CN110469333A CN201910828344.4A CN201910828344A CN110469333A CN 110469333 A CN110469333 A CN 110469333A CN 201910828344 A CN201910828344 A CN 201910828344A CN 110469333 A CN110469333 A CN 110469333A
Authority
CN
China
Prior art keywords
hole
expansion hole
emptying aperture
driving method
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910828344.4A
Other languages
Chinese (zh)
Inventor
汪龙
孟祥栋
唐先泽
陈代耘
田振农
丁纪兴
樊守亮
谢金晶
王儒瑞
贺恩明
孙波勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CHONGQING BLASTING CONSTRUCTION CO LTD
Shandong Hengtai Engineering Group Co Ltd
Chongqing Urban Construction Holding (group) Co Ltd
Chongqing Construction Engineering Group Co Ltd
Original Assignee
CHONGQING BLASTING CONSTRUCTION CO LTD
Shandong Hengtai Engineering Group Co Ltd
Chongqing Urban Construction Holding (group) Co Ltd
Chongqing Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CHONGQING BLASTING CONSTRUCTION CO LTD, Shandong Hengtai Engineering Group Co Ltd, Chongqing Urban Construction Holding (group) Co Ltd, Chongqing Construction Engineering Group Co Ltd filed Critical CHONGQING BLASTING CONSTRUCTION CO LTD
Priority to CN201910828344.4A priority Critical patent/CN110469333A/en
Publication of CN110469333A publication Critical patent/CN110469333A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B33/00Sealing or packing boreholes or wells
    • E21B33/10Sealing or packing boreholes or wells in the borehole
    • E21B33/13Methods or devices for cementing, for plugging holes, crevices or the like
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/006Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by making use of blasting methods
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/10Making by using boring or cutting machines
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/12Devices for removing or hauling away excavated material or spoil; Working or loading platforms
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21FSAFETY DEVICES, TRANSPORT, FILLING-UP, RESCUE, VENTILATION, OR DRAINING IN OR OF MINES OR TUNNELS
    • E21F1/00Ventilation of mines or tunnels; Distribution of ventilating currents
    • E21F1/08Ventilation arrangements in connection with air ducts, e.g. arrangements for mounting ventilators

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Fluid Mechanics (AREA)
  • Earth Drilling (AREA)

Abstract

The present invention relates to a kind of driving method of small bore rocky tunnel, construction procedure is as follows: a) preparation of construction: surveying design with carrying out, draws excavation contour line with red paint;B) cloth hole and drilling: emptying aperture and expansion hole are poured in excavated section subscript;Boring work is completed using drilling device;C) guard aperture: after drilling, emptying aperture and expansion hole inside and periphery landwaste are cleared up, and the opening of emptying aperture and expansion hole is blocked;D) powder charge: filling out combustion adjuvant, electrolyte solution and swelling agent along expansion hole, and opening is blocked closely knit;E) warning and broken rock;F) it discharges fume and removes the gred;G) supporting is set after the completion of slagging-off, and recycle and gradually tunnel.Using technical solution of the present invention, the fractured rock in such a way that quiet swollen effect is combined with machinery can be improved the driving speed of small area rocky tunnel.

