RU2674480C1 - Method of drilling reinforced concrete column erection - Google Patents

Method of drilling reinforced concrete column erection Download PDF

Info

Publication number
RU2674480C1
RU2674480C1 RU2017137685A RU2017137685A RU2674480C1 RU 2674480 C1 RU2674480 C1 RU 2674480C1 RU 2017137685 A RU2017137685 A RU 2017137685A RU 2017137685 A RU2017137685 A RU 2017137685A RU 2674480 C1 RU2674480 C1 RU 2674480C1
Authority
RU
Russia
Prior art keywords
concrete
column
casing
pipe
well
Prior art date
Application number
RU2017137685A
Other languages
Russian (ru)
Inventor
Игорь Валерьевич Ильин
Владимир Андреевич Марков
Виталий Михайлович Клочанов
Original Assignee
Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=64752984&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=RU2674480(C1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" filed Critical Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс"
Priority to RU2017137685A priority Critical patent/RU2674480C1/en
Application granted granted Critical
Publication of RU2674480C1 publication Critical patent/RU2674480C1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

FIELD: construction.SUBSTANCE: invention relates to the construction, in particular to the manufacturing technology of drilling reinforced concrete columns, and can be used to create pile foundations for underground and above ground multi-level buildings and structures for various purposes, including those erected in a semi-enclosed way in cramped conditions. Method of construction of the drill concrete column includes the formation of a well using a casing, the manufacture of the reinforcement cage of the column, the placement of the reinforcement cage of the column in the pipe. Casing pipe inclinometry is performed after drilling a well to the projected depth. Metal centralizers are welded to the pipe with the reinforcement cage of the column, wrapped in two layers of polyethylene, lowered into the casing, through the inner part of the reinforcement cage of the column, the concrete line is lowered and the concrete mix is placed with the accelerator setting to a height sufficient to fix the lower part of the reinforced concrete column. Raise the concrete pipe to a height of not more than the height of the concrete mix with the accelerator setting and stack the concrete mix with a retarder while raising the concrete pipe, embedded in the stackable mixture. Laid concrete mixture is kept up to a set of concrete mixture with an accelerator setting at the base of the column of minimum strength. Check the fixation of the reinforcement cage of the column and continue concreting to the design elevations while simultaneously removing the casing from the well and filling the annular space with a cement-sand mortar.EFFECT: technical result consists in simplifying the method for erecting a drill concrete column and increasing productivity due to the absence of the need to center the reinforcement cage after lowering it in the casing.1 cl, 2 dwg

Description

Изобретение относится к строительству, в частности к технологии изготовления буровых железобетонных колонн, и может быть использовано для создания свайных оснований для подземных и наземных многоуровневых зданий и сооружений различного назначения, в том числе возводимых полузакрытым способом в стесненных условиях.The invention relates to the construction, in particular, to the technology of manufacturing reinforced concrete drill columns, and can be used to create pile foundations for underground and ground multi-level buildings and structures for various purposes, including those being constructed in a semi-closed manner in cramped conditions.

Известен способ возведения железобетонной колонны, включающий операции изготовления арматурного каркаса колонны с закладными деталями, бетонирования в неизвлекаемой опалубке в проектном положении в скважине с замоноличиванием (Юркевич П.Б. «Буровые колонны - новая реальность» // «Подземное пространство мира», 2001, №4, с. 12-21, ISSN 0869-799 Х, ТИМР, Москва).A known method of erecting a reinforced concrete column, including the operations of manufacturing a reinforcing cage of a column with embedded parts, concreting in an unrecoverable formwork in a design position in a well with monolithing (Yurkevich PB “Drill columns - a new reality” // “Underground space of the world”, 2001, No. 4, pp. 12-21, ISSN 0869-799 X, TIMR, Moscow).

Недостатком данного способа являются длительные сроки производства работ из-за невозможности совмещения работ нулевого цикла с работами по возведению элементов здания или сооружения выше нулевой отметки.The disadvantage of this method is the long lead time due to the impossibility of combining work of the zero cycle with the construction of elements of a building or structure above the zero mark.

