SG11202000638TA - Integrated Construction and Installation Method for Upper Process Assembly of Floater - Google Patents
Integrated Construction and Installation Method for Upper Process Assembly of FloaterInfo
- Publication number
- SG11202000638TA SG11202000638TA SG11202000638TA SG11202000638TA SG11202000638TA SG 11202000638T A SG11202000638T A SG 11202000638TA SG 11202000638T A SG11202000638T A SG 11202000638TA SG 11202000638T A SG11202000638T A SG 11202000638TA SG 11202000638T A SG11202000638T A SG 11202000638TA
- Authority
- SG
- Singapore
- Prior art keywords
- floater
- installation method
- upper process
- process assembly
- integrated construction
- Prior art date
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/20—Building or assembling prefabricated vessel modules or parts other than hull blocks, e.g. engine rooms, rudders, propellers, superstructures, berths, holds or tanks
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B71/00—Designing vessels; Predicting their performance
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B73/00—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms
- B63B73/60—Building or assembling vessels or marine structures, e.g. hulls or offshore platforms characterised by the use of specific tools or equipment; characterised by automation, e.g. use of robots
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710813205.5A CN108454798B (en) | 2017-09-11 | 2017-09-11 | Integrated construction and installation method of upper process module of floating production facility |
PCT/CN2017/109504 WO2019047355A1 (en) | 2017-09-11 | 2017-11-06 | Integrated construction and installation method for upper part processing module of floating production facility |
Publications (1)
Publication Number | Publication Date |
---|---|
SG11202000638TA true SG11202000638TA (en) | 2020-02-27 |
Family
ID=63221060
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SG11202000638TA SG11202000638TA (en) | 2017-09-11 | 2017-11-06 | Integrated Construction and Installation Method for Upper Process Assembly of Floater |
Country Status (5)
Country | Link |
---|---|
KR (1) | KR102259819B1 (en) |
CN (1) | CN108454798B (en) |
RU (1) | RU2707205C2 (en) |
SG (1) | SG11202000638TA (en) |
WO (1) | WO2019047355A1 (en) |
Families Citing this family (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SG11202102521RA (en) * | 2018-12-03 | 2021-04-29 | Jgc Corp | Method of producing floating facility including natural gas liquefaction apparatus |
CN111762300B (en) * | 2020-07-10 | 2021-07-20 | 上海海事大学 | Sliding cabin entering tool for mail steamer cabin module |
CN111874179B (en) * | 2020-07-27 | 2022-02-18 | 中船邮轮科技发展有限公司 | Combined passenger ship building method |
CN112124520B (en) * | 2020-07-29 | 2023-10-20 | 沪东中华造船(集团)有限公司 | Pre-operation method of LNG ship containment system |
CN113536618A (en) * | 2021-05-21 | 2021-10-22 | 沪东中华造船(集团)有限公司 | Positioning method of large steel structure |
RU2757517C1 (en) | 2021-07-30 | 2021-10-18 | Публичное акционерное общество "НОВАТЭК" | Manufacturing method for integrated industrial complex on gravity based structure (gbs) |
CN113602447A (en) * | 2021-08-11 | 2021-11-05 | 上海外高桥造船有限公司 | Centralized control room unit modular construction and assembly method and ship |
CN114148485B (en) * | 2021-11-09 | 2022-12-30 | 中船澄西船舶修造有限公司 | Boats and ships bottom lacquer painting processing is with putting on shelf support frock |
Family Cites Families (20)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1131759A1 (en) * | 1982-12-20 | 1984-12-30 | Предприятие П/Я А-7427 | Method for building and launching self-lifting floating drilling platform |
US7044685B2 (en) * | 2003-02-28 | 2006-05-16 | Modec International Llc | Method of installation of a tension leg platform |
SG135929A1 (en) * | 2003-10-17 | 2007-10-29 | Jurong Shipyard Pte Ltd | A method of constructing a semi-submersible vessel using dry dock mating |
CN100537348C (en) * | 2007-06-12 | 2009-09-09 | 烟台来福士海洋工程有限公司 | Offshore platform integral constructing and hoisting method and special-purpose hoisting machine for the same |
KR20090007920A (en) * | 2007-07-16 | 2009-01-21 | 대우조선해양 주식회사 | Ship assembling and launching method using divided land and marine construction |
KR100960397B1 (en) * | 2008-01-18 | 2010-05-28 | 도일웅 | Continuous Assembly Line System of Hull |
