CN105667726B - High useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work - Google Patents
High useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work Download PDFInfo
- Publication number
- CN105667726B CN105667726B CN201610208452.8A CN201610208452A CN105667726B CN 105667726 B CN105667726 B CN 105667726B CN 201610208452 A CN201610208452 A CN 201610208452A CN 105667726 B CN105667726 B CN 105667726B
- Authority
- CN
- China
- Prior art keywords
- blower fan
- pylon
- cabin
- ship
- deck
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000009434 installation Methods 0.000 title claims abstract description 48
- 238000000034 method Methods 0.000 title claims abstract description 18
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 25
- 239000002283 diesel fuel Substances 0.000 claims abstract description 12
- 230000005540 biological transmission Effects 0.000 claims description 16
- 239000013505 freshwater Substances 0.000 claims description 5
- 230000008859 change Effects 0.000 claims description 4
- 239000003651 drinking water Substances 0.000 claims description 4
- 235000020188 drinking water Nutrition 0.000 claims description 4
- 238000007667 floating Methods 0.000 abstract description 5
- 230000007613 environmental effect Effects 0.000 abstract description 4
- 230000005611 electricity Effects 0.000 description 6
- 239000000446 fuel Substances 0.000 description 4
- NJPPVKZQTLUDBO-UHFFFAOYSA-N novaluron Chemical compound C1=C(Cl)C(OC(F)(F)C(OC(F)(F)F)F)=CC=C1NC(=O)NC(=O)C1=C(F)C=CC=C1F NJPPVKZQTLUDBO-UHFFFAOYSA-N 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 239000004744 fabric Substances 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 238000011900 installation process Methods 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000033228 biological regulation Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000003028 elevating effect Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 230000006641 stabilisation Effects 0.000 description 1
- 238000011105 stabilization Methods 0.000 description 1
- 230000032258 transport Effects 0.000 description 1
- 239000003643 water by type Substances 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B2035/4433—Floating structures carrying electric power plants
- B63B2035/446—Floating structures carrying electric power plants for converting wind energy into electric energy
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
- Wind Motors (AREA)
Abstract
A kind of high useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work, belong to marine transportation and marine engineering equipment technical field.The installation ship includes spar deck, loading deck, main crane, auxiliary loop wheel machine, swinging propeller, bulb bow Side Thrusters, streamlining, spud leg, cabin area and single point mooring's equipment.The installation ship is laid on loading deck by the thick pylon of blower fan and the thin pylon of blower fan are horizontal, and fan blade and blower fan cabin are laid on spar deck, more blower fan can be carried, while improving stability;Its main crane and auxiliary loop wheel machine collocation are used, and the lifting work of the thick pylon of blower fan and the thin pylon of blower fan can be completed while one side assembles fan blade and blower fan cabin, and installation effectiveness is higher;Auxiliary diesel fuel compartment inside installation ship and by cable with having installed method that blower fan is connected so that installation ship more environmental protection;Installation ship can complete to install under floating and standing operating mode simultaneously, adapt to the installment work in the different marine site of the depth of water.
Description
Technical field
The present invention relates to a kind of high useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work, belong to marine fortune
Defeated and marine engineering equipment technical field.
Background technology
With the propulsion of offshore wind farm installation project, in order that obtaining marine green resource wind energy obtains effective fully profit
With a kind of multi-functional ship installed for offshore wind turbine is also born therewith.An initial generation " installation ship " be by seagoing barge,
Fleet's joint of weight ship and dragging wheel combination completes corresponding task.Present third generation wind turbine installation vessel collection rises ability, fortune certainly
Movement Capabilities and elevating capacity are integrated, and installation ship as compared with the past has larger improvement.However, it is by installing, the depth of water is deep, work
Make the not high factors of single operating mode, installation effectiveness and conevying efficiency largely to limit.Meanwhile, it transports and installed
The consumption to the energy and the pollution to environment also cause itself and the purpose for developing offshore wind farm to run in the opposite direction in journey.
