RU210540U1 - Support for supporting mountain arch workings - Google Patents
Support for supporting mountain arch workings Download PDFInfo
- Publication number
- RU210540U1 RU210540U1 RU2021133324U RU2021133324U RU210540U1 RU 210540 U1 RU210540 U1 RU 210540U1 RU 2021133324 U RU2021133324 U RU 2021133324U RU 2021133324 U RU2021133324 U RU 2021133324U RU 210540 U1 RU210540 U1 RU 210540U1
- Authority
- RU
- Russia
- Prior art keywords
- workings
- arched
- cross
- support
- section
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Structural Engineering (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Полезная модель относится к горному делу, а именно к крепям для поддержания горных арочных выработок, и может найти применение для крепления как временных, подготовительных, так и нарезных выработок арочной формы и любой степени податливости, в том числе жесткой. Крепь для поддержания горных арочных выработок включает обнаженную поверхность ее кровли с подвешенным на стяжных элементах перекрытием и свернутую пустую гибкую оболочку со штуцером для нагнетания насосом сжатого агента. После нагнетания сжатого агента гибкая оболочка выполнена в расправленном состоянии в виде сегмента в поперечном сечении с заданными размерами, определяемыми по следующей зависимостим, где R - радиус окружности породы арочного пространства, м; L - ширина поперечного сечения арочного пространства при прямоугольно-сводчатой форме сечения выработки, м. Техническим результатом заявленного вида крепи горных выработок является уменьшение трудоемкости монтажа или демонтажа гибкой оболочки. Заполненная сжатым агентом оболочка при использовании повторно - это облегченный вариант анкерной крепи для поддержания горных арочных выработок. 2 ил.The utility model relates to mining, namely to supports for supporting arched mine workings, and can be used for fastening both temporary, preparatory, and threaded arched workings and any degree of compliance, including rigid. The support for supporting the mountain arch workings includes an exposed surface of its roof with a ceiling suspended on the tie elements and a rolled up empty flexible shell with a fitting for injecting a compressed agent with a pump. After injection of the compressed agent, the flexible shell is made in the straightened state in the form of a segment in cross section with specified dimensions determined by the following dependencies, where R is the radius of the circle of the rock of the arched space, m; L is the width of the cross-section of the arched space with a rectangular-vaulted cross-sectional shape of the working, m. The shell, filled with a compressed agent, when reused, is a lightweight version of rock bolting for supporting mountain arch workings. 2 ill.
Description
Разработка относится к горному делу, а именно к крепям для поддержания горных арочных выработок, и может найти применение для крепления как временных, подготовительных, так и нарезных выработок арочной формы и любой степени податливости, в том числе жесткой.The development relates to mining, namely to supports for supporting mountain arch workings, and can be used for fastening both temporary, preparatory, and threaded arch workings and any degree of compliance, including rigid.
Известна крепь для поддержания горных арочных выработок, включающая перекрытие, гибкую оболочку со штуцером, заполненную сжатым агентом, стяжные элементы (патент №1120110. Крепь для поддержания горных выработок, опубл. 23.10.1984. Бюл. №39).Known support for supporting mine workings, including overlap, flexible shell with a fitting filled with a compressed agent, tie elements (patent No. 1120110. Support for maintaining mine workings, publ. 23.10.1984. Bull. No. 39).
В данном случае недостатком разработки является загроможденность поперечного сечения выработки, отсутствует распор крепи.In this case, the disadvantage of the development is the clutter of the cross section of the working, there is no support expansion.
Известна крепь для поддержания горных арочных выработок, включающая перекрытие со стяжными элементами, оболочку со штуцером для нагнетания сжатого агента, уложенную на это перекрытие вдоль длины выработки. Цилиндрическая оболочка имеет переменную площадь сечения вдоль контура арочной крепи (патент №1301978. Арочная податливая крепь, опубл. 07.04.1987. Бюл. №13).Known support for maintaining rock arched workings, including overlap with tie elements, a shell with a fitting for injecting a compressed agent, laid on this floor along the length of the mine. The cylindrical shell has a variable cross-sectional area along the contour of the arch support (patent No. 1301978. Flexible arched support, publ. 04/07/1987. Bull. No. 13).
