RU2010124708A - METHOD FOR DEVELOPING MINERAL DEPOSITS - Google Patents

METHOD FOR DEVELOPING MINERAL DEPOSITS Download PDF

Info

Publication number
RU2010124708A
RU2010124708A RU2010124708/03A RU2010124708A RU2010124708A RU 2010124708 A RU2010124708 A RU 2010124708A RU 2010124708/03 A RU2010124708/03 A RU 2010124708/03A RU 2010124708 A RU2010124708 A RU 2010124708A RU 2010124708 A RU2010124708 A RU 2010124708A
Authority
RU
Russia
Prior art keywords
ore
layer
development
rock mass
drilling
Prior art date
Application number
RU2010124708/03A
Other languages
Russian (ru)
Other versions
RU2443864C1 (en
Inventor
Георгий Михайлович Еремин (RU)
Георгий Михайлович Еремин
Original Assignee
Георгий Михайлович Еремин (RU)
Георгий Михайлович Еремин
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Георгий Михайлович Еремин (RU), Георгий Михайлович Еремин filed Critical Георгий Михайлович Еремин (RU)
Priority to RU2010124708/03A priority Critical patent/RU2443864C1/en
Publication of RU2010124708A publication Critical patent/RU2010124708A/en
Application granted granted Critical
Publication of RU2443864C1 publication Critical patent/RU2443864C1/en

Links

Landscapes

  • Manufacture And Refinement Of Metals (AREA)
  • Earth Drilling (AREA)

Abstract

Способ разработки месторождений полезных ископаемых в виде рудных тел, включающий деление рудных зон по глубине на подэтажи и этажи и отработки их сверху-вниз с обрушением вышележащего массива пород или закладкой выработанного пространства инородным раздробленным материалом с меньшей прочностью и устойчивостью массива пород, а также разработку рудных тел снизу-вверх с традиционной технологией дроблением руды в блоках массовым взрывом, нарушающим окружающий породный массив, отличающийся тем, что ведут разработку рудных тел снизу-вверх слоевым способом с ограниченной выемочной мощностью слоя шпуровым (скважинным) способом из буровых ортов с применением механизмов бурения и конвейерного транспортирования рудного материала, причем параметры отбиваемого слоя соответствуют приемной способности конвейеров, подающих материал в рудоспуск, а из него в транспортный подъемный сосуд (например, скип), и разработку ведут, начиная с висячего бока залежи, и постепенно отрабатывают слой за слоем в сторону лежачего бока залежи, а для сбора материала, сползающего с конвейерного става и при разработке промежуточных слоев между выемочными по высоте и дробимыми позже, внизу создают траншеи, из которых по течкам подают его на общий конвейер, и при небольшой высоте выемочного слоя потери и разубоживание руды снижаются в 5-10 раз (до 1,5-2% соответственно), и создается устойчивое выработанное пространство, которое в зависимости от мощности рудного тела может быть разделено на категории и использовано в народном хозяйстве и в военной сфере. A method of developing mineral deposits in the form of ore bodies, including dividing the ore zones in depth into sub-floors and floors and working them up and down with the collapse of the overlying rock mass or laying the worked out space with foreign fragmented material with less strength and stability of the rock mass, as well as the development of ore bottom-up bodies with traditional technology of crushing ore in blocks by a massive explosion disrupting the surrounding rock mass, characterized in that they are developing ore bodies from bottom to top x by a layered method with a limited extraction capacity of the layer using a drilling (borehole) method from drilling units using drilling and conveyor transportation of ore material, and the parameters of the striked layer correspond to the receiving ability of conveyors supplying the material to the ore pass and from it to the transport lifting vessel (for example, skip), and development is carried out starting from the hanging side of the deposit, and gradually work out layer by layer towards the lying side of the deposit, and to collect material sliding from the conveyor stand and during the development of intermediate layers between the excavation heights and crushed later, trenches are created below, from which they are fed through the chutes to a common conveyor, and with a small excavation layer height, ore losses and dilution are reduced by 5-10 times (up to 1.5-2 %, respectively), and a stable developed space is created, which, depending on the capacity of the ore body, can be divided into categories and used in the national economy and in the military sphere.

