RU2623786C1 - Multi-rail trestle road, revolver unit and method of construction of the road - Google Patents

Multi-rail trestle road, revolver unit and method of construction of the road Download PDF

Info

Publication number
RU2623786C1
RU2623786C1 RU2016117778A RU2016117778A RU2623786C1 RU 2623786 C1 RU2623786 C1 RU 2623786C1 RU 2016117778 A RU2016117778 A RU 2016117778A RU 2016117778 A RU2016117778 A RU 2016117778A RU 2623786 C1 RU2623786 C1 RU 2623786C1
Authority
RU
Russia
Prior art keywords
construction
piles
road
rail
crossbars
Prior art date
Application number
RU2016117778A
Other languages
Russian (ru)
Inventor
Александр Сергеевич Савельев
Original Assignee
Александр Сергеевич Савельев
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Александр Сергеевич Савельев filed Critical Александр Сергеевич Савельев
Priority to RU2016117778A priority Critical patent/RU2623786C1/en
Application granted granted Critical
Publication of RU2623786C1 publication Critical patent/RU2623786C1/en

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61BRAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
    • B61B5/00Elevated railway systems without suspended vehicles
    • B61B5/02Elevated railway systems without suspended vehicles with two or more rails
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01BPERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
    • E01B2/00General structure of permanent way
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/22Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving for consolidating or finishing laid-down unset materials
    • E01C19/23Rollers therefor; Such rollers usable also for compacting soil
    • E01C19/26Rollers therefor; Such rollers usable also for compacting soil self-propelled or fitted to road vehicles
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C19/00Machines, tools or auxiliary devices for preparing or distributing paving materials, for working the placed materials, or for forming, consolidating, or finishing the paving
    • E01C19/52Apparatus for laying individual preformed surfacing elements, e.g. kerbstones
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/02Placing by driving

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Machines For Laying And Maintaining Railways (AREA)

Abstract

FIELD: construction.
SUBSTANCE: immersion of piles, installation of crossbars, laying of slabs and installation of tracks from rail assemblies is carried out by one turret unit consisting of a body on a railway run and a swing tower, on one side of which there is a device for piling, and on the opposite side there is a manipulator with the gripping device for the installation of crossbars, plates and rail assemblies. The totality of the properties of the turret unit and the multi-rail road, vehicles for the movement of which have the ability of transverse displacement, allow construction to be carried out in a way in which the construction of the next section of the road is made from the edge of the already constructed section and only from it.
EFFECT: condition is created for the construction of a road in a fully automatic mode, there is no need to build auxiliary roads with their subsequent reclamation.
3 cl, 13 dwg

Description

Группа изобретений относится к строительству многорельсовой железной дороги (описание: патент РФ №2439236), в частности к строительству двухпутной многорельсовой железной дороги свайно-эстакадного типа, включает конструкцию агрегата для строительства такой дороги и способ ее строительства.The group of inventions relates to the construction of a multi-rail railway (description: RF patent No. 2439236), in particular to the construction of a double-track multi-rail railway of pile-flyover type, includes the design of the unit for the construction of such a road and the method of its construction.

Многорельсовая дорога (патент РФ №2439236) состоит из рельсов пути и дополнительных рельсов, все рельсы уложены по ширине на одинаковом расстоянии. Транспорт

Figure 00000001
для движения по такой дороге снабжен механизмом перестановки колесных пар на шаг укладки рельсов в поперечном направлении. Это позволяет рельсовому транспорту совершать объезд, обгон, перестроение на другой путь в любом месте дороги.The multi-rail road (RF patent No. 2439236) consists of track rails and additional rails, all rails are laid in width at the same distance. Transport
Figure 00000001
for movement on such a road, it is equipped with a mechanism for rearranging wheel sets at the step of laying rails in the transverse direction. This allows rail vehicles to bypass, overtake, change lanes anywhere on the road.

Наиболее известной, уникальной (построена в море), протяженной (более 300 км) и долговечной (с 1947 г.) системой дорог свайно-эстакадного типа является сеть дорог для движения автомобилей на нефтяном месторождении «Нефтяные камни» в Азербайджане [1]. Конструкция таких дорог состоит из вбитых в грунт свай, уложенных на сваи поперечных балок (ригелей), установленных на ригели продольных балок или плит пролетного перекрытия, поверх которых сооружено дорожное покрытие для движения автомобильного транспорта.The most famous, unique (built at sea), long (over 300 km) and long-lived (since 1947) system of pile-flyover type roads is a network of roads for motor vehicles at the Oil Rocks oil field in Azerbaijan [1]. The design of such roads consists of piles driven into the ground, laid on piles of transverse beams (crossbars), mounted on crossbars of longitudinal beams or floor slabs, on top of which a pavement is constructed for the movement of road vehicles.

Существуют варианты конструкции дорог на сваях и способы их строительства. Все они относятся к дорогам для автомобильного транспорта.There are options for the construction of roads on stilts and methods for their construction. All of them relate to roads for automobile transport.

Известна конструкция автомобильной дороги из бетонных плит на сваях, содержащая погруженные в грунт сваи, установленные на оголовках свай поперечные балки (ригели), и уложенные на ригели плиты [2]. Конструкция дороги решает задачу строительства дорог на заболоченных грунтах и вечной мерзлоте с заполнением пространства между полотном и поверхностью земли демпфирующей прокладкой. Недостатком является предложенный способ строительства обычным способом с поверхности земли.A known construction of a highway made of concrete slabs on piles, containing piles immersed in the soil, transverse beams (beams) mounted on pile heads, and slabs laid on the beams [2]. The design of the road solves the problem of building roads on wetlands and permafrost with filling the space between the canvas and the surface of the earth with a damping pad. The disadvantage is the proposed method of construction in the usual way from the surface of the earth.

