RU2476636C1 - Device to connect reinforced concrete roadway slab with main beams of railway bridge span - Google Patents
Device to connect reinforced concrete roadway slab with main beams of railway bridge span Download PDFInfo
- Publication number
- RU2476636C1 RU2476636C1 RU2011138687/03A RU2011138687A RU2476636C1 RU 2476636 C1 RU2476636 C1 RU 2476636C1 RU 2011138687/03 A RU2011138687/03 A RU 2011138687/03A RU 2011138687 A RU2011138687 A RU 2011138687A RU 2476636 C1 RU2476636 C1 RU 2476636C1
- Authority
- RU
- Russia
- Prior art keywords
- reinforced concrete
- main beams
- contour
- concrete roadway
- span
- Prior art date
Links
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
Description
Изобретение относится к мостостроению и может быть использовано при прикреплении железобетонной плиты проезда к главным балкам пролетного строения железнодорожного моста.The invention relates to bridge construction and can be used when attaching a reinforced concrete slab passage to the main beams of the span of a railway bridge.
Известно устройство для соединения железобетонной плиты проезда с балками пролетного строения железнодорожного моста, включающее соединительный элемент в виде стального тавра, длина которого равна ширине железобетонной плиты и к полкам которого приварены шпильки Нельсона, замоноличенные в тело железобетонной плиты проезда, и элементы прикрепления тавра к главным балкам пролетного строения в виде спаренных уголков-коротышей и высокопрочных болтов /1/.A device is known for connecting a reinforced concrete drive plate with beams of the span structure of a railway bridge, including a connecting element in the form of a steel tee, the length of which is equal to the width of the reinforced concrete plate and to the shelves of which Nelson studs are welded into the body of the reinforced concrete drive plate, and elements for attaching the brand to the main beams span in the form of twin short-angles and high-strength bolts / 1 /.
Недостатком известного устройства является ограниченная площадь опирания железобетонной плиты проезда на главные балки пролетного строения, что в условиях сложного (двухосного) нагружения от подвижной нагрузки приводит к изгибу железобетонной плиты проезда и соответственно к передаче на элементы крепления крутящих моментов, которые приводят к перегрузке главных балок пролетного строения и, в ряде случаев, - к появлению в них трещин.A disadvantage of the known device is the limited area of support of the reinforced concrete driveway plate to the main beams of the span structure, which under complex (biaxial) loading from the moving load leads to bending of the reinforced concrete driveway plate and, accordingly, to the transmission of torque to the fastening elements, which lead to overloading of the main beams of the span structures and, in some cases, to the appearance of cracks in them.
Задачей настоящего изобретения является повышение прочности и надежности соединения железобетонной плиты проезда с главными балками пролетного строения по всей их площади контакта и устранение изгиба железобетонных плит проезда с целью улучшения условий работы главных балок пролетного строения и повышения их долговечности.The objective of the present invention is to increase the strength and reliability of the connection of a reinforced concrete driveway plate with the main beams of the span throughout their contact area and elimination of bending of the reinforced concrete driveway slabs in order to improve the working conditions of the main beams of the span and increase their durability.
Поставленная задача решается за счет того, что в устройстве для соединения железобетонной плиты проезда с балками пролетного строения железнодорожного моста, включающем соединительный элемент в виде стального тавра, к полкам которого приварены шпильки Нельсона, замоноличенные в тело железобетонной плиты проезда, и элементы прикрепления тавра к главным балкам пролетного строения в виде спаренных уголков-коротышей и высокопрочных болтов, стальной тавр выполнен в виде центрального замкнутого по контуру элемента и двух боковых U-образных элементов, пристыкованных своими стенками к центральному замкнутому по контуру элементу, причем к полкам тавра по всей длине центрального замкнутого по контуру элемента и боковым U-образным элементам прикреплены шпильки Нельсона, замоноличенные в тело железобетонной плиты проезда.The problem is solved due to the fact that in the device for connecting the reinforced concrete driveway plate with the beams of the span of the railway bridge, including a connecting element in the form of a steel Taurus, Nelson studs welded into the body of the reinforced concrete driveway, and elements for attaching the Taurus to the main span beams in the form of twin short angles and high-strength bolts, a steel tee is made in the form of a central element closed along the contour and two lateral U-shaped elements docked its walls to a central closed contour element, the brand to the shelves along the entire length of the central element of a closed contour and a lateral U-shaped elements are attached Nelson studs rendered monolithic reinforced concrete slab to the body passage.
Изобретение поясняется чертежами, где:The invention is illustrated by drawings, where:
- на фиг.1 изображено поперечное сечение верхнего строения пути с безбалластным мостовым полотном;- figure 1 shows a cross section of the upper structure of the track with ballastless canvas;
- на фиг 2 изображен вид по А-А на фиг.1;- figure 2 shows a view along aa in figure 1;
- на фиг.3 изображено сечение В-В на фиг.2.- figure 3 shows a section bb in figure 2.
Железобетонная плита проезда 1 имеет соединительное устройство в виде стального тавра 2, состоящего из центрального замкнутого по контуру элемента 3 и двух боковых U-образных элементов 4. Боковые U-образные элементы 4 пристыкованы своими полками 5 к боковым сторонам центрального замкнутого по контуру элемента 3. К полкам тавров центрального замкнутого по контуру элемента 3 и боковых U-образных элементов 4 прикреплены шпильки Нельсона 6, замоноличенные в тело железобетонной плиты проезда 1.The reinforced concrete slab of
Уголки-коротыши 7 прикреплены с помощью высокопрочных болтов 8 к стенке стального тавра 2 и к полкам 9 главных балок 10 пролетного строения.
Настоящее изобретение позволяет повысить надежность прикрепления железобетонной плиты проезда по всему контуру опирания на главные балки 10 пролетного строения и устранить изгиб железобетонной плиты проезда 1.The present invention improves the reliability of attaching reinforced concrete slabs of passage along the entire contour of abutment on the
Источники информацииInformation sources
1. Автореферат диссертации на соискание ученой степени кандидата технических наук Тановицкого Ю.Ю. «Напряженно-деформированное состояние элементов проезжей части на безбалластном мостовом полотне металлических мостов», Москва, 21 апреля 2010 г., библиотека ОАО ЦНИИС.1. Abstract of dissertation for the degree of candidate of technical sciences Tanovitsky Yu.Yu. “Stress-strain state of carriageway elements on ballastless metal sheet of metal bridges”, Moscow, April 21, 2010, library of Central Scientific Research Institute of Civil Engineering.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2011138687/03A RU2476636C1 (en) | 2011-09-21 | 2011-09-21 | Device to connect reinforced concrete roadway slab with main beams of railway bridge span |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2011138687/03A RU2476636C1 (en) | 2011-09-21 | 2011-09-21 | Device to connect reinforced concrete roadway slab with main beams of railway bridge span |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2476636C1 true RU2476636C1 (en) | 2013-02-27 |
Family
ID=49121504
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2011138687/03A RU2476636C1 (en) | 2011-09-21 | 2011-09-21 | Device to connect reinforced concrete roadway slab with main beams of railway bridge span |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2476636C1 (en) |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU642408A1 (en) * | 1974-09-25 | 1979-01-15 | Специальное Конструкторское Бюро Главмостостроя Министерства Транспортного Строительства Ссср | Steel reinforced concrete bridge span |
SU727732A1 (en) * | 1978-04-24 | 1980-04-15 | Специальное Конструкторское Бюро Главмостостроя Министерства Транспортного Строительства Ссср | Steel-ferroconcrete span structure of railway bridge |
SU1183597A1 (en) * | 1984-05-22 | 1985-10-07 | Научно-Исследовательский Институт Мостов Министерства Путей Сообщения Ссср | Bridge span structure |
SU1232726A1 (en) * | 1984-11-19 | 1986-05-23 | Ленинградский институт инженеров железнодорожного транспорта им.акад.В.Н.Образцова | Span structure of railway bridge |
SU1281614A1 (en) * | 1984-12-13 | 1987-01-07 | Научно-Исследовательский Институт Мостов | Arrangement for joining ferroconcrete roadway slab to girders of span structure of railway bridge |
SU1331934A1 (en) * | 1985-08-27 | 1987-08-23 | Научно-Исследовательский Институт Мостов | Joint of bridge roadway plate with beams of span structure |
SU1659564A1 (en) * | 1989-07-14 | 1991-06-30 | Государственный Проектно-Изыскательский Институт По Проектированию И Изысканиям Больших Мостов "Гипротрансмост" | Reenforced concrete steel construction of railway bridge |
GB2256881A (en) * | 1991-05-30 | 1992-12-23 | Ministry Of Transportation The | Load supporting structure |
RU2110639C1 (en) * | 1997-06-02 | 1998-05-10 | Научно-исследовательский центр "Мосты" Открытого акционерного общества "Научно-исследовательский институт транспортного строительства" | Butt joint of monolithic reinforced concrete slab and steel girder of steel-reinforced concrete bridge span structure |
RU2279503C1 (en) * | 2005-04-06 | 2006-07-10 | Открытое акционерное общество "Волгомост" (ОАО "Волгомост") | Method for composite reinforced concrete bridge span structure construction and composite reinforced concrete member for span structure construction |
-
2011
- 2011-09-21 RU RU2011138687/03A patent/RU2476636C1/en not_active IP Right Cessation
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU642408A1 (en) * | 1974-09-25 | 1979-01-15 | Специальное Конструкторское Бюро Главмостостроя Министерства Транспортного Строительства Ссср | Steel reinforced concrete bridge span |
SU727732A1 (en) * | 1978-04-24 | 1980-04-15 | Специальное Конструкторское Бюро Главмостостроя Министерства Транспортного Строительства Ссср | Steel-ferroconcrete span structure of railway bridge |
SU1183597A1 (en) * | 1984-05-22 | 1985-10-07 | Научно-Исследовательский Институт Мостов Министерства Путей Сообщения Ссср | Bridge span structure |
SU1232726A1 (en) * | 1984-11-19 | 1986-05-23 | Ленинградский институт инженеров железнодорожного транспорта им.акад.В.Н.Образцова | Span structure of railway bridge |
SU1281614A1 (en) * | 1984-12-13 | 1987-01-07 | Научно-Исследовательский Институт Мостов | Arrangement for joining ferroconcrete roadway slab to girders of span structure of railway bridge |
SU1331934A1 (en) * | 1985-08-27 | 1987-08-23 | Научно-Исследовательский Институт Мостов | Joint of bridge roadway plate with beams of span structure |
SU1659564A1 (en) * | 1989-07-14 | 1991-06-30 | Государственный Проектно-Изыскательский Институт По Проектированию И Изысканиям Больших Мостов "Гипротрансмост" | Reenforced concrete steel construction of railway bridge |
GB2256881A (en) * | 1991-05-30 | 1992-12-23 | Ministry Of Transportation The | Load supporting structure |
RU2110639C1 (en) * | 1997-06-02 | 1998-05-10 | Научно-исследовательский центр "Мосты" Открытого акционерного общества "Научно-исследовательский институт транспортного строительства" | Butt joint of monolithic reinforced concrete slab and steel girder of steel-reinforced concrete bridge span structure |
RU2279503C1 (en) * | 2005-04-06 | 2006-07-10 | Открытое акционерное общество "Волгомост" (ОАО "Волгомост") | Method for composite reinforced concrete bridge span structure construction and composite reinforced concrete member for span structure construction |
Non-Patent Citations (1)
Title |
---|
ТАНОВИЦКИЙ Ю.Ю. Напряженно-деформированное состояние элементов проезжей части на безбалластном мостовом полотне металлических мостов, 2010. * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204252345U (en) | The connecting structure of a kind of precast concrete plank and girder steel | |
CN105603860A (en) | Prefabricated T beam and construction method | |
CN204212042U (en) | Prefabricated ultra-high performance concrete π shape bridge construction | |
CN103711201A (en) | Large-span prestressed concrete beam board frame structural system | |
CN104264584B (en) | Combined cable-girder anchoring structure of pre-stressed concrete cable-stayed bridge top | |
EP1845199A3 (en) | Floor slab bridge structure | |
CN112982142B (en) | Cold-formed thin-walled steel web plate combined PC box girder | |
CN104389261A (en) | Prefabricated ultra-high-performance concrete pi-shaped beam unit, bridge structure and construction method thereof | |
CN203741730U (en) | T-shaped bridge reinforcing structure | |
CN203559341U (en) | Longitudinal and transverse beam system channel beam of railway longitudinal beam type box beam | |
RU2476636C1 (en) | Device to connect reinforced concrete roadway slab with main beams of railway bridge span | |
CN102463625A (en) | Railway type concrete maintenance shack | |
CN101255718A (en) | Ultra-high layer combined wall dual structure architecture | |
CN203514528U (en) | Composite connection structure of concrete filled steel tubular column and thin steel plate shear wall | |
CN204212043U (en) | Prefabricated ultra-high performance concrete π ellbeam unit | |
RU128636U1 (en) | BASE ASSEMBLY JOINT REINFORCED CONCRETE COLUMN WITH FOUNDATION | |
RU2608378C1 (en) | Method of reconstruction and reinforcement of steel-concrete composite simply supported bridge superstructure by straight cables | |
CN205474785U (en) | Steel - ultra high performance concrete combination continuous bridge structure | |
CN101994354B (en) | Method for constructing anti-cracking earthquake-proof plaster partition wall | |
RU92027U1 (en) | PRE-STRESSED BEAM OF THE SPAN STRUCTURE OF THE ROAD BRIDGE | |
JP2006169927A (en) | Prefabricated steel floor slab and steel girder bridge by on-site bonding and joint | |
RU162649U1 (en) | COMBINED MONOLITHIC SPAN STRUCTURE | |
CN109423951A (en) | A kind of steel bridge and its shearing resistance composite structure | |
CN203716373U (en) | U-shaped steel girder-rebar truss floor support plate building surface system | |
RU52008U1 (en) | STEEL AND CONCRETE SPAN STRUCTURE |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20140922 |