RU2010137427A - Мониторинг скважинных показателей при помощи измерительной системы, распределенной по бурильной колонне - Google Patents
Мониторинг скважинных показателей при помощи измерительной системы, распределенной по бурильной колонне Download PDFInfo
- Publication number
- RU2010137427A RU2010137427A RU2010137427/03A RU2010137427A RU2010137427A RU 2010137427 A RU2010137427 A RU 2010137427A RU 2010137427/03 A RU2010137427/03 A RU 2010137427/03A RU 2010137427 A RU2010137427 A RU 2010137427A RU 2010137427 A RU2010137427 A RU 2010137427A
- Authority
- RU
- Russia
- Prior art keywords
- borehole
- parameter
- data
- downhole
- specified
- Prior art date
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract 3
- 230000036642 wellbeing Effects 0.000 title 1
- 238000000034 method Methods 0.000 claims abstract 27
- 230000015572 biosynthetic process Effects 0.000 claims abstract 2
- 230000001105 regulatory effect Effects 0.000 claims 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
- E21B47/13—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling by electromagnetic energy, e.g. radio frequency
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B21/00—Methods or apparatus for flushing boreholes, e.g. by use of exhaust air from motor
- E21B21/08—Controlling or monitoring pressure or flow of drilling fluid, e.g. automatic filling of boreholes, automatic control of bottom pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/04—Measuring depth or liquid level
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/06—Measuring temperature or pressure
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B47/00—Survey of boreholes or wells
- E21B47/12—Means for transmitting measuring-signals or control signals from the well to the surface, or from the surface to the well, e.g. for logging while drilling
Landscapes
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geochemistry & Mineralogy (AREA)
- Geophysics (AREA)
- Remote Sensing (AREA)
- Mechanical Engineering (AREA)
- Electromagnetism (AREA)
- Geophysics And Detection Of Objects (AREA)
- Earth Drilling (AREA)
Abstract
1. Способ мониторинга скважинных показателей в буровой скважине, проходящей через формацию, согласно которому ! размещают в буровой скважине колонну соединенных труб, формирующую скважинную электромагнитную цепь, обеспечивающую создание электромагнитного сигнального канала, ! получают через скважинную электромагнитную цепь данные от датчиков; ! делают вывод о скважинном показателе на основе данных от датчиков; и ! на основе указанного вывода выборочно регулируют по меньшей мере один параметр, влияющий на указанный скважинный показатель. ! 2. Способ по п.1, согласно которому выборочную регулировку указанного по меньшей мере одного параметра выполняют до тех пор, пока указанный скважинный показатель не будет соответствовать целевому скважинному показателю в заданном диапазоне погрешности. ! 3. Способ по п.1, согласно которому выборочная регулировка указанного по меньшей мере одного параметра включает выборочную подачу команд по меньшей мере на одно скважинное устройство через скважинную электромагнитную цепь для регулировки указанного по меньшей мере одного параметра. ! 4. Способ по п.1, согласно которому выборочная регулировка указанного по меньшей мере одного параметра содержит выборочную регулировку этого по меньшей мере одного параметра с внешней стороны буровой скважины. ! 5. Способ по п.1, согласно которому при получении данных от датчиков получают данные по меньшей мере от одного первого датчика, выполненного с возможностью измерения скважинных показателей, которые с определенной степенью вероятности могут значительно изменяться с течением времени. ! 6. Способ по п.5, согласно которому при получе
Claims (21)
1. Способ мониторинга скважинных показателей в буровой скважине, проходящей через формацию, согласно которому
размещают в буровой скважине колонну соединенных труб, формирующую скважинную электромагнитную цепь, обеспечивающую создание электромагнитного сигнального канала,
получают через скважинную электромагнитную цепь данные от датчиков;
делают вывод о скважинном показателе на основе данных от датчиков; и
на основе указанного вывода выборочно регулируют по меньшей мере один параметр, влияющий на указанный скважинный показатель.
2. Способ по п.1, согласно которому выборочную регулировку указанного по меньшей мере одного параметра выполняют до тех пор, пока указанный скважинный показатель не будет соответствовать целевому скважинному показателю в заданном диапазоне погрешности.
3. Способ по п.1, согласно которому выборочная регулировка указанного по меньшей мере одного параметра включает выборочную подачу команд по меньшей мере на одно скважинное устройство через скважинную электромагнитную цепь для регулировки указанного по меньшей мере одного параметра.
4. Способ по п.1, согласно которому выборочная регулировка указанного по меньшей мере одного параметра содержит выборочную регулировку этого по меньшей мере одного параметра с внешней стороны буровой скважины.
5. Способ по п.1, согласно которому при получении данных от датчиков получают данные по меньшей мере от одного первого датчика, выполненного с возможностью измерения скважинных показателей, которые с определенной степенью вероятности могут значительно изменяться с течением времени.
6. Способ по п.5, согласно которому при получении данных от датчиков получают данные по меньшей мере от одного второго датчика, выполненного с возможностью измерения глубины колонны соединенных труб в скважине при измерении скважинных показателей.
7. Способ по п.6, согласно которому, когда делают вывод о скважинном показателе, сопоставляют часть данных от указанного по меньшей мере одного первого датчика с частью данных от указанного по меньшей мере одного второго датчика.
8. Способ по п.1, согласно которому при получении данных от датчиков получают данные по меньшей мере от одного датчика давления, размещенного в различных положениях вдоль колонны соединенных труб.
9. Способ по п.8, согласно которому, когда делают вывод о скважинном показателе, формируют кривую градиента давления, используя данные от датчиков.
10. Способ по п.9, согласно которому при выборочной регулировке указанного по меньшей мере одного параметра регулируют этот по меньшей мере один параметр, если кривая градиента давления не соответствует целевому градиенту давления в заданном диапазоне погрешности.
11. Способ по п.10, согласно которому при выборочной регулировке указанного по меньшей мере одного параметра регулируют распределение давления вдоль ствола скважины для изменения видимой эквивалентной циркуляционной плотности.
12. Способ по п.10, согласно которому при выборочной регулировке указанного по меньшей мере одного параметра (i) приводят в действие по меньшей мере один ограничитель неустановившегося течения и управляют этим ограничителем для ограничения расхода в кольцевой области между буровой скважиной и колонной труб, если давление в нижней части буровой скважины меньше, чем заданное придонное давление, или (ii) приводят в действие по меньшей мере один ограничитель неустановившегося течения и управляют этим ограничителем для ограничения течения внутри ствола колонны труб, если давление в нижней части буровой скважины больше, чем заданное придонное давление.
13. Способ по п.1, согласно которому при получении данных от датчиков получают данные по меньшей мере от одного датчика, выполненного с возможностью измерения скважинных показателей, которые с малой степенью вероятности могут значительно меняться с течением времени.
14. Способ по п.1, согласно которому при получении данных от датчиков получают информацию об изменениях скважинных показателей на выбранной глубине в буровой скважине с течением времени.
15. Способ по п.1, согласно которому при получении данных от датчиков получают данные, собранные первым датчиком в первом положении на колонне труб, когда первый датчик размещен на первой выбранной глубине в скважине, и данные, собранные вторым датчиком во втором положении на колонне труб, когда второй датчик размещен на первой выбранной глубине, причем первое положение расположено на расстоянии в продольном направлении от второго положения вдоль колонны труб.
16. Способ по п.15, в котором данные, собранные первым и вторым датчиками, относятся к профилю скважины на первой выбранной глубине.
17. Способ по п.1, согласно которому получение данных от датчиков осуществляют в выбранные промежутки времени.
18. Способ по п.1, согласно которому перед получением данных от датчиков передают по меньшей мере один командный сигнал по меньшей мере на один датчик через скважинную электромагнитную цепь для измерения по меньшей мере одного скважинного показателя.
19. Способ по п.1, в котором скважинные показатели представляют собой динамическую устойчивость колонны труб.
20. Способ по п.19, согласно которому при выборочной регулировке указанного по меньшей мере одного параметра приводят в действие балансировочное устройство для нейтрализации выбранных гармоник на колонне труб.
21. Способ по п.19, в котором указанный по меньшей мере один параметр является входным параметром колонны труб, выбранным из группы, включающей скорость потока, нагрузку на долото и частоту вращения.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US3324908P | 2008-03-03 | 2008-03-03 | |
US61/033,249 | 2008-03-03 | ||
PCT/US2009/035767 WO2009111412A2 (en) | 2008-03-03 | 2009-03-02 | Monitoring downhole conditions with drill string distributed measurement system |
Related Child Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2015105531/03A Division RU2015105531A (ru) | 2008-03-03 | 2009-03-02 | Мониторинг скважинных показателей при помощи измерительной системы, распределенной по бурильной колонне |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2010137427A true RU2010137427A (ru) | 2012-04-10 |
RU2613374C2 RU2613374C2 (ru) | 2017-03-16 |
Family
ID=41056584
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2015105531/03A RU2015105531A (ru) | 2008-03-03 | 2009-03-02 | Мониторинг скважинных показателей при помощи измерительной системы, распределенной по бурильной колонне |
