Russia
Prior art keywords
sections
working
support
shells
lining
Prior art date
Application number
Other languages
Russian (ru)
Inventor
В.И. Штеле
Original Assignee
Красноярский отдел Института горного дела СО РАН
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Красноярский отдел Института горного дела СО РАН filed Critical Красноярский отдел Института горного дела СО РАН
Priority to SU4651507 priority Critical patent/RU2016199C1/en
Application granted granted Critical
Publication of RU2016199C1 publication Critical patent/RU2016199C1/en

Links

Images

Abstract

FIELD: mining industry. SUBSTANCE: sheathing support formed by steel arched support sections is mounted in the working. The sections has a trough- like shape, made of a steel plates and mounted abut to each another. Flexible sheathing are disposed beyond the sections. The sheathings are folded to form longitudinal folds clamped between the sections to ensure their reliable fixing beyond the support. The sheathings are filled with a hardening mass to form concrete belts around the working. EFFECT: improved quality and reliability of mine working supports. 1 dwg

Description

Изобретение относится к горной промышленности и может быть использовано для крепления капитальных и подготовительных горных выработок. The invention relates to the mining industry and can be used for fastening capital and preparatory mining.

Известен способ, включающий установку тонкостенной стальной арочной крепи корытообразной формы встык друг к другу с полной затяжкой стенок выработок секциями крепи и заполнение зазора между крепью-оболочкой и горными породами твердеющей массой, например бетоном [1]. A known method, including the installation of a thin-walled steel arch lining of a trough-shaped butt end-to-end to each other with a full tightening of the walls of the workings by the lining sections and filling the gap between the lining-shell and rocks with a hardening mass, for example concrete [1].

Недостатком данного способа является повышенный расход вяжущего из-за низкой герметичности крепи-оболочки, трудность контроля качества заполнения закрепного пространства, особенно сводной части выработки. Этот способ исключает возможность распора крепи-оболочки при нагнетании твердеющей массы в зазор между крепью и горными породами, что снижает качество крепления выработки. The disadvantage of this method is the increased consumption of binder due to the low tightness of the lining-shell, the difficulty of controlling the quality of filling the fixed space, especially the composite part of the output. This method eliminates the possibility of expansion of the lining shell when injecting a hardening mass into the gap between the lining and the rocks, which reduces the quality of the fastening of the output.

Наиболее близким к предлагаемому по технической сущности и достигаемому результату является способ, включающий установку арочной крепи из секций, имеющих корытообразную форму, размещение между секциями крепи и горными породами гибких оболочек цилиндрической формы, нагнетание в оболочки твердеющей массы [2]. Closest to the proposed technical essence and the achieved result is a method comprising installing arch support from sections having a trough-like shape, placing flexible shells of cylindrical shape between support sections and rocks, injecting hardening mass into shells [2].

Недостатком данного способа является низкое качество и ненадежность фиксации оболочек за секциями крепи, что приводит к их деформации и перемещению при заполнении оболочек твердеющей массой, вес которой может составлять несколько тонн. Это снижает качество крепления выработки и повышает опасность работ по возведению крепи. The disadvantage of this method is the low quality and unreliability of fixing the shells behind the lining sections, which leads to their deformation and movement when filling the shells with a hardening mass, the weight of which can be several tons. This reduces the quality of the fastening of the mine and increases the risk of work on the construction of the lining.

Целью изобретения является повышение качества крепления горных выработок. The aim of the invention is to improve the quality of fastening of mine workings.

С этой целью согласно известному способу, включающему установку арочной крепи из секций, имеющих корытообразную форму, размещение между секциями крепи и горными породами гибких оболочек цилиндрической формы, нагнетание в оболочки твердеющей массы, складывают оболочки с образованием продольных складок, а складки защемляют между секциями крепи. To this end, according to the known method, including installing arch support from sections having a trough-like shape, placing flexible cylindrical shells between the support sections and rocks, injecting hardening mass into the shells, folding the shells with the formation of longitudinal folds, and the wrinkles are pinched between the roof support sections.

На чертеже изображен закрепленный участок горной выработки, продольный разрез. The drawing shows a fixed section of a mine working, a longitudinal section.

