии, кратном шагу отверстий в ряду вдоль ширины щита, навесная площадка далее содержит болты для зацепления захватов, выполненные с возможностью прохождения в сквозные отверстия в стене, остающиеся после удаления стяжных шпилек, каждый болт содержит средство для закрепления болта в стене, болт выполнен так, что, будучи введен с одной стороны стены в сквозное отверстие в стене, может быть закреплен, а также, освобожден и вытолкнут обратно из сквозного отверстия со стороны противоположной той, с которой введен.1. A system for floor-by-floor erection of an external wall of a building made of reinforced concrete, including a formwork containing two boards for pouring concrete mortar between them to the height of the boards when erecting the wall of the next floor, the formwork contains tie rods, and the boards have openings arranged in rows located in rows with at a predetermined step along the width of the shield for passage of the tie rods through them and mutual fixation of the shields with the tie rods at a distance equal to the thickness of the wall being erected, the tie rods are made to be removed from the wall after hardening of the concrete mortar, characterized in that it contains a hinged platform for supporting the shield, the hinged platform includes a housing comprising a frame, at least one deck fixed to the frame and at least two grips fixed to the frame a distance multiple of the step of the holes in a row along the width of the shield, the hinged platform further comprises bolts for engaging the grippers, made with the possibility of passing through the holes in the wall remaining after removing the tie rods, each bolt contains Means for fastening the bolt in the wall, the bolt is made so that, being inserted from one side of the wall into the through hole in the wall, it can be fixed as well as released and pushed back from the through hole from the opposite side from which it was inserted. 2. Система по п.1, отличающаяся тем, что навесная площадка выполнена одноуровневой, содержащей одну палубу.2. The system according to claim 1, characterized in that the hinged platform is made single-level, containing one deck. 3. Система по п.1, отличающаяся тем, что навесная площадка содержит болты для зацепления захватов в количестве, вдвое превышающем количество захватов, навесная площадка далее содержит тросы, соединяющие каждый болт с корпусом навесной площадки так, что места закрепления тросов на корпусе доступны монтажнику с палубы навесной площадки.3. The system according to claim 1, characterized in that the hinged platform contains bolts for engaging the grippers in an amount twice the number of grippers, the hinged platform further comprises cables connecting each bolt to the body of the hinged platform so that the cable mounting points on the housing are accessible to the installer from the deck of the landing platform. 4. Навесная площадка для опоры щита опалубки, применяемой при поэтажном возведении внешней стены здания из монолитного железобетона, навесная площадка содержит каркас и средство для ее установки на стене здания в заданном положении, средство включает закрепленное на каркасе приспособление для зацепления строп внешнего подъемного устройства, по меньшей мере, два закрепленных на каркасе захвата и узлы для зацепления захватов, выполненные с возможностью закрепления в стене и зацепления за них захватов, когда указанные узлы закреплены в стене, при этом, по меньшей мере, два захвата содержат каждый по подвижному фиксатору, выполненному с возможностью установки в закрытое положение, в котором, когда захват находится в зацеплении с указанным узлом, фиксатор препятствует их разъединению, и в открытое положение, обеспечивающее возможность зацепления и разъединения захвата с указанным узлом, отличающаяся тем, что приспособление для зацепления строп содержит оси, закрепленные на каркасе, и рычаги, установленные по одному на каждой оси, на одном конце каждого рычага выполнена такелажная проушина для зацепления стропы подъемного устройства, рычаги установлены на осях с возможностью поворота их в поднятое положение, которое они занимают под нагрузкой, когда навесная площадка висит на стропах подъемного устройства, зацепленных за такелажные проушины в рычагах, и в опущенное положение, когда рычаги свободны от нагрузки, каждый захват, содержащий фиксатор, содержит кинематическое соединение фиксатора с рычагом, обеспечивающее закрытое положение фиксатора при опущенном положении рычагов и открытое положение фиксатора при поднятом положении рычагов.4. A hinged platform for supporting the formwork shield used in the floor-by-floor erection of a building’s external wall made of reinforced concrete, the hinged platform contains a frame and means for its installation on the building wall in a predetermined position, the tool includes a device attached to the frame to engage the slings of an external lifting device, at least two grippers fixed to the frame and nodes for engaging the grippers, configured to be fixed in the wall and to engage grips for them, when these nodes are fixed in At the same time, at least two grippers each contain a movable latch, which can be installed in a closed position, in which, when the gripper is engaged with the specified node, the latch prevents them from being disconnected, and in the open position, which makes it possible to engage and disconnecting the gripper with the specified node, characterized in that the device for engaging the slings contains axes mounted on the frame, and levers mounted one on each axis, at one end of each lever is made a cage eye to engage the slings of the lifting device, the levers are mounted on the axles with the possibility of turning them into the raised position that they hold under load when the hinged platform hangs on the slings of the lifting device, hooked to the lifting eyes in the levers, and in the lowered position when the levers are free from the load, each grip containing the latch contains a kinematic connection of the latch with the lever, providing a closed position of the latch with the levers lowered and an open position of the latch pa at the raised position levers. 5. Навесная площадка по п.4, отличающаяся тем, что средство для ее установки на стене здания содержит два содержащих фиксаторы захвата, при этом каждый из соединенных с фиксаторами рычагов соединен с одним фиксатором.5. A hinged platform according to claim 4, characterized in that the means for installing it on the wall of the building contains two gripping clamps, each of which is connected to the clamps of the levers connected to one clamp. 6. Навесная площадка по п.5, отличающаяся тем, что кинематическое соединение фиксатора с рычагом содержит тягу, концы которой шарнирно соединены, соответственно, с фиксатором и рычагом.6. A hinged platform according to claim 5, characterized in that the kinematic connection of the latch with the lever contains a rod, the ends of which are pivotally connected, respectively, with the latch and the lever. 7. Навесная площадка по п.4, отличающаяся тем, что узел для зацепления захвата содержит болт, имеющий на одном конце головку, а каждый захват содержит вилку, в головке болта выполнена кольцевая канавка для прохождения в ней вилки, захват, содержащий фиксатор, содержит закрепленную на вилке ось фиксатора, на которой фиксатор установлен с возможностью поворота между открытым и закрытым положением, фиксатор содержит зуб, который в закрытом положении фиксатора перегораживает устье вилки.7. A hinged platform according to claim 4, characterized in that the assembly for engaging the gripper comprises a bolt having a head at one end, and each gripper contains a fork, an annular groove is made in the head of the bolt for passing the forks in it, the gripper containing a latch contains the axis of the latch fixed on the fork, on which the latch is mounted to rotate between the open and closed positions, the latch contains a tooth that blocks the mouth of the fork in the closed position of the latch. 8. Навесная площадка по п.4, отличающаяся тем, что рычаги приспособления для зацепления строп выполнены с возможностью принимать, в отсутствие нагрузки, опущенное положение под действием собственного веса, когда навесная площадка установлена на стене здания в заданном положении.
Figure 00000001
8. The hinged platform according to claim 4, characterized in that the levers of the device for hooking the slings are configured to accept, in the absence of load, the lowered position under the influence of its own weight, when the hinged platform is mounted on the wall of the building in a predetermined position.
Figure 00000001
RU2005113137/22U 2005-04-25 2005-04-25 SYSTEM FOR FLOORING ESTABLISHMENT OF THE EXTERNAL WALL OF THE BUILDING FROM MONOLITHIC REINFORCED CONCRETE AND SYSTEM HINGED SITE RU47410U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2005113137/22U RU47410U1 (en) 2005-04-25 2005-04-25 SYSTEM FOR FLOORING ESTABLISHMENT OF THE EXTERNAL WALL OF THE BUILDING FROM MONOLITHIC REINFORCED CONCRETE AND SYSTEM HINGED SITE

