SG102542A1 - Piling system with continuous load measurement - Google Patents
Piling system with continuous load measurementInfo
- Publication number
- SG102542A1 SG102542A1 SG9903106A SG1999003106A SG102542A1 SG 102542 A1 SG102542 A1 SG 102542A1 SG 9903106 A SG9903106 A SG 9903106A SG 1999003106 A SG1999003106 A SG 1999003106A SG 102542 A1 SG102542 A1 SG 102542A1
- Authority
- SG
- Singapore
- Prior art keywords
- load measurement
- continuous load
- piling system
- piling
- continuous
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D33/00—Testing foundations or foundation structures
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/28—Placing of hollow pipes or mould pipes by means arranged inside the piles or pipes
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SG9903106A SG102542A1 (en) | 1998-12-22 | 1999-06-22 | Piling system with continuous load measurement |
GB9930254A GB2346917A (en) | 1998-12-22 | 1999-12-21 | Piling system with continuous load measurement |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SG9804829 | 1998-12-22 | ||
SG9903106A SG102542A1 (en) | 1998-12-22 | 1999-06-22 | Piling system with continuous load measurement |
Publications (1)
Publication Number | Publication Date |
---|---|
SG102542A1 true SG102542A1 (en) | 2004-03-26 |
Family
ID=26665186
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SG9903106A SG102542A1 (en) | 1998-12-22 | 1999-06-22 | Piling system with continuous load measurement |
Country Status (2)
Country | Link |
---|---|
GB (1) | GB2346917A (en) |
SG (1) | SG102542A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109930633A (en) * | 2019-03-15 | 2019-06-25 | 天津大学 | Indoor model stake, pilot system and the method for outer frictional resistance distribution in a kind of measurement large diameter steel pipe pile |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10346040A1 (en) | 2003-10-02 | 2005-05-25 | Bauer Maschinen Gmbh | Method and test arrangement for determining the carrying behavior of displacement piles |
GB2414032B (en) * | 2004-05-11 | 2008-12-10 | Shire Structures Ltd | Improvements in or relating to piles |
AT10956U3 (en) * | 2009-09-01 | 2010-06-15 | Grund Pfahl Und Sonderbau Gmbh | TEST PROCEDURE FOR PUNCHES |
NL2004073C2 (en) * | 2010-01-07 | 2011-07-11 | Geoconsult B V | METHOD FOR PLACING A SCREW DRILL POLE |
CN103266637B (en) * | 2013-06-04 | 2015-05-20 | 天津大学 | In-situ measurement device and method for end resistance and frictional resistance of skirtboard foundation in penetration process |
CN103362151B (en) * | 2013-07-30 | 2015-02-18 | 中国化学工程第一岩土工程有限公司 | Method for detecting prestress concrete pipe pile horizontal stress |
CN104164873B (en) * | 2014-06-06 | 2017-01-25 | 深圳市工勘岩土集团有限公司 | Prestressed pipe pile and construction method thereof |
CN105926689A (en) * | 2016-05-18 | 2016-09-07 | 中铁上海设计院集团有限公司 | Calculation method for allowable single pile bearing capacity of following drilling method railway tubular piles |
CN106223375B (en) * | 2016-09-20 | 2017-12-29 | 广州聚散流沙科技有限公司 | Pre-buried type pile end groundwork detecting system |
CH715377A1 (en) * | 2018-09-24 | 2020-03-31 | Krinner Innovation Gmbh | Procedure for checking the load-bearing capacity of a foundation. |
CN111335305A (en) * | 2020-03-19 | 2020-06-26 | 中铁六局集团有限公司 | Double-casing zero-friction static load detection construction method based on uplift pile |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2592414A1 (en) * | 1985-12-30 | 1987-07-03 | Frankignoul Pieux Armes | Method and device for driving a driving tube in order to form a pile |
DD257656A1 (en) * | 1987-02-16 | 1988-06-22 | Bau Und Montagekombinat Sued K | DEVICE FOR INTRODUCING PIPING |
GB2218722A (en) * | 1988-05-19 | 1989-11-22 | Basil Green | Pile pressing |
US5282701A (en) * | 1990-07-10 | 1994-02-01 | Samsung Construction Co., Ltd. | Method and apparatus for a loading test of a pile using a self-repulsive force |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB504625A (en) * | 1937-10-27 | 1939-04-27 | Gower Bouverie Raynor Pimm | Improvements in or relating to the measurement of the resistance experienced by a pile in pile driving |
US3449918A (en) * | 1967-01-13 | 1969-06-17 | Gabriel Fuentes Jr | Concrete piles and methods and apparatus for forming and splicing them together |
JPS5792211A (en) * | 1980-11-27 | 1982-06-08 | Sano Soiru:Kk | Load testing method for pile |
GB2299360B (en) * | 1995-03-31 | 1998-10-14 | Subsidence Surveys Limited | Pile and pile segment |
-
1999
- 1999-06-22 SG SG9903106A patent/SG102542A1/en unknown
- 1999-12-21 GB GB9930254A patent/GB2346917A/en not_active Withdrawn
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2592414A1 (en) * | 1985-12-30 | 1987-07-03 | Frankignoul Pieux Armes | Method and device for driving a driving tube in order to form a pile |
DD257656A1 (en) * | 1987-02-16 | 1988-06-22 | Bau Und Montagekombinat Sued K | DEVICE FOR INTRODUCING PIPING |
GB2218722A (en) * | 1988-05-19 | 1989-11-22 | Basil Green | Pile pressing |
US5282701A (en) * | 1990-07-10 | 1994-02-01 | Samsung Construction Co., Ltd. | Method and apparatus for a loading test of a pile using a self-repulsive force |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109930633A (en) * | 2019-03-15 | 2019-06-25 | 天津大学 | Indoor model stake, pilot system and the method for outer frictional resistance distribution in a kind of measurement large diameter steel pipe pile |
Also Published As
Publication number | Publication date |
---|---|
GB9930254D0 (en) | 2000-02-09 |
GB2346917A (en) | 2000-08-23 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0964232A4 (en) | Load sensor | |
IL121109A0 (en) | Slewing bearer with integral sensor | |
GB9812782D0 (en) | Tractor load weighing device | |
HUP0102601A3 (en) | Construction system | |
SG102542A1 (en) | Piling system with continuous load measurement | |
GB9825958D0 (en) | Load-bearing structures | |
AU9769698A (en) | Load indicator | |
GB2338793B (en) | Force measurement system | |
ZA965052B (en) | Load measurement | |
GB9912080D0 (en) | Direction indicator | |
ZA981632B (en) | Load measurement | |
GB9824325D0 (en) | Displacement measurement | |
GB9816898D0 (en) | Fastener load indication means | |
GB2338227B (en) | Measure system | |
GB9811755D0 (en) | Measuring system | |
GB2332918B (en) | Steel structures | |
GB9926526D0 (en) | Displacement measurement | |
GB9811158D0 (en) | Direction indicator | |
TW381694U (en) | Direction indicator | |
GB9812029D0 (en) | Direction indicator | |
GB9812591D0 (en) | Piling system | |
GB9824486D0 (en) | Displacement measurement | |
GB9824485D0 (en) | Displacement measurement | |
GB9824484D0 (en) | Displacement measurement | |
TW350444U (en) | Simplified measuring device for anchor load change |