Известен способ строительства эстакады, при котором строительная техника при строительстве следующего участка размещается на краю уже построенного участка или на передвигаемых по ходу строительства рамах или платформах, а подвоз строительных материалов происходит по построенному участку дороги [3], [4], [5]. Предложенный способ позволяет не строить вспомогательные дороги с их последующей рекультивацией, а при строительстве причальных сооружений этот способ позволяет не использовать вспомогательные плавсредства. В описании [4] такой способ назван способом строительства «под себя». Недостатком строительства способом «под себя» из перечисленных источников является необходимость использования рам или платформ, а при строительстве таким способом предлагается использовать обычную технику. Существенным недостатком способа строительства «под себя» автомобильных дорог заключается в невозможности строительства эстакадной дороги шириной 8 метров, что является наиболее частым габаритом дороги с двухсторонним движением. Это следует из того, что при подвозе строительных материалов по эстакаде у автотранспорта должна быть возможность безопасно развернуться в пределах ширины эстакады для движения в обратном направлении. Радиус разворота грузовых автомобилей минимум 7 метров, а у автомобилей для перевозки плит и свай он не менее 9-ти метров, что соответствует диаметру 18 метров, что, в свою очередь, и определяет минимальную ширину автомобильной эстакады, которую можно строить методом «под себя». Разворот и движение задним ходом на эстакаде опасны (запрещены правилами дорожного движения), поэтому для безопасного разворота ширина дороги должна быть много больше минимального диаметра для разворота грузовых автомобилей.There is a known method of building a flyover, in which construction equipment during the construction of the next section is located on the edge of the already constructed section or on frames or platforms moved along the course of construction, and building materials are transported along the constructed section of the road [3], [4], [5]. The proposed method allows not to build auxiliary roads with their subsequent reclamation, and during the construction of berthing facilities, this method allows not to use auxiliary boats. In the description [4], such a method is called a “for itself” construction method. The disadvantage of building a way "for themselves" from the above sources is the need to use frames or platforms, and during construction in this way it is proposed to use conventional equipment. A significant drawback of the method of building "for themselves" roads is the impossibility of building an overpass road with a width of 8 meters, which is the most common dimension of a two-way road. This follows from the fact that when transporting building materials along a flyover, vehicles should be able to safely deploy within the width of the flyover for moving in the opposite direction. The turning radius of trucks is at least 7 meters, and for vehicles for transporting plates and piles it is at least 9 meters, which corresponds to a diameter of 18 meters, which, in turn, determines the minimum width of the automobile flyover that can be built using the “for yourself” method ". U-turn and reverse on the overpass are dangerous (prohibited by the rules of the road), therefore, for a safe turn, the width of the road should be much larger than the minimum diameter for a turn of trucks.

Известен многофункциональный агрегат для строительства автомобильной дороги [6]. Недостатком является то, что агрегат не пригоден для строительства эстакадной дороги.Known multi-functional unit for the construction of the road [6]. The disadvantage is that the unit is not suitable for the construction of an overpass road.

Известны конструкции строительной техники на железнодорожном ходу, имеющие полноповоротную раму, применяемые для строительства эстакад. Это краны, например кран ПК-ЦУМЗ-15 [7], и копровые установки, например рельсовый копер СП-69 [8]. Недостатком названной техники является их узкая специализация, предназначены для выполнения одной-единственной технологической операции.Known designs of construction equipment on the railway, having a full-frame frame, used for the construction of flyovers. These are cranes, for example, the PK-TsUMZ-15 crane [7], and pile drivers, for example, the SP-69 rail driver [8]. The disadvantage of this technique is their narrow specialization, designed to perform a single technological operation.

Прототипом для способа строительства свайно-эстакадной железной дороги выбран способ строительства причального сооружения на сваях [5].The prototype for the method of construction of the pile-flyover railway was chosen as the method of construction of the berthing facilities on piles [5].

Конструкция эстакады [5] состоит из вбитых в грунт свай, установленных на сваи ригелей и уложенных на ригели плит.The construction of the flyover [5] consists of piles driven into the ground, mounted on piles of crossbars and laid on slats.

Способ строительства [5] предусматривает, во-первых, использование рамы-кондуктора, на которой находится оборудование для погружения свай, во-вторых, использование большегрузного крана, размещенного на краю построенной части эстакады и выполняющего несколько функций: перемещение кондукторной рамы на шаг установки свай, установку сваи в кондуктор, установку ригелей и укладку плиты на ригели. Подвоз строительных материалов происходит по отстроенному участку эстакады, а их разгрузка осуществляется тем же краном. Недостаток способа строительства заключается в необходимости использовать переставляемую раму - кондуктор с размещенным не ней оборудованием для погружения свай. Другим недостатком способа строительства эстакады является использование подъемного крана для разгрузки и монтажа плит и ригелей, т.к. использование крана ограничивает степень автоматизации строительства и предполагает обязательное наличие людей (стропальщиков) для закрепления, ориентации и монтажа тяжелого груза, находящихся на эстакаде (на высоте) и в близости с работающей техникой и перемещаемым грузом, что может привести к несчастному случаю. Третьим недостатком предложенного способа является нерешенная задача возвращения по эстакаде транспорта, подвозящего сваи и плиты перекрытия. Если при строительстве эстакады предполагается движение автотранспорта задним ходом, то эстакады при строительстве таким способом не могут быть протяженными и, как следствие, способ не пригоден для строительства протяженных дорог эстакадного типа.The construction method [5] provides, firstly, the use of a conductor frame on which the equipment for immersion piles is located, and secondly, the use of a heavy crane located on the edge of the constructed part of the flyover and performing several functions: moving the conductor frame to the step of installing the piles installation of piles in a conductor; installation of crossbars and laying of a plate on crossbars. Construction materials are transported along the built-up section of the flyover, and their unloading is carried out by the same crane. The disadvantage of the construction method is the need to use a rearranged frame - a conductor with equipment placed thereon for immersing piles. Another disadvantage of the method of construction of the flyover is the use of a crane for unloading and installation of plates and crossbars, because the use of a crane limits the degree of automation of construction and presupposes the obligatory presence of people (slingers) for securing, orienting and assembling heavy loads located on a flyover (at a height) and in close proximity to working equipment and moving loads, which can lead to an accident. The third disadvantage of the proposed method is the unresolved problem of returning over the overpass transport, bringing piles and floor slabs. If during the construction of the overpass it is assumed that the vehicle will reverse, then the overpass during construction in this way cannot be long and, as a result, the method is not suitable for the construction of long overpass roads.