Известна крепь для поддержания горных арочных выработок, включающая подвешенное на стяжных элементах перекрытие, уложенную на это перекрытие вдоль длины выработки гибкую оболочку (патент №2016199. Способ крепления горный выработки, опубл. 15.07.1994).Known support for maintaining mountain arch workings, including a floor suspended on tie elements, a flexible shell laid on this floor along the length of the working (patent No. 2016199. Method of fastening a mine working, publ.
Недостатком известных крепей является высокая трудоемкость монтажа или демонтажа гибкой оболочки, значительный расход и сравнительно высокий вес твердеющей массы в оболочке, который может составлять несколько тонн.The disadvantage of the known supports is the high complexity of mounting or dismantling the flexible shell, significant consumption and relatively high weight of the hardening mass in the shell, which can be several tons.
Также известна крепь для поддержания горных арочных выработок, включающая подвешенное на стяжных элементах перекрытие, уложенную на это перекрытие вдоль длины выработки гибкую оболочку с переменной площадью сечения со штуцером для нагнетания сжатого агента, которая выполнена в расправленном состоянии после нагнетания сжатого агента. Гибкая оболочка со сжатым агентом выполнена в виде трубчатого сечения (патент №672349. Подвесная крепь, опубл. 05.07.1979).Also known is a support for supporting mountain arch workings, including a ceiling suspended on tie elements, a flexible shell with a variable cross-sectional area with a fitting for injecting a compressed agent, which is made in a straightened state after injecting a compressed agent, laid on this ceiling along the length of the working. A flexible shell with a compressed agent is made in the form of a tubular section (patent No. 672349. Suspension support, publ. 07/05/1979).
В этой крепи не предусмотрено использование поперечного сечения гибкой оболочки в виде сегмента с параметрами по высоте и ширине, соответствующих параметрам поперечного сечения арочных выработок. При этом отсутствует возможность повторного использования в свернутом состоянии гибкой оболочки с учетом транспортабельности и мобильности, что отражается на трудозатратах при использовании предлагаемой гибкой оболочки.This lining does not provide for the use of a cross section of a flexible shell in the form of a segment with parameters in height and width corresponding to the parameters of the cross section of arched workings. At the same time, there is no possibility of reusing the flexible shell in the collapsed state, taking into account transportability and mobility, which affects labor costs when using the proposed flexible shell.
Задачей заявленного вида крепи для временных горных выработок является ее возможность приобретения поперечного сечения в виде сегмента с параметрами, соответствующих параметрам поперечного сечения арочных выработок. При этом обеспечивается мобильность повторного использования при передвижении крепи на новое место за счет выпуска всего сжатый агента и демонтажа ее в скрученном состоянии для передачи на новое место и вновь нагнетания сжатым агентом. За счет этого трудоемкость монтажа или демонтажа устройства уменьшается.The task of the proposed type of lining for temporary mine workings is its ability to acquire a cross section in the form of a segment with parameters corresponding to the parameters of the cross section of arched workings. This ensures the mobility of reuse when moving the support to a new location by releasing the entire compressed agent and dismantling it in a twisted state for transfer to a new location and re-injection with a compressed agent. Due to this, the complexity of mounting or dismantling the device is reduced.
Поставленная задача достигается тем, что в анкерной крепи для поддержания горных арочных выработок, включающей подвешенное на стяжных элементах перекрытие, уложенную на это перекрытие вдоль длины выработки гибкую оболочку с переменной площадью сечения со штуцером для нагнетания сжатого агента, которая выполнена в расправленном состоянии после нагнетания сжатого агента, гибкая оболочка в расправленном состоянии выполнена в виде сегмента в поперечном сечении с возможностью приобретения высоты полости h, м, радиуса R, м, окружности арочного пространства и ширины L, м, поперечного сечения арочного пространства выработки по всей его длине, определяемыми по следующей зависимости, м, и с возможностью приобретения свернутого состояния после полного выпуска сжатого агента для использования повторно при передвижении крепи на новое место.The task is achieved by the fact that in the anchor support for supporting mountain arch workings, including a floor suspended on tie elements, a flexible shell with a variable cross-sectional area laid on this floor along the length of the working with a fitting for injecting a compressed agent, which is made in a straightened state after injecting a compressed agent, the flexible shell in the expanded state is made in the form of a segment in cross section with the possibility of acquiring the height of the cavity h, m, radius R, m, the circumference of the arched space and the width L, m, the cross section of the arched space of the working along its entire length, determined by the following dependencies , m, and with the possibility of acquiring a collapsed state after the complete release of the compressed agent for reuse when moving the support to a new location.