Наиболее близким техническим решением к заявляемому изобретению является способ возведения буровой железобетонной колонны, включающий изготовление арматурного каркаса колонны с закладными деталями, бетонирование в неизвлекаемой опалубке в проектном положении в скважине с замоноличиванием. Колонну выполняют из верхней опорной части и нижней фундаментной части, бурят скважину и погружают арматурный каркас колонны вертикально в скважину с зазором от дна скважины, вертикально центрируют с компенсацией эксцентриситета, фиксируют верхнюю часть колонны от горизонтальных смещений, вертикально опускают на основание скважины с фиксированием нижней части фиксаторами, замоноличивают бетонной смесью снизу вверх нижнюю фундаментную часть колонны и внутреннюю часть неизвлекаемой опалубки верхней опорной части колонны, осуществляют уширение и цементацию грунтового основания через технологический трубопровод, размещаемый внутри арматурного каркаса, пространство между неизвлекаемой опалубкой и стенками скважины верхней опорной части заполняют зернистым материалом (RU 2229557, E02D 5/00, E02D 5/38, E02D 5/60, E02D 5/66, 27.05.2004).The closest technical solution to the claimed invention is a method of erecting a reinforced concrete drill string, including the manufacture of a reinforcing casing of the column with embedded parts, concreting in non-removable formwork in the design position in the well with filling. The column is made from the upper supporting part and the lower foundation part, the well is drilled and the reinforcing cage of the column is immersed vertically into the well with a gap from the bottom of the well, vertically centered with compensation for eccentricity, the upper part of the column is fixed from horizontal displacements, vertically lowered to the base of the well with fixing the lower part clamps, monolithic concrete mixture from bottom to top, the lower base part of the column and the inner part of the non-removable formwork of the upper supporting part of the column, t broadening and cementing of the soil base through a process pipe placed inside the reinforcing cage, the space between the non-removable formwork and the borehole walls of the upper supporting part is filled with granular material (RU 2229557, E02D 5/00, E02D 5/38, E02D 5/60, E02D 5 / 66, May 27, 2004).

Недостатком данного способа является трудоемкость выполнения работ по обеспечению необходимой точности вертикального положения арматурного каркаса.The disadvantage of this method is the complexity of the work to ensure the necessary accuracy of the vertical position of the reinforcing cage.

Задачей настоящего изобретения является упрощение способа возведения буровой железобетонной колонны и повышение производительности за счет отсутствия необходимости центрирования арматурного каркаса после опускания в обсадную трубу.The present invention is to simplify the method of construction of a reinforced concrete drill string and increase productivity due to the lack of the need to center the reinforcing cage after lowering into the casing.

Технический результат достигается тем, что в способе возведения буровой железобетонной колонны, включающем образование скважины с использованием обсадной трубы, изготовление арматурного каркаса колонны, помещение арматурного каркаса колонны в трубу, после бурения скважины до проектной глубины производят инклинометрию обсадной трубы, а к трубе с арматурным каркасом колонны приваривают металлические центраторы, оборачивают ее двумя слоями полиэтилена, опускают в обсадную трубу, через внутреннюю часть арматурного каркаса колонны опускают бетоновод и укладывают бетонную смесь с ускорителем схватывания на высоту, достаточную для фиксации нижней части буровой железобетонной колонны, поднимают бетоновод на высоту не более высоты укладки бетонной смеси с ускорителем схватывания и укладывают бетонную смесь с замедлителем схватывания с одновременным поднятием бетоновода, заглубленного в укладываемую смесь, уложенную бетонную смесь выдерживают до набора бетонной смесью с ускорителем схватывания в основании колонны минимальной прочности, проверяют фиксацию арматурного каркаса колонны и продолжают бетонирование до проектных отметок с одновременным извлечением из скважины обсадной трубы и заполнением межтрубного пространства цементно-песчаным раствором.The technical result is achieved by the fact that in the method of erecting a reinforced concrete drill string, which includes producing a well using a casing, manufacturing a reinforcing casing of the string, placing the reinforcing casing in the pipe, after drilling the well to the design depth, the casing is inclinometric and to the pipe with a reinforcing cage the columns are welded with metal centralizers, wrapped in two layers of polyethylene, lowered into the casing, through the inner part of the reinforcing casing of the column opus the concrete duct is laid and the concrete mixture with the setting accelerator is laid to a height sufficient to fix the lower part of the reinforced concrete drill string, the concrete line is raised to a height not exceeding the concrete mix height with the setting accelerator and the concrete mixture is set with the setting retarder while lifting the concrete duct buried in the stacked mixture , the laid concrete mixture is kept until it is set with concrete mixture with a setting accelerator at the base of the minimum strength column, the fixation of the reinforcing bar is checked about the frame of the string and continue concreting to design elevations with simultaneous extraction of the casing from the well and filling the annulus with cement-sand mortar.