Description

The driving method of small bore rocky tunnel
Technical field
The present invention relates to tunnelling fields, and in particular to a kind of driving method of small bore rocky tunnel.
Background technique
With the development of national urban construction, underground pipeline engineering is also more and more.The tunnel sectional area of this kind of engineering compared with Small (generally less than 50 ㎡), on cover that thickness is small, ambient enviroment is complicated.
When encountering rocky tunnel, due to many geotechnical engineering machinery because insufficient space is difficult to apply, often tunneled with rock drilling For main construction means, drivage efficiency is very low, becomes the principal element for delaying the duration.According to micro- vibration blasting technique, It is difficult to reach the safety requirements of structures around and facility.And using the method for splitting machine broken rock, due to small bore rock matter tunnel The clamping action of road country rock is larger, and effect is also undesirable.
For above-mentioned engineering problem, it is necessary to carry out corresponding technical research, be the quick of city small bore rocky tunnel A kind of new technical method is explored in construction.
Summary of the invention
To solve in the prior art, the slower problem of the method driving speed of small bore rocky tunnel;The present invention provides A kind of driving method of small bore rocky tunnel;The fractured rock in such a way that quiet swollen effect is combined with machinery, can be improved The driving speed of small area rocky tunnel.
To achieve the above object, the application adopts the technical scheme that:
A kind of driving method of small bore rocky tunnel, construction procedure are as follows:
A) it preparation of construction: surveys design with carrying out, to hydrogeologic condition detailed survey, designs the face in tunnel, use red paint Draw excavation contour line;
B) cloth hole and drilling: being poured in emptying aperture in excavated section subscript, and using emptying aperture as the center of circle, swollen around emptying aperture arrangement multi-turn Swollen hole;Boring work is completed using drilling device;
C) guard aperture: after drilling, clearing up inside emptying aperture and expansion hole and periphery landwaste, and by emptying aperture and expansion hole Opening blocks, and landwaste is avoided to fall into;
D) powder charge: along expansion hole radial direction, combustion adjuvant, electrolyte solution and swelling agent successively is filled out by layer from inside to outside, is used in combination Clay blocks expansion hole opening closely knit;Wherein, ignition is enclosed in combustion adjuvant;Ignition is connected with its opening and closing Remote controler;
E) warning and broken rock: tunnel near zone is checked comprehensively before broken rock, withdraws the owner near tunnel Member and equipment;And ignition is opened using remote control device;
F) it discharges fume and removes the gred: in broken rock 5~after ten minutes, opening ventilation blower smoke evacuation;It discharges fume after half an hour, measurement exports After air quality is qualified, remove the gred;
G) supporting: being arranged supporting after the completion of slagging-off, with the gap of fine sand filling and support part;Place cleaning again, and follow Ring gradually tunnels.
Using technical solution of the present invention, the emptying aperture opened up can increase the intracorporal scope of freedom of rock, and increase rock mass faces sky Face can improve the intracorporal stress of rock, be conducive to the broken rock under quiet swollen effect.In addition, stress can occur in the presence of emptying aperture Concentration phenomenon plays guiding role to the extension of rock mass internal fissure, is conducive to rock crushing.Utilize quiet swollen effect and mechanical phase In conjunction with mode fractured rock, can be improved small bore rocky tunnel driving speed.Due to using remote controler and electronics point Firearm can make expansion hole while rise to maximum pressure, enhance the superposition of rock mass internal stress, be conducive to rock crushing.
Preferably, the combustion adjuvant is wrapped up by powder stick;Electrolyte solution on the outside of powder stick is contained by film;Electrolyte solution The swelling agent in outside is fitted into plastic housing.
Charge constitution is layered continuous charging by combustion adjuvant, electrolyte solution, swelling agent interval, makes the physical-chemical reaction time More sufficiently, quiet swelling pressure power can be improved within a short period of time.
Preferably, the combustion adjuvant is thermite;Quiet swollen dose of the main component is calcium oxide.
It reacts fierce after the combustion of thermite antipoints, big calorimetric can be released and heat swelling agent, and electrolyte can be made molten Liquid mist makes electrolyte in conjunction with swelling agent.Main component meets water for the swelling agent of calcium oxide in confined space can produce 100 The quiet expansive force of megapascal is convenient for rock crushing.
Preferably, the emptying aperture and expansion hole have 1.5 °~3 ° of the elevation angle.Residue in easy cleaning emptying aperture and expansion hole.
Preferably, the diameter of the emptying aperture is the ㎜ of 180 ㎜~220;The diameter of the expansion hole is the ㎜ of 30 ㎜~50;It is empty The hole depth of hole and expansion hole is 1.5m~2.5m;Pitch-row between each molding hole is the ㎜ of 180 ㎜~220.Rock breaking efficiency is good.
Preferably, the length that blocks of the expansion hole is 20~30 times of aperture;Closure process is divided clay using waddy Layer tamping, clay thickness are the ㎝ of 5 ㎝~10.Expansion hole is blocked closely knit, the case where avoiding punching by guarantee.
Preferably, in the boring procedure, when residual hole occur or encountering rock cavity, adjustment bore position is closed on, is adopted The measure for taking perforations adding plus boring.
Preferably, the slagging-off work uses semi-mechanization operation;Guideway transport vehicle is being set at 10 meters of hole;Slag Stone is promoted using winch.It can be improved slagging-off efficiency, debris casualty accident during avoiding being promoted.