In this context, the present invention have developed a kind of high useful load, multi-state, environment-friendly type wind turbine installation vessel.This wind-powered electricity generation is pacified
Load the third generation wind turbine installation vessel compared to conventional same scale onto ship, more set marine power generation blower fans can be loaded, can be many
Plant and be adapted to the advantages of a variety of depth of waters progress installment works and more environmental protection under operating mode.Meanwhile, its arrangement special to blower fan
Method causes center of gravity to reduce and can improve stability;Single positioning working range is increased positioned at the main crane of a side of a ship, it is another
The auxiliary loop wheel machine of the side of a ship fills spar deck space vacant under new arrangement method while main crane carries out installment work
Divide and utilize, carry out paddle, the propeller hub assembly working of blower fan.This wind turbine installation vessel adapts to the installment work under various operating modes, base
Larger reformed AHP has been carried out in the deficiency existed in the past, has been a kind of economic, efficient and environmentally friendly wind turbine installation vessel.
The content of the invention
The invention provides a kind of high useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work, wind-powered electricity generation peace
Shipment take into full account work capacity under different water depth, improve single go to sea work freight volume and operating efficiency and environmental protection etc.
Problem, novel with arrangement, installation effectiveness is high and the advantages of energy-saving and emission-reduction, with commercialization value.
The technical solution adopted by the present invention is:A kind of high useful load, multi-state, environment-friendly type wind turbine installation vessel, it includes work
Make deck, main crane, auxiliary loop wheel machine, swinging propeller, bulb bow Side Thrusters, streamlining, lifeboat, cabin
Area and single point mooring's equipment, it also lays transmission belt, lifting body and tower including loading deck, spud leg, spud leg lifting area, fan blade
Frame transmission belt, the spar deck is discontinuous structure, is offered positioned at topside and fan blade cloth is disposed with overhead door, spar deck
Transmission belt and blower fan cabin are put, the spud leg lifting area for lifting area and stem positioned at the spud leg of stern is respectively arranged main crane and auxiliary
Loop wheel machine, the lower section of the overhead door is provided with the lifting body being located on loading deck, and the fan blade lays transmission belt with ship center line
The side of a ship of hull two is symmetrically distributed in, thereon laterally disposed multiple fan blades, the blower fan cabin is uprightly placed on after streamlining;
The loading deck is continuous structure, lifting body, pylon transmission belt is disposed with thereon, the pylon transmission belt is laterally from a side of a ship
Another side of a ship is extended to, thereon the thick pylon of placed longitudinally blower fan and the thin pylon of blower fan;The spud leg is truss form, the cabin area
Inside it is disposed with ballast tank, control cabinet, fresh-water tank, diesel fuel cabin, auxiliary diesel fuel compartment, propeller room, equipment compartment and change
Arrangement intelligence, which is adjusted, in pressure chamber, the control cabinet carries arrangement LNG flow containers, the propeller room in instrument, the auxiliary diesel fuel compartment
In bow and stern, one, stern arrangement swinging propeller, bow arrangement bulb bow Side Thrusters are respectively set.
A kind of high useful load, multi-state, the method for work of environment-friendly type wind turbine installation vessel:
(a)The first working condition:First empty ballast water in ballast tank, spud leg is put to seabed, hull is lifted
Rise to more than the water surface, auxiliary loop wheel machine starts assembling fan blade and blower fan cabin, while lifting body is by the thick pylon of blower fan and the thin tower of blower fan
Frame delivers to spar deck by overhead door top, and main crane starts the thick pylon of blower fan and the thin pylon of blower fan being sequentially arranged at specified
Place, the stem for finally combining fan blade and blower fan cabin is arranged on the thin pylon of blower fan;
(b)Second of working condition:Make to be mounted with appropriate ballast water in ballast tank first, spud leg is withdrawn, makes ship
Body swims in specified drinking water, and single point mooring's equipment is connected with column turntable, and auxiliary loop wheel machine starts assembling fan blade and blower fan cabin, simultaneously
The thick pylon of blower fan and the thin pylon of blower fan are delivered to spar deck by lifting body by overhead door top, and main crane starts blower fan is thick
Pylon and the thin pylon of blower fan are sequentially arranged at appointed place, and the stem for finally combining fan blade and blower fan cabin is arranged on blower fan
On thin pylon, during each crane work, intelligence adjusts load instrument to adjust the ballast water in ballast tank according to hull floading condition.