Сущность данного изобретения поясняется чертежами, где на фиг. 1 изображен общий вид буровой железобетонной колонны, а на фиг. 2 - сечение А-А.The essence of the present invention is illustrated by drawings, where in FIG. 1 shows a general view of a reinforced concrete drill string, and FIG. 2 - section aa.

Предлагаемый способ возведения буровой железобетонной колонны осуществляется следующим образом.The proposed method of construction of a reinforced concrete drill string is as follows.

Первоначально образуют скважину 1 для буровой железобетонной колонны соответствующего диаметра. Одновременно с бурением скважины 1 производят крепление грунта стенок скважины с использованием обсадной трубы 2. После бурения скважины 1 до проектной глубины производят инклинометрию обсадной трубы 2 для определения ее отклонения по вертикали. Изготавливают арматурный каркас колонны 3 и помещают в трубу 4, к которой приваривают металлические центраторы 5, позволяющие установить трубу 4 с арматурным каркасом колонны 3 в проектное положение внутри обсадной трубы 2 с учетом корректировки отклонения от вертикали пробуренной скважины 1. Затем оборачивают трубу 4 с арматурным каркасом колонны 3 двумя слоями полиэтилена 6 для уменьшения адгезии между цементно-песчаным раствором и трубой 4 с арматурным каркасом колонны 3, опускают трубу 4 в обсадную трубу 2 и фиксируют в проектном положении.Initially, a well 1 is formed for a reinforced concrete drill string of the corresponding diameter. Simultaneously with the drilling of well 1, the soil of the walls of the well is secured using the casing 2. After drilling the well 1 to the design depth, the casing 2 is inclinometric to determine its vertical deviation. The reinforcing casing of the column 3 is made and placed in the pipe 4, to which metal centralizers 5 are welded, allowing the pipe 4 with the reinforcing cage of the column 3 to be installed in the design position inside the casing 2 taking into account the adjustment of the deviation from the vertical of the drilled well 1. Then, the pipe 4 with the reinforcing bar is wrapped the frame of the column 3 with two layers of polyethylene 6 to reduce adhesion between the cement-sand mortar and the pipe 4 with the reinforcing frame of the column 3, lower the pipe 4 into the casing 2 and fix it in the design position .

Через внутреннюю часть арматурного каркаса колонны 3 до забоя скважины 1 опускают бетоновод (не показан) и укладывают бетонную смесь с ускорителем схватывания в основание буровой железобетонной колонны методом вертикально перемещаемой трубы на высоту, достаточную для фиксации нижней части буровой железобетонной колонны, например 3 м. Ускоритель схватывания бетонной смеси необходим для минимизации сроков фиксации низа арматурного каркаса колонны 3 в забое скважины 1. Затем поднимают бетоновод на высоту не более высоты укладки бетонной смеси с ускорителем схватывания, например 2 м, и укладывают бетонную смесь с замедлителем схватывания на высоту, например, 5 м, с одновременным поднятием бетоновода, заглубленного в укладываемую смесь, например 2 м. Замедлитель схватывания бетонной смеси необходим для исключения потери подвижности бетонной смеси в бетоноводе при ожидании набора прочности ранее уложенным слоем бетонной смеси с ускорителем схватывания. Уложенную бетонную смесь выдерживают до набора бетонной смесью с ускорителем схватывания в основании колонны минимальной прочности, проверяют фиксацию арматурного каркаса колонны 3 и продолжают бетонирование колонны до проектных отметок с одновременным извлечением из скважины 1 обсадной трубы 2 и заполнением пространства между обсадной трубой 2 и трубой 4 с арматурным каркасом колонны 3 цементно-песчаным раствором, состава 1:2, до его излития из скважины 1.A concrete conduit (not shown) is lowered through the inner part of the reinforcing casing of column 3 to the bottom of well 1 and the concrete mixture with the accelerator is set into the base of the reinforced concrete column using a vertically movable pipe to a height sufficient to fix the lower part of the reinforced concrete column, for example, 3 m. Accelerator setting concrete mixture is necessary to minimize the time of fixing the bottom of the reinforcing casing of the column 3 in the bottom of the well 1. Then raise the concrete duct to a height of not more than the height of the concrete Spread with a setting accelerator, for example 2 m, and lay the concrete mixture with a setting retarder to a height, for example, 5 m, while lifting a concrete conduit buried in a laid mixture, for example 2 m. A setting retarder for concrete mix is necessary to prevent loss of mobility of the concrete mixture in to a concrete conduit while waiting for a set of strength with a previously laid concrete layer with a setting accelerator. The laid concrete mixture is kept until concrete is set with a setting accelerator in the base of the minimum strength column, the fixation of the reinforcing cage of column 3 is checked, and the concrete is concreted to the design marks while simultaneously removing casing 2 from the well 1 and filling the space between the casing 2 and pipe 4 with reinforcing casing of column 3 with cement-sand mortar, composition 1: 2, before it is poured out of well 1.

