CN106285732B - A kind of big duck eye diameter perforation excavation construction method of underground chamber - Google Patents

A kind of big duck eye diameter perforation excavation construction method of underground chamber Download PDF

Info

Publication number
CN106285732B
CN106285732B CN201610752992.2A CN201610752992A CN106285732B CN 106285732 B CN106285732 B CN 106285732B CN 201610752992 A CN201610752992 A CN 201610752992A CN 106285732 B CN106285732 B CN 106285732B
Authority
CN
China
Prior art keywords
cavern
excavation
explosion
big
duck eye
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201610752992.2A
Other languages
Chinese (zh)
Other versions
CN106285732A (en
Inventor
和丽钢
刘芳明
朱育宏
李辉
华石坤
蔡斌
陈继杨
李前昊
陈绍友
吴娟娥
杨涛
陈宇
张子松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 14 Co Ltd
Original Assignee
Sinohydro Bureau 14 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 14 Co Ltd filed Critical Sinohydro Bureau 14 Co Ltd
Priority to CN201610752992.2A priority Critical patent/CN106285732B/en
Publication of CN106285732A publication Critical patent/CN106285732A/en
Application granted granted Critical
Publication of CN106285732B publication Critical patent/CN106285732B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D13/00Large underground chambers; Methods or apparatus for making them
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F42AMMUNITION; BLASTING
    • F42DBLASTING
    • F42D1/00Blasting methods or apparatus, e.g. loading or tamping

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • General Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of big duck eye diameters of underground chamber to penetrate through excavation construction method, belongs to Construction Technology field.The present invention is to solve duck eye diameter cavern excavation to penetrate through Forming Quality, pass through optimum blast design, using not coupling short-delay blasting mode, controlled loading of explosive amount, duck eye diameter cavern's advanced excavation runs through big cavern, and big cavern reserves coating, radiates smooth surface blast hole later, it controls explosion in the form of intermediate kerve, explosion to be split to vibrate and disturb, so that reaching big small cavities' perforation excavates molding effect.The features such as technical solution of the present invention is reasonable, and explosion design safety is practical, and cavern's opening shaping is high-quality, can be effectively controlled out break and rock blasting loosening, and construction technology quality is guaranteed is suitable for the big small cavities' perforation Excavation blasting control construction of underground chamber.