The beneficial effects of the invention are as follows:This high useful load, multi-state, environment-friendly type wind turbine installation vessel mainly include work first
Plate, loading deck, main crane, auxiliary loop wheel machine, swinging propeller, bulb bow Side Thrusters, streamlining, spud leg,
Cabin area and single point mooring's equipment.The installation ship is laid on loading deck, fan blade by the thick pylon of blower fan and the thin pylon of blower fan are horizontal
It is laid on blower fan cabin on spar deck, more blower fan can be carried, while improving stability;Its main crane and auxiliary loop wheel machine
Collocation is used, and the lifting work of the thick pylon of blower fan and the thin pylon of blower fan can be completed while one side assembles fan blade and blower fan cabin,
Installation effectiveness is higher;Auxiliary diesel fuel compartment inside installation ship and caused by cable with having installed the method that blower fan is connected
Installation ship more environmental protection;Installation ship can complete to install under floating and standing operating mode simultaneously, adapt to the different sea of the depth of water
The installment work in domain.
Brief description of the drawings
Fig. 1 is high useful load, multi-state, the front view of environment-friendly type wind turbine installation vessel.
Fig. 2 is high useful load, multi-state, the top view of environment-friendly type wind turbine installation vessel.
Fig. 3 is high useful load, multi-state, the left view of environment-friendly type wind turbine installation vessel.
Fig. 4 is the A-A sectional views in Fig. 1.
Fig. 5 is the B-B sectional views in Fig. 1.
Fig. 6 is the C-C sectional views in Fig. 3.
Fig. 7 is high useful load, multi-state, the first working state figure of environment-friendly type wind turbine installation vessel.
Fig. 8 is high useful load, multi-state, the second working state figure of environment-friendly type wind turbine installation vessel.
Fig. 9 is high useful load, multi-state, the second working condition mooring figure of environment-friendly type wind turbine installation vessel.
Figure 10 is high useful load, multi-state, the workflow schematic diagram of environment-friendly type wind turbine installation vessel.
Figure 11 is high useful load, multi-state, the operation process chart of environment-friendly type wind turbine installation vessel.
In figure:1st, spar deck, 1a, fan blade lay transmission belt, 1b, overhead door, and 2, loading deck, 2a, lifting body,
2b, pylon transmission belt, 3, main crane, 4, auxiliary loop wheel machine, 5, swinging propeller, 6, bulb bow Side Thrusters, 7, it is streamlined on
Layer building, 7a, helicopter deck, 7b, lifeboat ejection door, 7c, lifeboat, 8, spud leg, 9, spud leg lifting area, 10, single-point system
Moor equipment, 11, fan blade, 12, blower fan cabin, 13, the thick pylon of blower fan, 14, the thin pylon of blower fan, 15, cabin area, 15a, ballast tank,
15b, control cabinet, 15c, fresh-water tank, 15d, diesel fuel cabin, 15e, auxiliary diesel fuel compartment, 15f, propeller room, 15g, equipment
Cabin, 15h, intelligence, which are adjusted, carries instrument, 15i, LNG flow container, 15j, pressure change chamber, and 16, installed blower fan, 17, cable.
Specific implementation method
The structure to the present invention is described further referring to the drawings.
