RU2037604C1 - Method to reinforce building, construction foundation - Google Patents

Method to reinforce building, construction foundation Download PDF

Info

Publication number
RU2037604C1
RU2037604C1 SU5014289A RU2037604C1 RU 2037604 C1 RU2037604 C1 RU 2037604C1 SU 5014289 A SU5014289 A SU 5014289A RU 2037604 C1 RU2037604 C1 RU 2037604C1
Authority
RU
Russia
Prior art keywords
foundation
jack
piles
plate
wall
Prior art date
Application number
Other languages
Russian (ru)
Inventor
Э.И. Мулюков
И.П. Полишко
Original Assignee
Уфимский научно-исследовательский и конструкторский институт промышленного строительства
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Уфимский научно-исследовательский и конструкторский институт промышленного строительства filed Critical Уфимский научно-исследовательский и конструкторский институт промышленного строительства
Priority to SU5014289 priority Critical patent/RU2037604C1/en
Application granted granted Critical
Publication of RU2037604C1 publication Critical patent/RU2037604C1/en

Links

Images

Landscapes

  • Foundations (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

FIELD: civil engineering. SUBSTANCE: method to reinforce construction, building foundation includes sectional caving in piles through openings in the center of foundation plate. The piles are jacked in up to a proper value of soil resistance. The jack is installed in a niche pierced in wall. Insertion pieces are installed in walls where niches are located, or niches are filled with material of low strength with further withdrawal of the material when the foundation is being built. The jack is fixed through tie- rods to assembly hinges of foundation plate. Then the last section of a pile is fixed to foundation plate, and the jack is dismantled. EFFECT: high productivity. 2 dwg

Description

Изобретение относится к строительству и может быть использовано при устройстве и усилении фундаментов в сложных инженерно-геологических условиях, предрасположенных к проявлению отказа оснований под воздействием антропогенного фактора. The invention relates to construction and can be used in the construction and strengthening of foundations in difficult engineering and geological conditions, predisposed to the manifestation of base failure under the influence of an anthropogenic factor.

Известен способ усиления фундамента, состоящего из полой сваи, включающий образование в полости грунтовой пробки и втрамбовывание ее до создания напряжений в грунте, превышающих предел прочности стенки. A known method of strengthening the foundation, consisting of a hollow pile, including the formation in the cavity of the soil plug and ramming it to create stresses in the soil, exceeding the ultimate strength of the wall.

Недостаток известного способа невозможность использования для усиления фундаментов существующих зданий. The disadvantage of this method is the inability to use to strengthen the foundations of existing buildings.

Наиболее близким по технической сущности и достигаемому эффекту к изобретению является способ усиления существующего фундамента сваями "Мега", включающий образование полости в фундаментной стене и долбление через нее сквозного отверстия в фундаментной плите, крепление распределительного элемента к фундаментной стене, установку и крепление домкрата к распределительному элементу, подведение секций сваи и погружение ее через отверстие в плите до заданного сопротивления, установку и заклинивание стальными пластинами подпорок между сваей и распределительным элементом. The closest in technical essence and the achieved effect to the invention is a method of reinforcing the existing foundation with Mega piles, including the formation of a cavity in the foundation wall and hollowing through it through holes in the foundation plate, attaching the distribution element to the foundation wall, installing and attaching the jack to the distribution element , bringing the sections of the pile and immersing it through the hole in the plate to the specified resistance, installing and jamming the steel supports between the joints with steel plates her and the distribution element.

Однако этот способ трудоемок из-за необходимости пробивки отверстий в стене и плите фундамента и обеспечения вертикального погружения сваи, требующего укладку выравнивающего слоя раствора, под распределительный элемент. However, this method is time-consuming due to the need to punch holes in the wall and foundation plate and to provide vertical immersion of the pile, requiring laying the leveling layer of the solution, under the distribution element.

Задача изобретения снижение трудоемкости усиления фундамента сооружения сваями "Мега". The objective of the invention is the reduction of the complexity of reinforcing the foundation of the structure with Mega piles.

Эта задача решается тем, что способ усиления фундамента здания, сооружения включает секционное задавливание свай через образованные в плите фундамента отверстия до заданного сопротивления посредством домкрата, предварительно установлено в пробитой в стене нише, демонтаж домкрата и закрепление последней секции свай в плите фундамента. This problem is solved in that the method of strengthening the foundation of a building, structure includes sectional crushing of piles through holes formed in the foundation plate to the specified resistance by means of a jack, previously installed in a niche punched in the wall, dismantling the jack and fixing the last section of piles in the foundation plate.

Для усиления используют фундаментные плиты, отверстия в которых образованы при их изготовлении, а в местах пробивки ниши в стенах при их сооружении устанавливают вкладыши или заполняют их малопрочным материалом с последующим соответственно изъятием или разрушением, при этом домкрат крепят при задавливании посредством тяг к монтажным петлям фундаментной плиты, связанным при ее изготовлении с рабочей арматурой последней. For reinforcement, foundation slabs are used, the holes in which are formed during their manufacture, and in the places where the niches are punched, liners are installed in the walls during their construction, or they are filled with low-strength material, followed by removal or destruction, respectively, while the jack is fixed when crushed by rods to the foundation mounting loops slabs connected in its manufacture with the working reinforcement of the latter.

Выполнение фундаментной плиты с отверстием, поперечные размеры которого превышают поперечные размеры сваи, позволяет снизить трудоемкость усиления фундамента, а выполнение отверстия в центре плиты и установка монтажных петель соосно центральной оси симметрии отверстия, связанных с рабочей арматурой плиты, позволяют крепить домкрат к монтажным петлям и передавать усилие вдавливания через плиту к несущим стенам, т.е. использовать плиту в качестве распределительного элемента. The implementation of the foundation plate with a hole whose transverse dimensions exceed the transverse dimensions of the piles reduces the laboriousness of strengthening the foundation, and making the hole in the center of the plate and installing mounting loops coaxially with the axis of symmetry of the hole associated with the plate working reinforcement allows the jack to be fastened to the mounting loops and transfer indentation force through the plate to the supporting walls, i.e. use the plate as a distribution element.

Выполнение ниши в нижней части стены, примыкающей к отверстию фундаментной плиты, и заполнение ее вкладышем или малопрочным материалом во время строительства позволяют легко и быстро извлечь их при необходимости и вставить в образовавшуюся полость домкрат, необходимые приспособления и секцию сваи, что также обеспечивает снижение трудоемкости усиления фундамента. The implementation of a niche in the lower part of the wall adjacent to the opening of the foundation plate, and filling it with a liner or low-strength material during construction, makes it possible to quickly and easily remove them if necessary and insert jacks, necessary devices and pile section into the cavity, which also reduces the complexity of reinforcement foundation.

Изобретение поясняется фиг.1 и 2, иллюстрирующими способ усиления фундамента. The invention is illustrated in figures 1 and 2, illustrating a method of strengthening the foundation.

Усиление фундамента производят следующим образом. Strengthening the foundation is as follows.

Усилению подлежат фундаменты как сборного, так и монолитного исполнения. The foundations of both prefabricated and monolithic execution are subject to reinforcement.

Перед устройством сборного фундамента здания или сооружения в сложных инженерно-геологических условиях (карстоопасные, лессовые и т.п. грунты), когда есть вероятность недопустимо больших неравномерных осадок, изготавливают специальные фундаментные плиты 1 со сквозным центральным отверстием 2 и монтажными петлями 3, размещенными соосно центральной оси симметрии отверстия и связанными с рабочей арматурой фундаментной плиты. Укладку фундаментной стены 4 производят из железобетонных блоков так, чтобы над отверстием 2 фундаментной плиты 1 нижнюю часть стены 4 заполнить малопрочным материалом 5. Before installing the prefabricated foundation of a building or structure in difficult engineering and geological conditions (karst, loess, etc. soils), when there is a possibility of unacceptably large uneven deposits, special foundation plates 1 are made with a through central hole 2 and mounting loops 3 placed coaxially the central axis of symmetry of the hole and associated with the working reinforcement of the base plate. Laying the foundation wall 4 is made of reinforced concrete blocks so that over the hole 2 of the foundation plate 1 the lower part of the wall 4 is filled with low-strength material 5.

При устройстве монолитного фундамента перед его бетонированием в необходимом месте (по длине согласно проекту, по ширине фундамента вдоль оси симметрии) устанавливают вкладыши для образования ниш, а монтажные петли (для тяг) раскрепляют к рабочей арматуре фундаментной плиты соосно центральной оси симметрии отверстий. Перед бетонированием монолитной фундаментной стены вкладыши (размером, достаточным для установки домкрата и одной секции сваи) размещают над отверстием и затем после набора прочности фундаментной стены образовавшуюся нишу заполняют малопрочным материалом. When installing a monolithic foundation before concreting it in the required place (according to the design, along the width of the foundation along the axis of symmetry), inserts are installed for the formation of niches, and mounting loops (for rods) are fastened to the working reinforcement of the foundation plate coaxially with the central axis of symmetry of the holes. Before concreting the monolithic foundation wall, the liners (the size is sufficient to install the jack and one section of the pile) are placed above the hole and then, after the foundation wall has gained strength, the formed niche is filled with low-strength material.

При недопустимо больших оcадках здания из нижней части фундаментной стены 4 извлекают малопрочный материал 5, в отверстие 2 фундаментной плиты 1 вводят секцию сваи 6, а к монтажным петлям 3 посредством тяг 7 крепят домкрат 8. With unacceptably large building slumps, low-strength material 5 is removed from the bottom of the foundation wall 4, a pile section 6 is introduced into the opening 2 of the foundation plate 1, and a jack 8 is attached to the mounting loops 3 by means of rods 7.

Вдавливание свай "Мега" производят по известной технологии до заданного сопротивления, при этом затирания свай о боковую поверхность отверстия 2 не происходит, т.к. монтажные петли 3 размещены симметрично относительно него. При достижении заданного сопротивления усилия вдавливания сваю 6 закрепляют в отверстии 2 инвентарными клиньями 9, забивая их в полость, образованную между боковой поверхностью сваи и отверстием плиты. The Mega piles are pressed in according to the known technology to a predetermined resistance, while the piles are not rubbed against the side surface of the hole 2, because mounting loops 3 are placed symmetrically relative to it. Upon reaching the specified resistance, the indentation efforts of the pile 6 are fixed in the hole 2 with inventory wedges 9, driving them into the cavity formed between the side surface of the pile and the hole of the plate.

Домкрат снимают, полость в нижней части фундаментной стены заполняют, фундамент готов к работе. Работа фундамента заключается в том, что при незначительных осадках сваи "Мега" нагрузка перераспределяется на существующий фундамент и они работаю вместе, осадки резко снижаются. The jack is removed, the cavity in the lower part of the foundation wall is filled, the foundation is ready for operation. The work of the foundation is that with minor precipitation of the Mega pile, the load is redistributed to the existing foundation and they work together, precipitation decreases sharply.

Применение предложенного способа усиления фундамента здания, сооружения в сложных инженерно-геологических условиях позволит снизить трудозатраты усиления фундамента за счет его предварительной подготовки в 3-5 раз, а кроме того, увеличить несущую способность фундамента на 20-40% за счет совместной работы сваи "Мега" и существующего фундамента и повысить качество и культуру производства работ. Application of the proposed method for strengthening the foundation of a building, structure in difficult engineering and geological conditions will reduce the labor costs of strengthening the foundation due to its preliminary preparation by 3-5 times, and in addition, increase the bearing capacity of the foundation by 20-40% due to the joint work of the Mega pile "and the existing foundation and improve the quality and culture of work.

Claims (1)

СПОСОБ УСИЛЕНИЯ ФУНДАМЕНТА ЗДАНИЯ, СООРУЖЕНИЯ, включающий секционное вдавливание свай через образованные в плите фундамента отверстия до заданного сопротивления грунта посредством домкрата, предварительно установленного в пробитой в стене предусмотренной нише, демонтаж домкрата и закрепление последней секции свай в плите фундамента, отличающийся тем, что для усиления используют плиты, образование отверстий в которых осуществляют в ее центре при изготовлении, а в местах пробивки ниш в стенах фундамента при его строительстве устанавливают вкладыши или заполняют малопрочным материалом с последующим их соответственно извлечением или разрушением, причем при вдавливании домкрат фиксируют посредством тяг к монтажным петлям фундаментной плиты, которые связывают при изготовлении последней с ее рабочей арматурой. METHOD FOR STRENGTHENING THE BUILDING FOUNDATION, STRUCTURES, including sectional pressing of piles through holes formed in the foundation plate to the specified soil resistance by means of a jack previously installed in the provided niche punched in the wall, dismantling the jack and securing the last section of piles in the foundation plate, characterized in that for reinforcing use plates, the formation of holes in which is carried out in its center during manufacture, and in places of punching niches in the walls of the foundation during its construction vayut inserts or filled with low-strength material, followed by removing them respectively or destruction, wherein the indentation jack rods are fixed by hinges to the mounting foundation slab that bind in the manufacture of the latter with its working reinforcement.
SU5014289 1991-09-25 1991-09-25 Method to reinforce building, construction foundation RU2037604C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU5014289 RU2037604C1 (en) 1991-09-25 1991-09-25 Method to reinforce building, construction foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU5014289 RU2037604C1 (en) 1991-09-25 1991-09-25 Method to reinforce building, construction foundation

Publications (1)

Publication Number Publication Date
RU2037604C1 true RU2037604C1 (en) 1995-06-19

Family

ID=21590416

Family Applications (1)

Application Number Title Priority Date Filing Date
SU5014289 RU2037604C1 (en) 1991-09-25 1991-09-25 Method to reinforce building, construction foundation

Country Status (1)

Country Link
RU (1) RU2037604C1 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2472900C1 (en) * 2011-07-29 2013-01-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method of strip footing reinforcement
RU2581853C1 (en) * 2015-03-11 2016-04-20 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method for construction of pile foundation
RU2633619C1 (en) * 2016-07-06 2017-10-16 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method of strengthening foundation at reconstruction
RU2667163C2 (en) * 2015-12-30 2018-09-17 Федеральное государственное бюджетное учреждение науки Институт прикладной механики Российской академии наук (ИПРИМ РАН) Combined (pile-slab, pile-belt, pile-columnar) foundation erection method
RU2691799C1 (en) * 2018-02-12 2019-06-18 Виктор Дмитриевич Ирхин Keyboard flat foundation
RU201613U1 (en) * 2020-06-05 2020-12-23 Юрий Павлович Стриганов DEVICE FOR STRENGTHENING THE FOUNDATIONS OF EXISTING BUILDINGS

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР N 1506027, кл. E 02D 27/08, 1987. *
Ганичев Н.А. Устройство искусственных оснований и фундаментов. М.: Стройиздат, 1981, с.225, рис.3.17. *

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2472900C1 (en) * 2011-07-29 2013-01-20 Федеральное Государственное Автономное Образовательное Учреждение Высшего Профессионального Образования "Сибирский Федеральный Университет" Method of strip footing reinforcement
RU2581853C1 (en) * 2015-03-11 2016-04-20 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method for construction of pile foundation
RU2667163C2 (en) * 2015-12-30 2018-09-17 Федеральное государственное бюджетное учреждение науки Институт прикладной механики Российской академии наук (ИПРИМ РАН) Combined (pile-slab, pile-belt, pile-columnar) foundation erection method
RU2633619C1 (en) * 2016-07-06 2017-10-16 Федеральное государственное автономное образовательное учреждение высшего образования "Сибирский федеральный университет" Method of strengthening foundation at reconstruction
RU2691799C1 (en) * 2018-02-12 2019-06-18 Виктор Дмитриевич Ирхин Keyboard flat foundation
RU201613U1 (en) * 2020-06-05 2020-12-23 Юрий Павлович Стриганов DEVICE FOR STRENGTHENING THE FOUNDATIONS OF EXISTING BUILDINGS

Similar Documents

Publication Publication Date Title
US6503025B1 (en) Precast concrete beam element and methods of making and installing same
US3184893A (en) Contact foundation method
US4353194A (en) Method of straightening and reinforcing structural members
RU2037604C1 (en) Method to reinforce building, construction foundation
KR20080025219A (en) Underground outer wall construction method using deck-plate and deck-plate for constructing underground outer wall
KR20060117746A (en) A pc girder member for frame of underground layer and assembling structure of frame of underground by using of it and the method therof
JP3760304B2 (en) Building foundation construction method
US20030131544A1 (en) Precast concrete beam element and methods of making and installing same
KR100562686B1 (en) The underground structure and it's construction method is using sheet pile and cast in a place concrete
US6394703B1 (en) Formation of capping beams for piles
KR100397958B1 (en) The structure timbering of cut with separating wale and the construction method thereof
KR960016755B1 (en) Working method and working apparatus of underground structure
JPS63280153A (en) Underground inverted lining method
CN218933149U (en) SMW construction method pile structure
JP4159148B2 (en) Construction method of shaft
KR101256311B1 (en) Structual deepening method
JP4479099B2 (en) Building foundation construction method
CN219175269U (en) Inner support supporting structure fused with main body frame
JP3281554B2 (en) How to rebuild underground structures
JP2838019B2 (en) Caisson blade framing method
JP2506978Y2 (en) Synthetic retaining wall
US20030084630A1 (en) Perimeter walls
SU1518455A1 (en) Prefabricated foundation mat of pile foundation
WO2021069939A1 (en) Piling method
RU2646267C1 (en) Precast pile with widening