Сущность способа заключается в следующем. При монтаже крепи-оболочки из тонкостенных стальных секций 1 перед их соединением с помощью крепежных элементов 2 пустые гибкие оболочки 3 цилиндрической формы размещают за секциями 1 с формированием продольной складки 4. Затем складку 4 помещают между секциями 1 и зажимают с помощью крепежных элементов. При этом оболочки 3 надежно фиксируются относительно секций 1 крепи. После монтажа крепи или по мере монтажа секций в оболочки 3 нагнетают с помощью бетононасоса твердеющую массу через штуцеры, выполненные в секциях 1 (не показаны). При этом происходит распрямление оболочек 3 и заполнение зазора 5 между секциями 1 и горными породами 6 твердеющей массой. Оболочки 3 облегают все неровности контура горных пород 5, что обеспечивает равномерную нагрузку на крепь при интенсификации горного давления. В оболочках 3 может создаваться повышенное давление жидкой твердеющей массы 7, что обеспечивает восприятие крепи нагрузок и ее распор до момента затвердевания массы 7. Вес твердеющей массы 6 в одной оболочке 3 может составлять несколько тонн, однако ее качественная фиксация между секциями 1 исключает деформацию оболочки, ее смещение за крепью, что гарантирует формирование бетонного пояса заданных размеров между секциями 1 и горными породами 7. Размер оболочек 3 определяется в зависимости от размера зазора 5. Ширина складки 4 выбирается из условия надежной фиксации оболочки 3 за секциями 1 при ее заполнении жидкой твердеющей массой 7. Оболочки 3 выполняют из полимерного материала или прорезиненной ткани. Толщина листов секции 1 корытообразной формы принимается равной 3-5 см. Для усиления крепи могут дополнительно устанавливаться арки из спецпрофиля. The essence of the method is as follows. When mounting the lining-shell of thin-walled steel sections 1 before connecting them with fasteners 2, empty flexible cylindrical shells 3 are placed behind the sections 1 with the formation of a longitudinal fold 4. Then the fold 4 is placed between the sections 1 and clamped with fasteners. In this case, the shell 3 is securely fixed relative to the support sections 1. After mounting the lining or as the sections are mounted in the casings 3, a hardening mass is pumped with a concrete pump through fittings made in sections 1 (not shown). In this case, the shells 3 are straightened and the gap 5 is filled between sections 1 and rocks 6 with a hardening mass. Shell 3 fit all the irregularities of the contour of rocks 5, which provides a uniform load on the lining during the intensification of rock pressure. In the casings 3, an increased pressure of the liquid hardening mass 7 can be created, which ensures the perception of the load supports and its spacing up to the moment of hardening of the mass 7. The weight of the hardening mass 6 in one shell 3 can be several tons, however, its qualitative fixation between sections 1 eliminates the deformation of the shell, its displacement behind the lining, which guarantees the formation of a concrete belt of a given size between sections 1 and rocks 7. The size of the shells 3 is determined depending on the size of the gap 5. The width of the fold 4 is selected from Via secure fixation shell 3 for sections 1 in filling the liquid hardenable mass 7. Shell 3 is made of a polymeric material or rubberized fabric. The thickness of the sheets of the trough-shaped section 1 is taken to be 3-5 cm. To strengthen the lining, arches from a special profile can be additionally installed.

Способ может найти применение при креплении горных выработок в сложных геомеханических условиях. The method can find application in fixing mine workings in difficult geomechanical conditions.

Claims (1)

СПОСОБ КРЕПЛЕНИЯ ГОРНОЙ ВЫРАБОТКИ, включающий установку арочной крепи, состоящей из секций, размещение между секциями крепи и горными породами гибких цилиндрических оболочек и нагнетания в них твердеющей массы, например бетона, отличающийся тем, что, с целью повышения качества крепления горных пород, размещенные за крепью гибкие оболочки складывают с образованием продольных складок, при этом последние размещают между бортами соседних секций и затем их зажимают. METHOD FOR MOUNTING THE MINING, including installation of arched roof support consisting of sections, placement between the roof supports and the rocks of flexible cylindrical shells and injection into them of a hardening mass, for example concrete, characterized in that, in order to improve the quality of the fastening of rocks located behind the roof support flexible shells are folded with the formation of longitudinal folds, the latter being placed between the sides of adjacent sections and then clamped.
SU4651507 1989-02-16 1989-02-16 Method for supporting a mine working RU2016199C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU4651507 RU2016199C1 (en) 1989-02-16 1989-02-16 Method for supporting a mine working

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU4651507 RU2016199C1 (en) 1989-02-16 1989-02-16 Method for supporting a mine working

Publications (1)

Publication Number Publication Date
RU2016199C1 true RU2016199C1 (en) 1994-07-15

Family

ID=21429214

Family Applications (1)

Application Number Title Priority Date Filing Date
SU4651507 RU2016199C1 (en) 1989-02-16 1989-02-16 Method for supporting a mine working

Country Status (1)

Country Link
RU (1) RU2016199C1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790597A (en) * 2014-01-26 2014-05-14 太原理工大学 Active backfilling support method with pressure support used
CN105114099A (en) * 2015-09-15 2015-12-02 内蒙古伊泰广联煤化有限责任公司 Poorly consolidated formation roadway support method and system
RU2702308C1 (en) * 2019-02-11 2019-10-07 Общество с ограниченной ответственностью "Управление горного сервиса" Formwork for attachment of mine working
RU210540U1 (en) * 2021-04-28 2022-04-19 Федеральное государственное бюджетное образовательное учреждение высшего образования "Уральский государственный горный университет" Support for supporting mountain arch workings

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Glurauf, 1987, N 21, с.17. *
Патент ФРГ N 301001, кл. E 21D 11/14, опублик. 1981. *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103790597A (en) * 2014-01-26 2014-05-14 太原理工大学 Active backfilling support method with pressure support used
CN105114099A (en) * 2015-09-15 2015-12-02 内蒙古伊泰广联煤化有限责任公司 Poorly consolidated formation roadway support method and system
CN105114099B (en) * 2015-09-15 2018-03-27 内蒙古伊泰广联煤化有限责任公司 A kind of weak consolidated formation laneway support method and support system
RU2702308C1 (en) * 2019-02-11 2019-10-07 Общество с ограниченной ответственностью "Управление горного сервиса" Formwork for attachment of mine working
RU210540U1 (en) * 2021-04-28 2022-04-19 Федеральное государственное бюджетное образовательное учреждение высшего образования "Уральский государственный горный университет" Support for supporting mountain arch workings

Similar Documents

Publication Publication Date Title
US4983077A (en) Method and an apparatus for producing fabric-reinforced lining supports or slender supporting structural units
US3750407A (en) Tunnel construction method
RU2016199C1 (en) Method for supporting a mine working
CA3072965C (en) Reinforcement system for the concrete lining of the inner shell of a tunnel construction
RU2101501C1 (en) Method of preservation of mine working
RU2043505C1 (en) Method for support of mine workings
CA1251942A (en) Method and apparatus for forming reinforced concrete walls with continuous steel reinforcement
SU1262046A1 (en) Method of supporting mine workings with filling-up of beyond-support space
SU1301978A1 (en) Yieldable arch support
SU1714150A1 (en) Reinforced framed support
RU2702308C1 (en) Formwork for attachment of mine working
SU1520249A1 (en) Frame support for mine workings and method of erecting same
US3417568A (en) Mine shaft bratticing
RU2112141C1 (en) Process of location of braces on frame members of support and gear for its realization
SU1315568A1 (en) Method of constructing a tunnel
SU1693252A1 (en) Shuttering for supporting development workings
SU887812A1 (en) Method of controlling a preparation working with yielding frame-type roof support
SU1263871A1 (en) Roof support for mine roadways
SU622982A1 (en) Anchor-frame roof support
RU2246622C1 (en) Tie-bar for frame supports of special profile
SU1164427A1 (en) Matching mine support
SU1240921A2 (en) Movable support forms
RU2078931C1 (en) Method of support of mine workings and frame support for its embodiment
SU1055880A2 (en) Brace of arcuate metal roof support
SU1125378A1 (en) Mining working anchor frame support