На фиг. 1 дана схема устройства анкерной крепи горных выработок; на фиг. 2 - схема определения параметров гибкой оболочки после заполнения сжатым агентомIn FIG. 1 shows a diagram of the installation of anchor support for mine workings; in fig. 2 - scheme for determining the parameters of a flexible shell after filling with a compressed agent
Крепь для поддержания горных арочных выработок включает гибкую оболочка 1, уложенную на перекрытие 2. Перекрытие 2 подвешено на стяжных элементах 3, которые закреплены на податливых анкерах 4. Пустая гибкая оболочка 1 в свернутом состоянии уложена на перекрытии 2. Для приведения крепи в рабочее положение через штуцеры (не показаны) оболочки 1 наполняют сжатым агентом (воздухом или жидкостью). Уложенная вдоль длины выработки с переменной площадью сечения по длине гибкая оболочка 1 приобретает расправленное состояние. Расправленное состояние оболочки имеет вид сегмента в поперечном сечении. Под действием давления сжатого агента гибкая оболочка 1 приобретает в соответствии габаритов арочного пространства заданную высоту полости h, м, заданный радиус R, м, окружности арочного пространства и заданную ширину L, м, поперечного сечения арочного пространства выработки по всей ее длине. Определялись заданные параметры гибкой оболочки с переменной площадью сечения в соответствии габаритов сечения арочного пространства по следующей зависимости: м. м. Оболочка 1 облегает все неровности контура арочного пространства, что обеспечивает равномерную нагрузку на крепь при интенсификации горного давления. Повышенное давление в оболочках обеспечивает восприятие крепи нагрузок и ее распор. В случае повторного использования при передвижении крепи на новое место из оболочки выпускают весь сжатый агент и демонтируют в скрученном состоянии. За счет этого трудоемкость монтажа или демонтажа уменьшается многократно. Этим обеспечивается мобильность использования предлагаемого устройства. Крепь несет полную нагрузку со стороны свода. Со стороны боков нагрузка отсутствует (породы в боках устойчивы). Для определения нагрузки на крепь со стороны свода пользуются известным расчетным методом (http://mining-prom.ru/gornoe/tech/gornava-vyrabotka/). При смещении в горизонтальной плоскости, для обеспечения равномерной деформации крепи горной выработки, эластичные оболочки арочной крепи могут быть с переменной площадью сечения по их длине.The support for supporting the mountain arch workings includes a
Таким образом, техническим результатом заявленной крепи для временных горных выработок является ее возможность приобретения поперечного сечения в виде сегмента с параметрами, соответствующих параметрам поперечного сечения арочных выработок. При этом обеспечивается мобильность повторного использования при передвижении крепи на новое место за счет выпуска всего сжатого агента и демонтажа ее в скрученном состоянии для передачи на новое место и вновь нагнетания сжатым агентом. За счет этого трудоемкость монтажа или демонтажа устройства уменьшается.Thus, the technical result of the claimed lining for temporary mine workings is its ability to acquire a cross section in the form of a segment with parameters corresponding to the parameters of the cross section of arched workings. This ensures the mobility of reuse when moving the support to a new place by releasing the entire compressed agent and dismantling it in a twisted state for transfer to a new location and re-injection with a compressed agent. Due to this, the complexity of mounting or dismantling the device is reduced.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2021133324U RU210540U1 (en) | 2021-04-28 | 2021-04-28 | Support for supporting mountain arch workings |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2021133324U RU210540U1 (en) | 2021-04-28 | 2021-04-28 | Support for supporting mountain arch workings |
Publications (1)
Publication Number | Publication Date |
---|---|
RU210540U1 true RU210540U1 (en) | 2022-04-19 |
Family
ID=81255650
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2021133324U RU210540U1 (en) | 2021-04-28 | 2021-04-28 | Support for supporting mountain arch workings |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU210540U1 (en) |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU672349A1 (en) * | 1977-03-09 | 1979-07-05 | Институт Горного Дела Ан Казахской Сср | Suspended mine roof support |
DE3012613C2 (en) * | 1980-04-01 | 1982-12-23 | Bwz Berg- Und Industrietechnik Gmbh, 4250 Bottrop | Anchor expansion for routes of underground mining, tunnels or the like. |
SU1065062A1 (en) * | 1982-04-12 | 1984-01-07 | Shirokov Anatolij P | Method of securing mine working roof |
SU1125378A1 (en) * | 1983-06-10 | 1984-11-23 | Предприятие П/Я А-3159 | Mining working anchor frame support |
SU1301978A1 (en) * | 1985-02-04 | 1987-04-07 | Shtele Vladimir | Yieldable arch support |
SU1594280A1 (en) * | 1987-12-25 | 1990-09-23 | Институт горного дела им.А.А.Скочинского | Yielding roof bolt and method of supporting mine workings |
RU2016199C1 (en) * | 1989-02-16 | 1994-07-15 | Красноярский отдел Института горного дела СО РАН | Method for supporting a mine working |
RU2043505C1 (en) * | 1992-02-25 | 1995-09-10 | Игорь Иванович Мартыненко | Method for support of mine workings |
-
2021
- 2021-04-28 RU RU2021133324U patent/RU210540U1/en active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU672349A1 (en) * | 1977-03-09 | 1979-07-05 | Институт Горного Дела Ан Казахской Сср | Suspended mine roof support |
DE3012613C2 (en) * | 1980-04-01 | 1982-12-23 | Bwz Berg- Und Industrietechnik Gmbh, 4250 Bottrop | Anchor expansion for routes of underground mining, tunnels or the like. |
SU1065062A1 (en) * | 1982-04-12 | 1984-01-07 | Shirokov Anatolij P | Method of securing mine working roof |
SU1125378A1 (en) * | 1983-06-10 | 1984-11-23 | Предприятие П/Я А-3159 | Mining working anchor frame support |
SU1301978A1 (en) * | 1985-02-04 | 1987-04-07 | Shtele Vladimir | Yieldable arch support |
SU1594280A1 (en) * | 1987-12-25 | 1990-09-23 | Институт горного дела им.А.А.Скочинского | Yielding roof bolt and method of supporting mine workings |
RU2016199C1 (en) * | 1989-02-16 | 1994-07-15 | Красноярский отдел Института горного дела СО РАН | Method for supporting a mine working |
RU2043505C1 (en) * | 1992-02-25 | 1995-09-10 | Игорь Иванович Мартыненко | Method for support of mine workings |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EA035418B1 (en) | Tunnel construction method using a pre-support member and a post-support member | |
CN208294567U (en) | A kind of fixation device for the soft mould pocket type mold pouring walling suitable for underground | |
CN208380593U (en) | A kind of tunnel side wall crack ruggedized construction | |
CN104018863A (en) | Multi-section-expansion yielding prestress grouting anchor rod and using method thereof | |
CN105672337B (en) | The construction method of cast-in-place open caisson formwork system | |
JP2017089104A (en) | Structure and method for constructing tunnel lining body | |
CN109519193B (en) | Tunnel lining structure of existing railway line and construction method thereof | |
CN204457826U (en) | A kind of expansion antiskid anchor pole | |
RU210540U1 (en) | Support for supporting mountain arch workings | |
CN105443143A (en) | Tunnel support device of coal mine goaf and construction method thereof | |
CN204436419U (en) | Simple and easy interim hydraulic pressure advanced stand device | |
CN205117354U (en) | Reinforcing bar grid crowd with encircle foot strengthens device temporarily | |
KR20160000792A (en) | Natm tunnel structure and construction method thereof | |
CN107816359B (en) | Construction method of underground engineering manual support | |
RU2101501C1 (en) | Method of preservation of mine working | |
CN112228076B (en) | Fast excavation construction method for hard rock large-span tunnel | |
CN212296444U (en) | Let pressure stock suitable for soft rock large deformation underground space | |
LV et al. | Study on deformation and failure of roadway of rock bolting under impact loading | |
CN211038697U (en) | Underground excavation small-section tunnel construction supporting device | |
CN102031978A (en) | Internal drawing tunnel/hole reinforced concrete support-free upright die | |
CN208534517U (en) | A kind of combined anchor anchor cable support apparatus | |
CN205277438U (en) | Cast -in -place continuous concrete support | |
RU108785U1 (en) | DEVICE FOR UNLOADING STONE CONSTRUCTIONS OF BUILDING | |
RU144480U1 (en) | FORMWORK FOR CONSTRUCTION OF CONCRETE FASTENERS OF TUNNELS | |
CN116398197A (en) | Rapid active supporting method for high-stress soft rock large-deformation tunnel |