Description

A kind of big duck eye diameter perforation excavation construction method of underground chamber
Technical field
The invention belongs to Construction Technology fields, and in particular to a kind of underground chamber big duck eye diameter perforation excavation construction side Method is suitable for Underground Engineering Blasting excavation construction.
Background technique
With the development of human society, underground engineering will be increasingly used in each neck of national economy capital construction Domain uses underground chamber in the engineering constructions such as water conservancy and hydropower, highway, railway, oil depot more and more.
Before the 1960s, Underground Engineering Excavation is with hand air drill pore-creating, free explosion;The initial stage eighties, in Xi Er River power station, the power station fishing Zi Xi, Baishan Hydroelectric Power Station construction in, use photoface exploision;To after 1985, draw in infectious coryza lattice power station In water tunnel excavation, using drill jumbo, non-electric ms detonator, full*.face smooth blasting, average drill footage per month 231m, the highest moon are created The record of drilling depth 373.5m.It promotes, obtains in the tunnel excavation of the engineerings such as the power station Man Wan, Guangzhou Pump-Storaged Plant in succession Preferable achievement, makes China's underground engineering construction reach a new level.
With drilling machine, explosive and drill bursting technology, and the development of " New Austrian Tunneling Method " construction technology, bolt-spary supports are made For the long lining cutting of water, Underground powerhouse excavation uses heading blast, Rock Crane Rail Support foundation excavation, photoface exploision, presplit blasting, buffering Blasting technique is widely used in underground engineering.
Traditional big duck eye diameter perforation excavation construction method of underground chamber is Xian Kai great Dong diameter cavern, then again towards duck eye diameter hole Room is excavated, this makes it difficult to control blasting vibration and rock relaxation zone, cavern's opening shaping of formation is second-rate.In Underground Tunnels During fine explosion key technology research is excavated in room, to ensure underground chamber opening shaping quality, it is quick-fried how to improve excavation light Effect effectively controls blasting vibration and rock relaxation zone, and carrying out reasonable control to out break becomes critical issue.
Summary of the invention
The purpose of the present invention is based on the deficiency during the fine blast working of underground powerhouse, to ensure big duck eye Diameter cavern penetrates through Excavation blasting Forming Quality, provides a kind of big duck eye diameter perforation excavation construction method of underground chamber, the construction party Method improves drill-blast tunnelling Forming Quality, and diameter molding in charge explosion hole meets design requirement, has reached expection to out break control Effect.
To achieve the above object, The technical solution adopted by the invention is as follows:
A kind of big duck eye diameter perforation excavation construction method of underground chamber, steps are as follows: duck eye diameter cavern advanced excavation runs through To great Dong diameter cavern, when backbreaking to the diameter cavern great Dong, need to reserve coating in great Dong diameter cavern, then in great Dong diameter cavern It is interior to move towards kerve among direction along cavern, and intermediate kerve is connected with the part of backbreaking of duck eye diameter cavern;Later to pre- It stays and carries out explosion to be split at coating, when explosion to be split, first radiate smooth surface blast hole, then using not coupling short-delay blasting mode Explosion is carried out, finally to great Dong diameter cavern stage excavation.
It is further preferred that specific blasting construction method is as follows:
Step (1), wind, water, electricity are ready, and construction personnel, equipment prepare in place;
Step (2), measurement control: Traverse Network and construction survey are implemented by professional;Every artillery salvo is set according to explosion Count parameter point cloth hole;Excavated section inspection carries out before spraying concrete, checks spacing 5m;The laggard row conductor point inspection of 3-5d and repetition measurement, To ensure to measure control precision;
Step (3), every artillery salvo is checked by technician on duty by the requirement of " flat, straight, neat ", accomplishes that the bottom hole of blasthole is fallen On the same vertical section as defined in explosion;Meanwhile the borehole accuracy of the pre- ceasma of strict control;