Прототипом для револьверного агрегата выбрана конструкция копрового устройства для забивки свай [9], работающая с железнодорожной платформы с движением по железнодорожному пути железной дороги общего назначения. Устройство имеет самоходную ходовую часть, поворотную раму с кабиной для оператора. На раме перед кабиной смонтирована мачта копра с механизмами для ее выдвижения и ориентации. С другой стороны рамы находится противовес. Недостатком устройства является то, что оно предназначено для выполнения единственной операции забивания свай.The prototype for the revolving unit was the design of a pile driving device for driving piles [9], operating from a railway platform with movement along the railway track of a general purpose railway. The device has a self-propelled chassis, a swing frame with a cab for the operator. A copra mast with mechanisms for its extension and orientation is mounted on the frame in front of the cab. On the other side of the frame is a counterweight. The disadvantage of this device is that it is designed to perform a single operation of driving piles.

Изобретение направлено на осуществление строительства двухпутных многорельсовых железных дорог свайно-эстакадного типа способом, при котором строительство следующего участка строится с уже построенного и только с него (метод строительства «под себя»), и преимущественно в автоматическом режиме.The invention is directed to the implementation of the construction of double-track multi-rail railways of pile-flyover type in a way in which the construction of the next section is built from already built and only from it (the construction method is "for yourself"), and mainly in automatic mode.

Технический результат достигается тем, что конструкция эстакадной дороги на сваях состоит из погруженных в землю свай, установленных на сваи поперечных ригелей, уложенных на ригели плит и закрепленных на плитах рельсов полотна двухпутной железной дороги. Плиты имеют габариты и массу, позволяющие перевозить их к месту строительства по построенному участку дороги с возможностью разъезда с встречным транспортом. На плитах и ригелях имеются конструктивные элементы для захвата их манипулятором. Железная дорога является многорельсовой железной дорогой [10] и она составлена из предварительно собранных на каркасе (подложке) секций (рельсовых сборок), длина которых равна шагу строительства эстакады, и секции имеют конструктивные элементы для захвата их манипулятором.The technical result is achieved by the fact that the construction of an overpass road on piles consists of piles immersed in the ground, mounted on piles of transverse crossbars, laid on crossbars of plates and fixed to the tracks of rails of a double-track railroad track. The plates have dimensions and mass, allowing them to be transported to the construction site along the constructed road section with the possibility of traveling with oncoming transport. On plates and crossbars there are structural elements for their capture by the manipulator. The railway is a multi-rail railway [10] and it is composed of sections (rail assemblies) pre-assembled on the frame (substrate), the length of which is equal to the step of the construction of the flyover, and the sections have structural elements for their capture by the manipulator.

Дополнительно технически результат достигается тем, что для строительства дороги используется агрегат (револьверный агрегат), перемещающийся по железной дороге, имеющий кузов на железнодорожных колесах с выдвижными упорами, поворотно-опорный круг с установленной на нем рамой, с одной стороны которой расположено устройство для погружения свай (например, копер) с устройством удержания сваи и механизмами ориентации и выдвижения, отличающийся тем, что поворотная рама выполнена в форме башни; на башне с противоположной стороны от копра установлен манипулятор для захвата, подъема (разгрузки) и монтажа плит, ригелей и рельсовых сборок; на свободных местах башни (по аналогии с расположением инструмента на револьверных металлорежущих станках) установлено оборудование для выполнения таких операций, как сварка, обрезка свай, герметизация, камнедробление, проведение экскаваторных работ, измерительных операций и других.Additionally, the technical result is achieved by the fact that for the construction of the road, an aggregate (revolving unit) is used, moving along the railway, having a body on railway wheels with retractable stops, a swing-support circle with a frame mounted on it, on one side of which there is a device for piling (for example, a pile driver) with a device for holding piles and mechanisms of orientation and extension, characterized in that the rotary frame is made in the form of a tower; on the tower, on the opposite side of the copra, a manipulator is installed for gripping, lifting (unloading) and mounting plates, crossbars and rail assemblies; on free places of the tower (by analogy with the location of the tool on revolving machine tools), equipment was installed to perform operations such as welding, cutting piles, sealing, stone crushing, excavation, measuring operations and others.

Дополнительно технический результат достигается способом строительства дороги, при котором строительство следующего участка производится с края уже построенного участка, подвоз строительных компонентов осуществляется по построенному участку, отличающимся тем, что погружение свай, установка ригелей, укладка плит и монтаж рельсового пути многорельсовой дороги осуществляется одним револьверным агрегатом, а для подвоза строительных компонентов используются транспортные средства с механизмом поперечного перемещения на многорельсовой дороге [10]. Степень автоматизации строительства дороги определяется степенью автоматизации управления исполнительными механизмами револьверного агрегата, транспортных средств и их взаимодействия.In addition, the technical result is achieved by the road construction method, in which the construction of the next section is carried out from the edge of the already constructed section, the construction components are transported along the constructed section, characterized in that the piles are immersed, the crossbars are installed, the slabs are laid and the multi-rail track is installed with one revolving unit and for the delivery of building components used vehicles with a mechanism for lateral movement on a multi-rail th road [10]. The degree of automation of road construction is determined by the degree of automation of control of the actuators of the revolving unit, vehicles and their interaction.

