RU2037604C1 - Method to reinforce building, construction foundation - Google Patents
Method to reinforce building, construction foundation Download PDFInfo
- Publication number
- RU2037604C1 RU2037604C1 SU5014289A RU2037604C1 RU 2037604 C1 RU2037604 C1 RU 2037604C1 SU 5014289 A SU5014289 A SU 5014289A RU 2037604 C1 RU2037604 C1 RU 2037604C1
- Authority
- RU
- Russia
- Prior art keywords
- foundation
- jack
- piles
- plate
- wall
- Prior art date
Links
Images
Landscapes
- Foundations (AREA)
- Piles And Underground Anchors (AREA)
Abstract
Description
Изобретение относится к строительству и может быть использовано при устройстве и усилении фундаментов в сложных инженерно-геологических условиях, предрасположенных к проявлению отказа оснований под воздействием антропогенного фактора. The invention relates to construction and can be used in the construction and strengthening of foundations in difficult engineering and geological conditions, predisposed to the manifestation of base failure under the influence of an anthropogenic factor.
Известен способ усиления фундамента, состоящего из полой сваи, включающий образование в полости грунтовой пробки и втрамбовывание ее до создания напряжений в грунте, превышающих предел прочности стенки. A known method of strengthening the foundation, consisting of a hollow pile, including the formation in the cavity of the soil plug and ramming it to create stresses in the soil, exceeding the ultimate strength of the wall.
Недостаток известного способа невозможность использования для усиления фундаментов существующих зданий. The disadvantage of this method is the inability to use to strengthen the foundations of existing buildings.
Наиболее близким по технической сущности и достигаемому эффекту к изобретению является способ усиления существующего фундамента сваями "Мега", включающий образование полости в фундаментной стене и долбление через нее сквозного отверстия в фундаментной плите, крепление распределительного элемента к фундаментной стене, установку и крепление домкрата к распределительному элементу, подведение секций сваи и погружение ее через отверстие в плите до заданного сопротивления, установку и заклинивание стальными пластинами подпорок между сваей и распределительным элементом. The closest in technical essence and the achieved effect to the invention is a method of reinforcing the existing foundation with Mega piles, including the formation of a cavity in the foundation wall and hollowing through it through holes in the foundation plate, attaching the distribution element to the foundation wall, installing and attaching the jack to the distribution element , bringing the sections of the pile and immersing it through the hole in the plate to the specified resistance, installing and jamming the steel supports between the joints with steel plates her and the distribution element.
Однако этот способ трудоемок из-за необходимости пробивки отверстий в стене и плите фундамента и обеспечения вертикального погружения сваи, требующего укладку выравнивающего слоя раствора, под распределительный элемент. However, this method is time-consuming due to the need to punch holes in the wall and foundation plate and to provide vertical immersion of the pile, requiring laying the leveling layer of the solution, under the distribution element.
Задача изобретения снижение трудоемкости усиления фундамента сооружения сваями "Мега". The objective of the invention is the reduction of the complexity of reinforcing the foundation of the structure with Mega piles.
Эта задача решается тем, что способ усиления фундамента здания, сооружения включает секционное задавливание свай через образованные в плите фундамента отверстия до заданного сопротивления посредством домкрата, предварительно установлено в пробитой в стене нише, демонтаж домкрата и закрепление последней секции свай в плите фундамента. This problem is solved in that the method of strengthening the foundation of a building, structure includes sectional crushing of piles through holes formed in the foundation plate to the specified resistance by means of a jack, previously installed in a niche punched in the wall, dismantling the jack and fixing the last section of piles in the foundation plate.
Для усиления используют фундаментные плиты, отверстия в которых образованы при их изготовлении, а в местах пробивки ниши в стенах при их сооружении устанавливают вкладыши или заполняют их малопрочным материалом с последующим соответственно изъятием или разрушением, при этом домкрат крепят при задавливании посредством тяг к монтажным петлям фундаментной плиты, связанным при ее изготовлении с рабочей арматурой последней. For reinforcement, foundation slabs are used, the holes in which are formed during their manufacture, and in the places where the niches are punched, liners are installed in the walls during their construction, or they are filled with low-strength material, followed by removal or destruction, respectively, while the jack is fixed when crushed by rods to the foundation mounting loops slabs connected in its manufacture with the working reinforcement of the latter.
Выполнение фундаментной плиты с отверстием, поперечные размеры которого превышают поперечные размеры сваи, позволяет снизить трудоемкость усиления фундамента, а выполнение отверстия в центре плиты и установка монтажных петель соосно центральной оси симметрии отверстия, связанных с рабочей арматурой плиты, позволяют крепить домкрат к монтажным петлям и передавать усилие вдавливания через плиту к несущим стенам, т.е. использовать плиту в качестве распределительного элемента. The implementation of the foundation plate with a hole whose transverse dimensions exceed the transverse dimensions of the piles reduces the laboriousness of strengthening the foundation, and making the hole in the center of the plate and installing mounting loops coaxially with the axis of symmetry of the hole associated with the plate working reinforcement allows the jack to be fastened to the mounting loops and transfer indentation force through the plate to the supporting walls, i.e. use the plate as a distribution element.
Выполнение ниши в нижней части стены, примыкающей к отверстию фундаментной плиты, и заполнение ее вкладышем или малопрочным материалом во время строительства позволяют легко и быстро извлечь их при необходимости и вставить в образовавшуюся полость домкрат, необходимые приспособления и секцию сваи, что также обеспечивает снижение трудоемкости усиления фундамента. The implementation of a niche in the lower part of the wall adjacent to the opening of the foundation plate, and filling it with a liner or low-strength material during construction, makes it possible to quickly and easily remove them if necessary and insert jacks, necessary devices and pile section into the cavity, which also reduces the complexity of reinforcement foundation.
Изобретение поясняется фиг.1 и 2, иллюстрирующими способ усиления фундамента. The invention is illustrated in figures 1 and 2, illustrating a method of strengthening the foundation.
Усиление фундамента производят следующим образом. Strengthening the foundation is as follows.
Усилению подлежат фундаменты как сборного, так и монолитного исполнения. The foundations of both prefabricated and monolithic execution are subject to reinforcement.
Перед устройством сборного фундамента здания или сооружения в сложных инженерно-геологических условиях (карстоопасные, лессовые и т.п. грунты), когда есть вероятность недопустимо больших неравномерных осадок, изготавливают специальные фундаментные плиты 1 со сквозным центральным отверстием 2 и монтажными петлями 3, размещенными соосно центральной оси симметрии отверстия и связанными с рабочей арматурой фундаментной плиты. Укладку фундаментной стены 4 производят из железобетонных блоков так, чтобы над отверстием 2 фундаментной плиты 1 нижнюю часть стены 4 заполнить малопрочным материалом 5. Before installing the prefabricated foundation of a building or structure in difficult engineering and geological conditions (karst, loess, etc. soils), when there is a possibility of unacceptably large uneven deposits,
При устройстве монолитного фундамента перед его бетонированием в необходимом месте (по длине согласно проекту, по ширине фундамента вдоль оси симметрии) устанавливают вкладыши для образования ниш, а монтажные петли (для тяг) раскрепляют к рабочей арматуре фундаментной плиты соосно центральной оси симметрии отверстий. Перед бетонированием монолитной фундаментной стены вкладыши (размером, достаточным для установки домкрата и одной секции сваи) размещают над отверстием и затем после набора прочности фундаментной стены образовавшуюся нишу заполняют малопрочным материалом. When installing a monolithic foundation before concreting it in the required place (according to the design, along the width of the foundation along the axis of symmetry), inserts are installed for the formation of niches, and mounting loops (for rods) are fastened to the working reinforcement of the foundation plate coaxially with the central axis of symmetry of the holes. Before concreting the monolithic foundation wall, the liners (the size is sufficient to install the jack and one section of the pile) are placed above the hole and then, after the foundation wall has gained strength, the formed niche is filled with low-strength material.
При недопустимо больших оcадках здания из нижней части фундаментной стены 4 извлекают малопрочный материал 5, в отверстие 2 фундаментной плиты 1 вводят секцию сваи 6, а к монтажным петлям 3 посредством тяг 7 крепят домкрат 8. With unacceptably large building slumps, low-
Вдавливание свай "Мега" производят по известной технологии до заданного сопротивления, при этом затирания свай о боковую поверхность отверстия 2 не происходит, т.к. монтажные петли 3 размещены симметрично относительно него. При достижении заданного сопротивления усилия вдавливания сваю 6 закрепляют в отверстии 2 инвентарными клиньями 9, забивая их в полость, образованную между боковой поверхностью сваи и отверстием плиты. The Mega piles are pressed in according to the known technology to a predetermined resistance, while the piles are not rubbed against the side surface of the
Домкрат снимают, полость в нижней части фундаментной стены заполняют, фундамент готов к работе. Работа фундамента заключается в том, что при незначительных осадках сваи "Мега" нагрузка перераспределяется на существующий фундамент и они работаю вместе, осадки резко снижаются. The jack is removed, the cavity in the lower part of the foundation wall is filled, the foundation is ready for operation. The work of the foundation is that with minor precipitation of the Mega pile, the load is redistributed to the existing foundation and they work together, precipitation decreases sharply.
Применение предложенного способа усиления фундамента здания, сооружения в сложных инженерно-геологических условиях позволит снизить трудозатраты усиления фундамента за счет его предварительной подготовки в 3-5 раз, а кроме того, увеличить несущую способность фундамента на 20-40% за счет совместной работы сваи "Мега" и существующего фундамента и повысить качество и культуру производства работ. Application of the proposed method for strengthening the foundation of a building, structure in difficult engineering and geological conditions will reduce the labor costs of strengthening the foundation due to its preliminary preparation by 3-5 times, and in addition, increase the bearing capacity of the foundation by 20-40% due to the joint work of the Mega pile "and the existing foundation and improve the quality and culture of work.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU5014289 RU2037604C1 (en) | 1991-09-25 | 1991-09-25 | Method to reinforce building, construction foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU5014289 RU2037604C1 (en) | 1991-09-25 | 1991-09-25 | Method to reinforce building, construction foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
RU2037604C1 true RU2037604C1 (en) | 1995-06-19 |
Family
ID=21590416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU5014289 RU2037604C1 (en) | 1991-09-25 | 1991-09-25 | Method to reinforce building, construction foundation |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2037604C1 (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2472900C1 (en) * | 2011-07-29 | 2013-01-20 | Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" | Method of strip footing reinforcement |
RU2581853C1 (en) * | 2015-03-11 | 2016-04-20 | Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" | Method for construction of pile foundation |
RU2633619C1 (en) * | 2016-07-06 | 2017-10-16 | Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" | Method of strengthening foundation at reconstruction |
RU2667163C2 (en) * | 2015-12-30 | 2018-09-17 | Федеральное государственное бюджетное учреждение науки Институт прикладной механики Российской академии наук (ИПРИМ РАН) | Combined (pile-slab, pile-belt, pile-columnar) foundation erection method |
RU2691799C1 (en) * | 2018-02-12 | 2019-06-18 | Виктор Дмитриевич Ирхин | Keyboard flat foundation |
RU201613U1 (en) * | 2020-06-05 | 2020-12-23 | Юрий Павлович Стриганов | DEVICE FOR STRENGTHENING THE FOUNDATIONS OF EXISTING BUILDINGS |
-
1991
- 1991-09-25 RU SU5014289 patent/RU2037604C1/en active
Non-Patent Citations (2)
Title |
---|
Авторское свидетельство СССР N 1506027, кл. E 02D 27/08, 1987. * |
Ганичев Н.А. Устройство искусственных оснований и фундаментов. М.: Стройиздат, 1981, с.225, рис.3.17. * |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2472900C1 (en) * | 2011-07-29 | 2013-01-20 | Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" | Method of strip footing reinforcement |
RU2581853C1 (en) * | 2015-03-11 | 2016-04-20 | Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" | Method for construction of pile foundation |
RU2667163C2 (en) * | 2015-12-30 | 2018-09-17 | Федеральное государственное бюджетное учреждение науки Институт прикладной механики Российской академии наук (ИПРИМ РАН) | Combined (pile-slab, pile-belt, pile-columnar) foundation erection method |
RU2633619C1 (en) * | 2016-07-06 | 2017-10-16 | Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" | Method of strengthening foundation at reconstruction |
RU2691799C1 (en) * | 2018-02-12 | 2019-06-18 | Виктор Дмитриевич Ирхин | Keyboard flat foundation |
RU201613U1 (en) * | 2020-06-05 | 2020-12-23 | Юрий Павлович Стриганов | DEVICE FOR STRENGTHENING THE FOUNDATIONS OF EXISTING BUILDINGS |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US6503025B1 (en) | Precast concrete beam element and methods of making and installing same | |
US3184893A (en) | Contact foundation method | |
US4353194A (en) | Method of straightening and reinforcing structural members | |
RU2037604C1 (en) | Method to reinforce building, construction foundation | |
KR20080025219A (en) | Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall | |
KR20060117746A (en) | A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof | |
JP3760304B2 (en) | Building foundation construction method | |
US20030131544A1 (en) | Precast concrete beam element and methods of making and installing same | |
KR100562686B1 (en) | The underground structure and it's construction method is using sheet pile and cast in a place concrete | |
US6394703B1 (en) | Formation of capping beams for piles | |
KR100397958B1 (en) | The structure timbering of cut with separating wale and the construction method thereof | |
KR960016755B1 (en) | Working method and working apparatus of underground structure | |
JPS63280153A (en) | Underground inverted lining method | |
CN218933149U (en) | SMW construction method pile structure | |
JP4159148B2 (en) | Construction method of shaft | |
KR101256311B1 (en) | Structual deepening method | |
JP4479099B2 (en) | Building foundation construction method | |
CN219175269U (en) | Inner support supporting structure fused with main body frame | |
JP3281554B2 (en) | How to rebuild underground structures | |
JP2838019B2 (en) | Caisson blade framing method | |
JP2506978Y2 (en) | Synthetic retaining wall | |
US20030084630A1 (en) | Perimeter walls | |
SU1518455A1 (en) | Prefabricated foundation mat of pile foundation | |
WO2021069939A1 (en) | Piling method | |
RU2646267C1 (en) | Precast pile with widening |