Step (4), sweeps drilling with high-pressure blast punching before powder charge, and blasthole after qualification, can carry out charge explosion on inspection;Blasthole Powder charge, blocking and blasting circuit on line should by it is qualified through examination and hold the big gun work of dynamiter's operation quality certification strictly by batch Quasi- hole blasting design is applied, and strictly observes shotfiring safety operating instruction;
Using drilling platform powder charge, blast hole powder charge wants closely knit, and blocks well, is filled in strict accordance with explosion design drawing Medicine is coupled initiation net with on-electric detonator, is finally checked and checked by big gun work and technician on duty, confirm it is errorless, evacuating people and Equipment, big gun work are responsible for ignition;
Step (5) terminates starting ventilation equipment ventilation always to slagging tap after Excavation blasting, will have in 2h after guaranteeing explosion Evil gas concentration drops in allowed band, to meet " water power construction of hydro project safety protection facility technical specification " (DL5162- And the requirement of " hydraulic structure underground excavation project construction technique normalizing " (DL/T5099-2011) 2013);
Step (6) removes remaining danger stone and fragment to guarantee the safety of personnel and equipment, carries out safety after slagging tap again It checks and handles, check whether that there are also danger stones to exist;In the construction process, the abutment wall country rock for needing constantly to observe excavation section is steady Pledge love condition, it is clear prize may slump, loosening sillar;
Step (7), slags tap and clear bottom: using 3m3Loading machine or 1.2m3Backhoe dress 20t dump truck is slagged tap;It slags tap and finishes Working face accumulated slag is cleared out with backhoe afterwards, quick-fried operation is bored for subsequent cycle and is ready;
Step (8), surrounding rock supporting: excavating out one section of one section of supporting, forms multi-process parallel construction.
It is further preferred that step (2), when cloth hole, uses the air drill pore-creating of YT28 hand.
It is further preferred that step (3), the borehole accuracy of the pre- ceasma of strict control, control hole to deviation be ± 2 °, hole Position deviation ± 1cm.
It is further preferred that step (6), which removes remaining danger stone and fragment, can use backhoe or artificial.
Charge explosion of the present invention is all made of the method construction of delaying blasting.
When explosion of the present invention, explosion is controlled in the form of intermediate kerve, abutment wall photoface exploision to be split and vibrates and disturbs.
Compared with prior art, the present invention has the advantages that:
The present invention is to solve duck eye diameter cavern excavation to penetrate through Forming Quality, micro- using not coupling by optimum blast design Poor blasting method, controlled loading of explosive amount, duck eye diameter cavern's advanced excavation run through big cavern, and big cavern reserves coating, abutment wall radiation Photoface exploision hole, using intermediate kerve, the form of abutment wall explosion to be split is vibrated and is disturbed controlling explosion, to reach big duck eye Molding effect is excavated in room perforation.
Construction method blast working Forming Quality of the present invention is good, and effectively control out break, construction safety are secure.It is suitable for Underground chamber big duck eye in Construction Technology field penetrates through excavation construction.Compared with traditional excavation construction method, Mei Yipai Big gun circulation can shift to an earlier date 3h completion, and entire engineering at least shifts to an earlier date 20 days, and cost can reduce 15%-20%.
Scheme is reasonable through the invention, and explosion design safety is practical, and hole is run through in opening shaping high-quality big small cavities in cavern's It is high-quality that room light bursts into type, can be effectively controlled out break and country rock in-place blasting out circle.
Detailed description of the invention
Fig. 1 is the big duck eye diameter perforation excavation construction method sequence of construction plan view of underground chamber of the present invention;
Fig. 2 is the A-A sectional view of Fig. 1;
Wherein, 1.-small cavities' advanced excavation construction, 2.-big cavern kerve step blast working, 3.-abutment wall radiate presplitting Smooth Blasting Construction, 4.-cavern's stage excavation construction greatly;5. reserved coating;
Arrow direction is construction direction.
Specific embodiment
Below with reference to embodiment, the present invention is described in further detail.
It will be understood to those of skill in the art that the following example is merely to illustrate the present invention, and it should not be regarded as limiting this hair Bright range.In the examples where no specific technique or condition is specified, according to the literature in the art, standardize described technology or Condition is carried out according to product description.Production firm person is not specified in material therefor or instrument, is that can be obtained by purchase The conventional products obtained.