CN101417693B (en) * | 2008-11-14 | 2012-10-10 | 大连船舶重工集团有限公司 | Oceanography engineering module integral hoisting method |
RU2441799C2 (en) * | 2010-03-22 | 2012-02-10 | Российская Федерация, от имени которой выступает Министерство промышленности и торговли РФ (МИНПРОМТОРГ РОССИИ) | Method for construction of floating structures |
KR20110130018A (en) * | 2010-05-27 | 2011-12-05 | 삼성중공업 주식회사 | Method for building a ship |
KR101273940B1 (en) * | 2011-04-06 | 2013-06-12 | 성동조선해양(주) | Bogie train for heavy load transfer and operating method of it |
KR102109170B1 (en) * | 2013-08-28 | 2020-05-12 | 대우조선해양 주식회사 | Lifeboat boarding structure for FLNG |
CN103963931B (en) * | 2014-04-20 | 2017-10-10 | 中交一航局第二工程有限公司 | Large-scale component semi-submersible type is waterborne to go out to transport installation system and construction method |
WO2016093772A1 (en) * | 2014-12-12 | 2016-06-16 | Seaway Yachts, D.O.O. | Method for external installation of a sailing boat lifting keel |
CN204527557U (en) * | 2015-01-04 | 2015-08-05 | 上海中远船务工程有限公司 | A kind of modularization drilling ship |
CN104787236B (en) * | 2015-03-16 | 2017-05-03 | 南京东泽船舶制造有限公司 | Integral hoisting technology of upper layer building of ship |
CN105667709A (en) * | 2015-12-31 | 2016-06-15 | 广船国际有限公司 | Hull manufacturing method |
CN105667726B (en) * | 2016-04-06 | 2017-07-21 | 大连理工大学 | High useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work |
CN105947109A (en) * | 2016-06-21 | 2016-09-21 | 江苏海通海洋工程装备有限公司 | Process for hoisting whole assembly section of upper-layer building living zone of ship |
CN106428446A (en) * | 2016-09-30 | 2017-02-22 | 吴植融 | Straight cylinder type floating platform with extended cylinder body |
CN106741610B (en) * | 2016-12-22 | 2018-11-13 | 浙江澳托美克船业有限公司 | The automatic manufacturing process of aluminum alloy ship |
-
2017
- 2017-09-11 CN CN201710813205.5A patent/CN108454798B/en active Active
- 2017-11-06 SG SG11202000638TA patent/SG11202000638TA/en unknown
- 2017-11-06 KR KR1020207004716A patent/KR102259819B1/en active IP Right Grant
- 2017-11-06 WO PCT/CN2017/109504 patent/WO2019047355A1/en active Application Filing
-
2018
- 2018-01-18 RU RU2018101871A patent/RU2707205C2/en active
Also Published As
Publication number | Publication date |
---|---|
KR20200038945A (en) | 2020-04-14 |
RU2018101871A3 (en) | 2019-10-11 |
RU2707205C2 (en) | 2019-11-25 |
CN108454798A (en) | 2018-08-28 |
CN108454798B (en) | 2022-04-26 |
WO2019047355A1 (en) | 2019-03-14 |
RU2018101871A (en) | 2019-07-19 |
KR102259819B1 (en) | 2021-06-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
SG11202000638TA (en) | Integrated Construction and Installation Method for Upper Process Assembly of Floater | |
ZA201608881B (en) | Floating structure and method of installing same | |
HRP20200869T8 (en) | Seabed base structure and method for installation of same | |
PT3653486T (en) | Floating structure and method of installing same | |
HK1243747A1 (en) | Sink and method of installing same | |
GB2579034B (en) | Software installation method | |
GB201605235D0 (en) | Method and apparatus for installation of a subsea tank | |
GB201508013D0 (en) | Cable restrictor and method of installation | |
EP3272258A4 (en) | Toilet cover and method for demounting and installing upper cover assembly of toilet cover | |
ZA201902184B (en) | Method and installation for obtaining hydrogen | |
GB2553390B (en) | Method of manufacture | |
PL3168366T3 (en) | Installation for the production of asphalt | |
GB2564665B (en) | Subsea installation method | |
EP3479977C0 (en) | Method for production of wall components for building | |
RS64446B1 (en) | Method for the production of mineral wool | |
PL3196363T3 (en) | Assembly and method for installation of offshore foundations | |
GB201703041D0 (en) | Installation of mono-pile | |
PL3462879T3 (en) | Method for improving the development of plants | |
GB201704816D0 (en) | Method of manufacture | |
GB2548128B (en) | Method of reducing outgassing | |
GB201703838D0 (en) | Improved valve apparatus and method of installation | |
PL3173385T3 (en) | Float glass production process and installation | |
PL3638817T3 (en) | Operating method of an iron making installation | |
IL266192B (en) | Method of substrate hydrophobization | |
PL3489218T3 (en) | Method for the production of phenylaminohydroxyanthrachinones |