Сущность изобретения поясняется чертежами:The invention is illustrated by drawings:

Фигура 1 - общий вид дороги с плитами прямоугольной формы;Figure 1 - General view of the road with rectangular plates;

Фигура 2 - общий вид дороги с плитами квадратной формы;Figure 2 - General view of the road with slabs of square shape;

Фигура 3 - вид револьверного агрегата на многорельсовой эстакадной дороге;Figure 3 is a view of a revolving unit on a multi-rail flyover;

Фигура 4 - вид револьверного агрегата на этапе установки сваи в копер;Figure 4 - view of the revolving unit at the stage of installation of piles in the pile driver;

Фигура 5 - вид револьверного агрегата на этапе погружения сваи;Figure 5 - view of the revolving unit at the stage of immersion piles;

Фигура 6 - вид револьверного агрегата на этапе захвата ригеля;Figure 6 - view of the revolving unit at the stage of capture of the crossbar;

Фигура 7 - вид револьверного агрегата на этапе установки ригеля;Figure 7 - view of the revolving unit at the stage of installation of the crossbar;

Фигура 8 - вид револьверного агрегата на этапе захвата плиты;Figure 8 is a view of a revolving unit at the stage of capture plate;

Фигура 9 - вид револьверного агрегата на этапе укладки плиты;Figure 9 is a view of a revolving unit at the stage of laying the slab;

Фигура 10 - вид револьверного агрегата на этапе захвата рельсовой сборки;Figure 10 is a view of a revolving unit at the stage of gripping the rail assembly;

Фигура 11 - вид револьверного агрегата на этапе монтажа рельсовой сборки;Figure 11 - view of the revolving unit at the stage of installation of the rail assembly;

Фигура 12 - вид дороги на стадии строительства перронов с указанием направлений движения снабжающего стройку транспорта;Figure 12 - view of the road at the stage of construction of aprons indicating the directions of movement of the vehicle supplying the construction site;

Фигура 13 - вид башни револьверного агрегата с установленными манипуляторами для выполнения промежуточных операций;Figure 13 is a view of the turret of a revolving unit with mounted manipulators to perform intermediate operations;

На фигуре 1 показан пример конструкции двухпутной многорельсовой дороги эстакадного типа на сваях (1). Дорога состоит из вбитых в землю с рельефом поверхности (2) свай (3), установленных на сваи ригелей (4), уложенных на ригели железобетонных прямоугольных плит (5), смонтированных поверх плит рельсовых сборок (6), из которых составлено полотно многорельсовой дороги (7) с двумя путями для движения. Рельсовая сборка (6) состоит из основания и закрепленных на нем всех рельсов участка дороги. На фигуре 2 показана аналогичная конструкция многорельсовой дороги эстакадного типа с тем отличием, что бетонные плиты (8) имеют квадратную форму. Ширина плит выбрана равной половине ширины эстакады. Если проектная ширина эстакады равна S, то сторона квадратной плиты равна S/2, и длина рельсовой сборки тоже равна S/2.

Figure 00000002
сторона прямоугольной плиты равна S, а меньшая сторона равна S/2. На ригелях (4), бетонных плитах (5) и (8), и рельсовых сборках (6) вокруг их центров тяжести выполнены отверстия для возможности захвата их манипулятором. Выбор размера плиты определяется возможностями производителя плит, ее весом и грузоподъемными характеристиками строительной техники. Количество свай зависит от проектной нагрузки на дорогу и несущей способности сваи, которая, в свою очередь, зависит от диаметра сваи, глубины погружения и характеристики грунта. Шаг строительства дороги на фигурах 1 и 2 равен половине проектной ширины эстакады, т.е. равен S/2.The figure 1 shows an example of the design of a double-track multi-rail flyover type on piles (1). The road consists of piles driven into the ground with a surface relief (2) (3), mounted on piles of crossbars (4), laid on crossbars of rectangular reinforced concrete slabs (5), mounted on top of rail assembly plates (6), of which the multi-rail track is composed (7) with two paths for movement. The rail assembly (6) consists of a base and all rails of a road section fixed on it. Figure 2 shows a similar construction of a flyover type rail with the difference that the concrete slabs (8) are square in shape. The width of the slabs is chosen equal to half the width of the flyover. If the design width of the flyover is S, then the side of the square plate is S / 2, and the length of the rail assembly is also S / 2.
Figure 00000002
the side of the rectangular slab is S, and the smaller side is S / 2. On the crossbars (4), concrete slabs (5) and (8), and rail assemblies (6), holes were made around their centers of gravity to be gripped by the manipulator. The choice of plate size is determined by the capabilities of the plate manufacturer, its weight and lifting characteristics of construction equipment. The number of piles depends on the design load on the road and the bearing capacity of the pile, which, in turn, depends on the diameter of the pile, the depth of immersion and soil characteristics. The road construction step in figures 1 and 2 is equal to half the design width of the flyover, i.e. equal to S / 2.

На фигуре 3 показан пример конструкции револьверного агрегата, состоящего из кузова (9) на железнодорожном ходу, цилиндрической башни (10) с возможностью полного поворота, балки (11) с возможностью перемещения вдоль диаметра башни. На балке (11) установлен копер, состоящий из мачты копра (12) с возможностью вертикального перемещения в суппорте копра (13), захватного устройства (14) для удержания в копре сваи (3), молота (15) и механизма ориентации мачты (16). С другой стороны башни смонтирован манипулятор, состоящий из опорной стойки (17) с отклоняющими гидроцилиндрами (18), стрелы (19) с гидроцилиндром подъема-опускания (20), гидромотора (21), на роторе которого расположена качель (22) с возможностью поворота вокруг оси подвеса, гидромотора (23) поворотного основания захватов (24) для захвата и удержания плиты (5) и других компонентов конструкции дороги. Агрегат движется по внешним рельсовым линиям пути многорельсовой дороги (7), при работе опирается на домкраты (25). На башне агрегата предусмотрены места (26) крепления оборудования (манипуляторов) для проведения промежуточных технологических операций.The figure 3 shows an example of the design of a revolving unit, consisting of a body (9) on a railway track, a cylindrical tower (10) with the possibility of complete rotation, the beam (11) with the ability to move along the diameter of the tower. On the beam (11), a pile driver is installed, consisting of a mast of the pile driver (12) with the possibility of vertical movement in the support of the pile driver (13), a gripping device (14) for holding piles (3), a hammer (15) and a mast orientation mechanism (16) ) On the other side of the tower, a manipulator is mounted, consisting of a support column (17) with deflecting hydraulic cylinders (18), boom (19) with a lifting and lowering hydraulic cylinder (20), a hydraulic motor (21), on the rotor of which a swing (22) is rotatable around the axis of the suspension, the hydraulic motor (23) of the rotary base of the grippers (24) for gripping and holding the plate (5) and other components of the road structure. The unit moves along the external rail lines of the multi-rail road (7), while working it relies on jacks (25). On the tower of the unit there are places (26) for fastening equipment (manipulators) for intermediate technological operations.

Работа револьверного агрегата поясняется на примере способа строительства дороги, при котором он используется для погружения (забивки) свай, установки ригелей, укладки бетонных плит и укладки рельсовых сборок.The operation of the revolving unit is illustrated by the example of a road construction method in which it is used for dipping (driving) piles, installing crossbars, laying concrete slabs and laying rail assemblies.

На фигуре 4 показано положение револьверного агрегата на этапе доставки к месту строительства свай. На этом этапе револьверный агрегат располагается на краю отстроенного участка дороги, а башня (10) разворачивается мачтой копра (12) в сторону транспортного средства (27), доставляющего сваи. Производится подъем сваи (3), а поворотом башни (10) и движением балки (11) происходит совмещение осей сваи (3) и молота (15) с последующей фиксацией сваи (3) в захватах (14) копрового устройства. На фигуре 5 показано положение револьверного агрегата на этапе погружения сваи. После передачи сваи в копровое устройство происходит поворот башни (10) в сторону строящегося участка дороги. Согласованными движениями башни (10) и балки (11) свая (3) помещается на вертикаль забивания, а опусканием мачты (12) свая (3) устанавливается в точку забивания, после чего происходит погружение сваи в грунт. Так забиваются все сваи для строительства следующего участка дороги.The figure 4 shows the position of the turret at the stage of delivery to the construction site of piles. At this stage, the revolving unit is located on the edge of the built-up section of the road, and the tower (10) is turned by the mast of the copra (12) in the direction of the vehicle (27) that delivers the piles. The pile is lifted (3), and by rotating the tower (10) and the beam (11), the axes of the pile (3) and the hammer (15) are combined, followed by the fixing of the pile (3) in the grips (14) of the coping device. The figure 5 shows the position of the revolving unit at the stage of immersion piles. After transferring the piles to the pile driver, the tower (10) rotates towards the road section under construction. By coordinated movements of the tower (10) and beam (11), the pile (3) is placed on the vertical of driving, and by lowering the mast (12), the pile (3) is installed at the driving point, after which the pile is immersed in the ground. So all the piles are hammered for the construction of the next section of the road.

На фигуре 6 показано положение револьверного агрегата на этапе доставки ригелей. На этом этапе в сторону транспортного средства (28) с ригелями (4) поворачивается манипулятор и согласованными движениями башни (10), опорной стойки (17), стрелы (19), поворотом гидромотора (21), качели (22), основания (23) захваты манипулятора (24) совмещаются с отверстиями в ригеле, после чего происходит его захват и подъем. На фигуре 7 показано положение револьверного агрегата на этапе установки ригеля на сваи. После захвата манипулятором ригеля поворотом башни манипулятор с ригелем разворачивается в сторону строительства участка и происходит установка ригеля (4) на оголовки ранее забитых свай (3).The figure 6 shows the position of the revolving unit at the stage of delivery of the crossbars. At this stage, the manipulator rotates in the direction of the vehicle (28) with crossbars (4) and with the coordinated movements of the tower (10), support stand (17), boom (19), rotation of the hydraulic motor (21), swing (22), base (23 ) the grips of the manipulator (24) are combined with the holes in the crossbar, after which it grabs and rises. The figure 7 shows the position of the revolving unit at the stage of installation of the crossbar on piles. After the crossbar captures the manipulator by turning the tower, the crossbar with the crossbar unfolds towards the construction of the site and the crossbar (4) is installed on the heads of previously driven piles (3).

На фигуре 8 показано положение револьверного агрегата на этапе доставки плиты (5) для перекрытия пролетов. Последовательность действий по захвату плиты и подъему ее манипулятором совпадают с действиями по захвату и подъему ригеля. Для разъезда с встречным транспортом на транспортном устройстве (29) плита (5) размещена под углом к горизонтальной плоскости. На фигуре 9 показано положение револьверного агрегата на этапе установки плиты на ригели. Последовательность действий по установки плиты (5) на ригели (4) совпадают с последовательностью действий при установке ригеля на оголовки свай.The figure 8 shows the position of the revolving unit at the stage of delivery of the plate (5) to cover the spans. The sequence of actions for capturing the plate and lifting it with the manipulator coincides with the actions for capturing and raising the crossbar. For driving with oncoming transport on the transport device (29), the plate (5) is placed at an angle to the horizontal plane. The figure 9 shows the position of the revolving unit at the stage of installation of the plate on the crossbars. The sequence of actions for installing the plate (5) on the crossbars (4) coincides with the sequence of actions when installing the crossbar on the pile heads.

На фигуре 10 показано положение револьверного агрегата на этапе доставки рельсовой сборки (6) к месту строительства. Рельсовая сборка расположена на транспортном средстве (30) под углом к горизонтальной поверхности для разъезда с встречным транспортом. Последовательность действий по захвату и подъему рельсовой сборки манипулятором совпадает с действиями по захвату и подъему ригеля. На фигуре 11 показано положение револьверного агрегата на этапе монтажа рельсовой сборки (6). Последовательность действий по монтажу рельсовой сборки совпадают с последовательностью действий по установке ригеля на сваи. Рельсовая сборка (6) укладывается в продолжение собранного рельсового полотна (7) многорельсовой дороги.The figure 10 shows the position of the turret unit at the stage of delivery of the rail assembly (6) to the construction site. The rail assembly is located on the vehicle (30) at an angle to the horizontal surface for traveling with oncoming vehicles. The sequence of actions for capturing and raising the rail assembly by the manipulator coincides with the actions for capturing and raising the rail. The figure 11 shows the position of the turret at the stage of installation of the rail assembly (6). The sequence of actions for mounting the rail assembly coincide with the sequence of actions for installing the crossbar on piles. The rail assembly (6) is laid in continuation of the assembled rail web (7) of the multi-rail.

После монтажа рельсовой сборки револьверный агрегат перемещается на величину построенного участка и все этапы строительства повторяются.After mounting the rail assembly, the revolving unit is moved by the size of the constructed section and all the stages of construction are repeated.

На фигуре 12 показан этап строительства площадки для посадки и высадки пассажиров (перрон) с применением плит квадратной формы. Забивка свай, установка ригелей и укладка плит для строительства перрона производится тем же револьверным агрегатом, что и строительство дороги. Стрелками показано движение транспорта для доставки строительных компонентов. Транспорт, подвозящий компоненты для строительства дороги, после разгрузки поперечным движением перемещается на второй путь и возвращается за новыми деталями. Такое движение возможно благодаря конструкции многорельсовой дороги и конструкции транспорта, снабженного механизмом поперечного перемещения (см. [10]).The figure 12 shows the stage of construction of the site for boarding and disembarking passengers (apron) using square-shaped plates. Pile driving, installation of crossbars and laying of plates for the construction of the apron is carried out by the same revolving unit as the construction of the road. Arrows indicate the movement of vehicles for the delivery of building components. Transport, bringing the components for the construction of the road, after unloading by a transverse movement moves to the second path and returns for new parts. Such movement is possible due to the design of the multi-rail road and the construction of the vehicle equipped with a transverse movement mechanism (see [10]).

На фигуре 13 показан вид башни (10) револьверного агрегата с расположенными на ней манипуляторами для выполнения промежуточных и сопутствующих операций. Для обрезки свай может быть установлен манипулятор с дисковой пилой (31); для сварки элементов конструкций - сварочный манипулятор (32); для расчистки места установки сваи - манипулятор с отбойным молотком (33); для контроля положения элементов конструкции дороги - манипулятор с измерительным щупом (31).The figure 13 shows a view of the turret (10) of the revolving unit with manipulators located on it to perform intermediate and related operations. To trim the piles, a manipulator with a circular saw (31) can be installed; for welding structural elements - welding manipulator (32); for clearing the place of installation of piles - a manipulator with a jackhammer (33); to control the position of road construction elements - a manipulator with a measuring probe (31).

Библиография.Bibliography.

1. Мир-Бабаев М.Ф. Нефтяные Камни - феномен Каспийского моря (к 60-летию открытия новой страницы в мировой истории нефтедобычи) - «Азербайджанское нефтяное хозяйство», 2009, №11, с. 79-85.1. Mir-Babaev M.F. Oil Stones - a phenomenon of the Caspian Sea (on the 60th anniversary of the opening of a new page in the world history of oil production) - "Azerbaijan Oil Industry", 2009, No. 11, p. 79-85.

2. Полезная модель RU 88359 U1; Е01С 9/00; Е01С 3/00; приоритет 10.07.2009; «Свайно-эстакадная дорожная конструкция».2. Utility model RU 88359 U1; ЕСС 9/00; Е01С 3/00; priority 10.07.2009; "Pile-flyover road construction."

3. Изобретение RU 2181396 C1; Е01С 1/00, E01D 1/00, E01D 21/00, E01D 21/06; приоритет 09.07.2001; «Способ и установка для сооружения скоростной автомобильной дороги и скоростная автомобильная дорога».3. The invention of RU 2181396 C1; E01C 1/00, E01D 1/00, E01D 21/00, E01D 21/06; priority 09.07.2001; "Method and installation for the construction of high-speed road and high-speed road."

4. Изобретение RU 2453650 C1; Е01С 5/08; приоритет 19.10.2010; «Комплекс строительства дорог на сваях».4. The invention of RU 2453650 C1; E01C 5/08; priority 10/19/2010; "Complex construction of roads on stilts."

5. Полезная модель RU 41032 U1; Е02В 1/00, Е02В 3/06, Е02В 17/00; приоритет 11.06.2004; «Технологический комплекс для возведения гидротехнического сооружения», (прототип для способа строительства).5. Utility model RU 41032 U1; ЕОВВ 1/00, ЕВВ 3/06, Е02В 17/00; priority 06/11/2004; "Technological complex for the construction of hydraulic structures", (prototype for the method of construction).

6. Изобретение RU 2485241 C1; Е01С 19/52; приоритет 05.12.2011; «Многофункциональный самоходный дорожный агрегат, дорожная плита и способ строительства дороги».6. The invention of RU 2485241 C1; ЕСС 19/52; priority 05.12.2011; "Multifunctional self-propelled road unit, road plate and method of road construction."