Beneficial effects of the present invention are the fractured rock in such a way that quiet swollen effect is combined with machinery, easy to accomplish complete Section once excavates, and mentions drivage efficiency 30%~50%;To the Underground Space Excavation engineering in city, can extend P. drechsleri into 1~2 times of ruler.The construction efficiency that can be improved 2~3 times of construction efficiency, can excavate the rock of 10~15 sides daily;Excavation cost can Reduce one third.
Specific embodiment
In order to be easy to understand the technical means, the creative features, the aims and the efficiencies achieved by the present invention, lower mask Body illustrates the present invention.
A kind of driving method of small bore rocky tunnel, construction procedure are as follows:
A) preparation of construction: surveying design with carrying out, and to hydrogeologic condition detailed survey, grasps the destruction mechanical property for excavating rock Matter;The face for designing tunnel, draws excavation contour line with red paint.It is familiar with quiet swollen dose of property and application method, understands existing Field mechanical equipment situation and technical level, the construction organization of construction personnel etc..
B) cloth hole and drilling: being poured in emptying aperture in excavated section subscript, and using emptying aperture as the center of circle, swollen around emptying aperture arrangement multi-turn Swollen hole;Perforating is completed using rock drill to work.
C) after drilling, emptying aperture and expansion hole inside and periphery landwaste, and measurement of verifying: measurement note guard aperture: are cleared up Nature of ground variation in hole is recorded, the position deviation etc. of register hole is examined.The opening of emptying aperture and expansion hole is blocked again, avoids landwaste It falls into.
D) powder charge: it is radial from inside to outside along expansion hole, combustion adjuvant, electrolyte solution and swelling agent successively are filled out by layer, is used in combination Clay blocks expansion hole opening closely knit;Wherein, ignition is enclosed in combustion adjuvant;Ignition is connected with its opening and closing Remote controler;
E) warning and broken rock: tunnel near zone is checked comprehensively before broken rock, withdraws the owner near tunnel Member and equipment;And ignition is opened using remote control device;
F) it discharges fume and removes the gred: in broken rock 5~after ten minutes, opening ventilation blower smoke evacuation;It discharges fume after half an hour, measurement exports After air quality is qualified, remove the gred;
G) supporting: being arranged supporting after the completion of slagging-off, with the gap of fine sand filling and support part;Place cleaning, and recycle Gradually tunnel.
Wherein, the diameter of the emptying aperture is the ㎜ of 180 ㎜~220;The diameter of the expansion hole is the ㎜ of 30 ㎜~50;Emptying aperture Hole depth with expansion hole is 1.5m~2.5m;Pitch-row between each molding hole is the ㎜ of 180 ㎜~220.Emptying aperture and expansion hole Location error is no more than 2cm.
In drilling, emptying aperture and expansion hole have 1.5 °~3 ° of the elevation angle.When residual hole occur or encountering rock cavity, tune is closed on Whole bore position, the measure taking perforations adding plus boring.After the completion of drilling, jewel hole orientation is measured, guarantees that error is no more than 0.01 °.
Combustion adjuvant in powder charge process is thermite;Quiet swollen dose of the main component is calcium oxide.Combustion adjuvant is by powder stick Package;Electrolyte solution on the outside of powder stick is contained by film;Swelling agent on the outside of electrolyte solution is fitted into plastic housing.Combustion adjuvant In ignition voltage rating 1.5V, rated current 0.1A.
The case where to guarantee that it is closely knit that expansion hole blocks, avoiding punching.Expansion hole blocks length as the 20~30 of aperture Times;Clay is layered using waddy and is consolidated by closure process, and clay thickness is the ㎝ of 5 ㎝~10.
After the completion of expansion hole blocks, line person is arranged to be responsible for connecting electric start network.Measure line in time during line Situation, record measurement resistance is connected in road.The problem of analysis is likely to occur.Prevent during line any electronics, electrical equipment band Enter scene.
It before fragmented rock body, needs to carry out Security alert, determines all personnel and mechanical equipment, and neighbouring all kinds of structures Under conditions of safety, ignition can be opened by controller.
After broken rock, it is ensured that tunnel tunnel face operation safety arranges construction personnel to carry out slagging-off work.It should be with during slagging-off When pay attention to the rock mass situation of naked loophole wall, discover abnormal necessary withdraw immediately.After slag removal, apply supporting.Supporting On cover free face distance in 0.5m~3m.Narrow-bore tunnel supporting is constructed using prefabricated modular, empty between supporting module and palisades Gap is not more than 5 ㎝, and all gaps are filled using fine sand after supporting.
After the completion of supporting, good berth face must be cleared up before carrying out subsequent processing operation, withdraws from unwanted tool equipment, Guarantee the unimpeded of walkway.
The basic principles, main features and advantages of the invention have been shown and described above.The technical staff of the industry should Understand, the present invention is not limited to the above embodiments, and the description in above embodiments and description only illustrates original of the invention Reason, without departing from the spirit and scope of the present invention, the present invention also has other changes and improvements, these changes and improvements It all fall within the protetion scope of the claimed invention.The claimed scope of the invention is by appended claims and its equivalent circle It is fixed.

Claims (8)

1. a kind of driving method of small bore rocky tunnel, which is characterized in that construction procedure is as follows:
A) it preparation of construction: surveys design with carrying out, to hydrogeologic condition detailed survey, designs the face in tunnel, drawn with red paint Excavation contour line;
B) cloth hole and drilling: being poured in emptying aperture in excavated section subscript, and using emptying aperture as the center of circle, around emptying aperture arrangement multi-turn expansion Hole;Boring work is completed using drilling device;
C) guard aperture: after drilling, clearing up inside emptying aperture and expansion hole and periphery landwaste, and by the opening of emptying aperture and expansion hole It blocks, landwaste is avoided to fall into;
D) powder charge: along expansion hole radial direction, successively loading combustion adjuvant, electrolyte solution and swelling agent by layer from inside to outside, and with sticking Soil blocks expansion hole opening closely knit;Wherein, ignition is enclosed in combustion adjuvant;Ignition is connected with its opening and closing Remote controler;
E) warning and broken rock: checking tunnel near zone before broken rock comprehensively, withdraw all personnel near tunnel with Equipment;And ignition is opened using remote control device;
F) it discharges fume and removes the gred: in broken rock 5~after ten minutes, opening ventilation blower smoke evacuation;It discharges fume after half an hour, measures outlet air After up-to-standard, remove the gred;
G) supporting: being arranged supporting after the completion of slagging-off, with the gap of fine sand filling and support part;Place cleaning again, and recycle by Step driving.
2. the driving method of small bore rocky tunnel according to claim 1, it is characterised in that: the combustion adjuvant by Powder stick package;Electrolyte solution on the outside of powder stick is contained by film;Swelling agent on the outside of electrolyte solution is fitted into plastic housing.
3. the driving method of small bore rocky tunnel according to claim 2, it is characterised in that: the combustion adjuvant is aluminothermy Agent;Quiet swollen dose of the main component is calcium oxide.
4. the driving method of small bore rocky tunnel according to claim 1, it is characterised in that: the emptying aperture and expansion hole There is 1.5 °~3 ° of the elevation angle.
5. the driving method of small bore rocky tunnel according to claim 1, it is characterised in that: the diameter of the emptying aperture is The ㎜ of 180 ㎜~220;The diameter of the expansion hole is the ㎜ of 30 ㎜~50;The hole depth of emptying aperture and expansion hole is 1.5m~2.5m;It is each Pitch-row between molding hole is the ㎜ of 180 ㎜~220.
6. the driving method of small bore rocky tunnel according to claim 5, it is characterised in that: the expansion hole blocks Length is 20~30 times of aperture;Clay is layered using waddy and is consolidated by closure process, and clay thickness is the ㎝ of 5 ㎝~10.
7. the driving method of small bore rocky tunnel according to claim 1, it is characterised in that: in the boring procedure In, when residual hole occur or encountering rock cavity, adjustment bore position is closed on, the measure taking perforations adding plus boring.
8. the driving method of small bore rocky tunnel according to claim 6, it is characterised in that: the slagging-off work uses Semi-mechanization operation;Guideway transport vehicle is being set at 10 meters of hole;Debris is promoted using winch.
CN201910828344.4A 2019-09-03 2019-09-03 The driving method of small bore rocky tunnel Pending CN110469333A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910828344.4A CN110469333A (en) 2019-09-03 2019-09-03 The driving method of small bore rocky tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910828344.4A CN110469333A (en) 2019-09-03 2019-09-03 The driving method of small bore rocky tunnel

Publications (1)

Publication Number Publication Date
CN110469333A true CN110469333A (en) 2019-11-19

Family

ID=68514724

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910828344.4A Pending CN110469333A (en) 2019-09-03 2019-09-03 The driving method of small bore rocky tunnel

Country Status (1)

Country Link
CN (1) CN110469333A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111337644A (en) * 2019-12-31 2020-06-26 三峡大学 Tunnel step-by-step excavation simulation device and using method
CN113154979A (en) * 2021-04-22 2021-07-23 湖南军凯静爆科技有限公司 Static rock breaking construction method of large-inclination-angle wet drilling expanding agent