Fig. 1,2,3 show high useful load, multi-state, the layout drawing of environment-friendly type wind turbine installation vessel.The installation ship is mainly wrapped
Include spar deck 1, it is loading deck 2, main crane 3, auxiliary loop wheel machine 4, swinging propeller 5, bulb bow Side Thrusters 6, streamlined
Superstructure 7, spud leg 8, cabin area 15 and single point mooring's equipment 10.The place that spar deck 1 is assembled and lifted as blower fan, its
On be disposed with main crane 3, for the thick pylon 13 of blower fan, the thin pylon 14 of blower fan to be connected into local existing blower fan pedestal,
Auxiliary loop wheel machine 4, the fan blade 11 arranged for assembling fan blade on deck to lay on transmission belt 1a and blower fan cabin 12 are there also is provided simultaneously,
Two loop wheel machines are worked to improve under installation effectiveness, floating operating mode simultaneously, and single point mooring's equipment 10 is hinged with the external world, coordinates swinging
Propeller 5 and bulb bow Side Thrusters 6 carry out dynamic positioning, it is ensured that the stability of installation;Spud leg 8 is truss form, standing work
Under condition, spud leg 8 is put down, by hull lifting on the water surface, and under floating operating mode and running working condition, spud leg 8 is withdrawn;Streamlined upper strata
Building 7 is located at bow, is streamline structure, and top layer arranges helicopter deck 7a, and both sides are disposed with lifeboat ejection door 7b, door
Inside there is lifeboat 7c, under security situation, ejection door is closed, and building streamlined is complete, reduces ship resistance.
Fig. 4 shows the concrete form of loading deck 2, and loading deck 2 is strength deck, is loaded with the thick He of pylon 13 of blower fan
The thin pylon 14 of blower fan, and their horizontal are positioned on pylon transmission belt 2b are used to transmit, lower the center of gravity and improve stability, have
Under body operating mode, overhead door 1b is opened, and the thick pylon 13 of blower fan and blower fan undercarriage 14 are transferred to work first by lifting body 2a simultaneously
On plate 1, main crane 3 continues to complete the spud leg lifting area 9 that the whole hull of vertical insertion is there also is provided on corresponding operating mode, deck,
Lifting is disposed with spud leg 8 in area.
Fig. 5 shows the concrete form in cabin area 15, and multiple ballast tank 15a are disposed with around the outermost layer of cabin area 15,
For adjusting floading condition, stern and bow respectively arrange a propeller room 15f, are respectively used to arrangement swinging propeller 5 and ball nose
Bow thruster 6, region larboard at bow is disposed with a control cabinet 15b, and interior arrangement is intelligently adjusted and carries instrument 15h, for
Adjustment ballast water progress floading condition amendment in time when changing load is produced under operating mode is floated, region starboard at bow is disposed with
One fresh-water tank 15c, for storing full ship life domestic fresh water resource and drinking water sources, the region is located at midship larboard cloth
A diesel fuel cabin 15d is equipped with, for storing the main fuel resource needed for navigation process, the region is located at midship starboard
An auxiliary diesel fuel compartment 15e is disposed with, LNG flow container 15i are inside disposed with, for storing clean energy resource liquid LNG as auxiliary
Combustion-supporting material, the region arranges multiple equipment cabin 15g positioned at midship, for arranging the relevant devices such as main frame, distribution instrument.
Fig. 6 shows the profile type of streamlining 7, is streamlined, while inside is disposed with two suits of lifeboat
7c。
Fig. 7 shows high useful load, multi-state, the first working state figure of environment-friendly type wind turbine installation vessel, when the depth of water is shallower,
Spud leg 8 is put down completely stands on seabed, and hull is raised to and is higher by water surface certain altitude, and main crane 3 stretches out ship side by wind
The thick pylon 13 of machine and the thin pylon 14 of blower fan are sling and are sequentially arranged on existing blower fan pedestal, finally again by fan blade 11 and blower fan cabin
12 stems combined are sling on the thin pylon 14 of blower fan, complete work;Before next Fans are installed, with cable 17
Hull is connected with blower fan 16 has been installed, the electric energy of conveying is for the part household electricity in installation process.