7. Мужичков В.И. «Грузоподъемные краны на железнодорожном ходу». Учебник для технических школ железнодорожного транспорта, изд. Транспорт, 1978 г.7. Muzhichkov V.I. "Cranes on the railway." Textbook for technical schools of railway transport, ed. Transport, 1978

8. Владимирский С.Р. «Механизация строительства мостов». Учебное пособие, изд. 2-е, перераб. и доп. - СПб: Изд-во ДНК, 2005 г. - 152 с.8. Vladimirsky S.R. "Mechanization of the construction of bridges." Textbook, ed. 2nd, rev. and add. - St. Petersburg: Publishing House of DNA, 2005 - 152 p.

9. Изобретение RU 2101419 C1; E02D 7/02; 08.06.1993; «Устройство забивки свай при закладке фундамента опор» (прототип для револьверного агрегата).9. The invention of RU 2101419 C1; E02D 7/02; 06/08/1993; “Pile driving device when laying the foundation of supports” (prototype for a revolving unit).

10. Изобретение RU 2439236 С2; Е01В 2/00; В61В 1/00; приоритет 30.04.2009; «Многорельсовая железная дорога и поезд с механизмом поперечного перемещения».10. The invention of RU 2439236 C2; ЕВВ 2/00; B61B 1/00; priority 04/30/2009; "Multi-rail and transverse train."

Claims (3)

1. Агрегат для строительства эстакадных рельсовых дорог, состоящий из кузова на колесах для движения по рельсам, установленной на кузов через опорно-поворотный круг рамы, размещенного на раме устройства для погружения свай с механизмами ориентации сваи по вертикали, механизмом изменения положения сваи от оси вращения рамы, механизмом опускания сваи в точку погружения, с захватом для удержания сваи в устройстве погружения, отличающийся тем, что на раме в противовес устройству для погружения свай расположен манипулятор с захватным устройством для захвата, подъема, удержания и ориентации ригелей, плит перекрытия и рельсовых сборок, входящих в конструкцию рельсовой дороги свайно-эстакадного типа.1. A unit for the construction of trestle railways, consisting of a body on wheels for driving on rails mounted on a body through a slewing ring of a frame placed on the frame of the device for immersing piles with vertical orientation mechanisms of the pile, a mechanism for changing the position of the pile from the axis of rotation the frame, the mechanism for lowering the piles to the dive point, with a grip to hold the piles in the immersion device, characterized in that on the frame, as opposed to the device for immersing piles, is a manipulator with a gripping device Twom for gripping, lifting, holding and orienting crossbars, floor slabs and rail assemblies included in the construction of a pile-flyover rail. 2. Агрегат по п.1, отличающийся тем, что рама на опорно-поворотном круге выполнена в виде цилиндрической башни, на свободных местах которой установлено оборудование для выполнения промежуточных и сопутствующих операций строительства дороги.2. The unit according to claim 1, characterized in that the frame on the turntable is made in the form of a cylindrical tower, in the free places of which equipment is installed to perform intermediate and related road construction operations. 3. Способ строительства свайно-эстакадной многорельсовой дороги, состоящий из погружения свай в грунт, а также установки на сваи ригелей, укладки на ригели плит перекрытия, составления и монтажа рельсового пути из рельсовых сборок, отличающийся тем, что погружение свай, установку ригелей на сваи, укладку плит на ригели, составление и монтаж рельсового пути из рельсовых сборок производят агрегатом по п.1.3. A method of constructing a pile-overpass multi-rail road, consisting of immersing piles in the ground, as well as installing crossbars on piles, laying floor slabs on the crossbars, compiling and installing the rail track from rail assemblies, characterized in that the piling is dipping, installing the crossbars on piles , laying plates on the crossbars, the preparation and installation of the rail track from the rail assemblies is carried out by the unit according to claim 1.
RU2016117778A 2016-05-04 2016-05-04 Multi-rail trestle road, revolver unit and method of construction of the road RU2623786C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2016117778A RU2623786C1 (en) 2016-05-04 2016-05-04 Multi-rail trestle road, revolver unit and method of construction of the road

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2016117778A RU2623786C1 (en) 2016-05-04 2016-05-04 Multi-rail trestle road, revolver unit and method of construction of the road

Publications (1)

Publication Number Publication Date
RU2623786C1 true RU2623786C1 (en) 2017-06-29

Family

ID=59312346

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2016117778A RU2623786C1 (en) 2016-05-04 2016-05-04 Multi-rail trestle road, revolver unit and method of construction of the road

Country Status (1)

Country Link
RU (1) RU2623786C1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110450680A (en) * 2019-08-13 2019-11-15 浙江大学台州研究院 Catenary mast intelligent operation mechanical equipment
CN111576416A (en) * 2020-05-29 2020-08-25 官平达 Automatic pile driver of drill rod pile for water conservancy dam emergency rescue
IT201900013833A1 (en) * 2019-08-02 2021-02-02 Orteco S R L EQUIPMENT FOR INSERTING POLES IN THE GROUND
WO2021113946A1 (en) * 2019-12-12 2021-06-17 Анатолий Эдуардович Юницкий Transport system
RU2785238C1 (en) * 2022-08-04 2022-12-05 Федеральное государственное бюджетное образовательное учреждение высшего образования "Кузбасская государственная сельскохозяйственная академия" Method for construction of railway track in permafrost conditions