RU2010137427A RU2613374C2 (ru) | 2008-03-03 | 2009-03-02 | Мониторинг скважинных показателей при помощи измерительной системы, распределенной по бурильной колонне |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2015105531/03A RU2015105531A (ru) | 2008-03-03 | 2009-03-02 | Мониторинг скважинных показателей при помощи измерительной системы, распределенной по бурильной колонне |
Country Status (8)
Country | Link |
---|---|
US (1) | US8636060B2 (ru) |
EP (1) | EP2260176B1 (ru) |
AU (1) | AU2009222010B2 (ru) |
BR (1) | BRPI0908566B1 (ru) |
CA (1) | CA2717593C (ru) |
MX (1) | MX2010009656A (ru) |
RU (2) | RU2015105531A (ru) |
WO (1) | WO2009111412A2 (ru) |
Families Citing this family (87)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2007317276B2 (en) | 2006-11-07 | 2011-07-28 | Halliburton Energy Services, Inc. | Offshore universal riser system |
US20120323494A1 (en) * | 2007-02-20 | 2012-12-20 | Schlumberger Technology Corporation | Identifying types of sensors based on sensor measurement data |
EP2334905B1 (en) * | 2008-09-15 | 2019-06-05 | BP Corporation North America Inc. | Method of determining borehole conditions from distributed measurement data |
US8281875B2 (en) | 2008-12-19 | 2012-10-09 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
WO2011006083A1 (en) * | 2009-07-10 | 2011-01-13 | Schlumberger Canada Limited | Identifying types of sensors based on sensor measurement data |
US9567843B2 (en) | 2009-07-30 | 2017-02-14 | Halliburton Energy Services, Inc. | Well drilling methods with event detection |
US20110083845A1 (en) * | 2009-10-09 | 2011-04-14 | Impact Guidance Systems, Inc. | Datacoil™ Downhole Logging System |
US8362915B2 (en) * | 2009-10-30 | 2013-01-29 | Intelliserv, Llc | System and method for determining stretch or compression of a drill string |
WO2011084153A1 (en) * | 2010-01-05 | 2011-07-14 | Halliburton Energy Services, Inc. | Well control systems and methods |
WO2011119675A1 (en) * | 2010-03-23 | 2011-09-29 | Halliburton Energy Services Inc. | Apparatus and method for well operations |
US8820405B2 (en) | 2010-04-27 | 2014-09-02 | Halliburton Energy Services, Inc. | Segregating flowable materials in a well |
US8201628B2 (en) | 2010-04-27 | 2012-06-19 | Halliburton Energy Services, Inc. | Wellbore pressure control with segregated fluid columns |
CA2802320C (en) * | 2010-06-11 | 2017-07-18 | Halliburton Energy Services, Inc. | Detecting and mitigating borehole diameter enlargement |
US9249638B2 (en) | 2011-04-08 | 2016-02-02 | Halliburton Energy Services, Inc. | Wellbore pressure control with optimized pressure drilling |
CN103459755B (zh) | 2011-04-08 | 2016-04-27 | 哈利伯顿能源服务公司 | 钻井中的自动立管压力控制 |
US9080407B2 (en) | 2011-05-09 | 2015-07-14 | Halliburton Energy Services, Inc. | Pressure and flow control in drilling operations |
US9133665B2 (en) | 2011-06-11 | 2015-09-15 | Halliburton Energy Services, Inc. | Detecting and mitigating borehole diameter enlargement |
US9222350B2 (en) | 2011-06-21 | 2015-12-29 | Diamond Innovations, Inc. | Cutter tool insert having sensing device |
US8783381B2 (en) | 2011-07-12 | 2014-07-22 | Halliburton Energy Services, Inc. | Formation testing in managed pressure drilling |
MY172254A (en) | 2011-09-08 | 2019-11-20 | Halliburton Energy Services Inc | High temperature drilling with lower temperature drated tools |
WO2013062525A1 (en) * | 2011-10-25 | 2013-05-02 | Halliburton Energy Services, Inc. | Methods and systems for providing a package of sensors to enhance subterranean operations |
US9447647B2 (en) | 2011-11-08 | 2016-09-20 | Halliburton Energy Services, Inc. | Preemptive setpoint pressure offset for flow diversion in drilling operations |
CA2861641C (en) | 2012-01-04 | 2017-05-02 | Saudi Arabian Oil Comapny | Active drilling measurement and control system for extended reach and complex wells |
US9359841B2 (en) | 2012-01-23 | 2016-06-07 | Halliburton Energy Services, Inc. | Downhole robots and methods of using same |
EP2809879A2 (en) * | 2012-02-03 | 2014-12-10 | Intelliserv International Holding, Ltd | Wellsite communication system and method |
US9250339B2 (en) | 2012-03-27 | 2016-02-02 | Baker Hughes Incorporated | System and method to transport data from a downhole tool to the surface |
US9249658B2 (en) | 2012-07-05 | 2016-02-02 | Jonathan Macrae | Downhole data communication and logging system |
MX353463B (es) * | 2012-11-14 | 2018-01-15 | Halliburton Energy Services Inc | Sistema y método para sistema de registro en la nube. |