As shown in Figure 1 and 2, a kind of big duck eye diameter of underground chamber penetrates through excavation construction method, and steps are as follows:
Duck eye diameter cavern advanced excavation is through to great Dong diameter cavern, when backbreaking to the diameter cavern great Dong, needs in big hole diameter hole The reserved coating in interior, then moves towards kerve among direction along cavern in great Dong diameter cavern, and make intermediate kerve and duck eye The part of backbreaking of diameter cavern is connected;Later to carrying out explosion to be split at reserved coating, when explosion to be split, it is quick-fried first to radiate smooth surface Holes, then use does not couple short-delay blasting mode and carries out explosion, finally to great Dong diameter cavern stage excavation.
Specific blasting construction method is as follows:
Step (1), wind, water, electricity are ready, and construction personnel, equipment prepare in place;
Step (2), measurement control: Traverse Network and construction survey are implemented by professional;Every artillery salvo is set according to explosion Count parameter point cloth hole;Excavated section inspection carries out before spraying concrete, checks spacing 5m;The laggard row conductor point inspection of 3-5d and repetition measurement, To ensure to measure control precision;
Step (3), every artillery salvo is checked by technician on duty by the requirement of " flat, straight, neat ", accomplishes that the bottom hole of blasthole is fallen On the same vertical section as defined in explosion;Meanwhile the borehole accuracy of the pre- ceasma of strict control;
Step (4), sweeps drilling with high-pressure blast punching before powder charge, and blasthole after qualification, can carry out charge explosion on inspection;Blasthole Powder charge, blocking and blasting circuit on line should by it is qualified through examination and hold the big gun work of dynamiter's operation quality certification strictly by batch Quasi- hole blasting design is applied, and strictly observes shotfiring safety operating instruction;
Using drilling platform powder charge, blast hole powder charge wants closely knit, and blocks well, is filled in strict accordance with explosion design drawing Medicine is coupled initiation net with on-electric detonator, is finally checked and checked by big gun work and technician on duty, confirm it is errorless, evacuating people and Equipment, big gun work are responsible for ignition;
Step (5) terminates starting ventilation equipment ventilation always to slagging tap after Excavation blasting, will have in 2h after guaranteeing explosion Evil gas concentration drops in allowed band, to meet " water power construction of hydro project safety protection facility technical specification " (DL5162- And the requirement of " hydraulic structure underground excavation project construction technique normalizing " (DL/T5099-2011) 2013).
Step (6) removes remaining danger stone and fragment to guarantee the safety of personnel and equipment, carries out safety after slagging tap again It checks and handles, check whether that there are also danger stones to exist;In the construction process, the abutment wall country rock for needing constantly to observe excavation section is steady Pledge love condition, it is clear prize may slump, loosening sillar;
Step (7), slags tap and clear bottom: using 3m3Loading machine or 1.2m3Backhoe dress 20t dump truck is slagged tap;It slags tap and finishes Working face accumulated slag is cleared out with backhoe afterwards, quick-fried operation is bored for subsequent cycle and is ready;
Step (8), surrounding rock supporting: excavating out one section of one section of supporting, forms multi-process parallel construction.
Preferred embodiment is step (2), and the air drill pore-creating of YT28 hand is used when cloth hole.
Preferred embodiment is step (3), the borehole accuracy of the pre- ceasma of strict control, control hole to deviation be ± 2 °, hole location Deviation ± 1cm.
Preferred embodiment is that step (6), which removes remaining danger stone and fragment, can use backhoe or artificial.
The basic principles, main features and advantages of the present invention have been shown and described above.The technology of the industry Personnel are it should be appreciated that the present invention is not limited to the above embodiments, and the above embodiments and description only describe this The principle of invention, without departing from the spirit and scope of the present invention, various changes and improvements may be made to the invention, these changes Change and improvement all fall within the protetion scope of the claimed invention.The claimed scope of the invention by appended claims and its Equivalent thereof.