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE4240785A1 (en) * 1992-07-15 1994-01-20 Gottfried Perdolt Railway system for combined road - rail traffic - uses double car transporter, which has double wheel sets, to move on two adjacent railway tracks
RU2101419C1 (en) * 1992-06-10 1998-01-10 Элин Энергиферзоргунг Гезельшафт мбХ Device for driving piles at building foundations for supports
EA001267B1 (en) * 1997-08-28 2000-12-25 Фаст Фрэймс (Ю Кей) Лимитед Pile driving
RU41032U1 (en) * 2004-06-11 2004-10-10 Общество с ограниченной ответственностью Проектно-строительная фирма "СПЕЦФУНДАМЕНТСТРОЙ" TECHNOLOGICAL COMPLEX FOR CONSTRUCTION OF HYDROTECHNICAL STRUCTURE
EA006112B1 (en) * 2004-07-09 2005-08-25 Анатолий Эдуардович Юницкий Transport system of yunitsky and method of building the transport system
CN101041356A (en) * 2006-09-19 2007-09-26 贾正跃 Air light rail
EA200801256A1 (en) * 2008-04-16 2009-06-30 Игорь Владимирович Янковский GAS CONDUCTOR RESIDENTIAL AND PUBLIC BUILDINGS
RU2439236C2 (en) * 2009-04-30 2012-01-10 Александр Сергеевич Савельев Multitrack railway and train with transverse displacement mechanism
RU125759U1 (en) * 2012-08-16 2013-03-10 Ярослав Кимович Кочнов RADIOACTIVE WASTE CONTAINER

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2101419C1 (en) * 1992-06-10 1998-01-10 Элин Энергиферзоргунг Гезельшафт мбХ Device for driving piles at building foundations for supports
DE4240785A1 (en) * 1992-07-15 1994-01-20 Gottfried Perdolt Railway system for combined road - rail traffic - uses double car transporter, which has double wheel sets, to move on two adjacent railway tracks
EA001267B1 (en) * 1997-08-28 2000-12-25 Фаст Фрэймс (Ю Кей) Лимитед Pile driving
RU41032U1 (en) * 2004-06-11 2004-10-10 Общество с ограниченной ответственностью Проектно-строительная фирма "СПЕЦФУНДАМЕНТСТРОЙ" TECHNOLOGICAL COMPLEX FOR CONSTRUCTION OF HYDROTECHNICAL STRUCTURE
EA006112B1 (en) * 2004-07-09 2005-08-25 Анатолий Эдуардович Юницкий Transport system of yunitsky and method of building the transport system
CN101041356A (en) * 2006-09-19 2007-09-26 贾正跃 Air light rail
EA200801256A1 (en) * 2008-04-16 2009-06-30 Игорь Владимирович Янковский GAS CONDUCTOR RESIDENTIAL AND PUBLIC BUILDINGS
RU2439236C2 (en) * 2009-04-30 2012-01-10 Александр Сергеевич Савельев Multitrack railway and train with transverse displacement mechanism
RU125759U1 (en) * 2012-08-16 2013-03-10 Ярослав Кимович Кочнов RADIOACTIVE WASTE CONTAINER

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
IT201900013833A1 (en) * 2019-08-02 2021-02-02 Orteco S R L EQUIPMENT FOR INSERTING POLES IN THE GROUND
WO2021024097A1 (en) * 2019-08-02 2021-02-11 Orteco - S.R.L. Equipment for burying poles into the ground
CN110450680A (en) * 2019-08-13 2019-11-15 浙江大学台州研究院 Catenary mast intelligent operation mechanical equipment
CN110450680B (en) * 2019-08-13 2024-03-08 浙江大学台州研究院 Intelligent operation mechanical equipment for contact net support column
WO2021113946A1 (en) * 2019-12-12 2021-06-17 Анатолий Эдуардович Юницкий Transport system
EA039257B1 (en) * 2019-12-12 2021-12-23 Анатолий Эдуардович Юницкий Yunitsky transport system
CN111576416A (en) * 2020-05-29 2020-08-25 官平达 Automatic pile driver of drill rod pile for water conservancy dam emergency rescue
RU2785238C1 (en) * 2022-08-04 2022-12-05 Федеральное государственное бюджетное образовательное учреждение высшего образования "Кузбасская государственная сельскохозяйственная академия" Method for construction of railway track in permafrost conditions
RU2814450C1 (en) * 2023-06-19 2024-02-28 Вячеслав Васильевич Селин Construction of prefabricated ground foundation for high-speed rail transport overpass

Similar Documents

Publication Publication Date Title
RU2623786C1 (en) Multi-rail trestle road, revolver unit and method of construction of the road
US7520014B2 (en) Method and apparatus for bridge construction
CN111851313A (en) Pile-driving bridge erecting construction all-in-one machine and construction method thereof
JP2006161548A (en) Temporary pier, erection method for temporary pier, carriage used for temporary pier, and pile driving method using temporary pier
CN108487089B (en) A method of railroad bridge is removed and set up on hillside
CN110886233A (en) Construction method for connecting T-shaped beam with bridge
KR101026014B1 (en) Bridge deck construction method by means of pulling jack on the water
CN113152289B (en) Pile driving and beam erecting integrated construction method
CN111254837B (en) Construction method for building bridge by bridge crane fishing method
CN114382009A (en) Bridge erecting machine
KR102004922B1 (en) Dock building apparatus and method of construction using the same
CN105421239A (en) Hoisting method for large-span highway-railway dual-purpose steel truss girder bridge deck slab
CN113047179A (en) Pile and frame roof beam all-in-one
JP5318335B2 (en) Construction method of the structure above the railway
CN212612030U (en) Pile bridge erection construction all-in-one
CN215329387U (en) Pile and frame roof beam all-in-one
CN114481833A (en) Construction method of bridge girder erection machine
US3982634A (en) Method and apparatus for erecting a vertical structure
JP2902330B2 (en) Construction method of Incline equipment
JPH10196097A (en) Moving support device and construction method for temporary structure using it
CN217078422U (en) Bridge erecting machine
RU105912U1 (en) TECHNOLOGICAL COMPLEX FOR THE ESTABLISHMENT OF A ROAD FLAT BETWEEN OPERATING ROADS OR RAILWAYS
CN110318798A (en) Crawler belt carries the mobile air crossing system of formula and construction method
CN218090555U (en) Bridge fabrication machine
CN217810560U (en) Bridge fabrication machine

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20180505