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2005113137/22U RU47410U1 (en) 2005-04-25 2005-04-25 SYSTEM FOR FLOORING ESTABLISHMENT OF THE EXTERNAL WALL OF THE BUILDING FROM MONOLITHIC REINFORCED CONCRETE AND SYSTEM HINGED SITE

Publications (1)

Publication Number Publication Date
RU47410U1 true RU47410U1 (en) 2005-08-27

Family

ID=35847201

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2005113137/22U RU47410U1 (en) 2005-04-25 2005-04-25 SYSTEM FOR FLOORING ESTABLISHMENT OF THE EXTERNAL WALL OF THE BUILDING FROM MONOLITHIC REINFORCED CONCRETE AND SYSTEM HINGED SITE

Country Status (1)

Country Link
RU (1) RU47410U1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642048A (en) * 2017-09-22 2018-01-30 宁夏桥多美路桥钢模板科技有限公司 Pier stud high-altitude construction platform and high-altitude construction method
CN109457959A (en) * 2018-12-26 2019-03-12 中国三冶集团有限公司 A kind of construction integral type overhanging side bar suspension device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107642048A (en) * 2017-09-22 2018-01-30 宁夏桥多美路桥钢模板科技有限公司 Pier stud high-altitude construction platform and high-altitude construction method
CN109457959A (en) * 2018-12-26 2019-03-12 中国三冶集团有限公司 A kind of construction integral type overhanging side bar suspension device

Similar Documents

Publication Publication Date Title
DK1571275T3 (en) Device for mounting a temporary handrail on a scaffold
RU2400609C2 (en) Complex system of accident prevention support in construction
DK3012385T3 (en) Scaffolding Safety Railing
EP2354375A1 (en) A scaffolding system
CN111894272A (en) Intelligent construction platform and installation process and construction process thereof
KR20190113468A (en) Gang form falling prevention apparatus with locker
RU47410U1 (en) SYSTEM FOR FLOORING ESTABLISHMENT OF THE EXTERNAL WALL OF THE BUILDING FROM MONOLITHIC REINFORCED CONCRETE AND SYSTEM HINGED SITE
JP4814620B2 (en) Climbing method of external curing unit
JP2005524792A (en) Scaffolding system
CN110735530A (en) external wall steel formwork and internal wall aluminum formwork combination system and operation method thereof
GB2426278A (en) A climbing formwork system
EP2325415B1 (en) A guardrail system
CN111219046B (en) Composite scaffold erecting structure and construction process thereof
KR100812262B1 (en) Device for preventing falling of gangform and method for constructing reinforced concrete structure using the same
KR102327935B1 (en) Gang-form safety hanger bracket
CN114508231B (en) Quick combination construction method for I-steel component
US4056912A (en) Method for releasing tilt-up panel hoisting member
CN211368398U (en) Frame climbing structure
CN114046054A (en) Guide positioning device for assembly type building component and construction method
KR100406619B1 (en) Sliding form
CN110409791A (en) Construction method for mounting climbing frame attached wall by utilizing embedded high-strength bolt
JP4101232B2 (en) Construction method using a temporary scaffolding that can be raised and lowered
JPH05163833A (en) Erected frame with safety net
CN211369478U (en) Door type structural hanging basket suspension structure mounting system
CN107268972A (en) External hanging type scaffold and its installation method are climbed in one kind

Legal Events

Date Code Title Description
MM1K Utility model has become invalid (non-payment of fees)

Effective date: 20110426