Claims (5)

1. a kind of big duck eye diameter of underground chamber penetrates through excavation construction method, which is characterized in that steps are as follows: duck eye diameter cavern is advanced Excavation is through to great Dong diameter cavern, when backbreaking to the diameter cavern great Dong, needs to reserve coating in great Dong diameter cavern, then big Kerve among direction is moved towards along cavern in the cavern Dong Jing, and intermediate kerve is connected with the part of backbreaking of duck eye diameter cavern; Later to carrying out explosion to be split at reserved coating, when explosion to be split, smooth surface blast hole is first radiated, then using not coupling elementary errors Blasting method carries out explosion, finally to great Dong diameter cavern stage excavation.
2. the big duck eye diameter of underground chamber according to claim 1 penetrates through excavation construction method, which is characterized in that specific explosion Construction method is as follows:
Step (1), wind, water, electricity are ready, and construction personnel, equipment prepare in place;
Step (2), measurement control: Traverse Network and construction survey are implemented by professional;Every artillery salvo is designed according to explosion joins Several cloth holes;Excavated section inspection carries out before spraying concrete, checks spacing 5m;The laggard row conductor point inspection of 3-5d and repetition measurement, with true Protect measurement control precision;
Step (3), every artillery salvo is checked by technician on duty by the requirement of " flat, straight, neat ", and it is quick-fried to accomplish that the bottom hole of blasthole is fallen in On the same vertical section as defined in broken;Meanwhile the borehole accuracy of the pre- ceasma of strict control;
Step (4), sweeps drilling with high-pressure blast punching before powder charge, and blasthole after qualification, can carry out charge explosion on inspection;The dress of blasthole The on line of medicine, blocking and blasting circuit should be by being examined qualified and holding the big gun work of dynamiter's operation quality certification strictly by approval Hole blasting design is applied, and strictly observes shotfiring safety operating instruction;
Using drilling platform powder charge, blast hole powder charge wants closely knit, and blocks well, carries out powder charge in strict accordance with explosion design drawing, It is coupled initiation net with on-electric detonator, is finally checked and checked by big gun work and technician on duty, confirm errorless, evacuating people and sets Standby, big gun work is responsible for ignition;
Step (5) terminates starting ventilation equipment ventilation always to slagging tap after Excavation blasting, guarantees harmful gas after explosion in 2h Bulk concentration drops in allowed band;
Step (6) removes remaining danger stone and fragment to guarantee the safety of personnel and equipment, carries out safety inspection after slagging tap again And processing, check whether that there are also danger stones to exist;In the construction process, need constantly to observe the abutment wall adjoining rock stability feelings of excavation section Condition, the clear sillar for prizing possible slump, loosening;
Step (7), slags tap and clear bottom: using 3m3Loading machine or 1.2m3Backhoe dress 20t dump truck is slagged tap;It is used after slagging tap Backhoe clears out working face accumulated slag, bores quick-fried operation for subsequent cycle and is ready;
Step (8), surrounding rock supporting: excavating out one section of one section of supporting, forms multi-process parallel construction.
3. the big duck eye diameter of underground chamber according to claim 2 penetrates through excavation construction method, which is characterized in that step (2), The air drill pore-creating of YT28 hand is used when cloth hole.
4. the big duck eye diameter of underground chamber according to claim 2 penetrates through excavation construction method, which is characterized in that step (3) The borehole accuracy of the pre- ceasma of strict control, control hole to deviation be ± 2 °, hole location deviation ± 1cm.
5. the big duck eye diameter of underground chamber according to claim 2 penetrates through excavation construction method, which is characterized in that step (6) Backhoe or artificial can be used by removing remaining danger stone and fragment.
CN201610752992.2A 2016-08-30 2016-08-30 A kind of big duck eye diameter perforation excavation construction method of underground chamber Active CN106285732B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610752992.2A CN106285732B (en) 2016-08-30 2016-08-30 A kind of big duck eye diameter perforation excavation construction method of underground chamber

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610752992.2A CN106285732B (en) 2016-08-30 2016-08-30 A kind of big duck eye diameter perforation excavation construction method of underground chamber

Publications (2)

Publication Number Publication Date
CN106285732A CN106285732A (en) 2017-01-04
CN106285732B true CN106285732B (en) 2019-01-04

Family

ID=57674624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610752992.2A Active CN106285732B (en) 2016-08-30 2016-08-30 A kind of big duck eye diameter perforation excavation construction method of underground chamber

Country Status (1)

Country Link
CN (1) CN106285732B (en)

Families Citing this family (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109322683A (en) * 2018-10-24 2019-02-12 临沂会宝岭铁矿有限公司 Underground Large chamber medium-length hole controls blasting construction method
CN109488347B (en) * 2018-10-25 2021-01-15 浙江省隧道工程集团有限公司 Excavation construction method for special stratum chamber
CN110107323B (en) * 2019-05-10 2020-12-29 中国电建集团华东勘测设计研究院有限公司 Excavation and support construction method for first-hole and later-wall type crossed hole
CN111663946B (en) * 2020-06-03 2022-03-22 中国水利水电第四工程局有限公司 Variable-diameter excavation method for cavern
CN112065470B (en) * 2020-09-23 2022-03-15 中铁四局集团有限公司 Cave depot tank body excavation method
CN112065401B (en) * 2020-09-23 2022-06-17 中国水利水电第七工程局有限公司 Large-diameter vertical cavity excavation method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2364828C1 (en) * 2008-02-18 2009-08-20 Сергей Михайлович Федотенко Formation method of compound blast
CN101545746A (en) * 2009-05-06 2009-09-30 中铁二局股份有限公司 Method for smooth blasting construction with pre-eccentric uncoupling charging
CN102305580A (en) * 2011-09-01 2012-01-04 北京交通大学 Method for implementing full-face smooth blasting construction by using digital detonators
CN103185491A (en) * 2013-02-17 2013-07-03 中国水电顾问集团华东勘测设计研究院 Stress relieving blasting method for side wall rock pillar type rock burst of two synchronously tunneling deeply-buried tunnels
CN205156773U (en) * 2015-12-01 2016-04-13 中铁二十局集团有限公司 Rock stratum water pressure drilling -and -blasting construction structures for smooth blasting slowly inclines