По сравнению с прототипом данный способ возведения буровой железобетонной колонны обеспечивает упрощение способа возведения буровой железобетонной колонны и повышение производительности за счет отсутствия необходимости центрирования арматурного каркаса после опускания в обсадную трубу.Compared with the prototype, this method of construction of a reinforced concrete drill string provides a simplification of the method of construction of a reinforced concrete drill string and increased productivity due to the absence of the need to center the reinforcing cage after lowering into the casing.

Claims (1)

Способ возведения буровой железобетонной колонны, включающий образование скважины с использованием обсадной трубы, изготовление арматурного каркаса колонны, помещение арматурного каркаса колонны в трубу, отличающийся тем, что после бурения скважины до проектной глубины производят инклинометрию обсадной трубы, а к трубе с арматурным каркасом колонны приваривают металлические центраторы, оборачивают ее двумя слоями полиэтилена, опускают в обсадную трубу, через внутреннюю часть арматурного каркаса колонны опускают бетоновод и укладывают бетонную смесь с ускорителем схватывания на высоту, достаточную для фиксации нижней части буровой железобетонной колонны, поднимают бетоновод на высоту не более высоты укладки бетонной смеси с ускорителем схватывания и укладывают бетонную смесь с замедлителем схватывания с одновременным поднятием бетоновода, заглубленного в укладываемую смесь, уложенную бетонную смесь выдерживают до набора бетонной смесью с ускорителем схватывания в основании колонны минимальной прочности, проверяют фиксацию арматурного каркаса колонны и продолжают бетонирование до проектных отметок с одновременным извлечением из скважины обсадной трубы и заполнением межтрубного пространства цементно-песчаным раствором.A method of erecting a reinforced concrete drill string, including forming a well using a casing, manufacturing a reinforcing casing of a string, placing a reinforcing casing in a pipe, characterized in that, after drilling the well to the design depth, casing inclinometry is performed, and metal is welded to the pipe with a reinforcing casing centralizers, wrap it in two layers of polyethylene, lower it into the casing, lower the concrete duct and lay it through the inner part of the reinforcing cage of the column concrete mixture with setting accelerator is set to a height sufficient to fix the lower part of the reinforced concrete drill string, the concrete duct is raised to a height of not more than the concrete mix setting height with setting accelerator and concrete mixture is set with setting retarder while lifting the concrete duct buried in the stacked concrete mixture the mixture is kept up to set with concrete mixture with a setting accelerator in the base of the minimum strength column; the fixation of the reinforcing cage of the column is checked and lzhayut concreting to design marks while withdrawing from the well casing pipe and filling the annulus with cement-sand mortar.
RU2017137685A 2017-10-27 2017-10-27 Method of drilling reinforced concrete column erection RU2674480C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2017137685A RU2674480C1 (en) 2017-10-27 2017-10-27 Method of drilling reinforced concrete column erection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2017137685A RU2674480C1 (en) 2017-10-27 2017-10-27 Method of drilling reinforced concrete column erection

Publications (1)

Publication Number Publication Date
RU2674480C1 true RU2674480C1 (en) 2018-12-11

Family

ID=64752984

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2017137685A RU2674480C1 (en) 2017-10-27 2017-10-27 Method of drilling reinforced concrete column erection

Country Status (1)

Country Link
RU (1) RU2674480C1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2798149C2 (en) * 2022-02-04 2023-06-16 Общество с ограниченной ответственностью "Инженерное бюро Юркевича" Drilling reinforced concrete column and method for its construction

