RU2018115508A - The method of reclamation of disturbed lands - Google Patents

The method of reclamation of disturbed lands Download PDF

Info

Publication number
RU2018115508A
RU2018115508A RU2018115508A RU2018115508A RU2018115508A RU 2018115508 A RU2018115508 A RU 2018115508A RU 2018115508 A RU2018115508 A RU 2018115508A RU 2018115508 A RU2018115508 A RU 2018115508A RU 2018115508 A RU2018115508 A RU 2018115508A
Authority
RU
Russia
Prior art keywords
layer
quarry
soil
thickness
sand
Prior art date
Application number
RU2018115508A
Other languages
Russian (ru)
Other versions
RU2018115508A3 (en
RU2715768C2 (en
Inventor
Олег Валентинович Болдырев
Василий Васильевич Мухортов
Геннадий Сергеевич Морозов
Сергей Николаевич Попов
Original Assignee
Общество с ограниченной ответственностью "Экостройресурс", ООО "Экостройресурс"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество с ограниченной ответственностью "Экостройресурс", ООО "Экостройресурс" filed Critical Общество с ограниченной ответственностью "Экостройресурс", ООО "Экостройресурс"
Priority to RU2018115508A priority Critical patent/RU2715768C2/en
Publication of RU2018115508A3 publication Critical patent/RU2018115508A3/ru
Publication of RU2018115508A publication Critical patent/RU2018115508A/en
Application granted granted Critical
Publication of RU2715768C2 publication Critical patent/RU2715768C2/en

Links

Classifications

    • AHUMAN NECESSITIES
    • A01AGRICULTURE; FORESTRY; ANIMAL HUSBANDRY; HUNTING; TRAPPING; FISHING
    • A01BSOIL WORKING IN AGRICULTURE OR FORESTRY; PARTS, DETAILS, OR ACCESSORIES OF AGRICULTURAL MACHINES OR IMPLEMENTS, IN GENERAL
    • A01B79/00Methods for working soil
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21CMINING OR QUARRYING
    • E21C41/00Methods of underground or surface mining; Layouts therefor
    • E21C41/32Reclamation of surface-mined areas

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Remote Sensing (AREA)
  • Mechanical Engineering (AREA)
  • Soil Sciences (AREA)
  • Environmental Sciences (AREA)
  • Cultivation Of Plants (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Revetment (AREA)

Claims (1)

Способ рекультивации нарушенных земель, включающий раздельную выемку, перемещение и складирование в отдельные ленточные отвалы почвенного слоя и вскрышных пород, отработку карьерного поля, отличающийся тем, что после полной выработки карьерного поля вначале производят устройство обводненных карьеров для создания водоемов, для чего вначале производят выполаживание бортов карьера до крутизны склонов не более 12 градусов с последующим планированием и укреплением склонов карьера по всему его периметру посредством устройства ступенчатых террас различной ширины и длины, в виде площадок с незначительным уклоном в сторону склона карьера, на каждую из террас вначале укладывают слой вскрышных пород толщиной не менее 30 см и уплотняют его, а по нему отсыпают слой плодородной земли вместе с минеральными удобрениями и высевают семена многолетних трав, при этом каждую террасу по ее периметру обсаживают низкорослыми кустарниками и соединяют их между собой, начиная снизу вверх посредством укладки дорожек из камня на предварительно обустроенное основание из слоя утрамбованного дренирующего материала толщиной не менее 15 см и слоя песка толщиной не менее 7 см, причем сами дорожки укладывают так, чтобы каждая последующая дорожка была направлена в противоположную сторону от предыдущей, а береговую полосу водоема укрепляют с помощью слоя толщиной не менее 0,6 м из строительных отходов в виде битого обожженного кирпича, бетона, железобетона, керамической плитки с последующим уплотнением и укладкой песчано-гравийного слоя толщиной не менее 15 см, затем отсыпают песчаную полосу, кроме того, точечно, в местах соединения склона карьера и песчаной полосы высаживают деревья по всему периметру карьера, а свободные участки склонов карьера отсыпают слоем плодородной почвы с минеральными удобрениями и семенами многолетней травы, причем сухие, необводненные и неглубокие карьеры закладывают послойно вскрышными породами с уплотнением каждого слоя, затем отсыпают слой почвенной земли, выравнивают поверхность и засевают многолетними травами и высаживают деревья и кустарники.A method for reclamation of disturbed lands, including separate excavation, transfer and storage of soil layer and overburden into separate tape dumps, mining of a quarry field, characterized in that after the quarry field is fully developed, flooded quarries are first constructed to create reservoirs, for which the sides are flattened first. a quarry up to a steepness of the slopes of not more than 12 degrees with subsequent planning and strengthening of the slopes of the quarry along its entire perimeter by means of a step terraces of various widths and lengths, in the form of platforms with a slight slope towards the slope of the quarry, first lay a layer of overburden at least 30 cm thick on each of the terraces and compact it, and lay a layer of fertile soil along with mineral fertilizers on it and sow perennial seeds grass, with each terrace around its perimeter planted with undersized shrubs and connect them together, starting from the bottom up by laying tracks of stone on a pre-arranged base from a layer of rammed dr coating material with a thickness of at least 15 cm and a layer of sand with a thickness of at least 7 cm, and the paths themselves are laid so that each subsequent path is directed in the opposite direction from the previous one, and the coastal strip of the reservoir is strengthened with a layer of a thickness of at least 0.6 m from construction waste in the form of broken burnt bricks, concrete, reinforced concrete, ceramic tiles, followed by compaction and laying of a sand and gravel layer with a thickness of at least 15 cm, then pour a sand strip, in addition, pointwise, at the junction of the slope and the quarry and sand strip plant trees around the entire perimeter of the quarry, and free areas of the slopes of the quarry are covered with a layer of fertile soil with mineral fertilizers and seeds of perennial grass, and dry, non-irrigated and shallow quarries are layered by overburden with compaction of each layer, then a layer of soil soil is poured , level the surface and sow with perennial grasses and plant trees and shrubs.
RU2018115508A 2018-04-25 2018-04-25 Reclamation method of disturbed lands RU2715768C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2018115508A RU2715768C2 (en) 2018-04-25 2018-04-25 Reclamation method of disturbed lands

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2018115508A RU2715768C2 (en) 2018-04-25 2018-04-25 Reclamation method of disturbed lands

Publications (3)

Publication Number Publication Date
RU2018115508A3 RU2018115508A3 (en) 2019-10-25
RU2018115508A true RU2018115508A (en) 2019-10-25
RU2715768C2 RU2715768C2 (en) 2020-03-03

Family

ID=68342174

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2018115508A RU2715768C2 (en) 2018-04-25 2018-04-25 Reclamation method of disturbed lands

Country Status (1)

Country Link
RU (1) RU2715768C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112292957A (en) * 2020-10-30 2021-02-02 中国科学院地理科学与资源研究所 Method for repairing ammonia nitrogen and sulfate radical pollution of ionic storage yard

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2763561C1 (en) * 2021-06-30 2021-12-30 Владимир Васильевич Галайко Method for reclamation of the waste dump

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1062392A1 (en) * 1982-09-07 1983-12-23 Институт Горного Дела Ан Казсср Method of recultivation of open-cast mining
DE20302907U1 (en) * 2003-02-22 2003-05-08 eta AG, 03042 Cottbus Disused open cast mine flooding unit, comprises flooding or siphon pipe with large area distribution system at outlet region
RU2274750C1 (en) * 2005-04-15 2006-04-20 Общество с ограниченной ответственностью "Экостройресурс" Method for land reclamation in the case of land corruption by opened deposit development
RU2325534C1 (en) * 2007-06-06 2008-05-27 Общество с ограниченной ответственностью "Экостройресурс" Method for mined land reclamation
RU2442896C1 (en) * 2010-08-31 2012-02-20 Общество с ограниченной ответственностью "Экостройресурс" ООО "Экостройресурс" Method for reclamation of worked-out pits

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112292957A (en) * 2020-10-30 2021-02-02 中国科学院地理科学与资源研究所 Method for repairing ammonia nitrogen and sulfate radical pollution of ionic storage yard

Also Published As

Publication number Publication date
RU2018115508A3 (en) 2019-10-25
RU2715768C2 (en) 2020-03-03

Similar Documents

Publication Publication Date Title
CN106759104B (en) Ecological slope protection structure and construction method
CN103774679B (en) A kind of method of rock slope linked network
CN110512892B (en) Construction method for repairing existing ancient city wall
CN109594442B (en) Garden road construction process
RU2442896C1 (en) Method for reclamation of worked-out pits
Goodburn et al. Roman Britain in 1977
RU2374447C1 (en) Method for reclamation of disturbed lands
RU2018115508A (en) The method of reclamation of disturbed lands
Orchard et al. Third millennium oasis towns and environmental constraints on settlement in the Al-Hajar region Part I: The Al-Ḥajar Oasis Towns
RU2274750C1 (en) Method for land reclamation in the case of land corruption by opened deposit development
CN111630972B (en) Water and soil greening restoration and treatment method for mining area
CN211395577U (en) Ecological interlocking grass planting brick slope protection structure
CN211472454U (en) Structure is administered to soil crack
KR101525942B1 (en) Method for slope reinforcement construction using the ground improvement product
RU2325534C1 (en) Method for mined land reclamation
RU2016144492A (en) The method of restoring quarries for the construction of a cemetery
CN206418460U (en) Ecological slope protection structure
RU2448252C1 (en) Recovery method of mined-out pits for construction of cemetery-museum
RU2448251C1 (en) Recovery method of mined-out pits for construction of cemetery-museum
CN105908987A (en) Ecological reinforcement composite material used for historical site protection project and construction method thereof
RU2794684C1 (en) Eco-friendly rock dump
CN211210816U (en) Landscape district tree planting cultivation structure
Radder et al. Water harvesting procedures for dryland areas
Jones et al. The Apis House Project at Mit Rahinah: Preliminary Report of the Fifth Season, 1984-1985
CN206467631U (en) The domatic beam attachment structure of ecological slope protection

Legal Events

Date Code Title Description
HE9A Changing address for correspondence with an applicant