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2364828C1 (en) * 2008-02-18 2009-08-20 Сергей Михайлович Федотенко Formation method of compound blast
CN101545746A (en) * 2009-05-06 2009-09-30 中铁二局股份有限公司 Method for smooth blasting construction with pre-eccentric uncoupling charging
CN102305580A (en) * 2011-09-01 2012-01-04 北京交通大学 Method for implementing full-face smooth blasting construction by using digital detonators
CN103185491A (en) * 2013-02-17 2013-07-03 中国水电顾问集团华东勘测设计研究院 Stress relieving blasting method for side wall rock pillar type rock burst of two synchronously tunneling deeply-buried tunnels
CN205156773U (en) * 2015-12-01 2016-04-13 中铁二十局集团有限公司 Rock stratum water pressure drilling -and -blasting construction structures for smooth blasting slowly inclines

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
地下厂房开挖施工技术探讨;廖浜等;《企业科技与发展》;20131231(第24期);第50-52页,第55页 *
石英砂岩地质中型隧洞群进洞开挖方案探讨;曾利香;《吉林水利》;20100731(第7期);第14-17页 *

Also Published As

Publication number Publication date
CN106285732A (en) 2017-01-04

Similar Documents

Publication Publication Date Title
CN106285732B (en) A kind of big duck eye diameter perforation excavation construction method of underground chamber
CN103615941B (en) The blasting method of modernized railway shallow-buried sector
CN109373840A (en) Tunnel excavation hydraulic pressure demolition construction method
CN104482815B (en) Tunnel smooth blasting method
CN108286920A (en) A kind of implementation of Tunnel Blasting and excavation
CN105571415B (en) Precise control method for smooth surface blasting of fractured rock mass of highway tunnel
CN112922606B (en) Full-section smooth blasting construction method suitable for all-computer three-arm rock drilling jumbo for III-grade and IV-grade surrounding rock large-section railway tunnels
CN204718510U (en) A kind of novel joint-cutting quick-burning charge monoblock type photoface exploision device
CN207423009U (en) A kind of tunnel hydraulic pressure demolition constructing structure
CN104913696A (en) Side slope excavation smooth-surface blasting-method construction method
Innaurato et al. On the influence of rock mass quality on the quality of blasting work in tunnel driving
CN109238054A (en) A kind of oblique rock stratum high cut slope excavation construction method for supporting
CN103837366A (en) Visible sampling method for fracture network in surrounding rock
CN103835723A (en) Comprehensive pretreatment method for shaft penetration in mined-out area stratum
CN104654941B (en) A kind of dam foundation Rapid Excavation explosive forming method based on explosives mix-load truck
CN107130966A (en) Tunnel blasting excavates damage forecast method and blasting scheme optimization regulating method
CN105021096A (en) Five-segment-type millisecond electric detonator secondary blasting construction method applied to blasting of high-gas large-section tunnel
CN107024155A (en) A kind of underground chamber smooth blasting method of controlling profile surface evenness
CN110206547A (en) The method for being adapted to deep formation and high stress areas shaft sinking and supporting
CN104296609A (en) Different-hardness-degree rock stratum blasting control method used in deep-hole bench blasting
CN108386197A (en) A kind of up/down steps band inverted arch method for synchronously constructing based on tunnel bench cut method
CN102620614A (en) Construction method for cave depot slag funnel
CN110469333A (en) The driving method of small bore rocky tunnel
Paredes et al. Design and evaluation of single-phase drawbell excavation at the Chuquicamata underground mine
CN113175328A (en) Small-entrance large-section cavern excavation construction process

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant