RU2001105332A - METHOD FOR COMBINED DEVELOPMENT OF LAYERED DEPOSITS - Google Patents
METHOD FOR COMBINED DEVELOPMENT OF LAYERED DEPOSITSInfo
- Publication number
- RU2001105332A RU2001105332A RU2001105332/03A RU2001105332A RU2001105332A RU 2001105332 A RU2001105332 A RU 2001105332A RU 2001105332/03 A RU2001105332/03 A RU 2001105332/03A RU 2001105332 A RU2001105332 A RU 2001105332A RU 2001105332 A RU2001105332 A RU 2001105332A
- Authority
- RU
- Russia
- Prior art keywords
- mining
- underground
- formation
- lining
- open
- Prior art date
Links
- 238000005065 mining Methods 0.000 claims 7
- 230000015572 biosynthetic process Effects 0.000 claims 4
- 238000005755 formation reaction Methods 0.000 claims 4
- 238000009412 basement excavation Methods 0.000 claims 3
- 229910052500 inorganic mineral Inorganic materials 0.000 claims 2
- 239000011707 mineral Substances 0.000 claims 2
- 239000002689 soil Substances 0.000 claims 2
- 230000003245 working Effects 0.000 claims 2
- 238000009434 installation Methods 0.000 claims 1
- 239000011435 rock Substances 0.000 claims 1
- 238000009423 ventilation Methods 0.000 claims 1
- 239000010878 waste rock Substances 0.000 claims 1
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2001105332/03A RU2194858C2 (en) | 2001-02-26 | 2001-02-26 | Method of combined mining of bedded mineral deposits |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2001105332/03A RU2194858C2 (en) | 2001-02-26 | 2001-02-26 | Method of combined mining of bedded mineral deposits |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2194858C2 RU2194858C2 (en) | 2002-12-20 |
RU2001105332A true RU2001105332A (en) | 2003-01-27 |
Family
ID=20246511
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2001105332/03A RU2194858C2 (en) | 2001-02-26 | 2001-02-26 | Method of combined mining of bedded mineral deposits |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2194858C2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2455488C2 (en) * | 2010-09-27 | 2012-07-10 | Учреждение Российской академии наук Институт горного дела Севера им. Н.В. Черского Сибирского отделения РАН | Method to recover outbalance reserves in combined development of coal beds |
RU2520225C2 (en) * | 2013-02-05 | 2014-06-20 | Черных Николай Георгиевич | Method for open underground development of main inclined mine openings (shafts) |
RU2559272C1 (en) * | 2014-04-22 | 2015-08-10 | Федеральное государственное бюджетное учреждение науки Институт горного дела Севера им. Н.В. Черского Сибирского отделения Российской академии наук | Method of combined development of flat seams of coal deposits |
RU2704061C1 (en) * | 2018-12-01 | 2019-10-23 | Владимир Васильевич Галайко | Method for combined development of flat seams of coal deposits |
-
2001
- 2001-02-26 RU RU2001105332/03A patent/RU2194858C2/en not_active IP Right Cessation
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110242301A (en) | A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer | |
AU2017101825A4 (en) | Construction method of strong karst water-rich urban shallow-buried tunnel cantilever boring machine | |
CN102518470B (en) | Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel | |
CN103821558A (en) | Coal mine gob filling mining system and gob-side entry retaining filling process | |
RU2344291C2 (en) | System of deposit development | |
CN104088637B (en) | A kind of residual coal second mining of upper group shallow embedding method under coal seam group condition | |
RU2312218C2 (en) | Combined development method for flat-laying seams of coal field | |
RU2209972C2 (en) | Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks | |
RU2001105332A (en) | METHOD FOR COMBINED DEVELOPMENT OF LAYERED DEPOSITS | |
CN109630116B (en) | Mining method for inclined medium-thickness blind ore body | |
RU2194858C2 (en) | Method of combined mining of bedded mineral deposits | |
CN212225213U (en) | Inclined shaft construction equipment | |
RU2395691C2 (en) | Method for strengthening of hydraulic stowage massif surfaces | |
CN109403972A (en) | Sublevel open stoping afterwards filling mining method | |
RU2471990C1 (en) | Method to mine sloping and inclined coal beds of average capacity | |
SU1122828A1 (en) | Method of combination mining of seam deposits | |
JP3819902B2 (en) | How to reach the shield machine | |
RU2238407C1 (en) | Method for combined extraction of mineral resources deposits | |
SU861606A1 (en) | Method of mining thin steeply deeping veins | |
RU2005117488A (en) | METHOD FOR DEVELOPING OVERBREEDS | |
SU829991A1 (en) | Method of filling worked area | |
RU2229600C1 (en) | Method for excavation of steep-falling ore deposits | |
SU1416694A1 (en) | Method of open mining of mineral deposits | |
RU2513729C1 (en) | Method to develop thick steeply-dipping ore bodies | |
RU2238406C2 (en) | Method for open-underground extraction of deposits |