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020040950A (en) * 2000-11-25 2002-05-31 국천표,오의진 Tunnel pre-splitting blasting method
CN102032844A (en) * 2009-11-17 2011-04-27 广东爆破工程有限公司 Method for blasting closed rock of shield tunnel in complex strata
KR20120034328A (en) * 2010-10-01 2012-04-12 흥도이엔지 주식회사 Blast method for center hole of tunnel
CN104196537A (en) * 2014-08-26 2014-12-10 广东省建筑工程机械施工有限公司 Construction method of three parallel metro tunnels with ultra-small clear distance
CN104748632A (en) * 2015-04-03 2015-07-01 核工业井巷建设公司 Underwater rock plug blasting construction method
CN106524844A (en) * 2016-09-26 2017-03-22 中铁十六局集团北京轨道交通工程建设有限公司 Construction method for shield tunnel boulder exploration and blasting treatment
CN106565388A (en) * 2016-10-19 2017-04-19 安徽理工大学 Rock breaking grain and preparation method thereof
CN107324741A (en) * 2017-06-24 2017-11-07 常州市宝平不绣钢制品有限公司 A kind of static breaking agent and preparation method thereof
CN108374661A (en) * 2018-02-06 2018-08-07 浙江省隧道工程公司 A kind of middle pilot shaft shaft formatting by one blasting method

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20020040950A (en) * 2000-11-25 2002-05-31 국천표,오의진 Tunnel pre-splitting blasting method
CN102032844A (en) * 2009-11-17 2011-04-27 广东爆破工程有限公司 Method for blasting closed rock of shield tunnel in complex strata
KR20120034328A (en) * 2010-10-01 2012-04-12 흥도이엔지 주식회사 Blast method for center hole of tunnel
CN104196537A (en) * 2014-08-26 2014-12-10 广东省建筑工程机械施工有限公司 Construction method of three parallel metro tunnels with ultra-small clear distance
CN104748632A (en) * 2015-04-03 2015-07-01 核工业井巷建设公司 Underwater rock plug blasting construction method
CN106524844A (en) * 2016-09-26 2017-03-22 中铁十六局集团北京轨道交通工程建设有限公司 Construction method for shield tunnel boulder exploration and blasting treatment
CN106565388A (en) * 2016-10-19 2017-04-19 安徽理工大学 Rock breaking grain and preparation method thereof
CN107324741A (en) * 2017-06-24 2017-11-07 常州市宝平不绣钢制品有限公司 A kind of static breaking agent and preparation method thereof
CN108374661A (en) * 2018-02-06 2018-08-07 浙江省隧道工程公司 A kind of middle pilot shaft shaft formatting by one blasting method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111337644A (en) * 2019-12-31 2020-06-26 三峡大学 Tunnel step-by-step excavation simulation device and using method
CN113154979A (en) * 2021-04-22 2021-07-23 湖南军凯静爆科技有限公司 Static rock breaking construction method of large-inclination-angle wet drilling expanding agent

Similar Documents

Publication Publication Date Title
CN102032844B (en) Method for blasting closed rock of shield tunnel in complex strata
CN109208737A (en) A kind of down-stream pipeline changes move in new pipe is plugged into and former pipe blocks construction method
CN110513114A (en) A kind of shield-tunneling construction passes through the construction of high-strength boulder group
CN102425425B (en) Working face reinforcing structure in shield machine cabin as well as construction method and equipment thereof
CN110469333A (en) The driving method of small bore rocky tunnel
CN102518470B (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN108331573A (en) The abandoned well administering method of bank
CN102536250A (en) Construction method for tunnels with karst and gas simultaneously
CN101672197A (en) Processing method for high-pressure water-enriched filling karst cavity
CN111734420B (en) Water-rich stratum shield underwater receiving method provided with tunnel portal mortar retaining wall
CN110118084B (en) Ultra-deep shaft construction method
CN111997639B (en) Method for getting rid of trouble and reinforcing and improving geology of TBM construction tunnel bad geology section card machine
CN103510572A (en) Construction method of water getting vertical shaft under complex geological condition
JPH073769A (en) Method and device for constructing omnidirectional foundation ground improving body
CN110374617A (en) A kind of Shield Method Tunnel for Metro Tunnel Passing construction prestressed cable method
CN103527205A (en) Shield underwater oblique crossing hole entering construction method
JP6357017B2 (en) Sewer pipe crushing method and sewer pipe removal method
JP2751636B2 (en) Tunnel construction method and underground space construction method
CN103527202A (en) Method for constructing tunnel under complicated geological conditions
CN109630130A (en) A kind of tunnel active preventing control method based on constructing pilot tunnel
CN205618170U (en) Protective structure of no template punishment rock mass cavity in tunnel engineering
CN113684838A (en) Grooving construction method for rock-socketed ultra-deep underground diaphragm wall
CN106052494B (en) The blasthole method to set up of flood mine working driving and blasting method
JP2016205110A (en) Recovery method of shield machine
JPWO2020193960A5 (en)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191119