Fig. 8 shows high useful load, multi-state, the second working state figure of environment-friendly type wind turbine installation vessel, when the depth of water is deeper,
Spud leg 8 is withdrawn in hull completely, and hull swims in the water surface, and main crane 3 stretches out ship side by the thick pylon 13 of blower fan and blower fan
Thin pylon 14, which is sling, to be sequentially arranged on existing blower fan pedestal, the stem for finally again combining fan blade 11 and blower fan cabin 12
Sling on the thin pylon 14 of blower fan, complete work;Before next Fans are installed, with cable 17 is by hull and has installed
Blower fan 16 is connected, and the electric energy of conveying is for the part household electricity in installation process.
Fig. 9 shows high useful load, multi-state, the second working condition mooring figure of environment-friendly type wind turbine installation vessel, works as hull
When floating on the water surface, single point mooring's equipment 10 is connected with column turntable 18, to ensure the basic fixed position of hull, coordinates swinging to push away
Enter the power-assisted positioning of device 5 and bulb bow Side Thrusters 6, hull is stably accomplished work.
Figure 10 shows high useful load, multi-state, the energy supplying system of environment-friendly type wind turbine installation vessel.Energy supply method:Use bavin
Oil fuel cabin 15d and LNG flow containers 15i constitutes double fuel energy energy supplying system and provides fuel for main frame, and main engine power generation simultaneously provides complete
The energy needed for ship;After starting to install blower fan, hull is connected with having installed blower fan 16 by cable 17, will install blower fan
16 electrical energy transportations produced are converted into electric energy workable for hull to pressure change chamber 15j, and auxiliary provides equipment, household electricity.
Figure 11 shows high useful load, multi-state, the operation process chart of environment-friendly type wind turbine installation vessel.Above-mentioned wind-powered electricity generation is installed
Ship in the course of the work, mainly including following two working conditions and a kind of deck concurrent working method:
(a)The first working condition under shallow water:First empty the ballast water in ballast tank 15a, spud leg 8 is put to sea
Bottom, makes hull be raised to more than the water surface;
(b)The second working condition under deep water:Make to be mounted with certain ballast water in ballast tank 15a first, by spud leg 8
Withdraw, hull is swum in specified drinking water, single point mooring's equipment 10 is connected with column turntable 18, intelligence, which is adjusted, carries instrument 15h according to ship
Ballast water in body floading condition regulation ballast tank 15a;
Deck concurrent working method:After hull is in stabilization under above two working condition, auxiliary loop wheel machine 4 starts assembling
Fan blade 11 and blower fan cabin 12, now lifting body 2a the thick pylon 13 of blower fan and the thin pylon 14 of blower fan are delivered to by overhead door 1b tops
Spar deck 1, main crane 3 starts the thick pylon 13 of blower fan and the thin pylon 14 of blower fan being sequentially arranged at appointed place, finally will
The stem that fan blade 11 and blower fan cabin 12 are combined is arranged on the thin pylon 14 of blower fan.
Claims (2)
1. a kind of high useful load, multi-state, environment-friendly type wind turbine installation vessel, it includes spar deck(1), main crane(3), auxiliary
Loop wheel machine(4), swinging propeller(5), bulb bow Side Thrusters(6), streamlining(7), lifeboat(7c), cabin area
(15)With single point mooring's equipment(10), it is characterized in that:It also includes loading deck(2), spud leg(8), spud leg lifting area(9), wind
Leaf lays transmission belt(1a), lifting body(2a)With pylon transmission belt(2b), the spar deck(1)For discontinuous structure, position
Overhead door is offered in topside(1b), spar deck(1)On be disposed with fan blade and lay transmission belt(1a)With blower fan cabin(12), it is located at
The spud leg lifting area of stern(9)Area is lifted with the spud leg of stem(9)It is respectively arranged main crane(3)With auxiliary loop wheel machine(4), it is described
Overhead door(1b)Lower section be provided be located at loading deck(2)On lifting body(2a), the fan blade lays transmission belt(1a)With
Ship center line is symmetrically distributed in the side of a ship of hull two, thereon laterally disposed multiple fan blades(11), the blower fan cabin(12)Uprightly it is placed on stream
Line style superstructure(7)Afterwards;The loading deck(2)For continuous structure, lifting body is disposed with thereon(2a), pylon transmission belt
(2b), the pylon transmission belt(2b)Another side of a ship laterally is extended to from a side of a ship, thereon the thick pylon of placed longitudinally blower fan(13)And wind
The thin pylon of machine(14);The spud leg(8)For truss form, the cabin area(15)Inside it is disposed with ballast tank(15a), control cabinet
(15b), fresh-water tank(15c), diesel fuel cabin(15d), auxiliary diesel fuel compartment(15e), propeller room(15f), equipment compartment
(15g)And pressure change chamber(15j), the control cabinet(15b)Interior arrangement intelligence, which is adjusted, carries instrument(15h), the auxiliary diesel fuel compartment
(15e)Interior arrangement LNG flow containers(15i), the propeller room(15f)In bow and stern, one, stern arrangement revolution are respectively set
Formula propeller(5), bow arrangement bulb bow Side Thrusters(6).
2. a kind of high useful load according to claim 1, multi-state, the method for work of environment-friendly type wind turbine installation vessel, it is special
Levying is:
(a)The first working condition:Make ballast tank first(15a)Interior ballast water emptying, by spud leg(8)Put to seabed, make ship
Body is raised to more than the water surface, aids in loop wheel machine(4)Start to assemble fan blade(11)With blower fan cabin(12), while lifting body(2a)By wind
The thick pylon of machine(13)With the thin pylon of blower fan(14)Pass through overhead door(1b)Spar deck is delivered on top(1), main crane(3)Starting will
The thick pylon of blower fan(13)With the thin pylon of blower fan(14)Appointed place is sequentially arranged at, finally by fan blade(11)With blower fan cabin(12)Group
The stem closed is arranged on the thin pylon of blower fan(14)On;
(b)Second of working condition:Make ballast tank first(15a)Appropriate ballast water is inside mounted with, by spud leg(8)Withdraw,
Hull is set to swim in specified drinking water, single point mooring's equipment(10)With column turntable(18)It is connected, aids in loop wheel machine(4)Start to assemble wind
Leaf(11)With blower fan cabin(12), while lifting body(2a)By the thick pylon of blower fan(13)With the thin pylon of blower fan(14)Pass through overhead door
(1b)Spar deck is delivered on top(1), main crane(3)Start the thick pylon of blower fan(13)With the thin pylon of blower fan(14)Install successively
In appointed place, finally by fan blade(11)With blower fan cabin(12)The stem combined is arranged on the thin pylon of blower fan(14)On, often
Secondary crane(3)During work, intelligence, which is adjusted, carries instrument(15h)Ballast tank is adjusted according to hull floading condition(15a)Interior ballast water.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610208452.8A CN105667726B (en) | 2016-04-06 | 2016-04-06 | High useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201610208452.8A CN105667726B (en) | 2016-04-06 | 2016-04-06 | High useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work |
Publications (2)
Publication Number | Publication Date |
---|---|
CN105667726A CN105667726A (en) | 2016-06-15 |
CN105667726B true CN105667726B (en) | 2017-07-21 |
Family
ID=56308304
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201610208452.8A Active CN105667726B (en) | 2016-04-06 | 2016-04-06 | High useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105667726B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108454798B (en) * | 2017-09-11 | 2022-04-26 | 青岛武船麦克德莫特海洋工程有限公司 | Integrated construction and installation method of upper process module of floating production facility |
CN116201693B (en) * | 2023-04-23 | 2023-07-14 | 上海海事大学 | Self-propelled self-elevating fan mounting ship and mounting method |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7509919B2 (en) * | 2006-02-17 | 2009-03-31 | Single Buoy Moorings, Inc. | Deep water installation vessel |
CN201745721U (en) * | 2010-08-10 | 2011-02-16 | 江苏韩通船舶重工有限公司 | Special installation vessel for marine intertidal wind power generating set |
JP5383631B2 (en) * | 2010-11-18 | 2014-01-08 | 三菱重工業株式会社 | Offshore wind turbine installation ship and offshore wind turbine installation method using the same |
CN103183108A (en) * | 2011-12-30 | 2013-07-03 | 上海振华重工(集团)股份有限公司 | Ocean wind power mounting ship |
CN102704452B (en) * | 2012-07-05 | 2014-07-02 | 南通中远船务工程有限公司 | Ultra-large self-elevating wind turbine installation vessel with multi-type pile legs and design method thereof |
CN202686704U (en) * | 2012-07-12 | 2013-01-23 | 中国海洋石油总公司 | Harbor tugboat applying liquefied natural gas/fuel oil dual-fuel |
CN103600817B (en) * | 2013-10-15 | 2017-04-05 | 江苏韩通船舶重工有限公司 | Jack up mounting ship of offshore wind turbine |
CN103979081B (en) * | 2014-05-15 | 2016-07-20 | 上海交通大学 | The marine buoyant wind machine integral installation workboat of deep drinking water |
CN104554639A (en) * | 2014-12-19 | 2015-04-29 | 中远船务工程集团有限公司 | Installation equipment for large offshore wind power equipment |
CN205469697U (en) * | 2016-04-06 | 2016-08-17 | 大连理工大学 | High charge capacity, multiplex condition, environment -friendly wind -powered electricity generation installation ship |
-
2016
- 2016-04-06 CN CN201610208452.8A patent/CN105667726B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN105667726A (en) | 2016-06-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110945234B (en) | Offshore energy island device | |
CN204527563U (en) | Middle deep water semi-submersible drilling platform | |
CN104029798B (en) | Self installation production platform | |
CN106828812B (en) | Semi-submersible type deep-sea wind-powered electricity generation mounting platform and its wind power generating set integral installation method | |
CN105151236A (en) | Platform device for submerging, surfacing, moving and carrying floating piers and towers and working method thereof | |
CN205686599U (en) | A kind of mobile LNG fills ship | |
CN202201145U (en) | Semi-submersible type hoisting accommodation platform | |
CN205469697U (en) | High charge capacity, multiplex condition, environment -friendly wind -powered electricity generation installation ship | |
CN103256170B (en) | Floating-barrel type tidal current energy generating device | |
CN107640296A (en) | A kind of far-reaching extra large oil-gas field development drilling goods and materials storage transfer floating platform | |
CN105667726B (en) | High useful load, multi-state, environment-friendly type wind turbine installation vessel and its method of work | |
CN103661827A (en) | Installation system and construction method of wind turbine assembly in sea intertidal zone | |
CN206634171U (en) | Semi-submersible type deep-sea wind-powered electricity generation mounting platform | |
US11066138B2 (en) | Floating structure installation system and floating structure installation method | |
CN201132603Y (en) | Tugboat split type pocket-sized sightsee submarines | |
CN107878699A (en) | A kind of Floating LNG production vessel | |
CN107269448A (en) | Ultra-large type water-power plant | |
CN103935475A (en) | Sea water desalination engineering ship | |
CN105383645A (en) | Dragging floating type solar power station used for boat | |
CN106627979A (en) | Intertidal zone seaborne operation and maintenance catamaran | |
CN104554639A (en) | Installation equipment for large offshore wind power equipment | |
CN106382180A (en) | Floating type buoyancy pendulum wave power generation device | |
CN207292328U (en) | A kind of cable laying ship | |
CN108757332A (en) | A kind of semi-submerged offshore platform electricity generation system of photovoltaic and wind turbine cogeneration | |
CN106560557B (en) | A kind of self-propulsion type artificial floating island |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant |