Изобретение относится к горному делу и может быть использовано для заряжания скважин при производстве взрывных работ в горном деле. Изобретение может быть использовано также при производстве взрывов в строительстве.The invention relates to mining and can be used for loading wells during blasting in mining. The invention can also be used in the production of explosions in construction.
Известны способы заряжания обводненных скважин, в которых используют дорогие водоустойчивые взрывчатые вещества (ВВ) (В.Л.Барон, В.Х.Кантор «Техника и технология взрывных работ в США» М., Недра, 1989 г., 376 с.; Б.Н.Кутузов «Разрушение горных пород взрывом. Взрывные технологии в промышленности», М., Издательство Московского государственного горного университета, 1994 г., 446 с.), что повышает себестоимость подготовки 1 м3 взорванной горной массы.Known methods of loading flooded wells that use expensive waterproof explosives (BB) (V.L. Baron, V.Kh. Kantor "Technique and technology for blasting in the USA" M., Nedra, 1989, 376 p .; BN Kutuzov "Destruction of rocks by explosion. Explosive technologies in industry", Moscow, Publishing House of Moscow State Mining University, 1994, 446 pp.), Which increases the cost of preparing 1 m 3 of blasted rock mass.
Известен также способ формирования комбинированного заряда (В.Л.Барон, В.Х.Кантор «Техника и технология взрывных работ в США» М., Недра, 1989 г., 376 с.; Б.Н.Кутузов «Разрушение горных пород взрывом. Взрывные технологии в промышленности», М., Издательство Московского государственного горного университета, 1994 г., 446 с.), в котором в воду засыпают гранулированное водоустойчивое ВВ (гранулотол), которое тяжелее воды, и после заполнения им скважины на него заряжают неводоустойчивое ВВ. Но это ВВ в 2,0-2,5 раза дороже водоустойчивого эмульсионного ВВ и в настоящее время практически не используется.There is also known a method of forming a combined charge (V.L. Baron, V.Kh. Kantor "Technique and technology of blasting in the USA" M., Nedra, 1989, 376 pp .; B.N. Kutuzov "Destruction of rocks by explosion Explosive technologies in industry ”, Moscow, Publishing House of the Moscow State Mining University, 1994, 446 pp.), In which a granulated waterproof explosive (granulotol) is poured into the water, which is heavier than water, and after filling the well with it, it is non-waterproof BB But this explosive is 2.0-2.5 times more expensive than a waterproof emulsion explosive and is currently practically not used.
Известен способ формирования заряда и металлическая забойка для его осуществления (заявка РФ №2006108299, МПК E21C 37/00, F42D 1/00, опубл. 27.09.2007), принятый за прототип, включающий формирование в обводненной части скважины заряда из водоустойчивого ВВ, размещение на зеркале вытесненной вверх по скважине воды вспененного полистирола, формирование на него заряда из неводоустойчивого ВВ и установку забойки.A known method of forming a charge and metal stemming for its implementation (RF application No. 2006108299, IPC E21C 37/00,
Недостатки известного способа: сложность заряжания обводненных скважин, высокая стоимость производства взрывных работ, низкое качество подготовки взорванной массы.The disadvantages of this method: the difficulty of loading flooded wells, the high cost of blasting, low quality preparation of the blasted mass.
Задача изобретения - снижение стоимости производства взрывных работ за счет замены дорогого водоустойчивого ВВ на более дешевое неводоустойчивое ВВ, упрощение заряжания обводненных скважин.The objective of the invention is to reduce the cost of blasting by replacing an expensive waterproof BB with a cheaper non-waterproof BB, simplifying the loading of flooded wells.
Указанные задачи достигаются тем, что в способе формирования комбинированного заряда, включающем формирование в обводненной части скважины заряда из водоустойчивого ВВ, размещение на зеркале вытесненной вверх по скважине воды вспененного полистирола, формирование на него заряда из неводоустойчивого ВВ и установку забойки, согласно изобретению на зеркало вытесненной вверх по скважине воды помещают поплавок, выполненный из материала, обладающего плавучими свойствами, способный выдержать вес заряда из неводоустойчивого ВВ, на который опускают куски горной породы или бурового шлама, размещенные в тканевой или полиэтиленовой оболочке, диаметр которой больше диаметра скважины.These tasks are achieved by the fact that in the method of forming a combined charge, which includes forming a charge from a waterproof explosive in the flooded part of the well, placing expanded polystyrene on the water displaced upstream of the well, forming a charge from the non-waterproof explosive on it and installing a clogging device, according to the invention, to the displaced mirror a float is made up the water well, made of a material having floating properties, capable of supporting the weight of the charge from a non-water-resistant explosive, on which allowed pieces or rock cuttings placed in tissue or polyethylene sheath diameter is larger than the borehole diameter.
Заявляемый способ поясняется чертежом, на котором показана схема заряжания обводненной скважины.The inventive method is illustrated in the drawing, which shows a loading diagram of a waterlogged well.
Способ осуществляют следующим образом. Сначала на дно скважины опускают боевик 1, затем засыпают водоустойчивое ВВ 2 в минимальном допустимом по паспорту взрывных работ количестве. Затем на зеркало воды 3, вытесненной вверх по скважине водоустойчивым ВВ 2, опускают поплавок 4, выполненный из материала, обладающего плавучими свойствами, после чего на поплавок 4 опускают куски горной породы или бурового шлама, размещенные в тканевой или полиэтиленовой оболочке 5, диаметр которой больше диаметра скважины, для перекрытия промежутков между поплавком 3 и стенкой скважины, а затем опускают следующий боевик 1 и засыпают в скважину неводоустойчивое ВВ 6 в количестве, необходимом для качественного взрыва по паспорту ВВ. Осуществляют забойку скважины.The method is as follows. First,
Пример конкретного осуществления способа.An example of a specific implementation of the method.
Способ был осуществлен на Кедровском угольном разрезе филиала угольной компании «Кузбассразрезуголь» на горном участке №3, горизонт +174, при взрыве горных пород крепостью 9,5 по шкале проф. Протодьяконова М.М. Блок был забурен буровым станком ЗСБШ-200Н с сеткой скважин 6 м на 6 м, глубиной скважин 15 м и диаметром 215.9 мм. Скважины пробурены вертикальные. Заявляемый способ был опробован на 10 скважинах. Сначала на дно скважины опускали на детонирующем шнуре боевик ПТ П750, затем заливали дорогое водоустойчивое ВВ - Сибирит 1200 - 470 кг, затем на поверхность воды, вытесненной водоустойчивым ВВ, опускали поплавок (например, пустая пластиковая бутылка из-под питьевой воды емкостью 5 л), а на поплавок опускали куски горной породы или бурового шлама, размещенные в тканевой оболочке (например, полипропиленовый мешок со штыбом), диаметр которой больше диаметра скважины, после чего на поплавок опускали на детонирующем шнуре следующий боевик ПТ П500 и засыпали в скважину неводоустойчивое ВВ-гранулит УП-1 - в количестве 400 кг, необходимом для качественного взрыва по паспорту ВВ. Осуществляли забойку скважины. Таким образом было заряжено 10 скважин. Перед взрывом было измерено расстояние от дневной поверхности до верхней части заряда в скважине. Оно за время зарядки всего блока не изменилось. Несмотря на то, что часть дорогого ВВ была заменена на более дешевое ВВ, качество подготовки взорванной горной массы десяти контрольных скважин осталось таким же, как в остальных скважинах.The method was carried out at the Kedrovsky coal mine, a branch of the coal company Kuzbassrazrezugol, on a mining site No. 3, horizon +174, in case of a rock explosion with a strength of 9.5 on the scale of prof. Protodyakonova M.M. The block was drilled with a drilling rig ZSBSh-200N with a grid of 6 m by 6 m wells, a depth of 15 m and a diameter of 215.9 mm. Wells are drilled vertical. The inventive method was tested on 10 wells. First, the fighter PT P750 was lowered to the bottom of the well on a detonating cord, then an expensive waterproof BB - Sibirite 1200 - 470 kg was poured, then a float was lowered onto the surface of the water displaced by the waterproof BB (for example, an empty plastic 5-liter drinking water bottle) and pieces of rock or drill cuttings placed in a fabric sheath (for example, a polypropylene bag with a pin), the diameter of which is larger than the diameter of the well, were lowered onto the float, after which the next PT П500 fighter was lowered and It fell into the well nevodoustoychivoe BB beads UP-1 - in an amount of 400 kg, the required quality for explosion passport BB. Well clogging was carried out. Thus, 10 wells were charged. Before the explosion, the distance from the surface to the top of the charge in the borehole was measured. It has not changed during the charging of the entire unit. Despite the fact that part of the expensive explosive was replaced by a cheaper explosive, the quality of preparation of the blasted rock mass of ten control wells remained the same as in the remaining wells.
Заявляемый способ позволяет упростить заряжание обводненных скважин, снизить стоимость производства взрывных работ, не снижая качества подготовки взорванной массы.The inventive method allows to simplify the loading of flooded wells, reduce the cost of blasting, without compromising the quality of preparation of the blasted mass.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2008106302/03A RU2364828C1 (en) | 2008-02-18 | 2008-02-18 | Formation method of compound blast |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2008106302/03A RU2364828C1 (en) | 2008-02-18 | 2008-02-18 | Formation method of compound blast |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2364828C1 true RU2364828C1 (en) | 2009-08-20 |
Family
ID=41151313
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2008106302/03A RU2364828C1 (en) | 2008-02-18 | 2008-02-18 | Formation method of compound blast |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2364828C1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102230769A (en) * | 2011-06-16 | 2011-11-02 | 汇通路桥建设集团有限公司 | Multi-row micro-differential roadbed deep hole blasting construction method |
RU2506533C1 (en) * | 2012-09-24 | 2014-02-10 | Виктор Сергеевич Федотенко | Suspension well stemming |
RU2563265C1 (en) * | 2014-10-27 | 2015-09-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет" | Method of formation of short combined stemming of blast holes with stone material and device for its implementation |
RU2563266C1 (en) * | 2014-10-27 | 2015-09-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет" | Method of formation of short combined stemming of blast holes and device for its implementation |
RU2566522C1 (en) * | 2014-10-24 | 2015-10-27 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет" | Method of gopher hole formation of short combined stemming of blast holes and device for its implementation |
CN106285732A (en) * | 2016-08-30 | 2017-01-04 | 中国水利水电第十四工程局有限公司 | The through excavation construction method in a kind of underground chamber big duck eye footpath |
-
2008
- 2008-02-18 RU RU2008106302/03A patent/RU2364828C1/en not_active IP Right Cessation
Non-Patent Citations (1)
Title |
---|
ЮМАТОВ Б.П. и др. Экспериментальные исследования конструкции "плавающего заряда". - Взрывное дело N74/31. - М.: Недра, 1974, с.183-188. * |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102230769A (en) * | 2011-06-16 | 2011-11-02 | 汇通路桥建设集团有限公司 | Multi-row micro-differential roadbed deep hole blasting construction method |
CN102230769B (en) * | 2011-06-16 | 2013-06-05 | 汇通路桥建设集团有限公司 | Multi-row micro-differential roadbed deep hole blasting construction method |
RU2506533C1 (en) * | 2012-09-24 | 2014-02-10 | Виктор Сергеевич Федотенко | Suspension well stemming |
RU2566522C1 (en) * | 2014-10-24 | 2015-10-27 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет" | Method of gopher hole formation of short combined stemming of blast holes and device for its implementation |
RU2563265C1 (en) * | 2014-10-27 | 2015-09-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет" | Method of formation of short combined stemming of blast holes with stone material and device for its implementation |
RU2563266C1 (en) * | 2014-10-27 | 2015-09-20 | Федеральное государственное бюджетное образовательное учреждение высшего профессионального образования "Тихоокеанский государственный университет" | Method of formation of short combined stemming of blast holes and device for its implementation |
CN106285732A (en) * | 2016-08-30 | 2017-01-04 | 中国水利水电第十四工程局有限公司 | The through excavation construction method in a kind of underground chamber big duck eye footpath |
CN106285732B (en) * | 2016-08-30 | 2019-01-04 | 中国水利水电第十四工程局有限公司 | A kind of big duck eye diameter perforation excavation construction method of underground chamber |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2364828C1 (en) | Formation method of compound blast | |
EA201290820A1 (en) | UNDERGROUND DEVELOPMENT OF THE DEPOSIT | |
CN106288995A (en) | A kind of hole-by-hole initiation explosion treatment Abandoned golfs method | |
Rustan et al. | Mining and rock construction technology desk reference: Rock mechanics, drilling & blasting | |
RU2602567C1 (en) | Method of blasting ores and rocks | |
Chistyakov et al. | Investigation of the geomechanical processes while mining thick ore deposits by room systems with backfill of worked-out area | |
RU2319924C1 (en) | Method for charge dispersal in borehole | |
RU2409805C1 (en) | Suspension well stemming | |
RU46299U1 (en) | DEVICE FOR CREATING DISTRIBUTED CHARGES AND FORMING AIR SPACES IN WELLS | |
Mishra et al. | Blast-induced caving from surface over continuous miner panel at a 110m cover in an Indian mine | |
CN102486090A (en) | Method for recovering upper boundary residual mine and forming lower mining cover layer of stope | |
Dobrilović et al. | Measurement in blast hole stem and influence of steming material on blasting quality | |
RU2285895C1 (en) | Method for distribution of charge in a deep hole | |
RU146134U1 (en) | DEVICE FOR CREATING AN INTERMEDIATE IN A WELL | |
RU2425324C1 (en) | Combined charge shaping method | |
Camallanqui-Alborque et al. | Controlled Trim-Blasting Model to Improve Stability and Reduce Vibrations at a Production Gallery of the San Ignacio de Morococha SAA Mining Company | |
RU2371671C1 (en) | Suspended borehole plug | |
RU2754692C1 (en) | Borehole gap device | |
RU2449240C1 (en) | Method of ore and rock breakage in development of solid mineral deposits | |
RU2482442C1 (en) | Method to charge weakly water-cut downholes | |
Gupta | Emerging explosives and initiation devices for increased safety, reliability, and performance for excavation in weak rocks, mining and close to surface structures | |
Nguyen et al. | Prediction of ground vibration due to blasting: case study in some quarries in Vietnam | |
Konicek et al. | Rockbursts provoked by destress blasting in hard coal longwall mining | |
Konicek et al. | Practices to control rock burst in deep coal mines of Upper Silesian coal basin and their applicability for Disergarh seam of Raniganj coalfield | |
RU132884U1 (en) | EXPLOSIVE CHARGE FOR WATERFILLED WELLS |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20100219 |