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1819309A3 (en) * 1990-12-10 1993-05-30 METHOD FOR ESTABLISHING A PUNCHABLE PILET AND THE REINFORCED BAR FRAMEWORK
RU2119011C1 (en) * 1996-10-11 1998-09-20 Общество с ограниченной ответственностью "Гидроспецпроект" Method for erection of cast-in-place pile
RU2181410C2 (en) * 2000-06-09 2002-04-20 Закрытое акционерное общество научно-производственная компания "Комбест" Method for manufacture of cast-in-place reinforced piles
RU2229557C1 (en) * 2003-06-02 2004-05-27 ООО "Инженерное бюро Юркевича" Screw reinforced concrete column and building method thereof
RU2260653C1 (en) * 2004-12-03 2005-09-20 Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") Method for bored and cast-in-place pile forming in ground having silty interlayers
RU2375521C1 (en) * 2008-07-11 2009-12-10 Общество с Ограниченной ответственностью ООО "Технокомспецстрой" Method of erecting piled foundation designed for high loads

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1819309A3 (en) * 1990-12-10 1993-05-30 METHOD FOR ESTABLISHING A PUNCHABLE PILET AND THE REINFORCED BAR FRAMEWORK
RU2119011C1 (en) * 1996-10-11 1998-09-20 Общество с ограниченной ответственностью "Гидроспецпроект" Method for erection of cast-in-place pile
RU2181410C2 (en) * 2000-06-09 2002-04-20 Закрытое акционерное общество научно-производственная компания "Комбест" Method for manufacture of cast-in-place reinforced piles
RU2229557C1 (en) * 2003-06-02 2004-05-27 ООО "Инженерное бюро Юркевича" Screw reinforced concrete column and building method thereof
RU2260653C1 (en) * 2004-12-03 2005-09-20 Открытое акционерное общество "Мостотрест" (ОАО "Мостотрест") Method for bored and cast-in-place pile forming in ground having silty interlayers
RU2375521C1 (en) * 2008-07-11 2009-12-10 Общество с Ограниченной ответственностью ООО "Технокомспецстрой" Method of erecting piled foundation designed for high loads

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2798149C2 (en) * 2022-02-04 2023-06-16 Общество с ограниченной ответственностью "Инженерное бюро Юркевича" Drilling reinforced concrete column and method for its construction

Similar Documents

Publication Publication Date Title
JP6830748B2 (en) Open caisson construction structure and its construction method
US7585134B2 (en) Reinforced-concrete column in the soil pit and method of its construction
CN105840207B (en) Construction method for comprehensive tunnel entering structure of large-span tunnel penetrating shallow-buried bias-pressure loose accumulation body
CN205742213U (en) Foundation pit supporting construction
KR100788623B1 (en) Top-down method using precast-concrete colum
CN104264682B (en) A kind of anchor draws the lagging pile first floor to add concrete beam method for supporting
CN109024608A (en) The construction method that steel pipe column for contrary sequence method quickly positions
RU2375521C1 (en) Method of erecting piled foundation designed for high loads
RU2674480C1 (en) Method of drilling reinforced concrete column erection
CN109024657B (en) Construction method of super high-rise core tube deep pit edge tower crane foundation under complex conditions
KR20200026397A (en) Apparatus and method for arranging and holding head of bored pile by using horizontal means and holding means
RU2390609C1 (en) Method for erection of slab-pile foundation
RU2798149C2 (en) Drilling reinforced concrete column and method for its construction
RU2692396C1 (en) Method of erection of slab reinforced concrete foundation
RU2229557C1 (en) Screw reinforced concrete column and building method thereof
KR20210090100A (en) In a building where the underground structure is a wall structure, the shortened construction type top down construction method and structure that enables early ground frame start using temporary transfer structures
CN205934955U (en) Steel cushion cap formula tower crane foundation
JP6534026B2 (en) Seismic isolation building and its construction method
KR101222348B1 (en) The Supporting Structure and Pressing device of Underground Structure
CN206279522U (en) Ground-connecting-wall steel reinforcement cage
GB2261891A (en) Installing columns e.g. below ground
RU2601787C1 (en) Method for construction of foundation support
US1558430A (en) Underpinning
RU34952U1 (en) Reinforced concrete drill string
RU2482243C1 (en) Stay-in-place form for erection of walls in soil