Claims (1)

Способ разработки месторождений полезных ископаемых в виде рудных тел, включающий деление рудных зон по глубине на подэтажи и этажи и отработки их сверху-вниз с обрушением вышележащего массива пород или закладкой выработанного пространства инородным раздробленным материалом с меньшей прочностью и устойчивостью массива пород, а также разработку рудных тел снизу-вверх с традиционной технологией дроблением руды в блоках массовым взрывом, нарушающим окружающий породный массив, отличающийся тем, что ведут разработку рудных тел снизу-вверх слоевым способом с ограниченной выемочной мощностью слоя шпуровым (скважинным) способом из буровых ортов с применением механизмов бурения и конвейерного транспортирования рудного материала, причем параметры отбиваемого слоя соответствуют приемной способности конвейеров, подающих материал в рудоспуск, а из него в транспортный подъемный сосуд (например, скип), и разработку ведут, начиная с висячего бока залежи, и постепенно отрабатывают слой за слоем в сторону лежачего бока залежи, а для сбора материала, сползающего с конвейерного става и при разработке промежуточных слоев между выемочными по высоте и дробимыми позже, внизу создают траншеи, из которых по течкам подают его на общий конвейер, и при небольшой высоте выемочного слоя потери и разубоживание руды снижаются в 5-10 раз (до 1,5-2% соответственно), и создается устойчивое выработанное пространство, которое в зависимости от мощности рудного тела может быть разделено на категории и использовано в народном хозяйстве и в военной сфере. A method of developing mineral deposits in the form of ore bodies, including dividing the ore zones in depth into sub-floors and floors and working them up and down with the collapse of the overlying rock mass or laying the worked out space with foreign fragmented material with less strength and stability of the rock mass, as well as the development of ore bottom-up bodies with traditional technology of crushing ore in blocks by a massive explosion disrupting the surrounding rock mass, characterized in that they are developing ore bodies from bottom to top x by a layered method with a limited extraction capacity of the layer using a drilling (borehole) method from drilling units using drilling and conveyor transportation of ore material, and the parameters of the striked layer correspond to the receiving ability of conveyors supplying the material to the ore pass and from it to the transport lifting vessel (for example, skip), and development is carried out starting from the hanging side of the deposit, and gradually work out layer by layer towards the lying side of the deposit, and to collect material sliding from the conveyor stand and during the development of intermediate layers between the excavation heights and crushed later, trenches are created below, from which they are fed through the chutes to a common conveyor, and with a small excavation layer height, ore losses and dilution are reduced by 5-10 times (up to 1.5-2 %, respectively), and a stable developed space is created, which, depending on the capacity of the ore body, can be divided into categories and used in the national economy and in the military sphere.
RU2010124708/03A 2010-06-16 2010-06-16 Method to mine mineral deposits RU2443864C1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2010124708/03A RU2443864C1 (en) 2010-06-16 2010-06-16 Method to mine mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2010124708/03A RU2443864C1 (en) 2010-06-16 2010-06-16 Method to mine mineral deposits

Publications (2)

Publication Number Publication Date
RU2010124708A true RU2010124708A (en) 2011-12-27
RU2443864C1 RU2443864C1 (en) 2012-02-27

Family

ID=45782095

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2010124708/03A RU2443864C1 (en) 2010-06-16 2010-06-16 Method to mine mineral deposits

Country Status (1)

Country Link
RU (1) RU2443864C1 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619513A (en) * 2012-03-26 2012-08-01 中南大学 Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock
CN109403974A (en) * 2018-09-30 2019-03-01 中国矿业大学 A kind of mine, which picks up, unloads pumping and fills lasting exploit design method
CN114837665A (en) * 2022-04-21 2022-08-02 淮北市东鑫矿业有限公司 Intelligent mining device and method for upward layering empty field of gently inclined medium-thickness ore body

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2572257C2 (en) * 2013-12-30 2016-01-10 Евгений Михайлович Попов Modular system for working and storing of hydrocarbons

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU742589A1 (en) * 1978-03-06 1980-06-25 Иркутский политехнический институт Method of mining super-thin sharply assending seams
SU1083662A1 (en) * 1982-09-09 1986-09-07 Предприятие П/Я Г-4938 Method of mining steep-slope ore-bodies
SU1458574A1 (en) * 1986-10-21 1989-02-15 Институт проблем комплексного освоения недр АН СССР Method of mining ore bodies
SE460212B (en) * 1987-02-19 1989-09-18 Alimak Ab SETTING AND EQUIPMENT FOR SMALL ORE MINING
SU1642005A1 (en) * 1989-03-31 1991-04-15 Криворожский горнорудный институт Method of mining ore deposits
RU2236591C1 (en) * 2003-03-18 2004-09-20 Урбаев Денис Александрович Method for extraction of steeply dipping ore bodies

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102619513A (en) * 2012-03-26 2012-08-01 中南大学 Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock
CN102619513B (en) * 2012-03-26 2013-12-25 中南大学 Room and pillar type medium-length hole filling mining method using bottom ore withdrawal structures simultaneously arranged in original rock
CN109403974A (en) * 2018-09-30 2019-03-01 中国矿业大学 A kind of mine, which picks up, unloads pumping and fills lasting exploit design method
CN114837665A (en) * 2022-04-21 2022-08-02 淮北市东鑫矿业有限公司 Intelligent mining device and method for upward layering empty field of gently inclined medium-thickness ore body

Also Published As

Publication number Publication date
RU2443864C1 (en) 2012-02-27

Similar Documents

Publication Publication Date Title
RU2676770C1 (en) Method for determining length of a filled section of fully mechanized coal-mining filling mixing combine harvester
CN102704934A (en) High-yield and low-cost subsequent filling mining method for underground mine
RU2010124708A (en) METHOD FOR DEVELOPING MINERAL DEPOSITS
CN104358574B (en) The horizontal room-and-pillar stoping of gently inclined orebody
CN107975044B (en) Method for backfilling collapse method mine by utilizing tailing surface collapse pits
CN104863591A (en) Method for controlling caving and earth surface filling treatment in goaf
CN104088640A (en) Mining method for isolating mining and stowing space of deep ore body
CN102589372A (en) Chamber and deep hole blasting method of gob
Kalybekov et al. Efficient land use in open-cut mining
CN104750940B (en) Dynamic strength design method for cemented filling body of underground stope
RU2421617C1 (en) Mineral resources open development method
CN104481538B (en) Method for treating interlayer in steeply inclined multi-layer ore body of non-coal mine
RU2543765C2 (en) Method of open mining of mineral deposits with forming of dump with large volume and height in difficult conditions
Cheskidov et al. Diversification of open pit coal mining with draglining
CN106089204B (en) A kind of method that remnant reclaiming is realized in positive deep hole great explosion caving
CN110821495A (en) Multi-layer gentle dip ore body ore-waste separation collaborative mining method
RU2534301C1 (en) Method of mining steeply dipping ore deposits
CN114017030A (en) Ascending continuous mining method for building ore removal structure in roof caving area of staged stope
CN203044301U (en) Gravity screening orepass device
RU2514252C1 (en) Method to extract non-commercial reserves in development of coal beds
RU2015115098A (en) METHOD FOR MINING TECHNICAL RECULTIVATION OF ANTI-EROSION DUMPS OF HIGH ECOLOGICAL CAPACITY
RU2652223C1 (en) Method of developing of steeply dipping ore deposits with underground enrichment
RU2651727C1 (en) Method of underground development of the inclined ore deposits
CN204876592U (en) Merogenesis fortune brick case
Sedina et al. GEOMECHANICAL SUPPORT THE STABILITY OF DIP OPEN-PITS

Legal Events

Date Code Title Description
MM4A The patent is invalid due to non-payment of fees

Effective date: 20120617