US9458711B2 (en) | 2012-11-30 | 2016-10-04 | XACT Downhole Telemerty, Inc. | Downhole low rate linear repeater relay network timing system and method |
WO2014105049A1 (en) | 2012-12-28 | 2014-07-03 | Halliburton Energy Services, Inc. | Expanded mud pulse telemetry |
CA2906215C (en) | 2013-03-15 | 2021-01-19 | Xact Downhole Telemetry Inc. | Robust telemetry repeater network system and method |
US9631446B2 (en) | 2013-06-26 | 2017-04-25 | Impact Selector International, Llc | Impact sensing during jarring operations |
US9963936B2 (en) | 2013-10-09 | 2018-05-08 | Baker Hughes, A Ge Company, Llc | Downhole closed loop drilling system with depth measurement |
CA2929092C (en) | 2013-10-28 | 2021-10-26 | Schlumberger Canada Limited | Frequency analysis of drilling signals |
AU2014353871B2 (en) | 2013-11-19 | 2018-10-25 | Minex Crc Ltd | Borehole logging methods and apparatus |
US9631474B2 (en) * | 2013-11-25 | 2017-04-25 | Baker Hughes Incorporated | Systems and methods for real-time evaluation of coiled tubing matrix acidizing |
WO2015101520A1 (en) * | 2014-01-02 | 2015-07-09 | Shell Internationale Research Maatschappij B.V. | System and method for making downhole measurements |
US10358905B2 (en) * | 2014-01-13 | 2019-07-23 | Weatherford Technology Holdings, Llc | Ultrasonic logging methods and apparatus for measuring cement and casing properties using acoustic echoes |
CA2952885C (en) | 2014-06-23 | 2022-11-22 | Evolution Engineering Inc. | Optimizing downhole data communication with at bit sensors and nodes |
US10508536B2 (en) | 2014-09-12 | 2019-12-17 | Exxonmobil Upstream Research Company | Discrete wellbore devices, hydrocarbon wells including a downhole communication network and the discrete wellbore devices and systems and methods including the same |
GB2546209B (en) | 2014-10-28 | 2020-11-25 | Halliburton Energy Services Inc | Downhole state-machine-based monitoring of vibration |
US10036203B2 (en) | 2014-10-29 | 2018-07-31 | Baker Hughes, A Ge Company, Llc | Automated spiraling detection |
US20170356284A1 (en) * | 2014-12-17 | 2017-12-14 | National Oilwell Dht L.P. | Method of Pressure Testing a Wellbore |
US10920561B2 (en) | 2015-01-16 | 2021-02-16 | Schlumberger Technology Corporation | Drilling assessment system |
US10408047B2 (en) | 2015-01-26 | 2019-09-10 | Exxonmobil Upstream Research Company | Real-time well surveillance using a wireless network and an in-wellbore tool |
US9951602B2 (en) | 2015-03-05 | 2018-04-24 | Impact Selector International, Llc | Impact sensing during jarring operations |
WO2016148688A1 (en) * | 2015-03-16 | 2016-09-22 | Halliburton Energy Services, Inc. | Packoff pressure prevention systems and methods |
GB2560643B (en) * | 2015-09-30 | 2021-07-21 | Schlumberger Technology Bv | Downhole tool analysis using anomaly detection of measurement data |
US10392933B2 (en) * | 2015-10-30 | 2019-08-27 | Baker Hughes, A Ge Company, Llc | Multiple downhole sensor digital alignment using spatial transforms |
US10156656B2 (en) | 2015-11-06 | 2018-12-18 | Baker Hughes, A Ge Company, Llc | Apparatus and methods for determining real-time hole cleaning and drilled cuttings density quantification using nucleonic densitometers |
US11686168B2 (en) | 2015-11-12 | 2023-06-27 | Baker Hughes, A Ge Company, Llc | Apparatus and methods for determining in real-time efficiency of extracting gas from drilling fluid at surface |
US10781649B2 (en) | 2015-11-12 | 2020-09-22 | Baker Hughes, A Ge Company, Llc | Apparatus and methods for determining in real-time efficiency extracting gas from drilling fluid at surface |
US20170138181A1 (en) * | 2015-11-16 | 2017-05-18 | Sure Shot Wireline Inc. | Method and system for logging a well |
NZ746472A (en) * | 2016-02-26 | 2020-02-28 | Baker Hughes A Ge Co Llc | Real-time tension, compression and torque data monitoring system |
US11143013B2 (en) | 2016-03-14 | 2021-10-12 | Halliburton Energy Services, Inc. | Downhole vibration characterization |
US10287870B2 (en) | 2016-06-22 | 2019-05-14 | Baker Hughes, A Ge Company, Llc | Drill pipe monitoring and lifetime prediction through simulation based on drilling information |
US10590759B2 (en) | 2016-08-30 | 2020-03-17 | Exxonmobil Upstream Research Company | Zonal isolation devices including sensing and wireless telemetry and methods of utilizing the same |
US10415376B2 (en) | 2016-08-30 | 2019-09-17 | Exxonmobil Upstream Research Company | Dual transducer communications node for downhole acoustic wireless networks and method employing same |
US10465505B2 (en) | 2016-08-30 | 2019-11-05 | Exxonmobil Upstream Research Company | Reservoir formation characterization using a downhole wireless network |
US10526888B2 (en) | 2016-08-30 | 2020-01-07 | Exxonmobil Upstream Research Company | Downhole multiphase flow sensing methods |
US10344583B2 (en) | 2016-08-30 | 2019-07-09 | Exxonmobil Upstream Research Company | Acoustic housing for tubulars |
US10364669B2 (en) | 2016-08-30 | 2019-07-30 | Exxonmobil Upstream Research Company | Methods of acoustically communicating and wells that utilize the methods |
US10697287B2 (en) | 2016-08-30 | 2020-06-30 | Exxonmobil Upstream Research Company | Plunger lift monitoring via a downhole wireless network field |
US11828172B2 (en) * | 2016-08-30 | 2023-11-28 | ExxonMobil Technology and Engineering Company | Communication networks, relay nodes for communication networks, and methods of transmitting data among a plurality of relay nodes |
RU2752074C2 (ru) * | 2017-06-20 | 2021-07-22 | Шлюмберже Текнолоджи Б.В. | Компьютерный способ и вычислительная система для прогнозирования расходных характеристик потока в стволе скважины, проникающей в подземный углеводородный пласт |
CN107448187B (zh) * | 2017-09-27 | 2023-11-17 | 中国石油大学(北京) | 井下测量装置 |
CA3079020C (en) | 2017-10-13 | 2022-10-25 | Exxonmobil Upstream Research Company | Method and system for performing communications using aliasing |
CN111201454B (zh) | 2017-10-13 | 2022-09-09 | 埃克森美孚上游研究公司 | 用于利用通信执行操作的方法和系统 |
CN111201755B (zh) | 2017-10-13 | 2022-11-15 | 埃克森美孚上游研究公司 | 使用通信执行操作的方法和系统 |
US10837276B2 (en) | 2017-10-13 | 2020-11-17 | Exxonmobil Upstream Research Company | Method and system for performing wireless ultrasonic communications along a drilling string |
US10697288B2 (en) | 2017-10-13 | 2020-06-30 | Exxonmobil Upstream Research Company | Dual transducer communications node including piezo pre-tensioning for acoustic wireless networks and method employing same |
CA3078824C (en) | 2017-10-13 | 2022-08-16 | Exxonmobil Upstream Research Company | Method and system for performing hydrocarbon operations with mixed communication networks |
US12000273B2 (en) | 2017-11-17 | 2024-06-04 | ExxonMobil Technology and Engineering Company | Method and system for performing hydrocarbon operations using communications associated with completions |
US10690794B2 (en) | 2017-11-17 | 2020-06-23 | Exxonmobil Upstream Research Company | Method and system for performing operations using communications for a hydrocarbon system |
CN111247310B (zh) | 2017-11-17 | 2023-09-15 | 埃克森美孚技术与工程公司 | 沿着管状构件执行无线超声通信的方法和系统 |
US11966002B2 (en) | 2017-12-15 | 2024-04-23 | Baker Hughes, A Ge Company, Llc | Systems and methods for downhole determination of drilling characteristics |
US10844708B2 (en) | 2017-12-20 | 2020-11-24 | Exxonmobil Upstream Research Company | Energy efficient method of retrieving wireless networked sensor data |
MX2020005766A (es) | 2017-12-29 | 2020-08-20 | Exxonmobil Upstream Res Co | Metodos y sistemas para monitorear y optimizar las operaciones de estimulacion de yacimientos. |
US11156081B2 (en) | 2017-12-29 | 2021-10-26 | Exxonmobil Upstream Research Company | Methods and systems for operating and maintaining a downhole wireless network |
CA3090799C (en) | 2018-02-08 | 2023-10-10 | Exxonmobil Upstream Research Company | Methods of network peer identification and self-organization using unique tonal signatures and wells that use the methods |
US11268378B2 (en) | 2018-02-09 | 2022-03-08 | Exxonmobil Upstream Research Company | Downhole wireless communication node and sensor/tools interface |
US11035219B2 (en) * | 2018-05-10 | 2021-06-15 | Schlumberger Technology Corporation | System and method for drilling weight-on-bit based on distributed inputs |
NO20210545A1 (en) * | 2018-11-30 | 2021-04-30 | Landmark Graphics Corp | Using distributed sensor data to control cluster efficiency downhole |
US11293280B2 (en) | 2018-12-19 | 2022-04-05 | Exxonmobil Upstream Research Company | Method and system for monitoring post-stimulation operations through acoustic wireless sensor network |
US11952886B2 (en) | 2018-12-19 | 2024-04-09 | ExxonMobil Technology and Engineering Company | Method and system for monitoring sand production through acoustic wireless sensor network |
CN110359948B (zh) * | 2019-08-01 | 2024-04-12 | 中煤科工集团沈阳研究院有限公司 | 多孔联抽单孔瓦斯抽采参数自动巡回分检装置及方法 |
US11168524B2 (en) | 2019-09-04 | 2021-11-09 | Saudi Arabian Oil Company | Drilling system with circulation sub |
Family Cites Families (73)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US664082A (en) * | 1900-03-15 | 1900-12-18 | Smith Daniel J | Adjustable hoop. |
US4297880A (en) * | 1980-02-05 | 1981-11-03 | General Electric Company | Downhole pressure measurements of drilling mud |
US4606415A (en) * | 1984-11-19 | 1986-08-19 | Texaco Inc. | Method and system for detecting and identifying abnormal drilling conditions |
SU1430516A1 (ru) * | 1986-12-16 | 1988-10-15 | Специальное Конструкторско-Технологическое Бюро Геофизической Техники | Система передачи данных из буровых скважин |
US5184508A (en) * | 1990-06-15 | 1993-02-09 | Louisiana State University And Agricultural And Mechanical College | Method for determining formation pressure |
CA2133286C (en) * | 1993-09-30 | 2005-08-09 | Gordon Moake | Apparatus and method for measuring a borehole |
US5581024A (en) * | 1994-10-20 | 1996-12-03 | Baker Hughes Incorporated | Downhole depth correlation and computation apparatus and methods for combining multiple borehole measurements |
US5959547A (en) * | 1995-02-09 | 1999-09-28 | Baker Hughes Incorporated | Well control systems employing downhole network |
US5887657A (en) * | 1995-02-09 | 1999-03-30 | Baker Hughes Incorporated | Pressure test method for permanent downhole wells and apparatus therefore |
DE69636054T2 (de) * | 1995-10-23 | 2006-10-26 | Baker Hugues Inc., Houston | Drehbohrsystem in geschlossener schleife |
US6186248B1 (en) * | 1995-12-12 | 2001-02-13 | Boart Longyear Company | Closed loop control system for diamond core drilling |
US6787758B2 (en) * | 2001-02-06 | 2004-09-07 | Baker Hughes Incorporated | Wellbores utilizing fiber optic-based sensors and operating devices |
US6028534A (en) * | 1997-06-02 | 2000-02-22 | Schlumberger Technology Corporation | Formation data sensing with deployed remote sensors during well drilling |
US5934971A (en) * | 1997-10-28 | 1999-08-10 | United States Filter Corporation | Fiber optic deadman control |
US7174975B2 (en) * | 1998-07-15 | 2007-02-13 | Baker Hughes Incorporated | Control systems and methods for active controlled bottomhole pressure systems |
US7270185B2 (en) * | 1998-07-15 | 2007-09-18 | Baker Hughes Incorporated | Drilling system and method for controlling equivalent circulating density during drilling of wellbores |
US7721822B2 (en) * | 1998-07-15 | 2010-05-25 | Baker Hughes Incorporated | Control systems and methods for real-time downhole pressure management (ECD control) |
US6415877B1 (en) * | 1998-07-15 | 2002-07-09 | Deep Vision Llc | Subsea wellbore drilling system for reducing bottom hole pressure |
US6816082B1 (en) * | 1998-11-17 | 2004-11-09 | Schlumberger Technology Corporation | Communications system having redundant channels |
US6252518B1 (en) * | 1998-11-17 | 2001-06-26 | Schlumberger Technology Corporation | Communications systems in a well |
GB9825425D0 (en) * | 1998-11-19 | 1999-01-13 | Andergauge Ltd | Downhole tool |
RU2273727C2 (ru) * | 2000-01-24 | 2006-04-10 | Шелл Интернэшнл Рисерч Маатсхаппий Б.В. | Нефтяная скважина и способ работы ствола нефтяной скважины |
US6374913B1 (en) * | 2000-05-18 | 2002-04-23 | Halliburton Energy Services, Inc. | Sensor array suitable for long term placement inside wellbore casing |
US6670880B1 (en) * | 2000-07-19 | 2003-12-30 | Novatek Engineering, Inc. | Downhole data transmission system |
US6992554B2 (en) * | 2000-07-19 | 2006-01-31 | Intelliserv, Inc. | Data transmission element for downhole drilling components |
AU2001275969A1 (en) * | 2000-07-19 | 2002-01-30 | Novatek Engineering Inc. | Data transmission system for a string of downhole components |
US6888473B1 (en) * | 2000-07-20 | 2005-05-03 | Intelliserv, Inc. | Repeatable reference for positioning sensors and transducers in drill pipe |
US6415231B1 (en) * | 2000-08-14 | 2002-07-02 | Joel J. Hebert | Method and apparatus for planning and performing a pressure survey |
NO325151B1 (no) * | 2000-09-29 | 2008-02-11 | Baker Hughes Inc | Fremgangsmate og apparat for dynamisk prediksjonsstyring ved boring ved bruk av neurale nettverk |
US6648082B2 (en) | 2000-11-07 | 2003-11-18 | Halliburton Energy Services, Inc. | Differential sensor measurement method and apparatus to detect a drill bit failure and signal surface operator |
US6712160B1 (en) * | 2000-11-07 | 2004-03-30 | Halliburton Energy Services Inc. | Leadless sub assembly for downhole detection system |
US6722450B2 (en) * | 2000-11-07 | 2004-04-20 | Halliburton Energy Svcs. Inc. | Adaptive filter prediction method and system for detecting drill bit failure and signaling surface operator |
US20020112888A1 (en) * | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
US6659197B2 (en) * | 2001-08-07 | 2003-12-09 | Schlumberger Technology Corporation | Method for determining drilling fluid properties downhole during wellbore drilling |
US6725162B2 (en) * | 2001-12-13 | 2004-04-20 | Schlumberger Technology Corporation | Method for determining wellbore diameter by processing multiple sensor measurements |
CA2482922C (en) * | 2002-04-19 | 2008-06-17 | Mark W. Hutchinson | Method and apparatus for determining drill string movement mode |
US6738994B2 (en) | 2002-05-10 | 2004-05-25 | Triodyne Safety Systems, Llc | Drain cover |
WO2003096075A1 (en) * | 2002-05-13 | 2003-11-20 | Camco International (Uk) Limited | Recalibration of downhole sensors |
AU2003241616A1 (en) * | 2002-05-24 | 2003-12-12 | Baker Hughes Incorporated | A method and apparatus for high speed communication with a downhole tool |
US8955619B2 (en) * | 2002-05-28 | 2015-02-17 | Weatherford/Lamb, Inc. | Managed pressure drilling |
US7062959B2 (en) * | 2002-08-15 | 2006-06-20 | Schlumberger Technology Corporation | Method and apparatus for determining downhole pressures during a drilling operation |
US7224288B2 (en) * | 2003-07-02 | 2007-05-29 | Intelliserv, Inc. | Link module for a downhole drilling network |
US7098802B2 (en) * | 2002-12-10 | 2006-08-29 | Intelliserv, Inc. | Signal connection for a downhole tool string |
US7207396B2 (en) * | 2002-12-10 | 2007-04-24 | Intelliserv, Inc. | Method and apparatus of assessing down-hole drilling conditions |
US6868920B2 (en) * | 2002-12-31 | 2005-03-22 | Schlumberger Technology Corporation | Methods and systems for averting or mitigating undesirable drilling events |
US6821147B1 (en) * | 2003-08-14 | 2004-11-23 | Intelliserv, Inc. | Internal coaxial cable seal system |
US6830467B2 (en) * | 2003-01-31 | 2004-12-14 | Intelliserv, Inc. | Electrical transmission line diametrical retainer |
US6844498B2 (en) * | 2003-01-31 | 2005-01-18 | Novatek Engineering Inc. | Data transmission system for a downhole component |
US6986282B2 (en) * | 2003-02-18 | 2006-01-17 | Schlumberger Technology Corporation | Method and apparatus for determining downhole pressures during a drilling operation |
US7082821B2 (en) * | 2003-04-15 | 2006-08-01 | Halliburton Energy Services, Inc. | Method and apparatus for detecting torsional vibration with a downhole pressure sensor |
GB2400906B (en) * | 2003-04-24 | 2006-09-20 | Sensor Highway Ltd | Distributed optical fibre measurements |
US7296624B2 (en) * | 2003-05-21 | 2007-11-20 | Schlumberger Technology Corporation | Pressure control apparatus and method |
US7193526B2 (en) * | 2003-07-02 | 2007-03-20 | Intelliserv, Inc. | Downhole tool |
US7178607B2 (en) * | 2003-07-25 | 2007-02-20 | Schlumberger Technology Corporation | While drilling system and method |
US7139218B2 (en) * | 2003-08-13 | 2006-11-21 | Intelliserv, Inc. | Distributed downhole drilling network |
US6910388B2 (en) * | 2003-08-22 | 2005-06-28 | Weatherford/Lamb, Inc. | Flow meter using an expanded tube section and sensitive differential pressure measurement |
US7017667B2 (en) * | 2003-10-31 | 2006-03-28 | Intelliserv, Inc. | Drill string transmission line |
US7114562B2 (en) * | 2003-11-24 | 2006-10-03 | Schlumberger Technology Corporation | Apparatus and method for acquiring information while drilling |
US7069999B2 (en) * | 2004-02-10 | 2006-07-04 | Intelliserv, Inc. | Apparatus and method for routing a transmission line through a downhole tool |
US7999695B2 (en) * | 2004-03-03 | 2011-08-16 | Halliburton Energy Services, Inc. | Surface real-time processing of downhole data |
US9441476B2 (en) * | 2004-03-04 | 2016-09-13 | Halliburton Energy Services, Inc. | Multiple distributed pressure measurements |
AU2005224600B2 (en) * | 2004-03-04 | 2011-08-11 | Halliburton Energy Services, Inc. | Multiple distributed force measurements |
RU2270919C2 (ru) * | 2004-05-20 | 2006-02-27 | Закрытое акционерное общество "Научно-производственное предприятие геофизической аппаратуры "ЛУЧ" | Способ передачи информации от забойной телеметрической системы и устройство для его осуществления |
US20060033638A1 (en) * | 2004-08-10 | 2006-02-16 | Hall David R | Apparatus for Responding to an Anomalous Change in Downhole Pressure |
US7392243B2 (en) | 2004-10-20 | 2008-06-24 | Microsoft Corporation | Using permanent identifiers in documents for change management |
US7428924B2 (en) * | 2004-12-23 | 2008-09-30 | Schlumberger Technology Corporation | System and method for completing a subterranean well |
US20070017671A1 (en) * | 2005-07-05 | 2007-01-25 | Schlumberger Technology Corporation | Wellbore telemetry system and method |
US8004421B2 (en) * | 2006-05-10 | 2011-08-23 | Schlumberger Technology Corporation | Wellbore telemetry and noise cancellation systems and method for the same |
US7913773B2 (en) * | 2005-08-04 | 2011-03-29 | Schlumberger Technology Corporation | Bidirectional drill string telemetry for measuring and drilling control |
US20070030167A1 (en) * | 2005-08-04 | 2007-02-08 | Qiming Li | Surface communication apparatus and method for use with drill string telemetry |
US9109439B2 (en) * | 2005-09-16 | 2015-08-18 | Intelliserv, Llc | Wellbore telemetry system and method |
US7793718B2 (en) * | 2006-03-30 | 2010-09-14 | Schlumberger Technology Corporation | Communicating electrical energy with an electrical device in a well |
US20070278009A1 (en) * | 2006-06-06 | 2007-12-06 | Maximo Hernandez | Method and Apparatus for Sensing Downhole Characteristics |
-
2009
- 2009-03-02 RU RU2015105531/03A patent/RU2015105531A/ru not_active Application Discontinuation
- 2009-03-02 US US12/396,347 patent/US8636060B2/en active Active
- 2009-03-02 RU RU2010137427A patent/RU2613374C2/ru active
- 2009-03-02 MX MX2010009656A patent/MX2010009656A/es active IP Right Grant
- 2009-03-02 EP EP09716767.0A patent/EP2260176B1/en active Active
- 2009-03-02 WO PCT/US2009/035767 patent/WO2009111412A2/en active Application Filing
- 2009-03-02 BR BRPI0908566-1A patent/BRPI0908566B1/pt active IP Right Grant
- 2009-03-02 AU AU2009222010A patent/AU2009222010B2/en active Active
- 2009-03-02 CA CA2717593A patent/CA2717593C/en active Active
Also Published As
Publication number | Publication date |
---|---|
BRPI0908566B1 (pt) | 2021-05-25 |
CA2717593C (en) | 2015-12-08 |
EP2260176A2 (en) | 2010-12-15 |
RU2015105531A (ru) | 2015-11-10 |
AU2009222010A1 (en) | 2009-09-11 |
CA2717593A1 (en) | 2009-09-11 |
BRPI0908566A2 (pt) | 2020-07-28 |
WO2009111412A2 (en) | 2009-09-11 |
US8636060B2 (en) | 2014-01-28 |
AU2009222010B2 (en) | 2015-06-25 |
RU2613374C2 (ru) | 2017-03-16 |
MX2010009656A (es) | 2010-12-21 |
EP2260176A4 (en) | 2013-07-10 |
WO2009111412A3 (en) | 2009-12-10 |
US20090166031A1 (en) | 2009-07-02 |
EP2260176B1 (en) | 2018-07-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2010137427A (ru) | Мониторинг скважинных показателей при помощи измерительной системы, распределенной по бурильной колонне | |
US20120330466A1 (en) | Operational logic for pressure control of a wellhead | |
CN103459755A (zh) | 钻井中的自动立管压力控制 | |
BR112016008332B1 (pt) | Sistema e método de controle de perfuração semiautônomo | |
RU2012148756A (ru) | Оценка параметров породы с использованием установленных в долоте источника радиации и детектора гамма-излучения | |
AU2011369403B2 (en) | Optimized pressure drilling with continuous tubing drill string | |
MX2021001206A (es) | Metodos y sistemas de deteccion de rotura de tuberia de monitoreo de anillo y orificio. | |
DK179910B1 (en) | Method for estimating well productivity along a section of a well bore | |
RU2661502C1 (ru) | Способ оптимизации периодичности газодинамических исследований скважин на нефтегазоконденсатных месторождениях крайнего севера | |
EP3280875B1 (en) | Flow monitoring tool | |
CN109751043A (zh) | 用于地层压力随钻测量工具的压力脉冲编解码系统和方法 | |
CN108505978B (zh) | 气井井下流量控制系统和控制方法 | |
CN106801602A (zh) | 利用随钻测量工具的压力波信号实时监测气侵的方法 | |
US20070257810A1 (en) | Telemetry transmitter optimization via inferred measured depth | |
CN107304669A (zh) | 一种配水器的改进方法及智能配水器 | |
CN107605469B (zh) | 预测地层孔隙压力的方法 | |
NO20180361A1 (en) | System and method for obtaining an effective bulk modulus of a managed pressure drilling system | |
US20210180418A1 (en) | Prospective kick loss detection for off-shore drilling | |
US20180328165A1 (en) | Methods and systems employing a gradient sensor arrangement for ranging | |
US11248460B2 (en) | Detecting a flood front in a formation | |
GB2591394A (en) | Using a downhole accelerometer to monitor vibration | |
US11287357B2 (en) | Vortex fluid sensing to determine fluid properties | |
CN117027754A (zh) | 确定水平井井下流量的方法、装置及系统 | |
NO20121023A1 (no) | System for kontinuerlig evaluering av borevæskeegenskaper | |
RU2014121522A (ru) | Упреждающее изменение заданного давления для отведения потока при буровых работах |