RU2001105332A - METHOD FOR COMBINED DEVELOPMENT OF LAYERED DEPOSITS - Google Patents

METHOD FOR COMBINED DEVELOPMENT OF LAYERED DEPOSITS

Info

Publication number
RU2001105332A
RU2001105332A RU2001105332/03A RU2001105332A RU2001105332A RU 2001105332 A RU2001105332 A RU 2001105332A RU 2001105332/03 A RU2001105332/03 A RU 2001105332/03A RU 2001105332 A RU2001105332 A RU 2001105332A RU 2001105332 A RU2001105332 A RU 2001105332A
Authority
RU
Russia
Prior art keywords
mining
underground
formation
lining
open
Prior art date
Application number
RU2001105332/03A
Other languages
Russian (ru)
Other versions
RU2194858C2 (en
Inventor
Петр Назарович Васильев
Владимир Петрович Зубков
Original Assignee
Институт горного дела Севера СО РАН
Filing date
Publication date
Application filed by Институт горного дела Севера СО РАН filed Critical Институт горного дела Севера СО РАН
Priority to RU2001105332/03A priority Critical patent/RU2194858C2/en
Priority claimed from RU2001105332/03A external-priority patent/RU2194858C2/en
Application granted granted Critical
Publication of RU2194858C2 publication Critical patent/RU2194858C2/en
Publication of RU2001105332A publication Critical patent/RU2001105332A/en

Links

Claims (1)

Способ комбинированной разработки пластовых месторождений, включающий ведение вскрышных и добычных работ открытыми горными работами, проведение подземных вскрывающих и подготавливающих горных выработок, ведение очистных подземных работ с расположением вентиляционного штрека первого выемочного столба по простиранию пласта вдоль границы между открытыми и подземными горными работами, отличающийся тем, что вскрытие месторождения ведут внутренней траншеей вкрест простирания пласта от выхода его на поверхность до границы между открытыми и подземными горными работами, после выемки полезного ископаемого в траншее на почве пласта монтируют крепь вскрывающих капитальных выработок для участка подземных работ по всей длине внутренней траншеи, засыпают смонтированную крепь пустыми породами от продолжающихся открытых горных работ, слоем мощностью не менее 4-5 м, подготовку участка подземных работ через смонтированные выработки, а при выемке последней заходки на участке открытых работ после извлечения полезного ископаемого, на почве пласта, непосредственно у полезного ископаемого, монтируют крепь вентиляционного штрека и по мере монтажа крепи производят засыпку крепи пустыми породами с мощностью засыпки не менее 4-5 м.The method of combined development of reservoir deposits, including overburden and mining operations by open cast mining, underground excavation and preparation of mine workings, conducting underground mining works with the location of the ventilation drift of the first excavation column along the strike of the formation along the boundary between open and underground mining, characterized in that the opening of the deposit is carried out by an internal trench across the strike of the formation from its exit to the surface to the boundary between the open mining and underground mining, after excavation of the mineral in the trench on the soil of the formation, mount the lining of the openings for the underground work section along the entire length of the internal trench, fill the mounted lining with empty rocks from the ongoing opencast mining, with a thickness of at least 4-5 m, preparation of the underground work site through the installed workings, and when excavating the last run in the open work area after extracting the mineral, on the soil of the formation, directly from the useful suit a share, mount airway lining and as lining installation, the backfilling of waste rock bolting with a filling capacity of not less than 4-5 m.
RU2001105332/03A 2001-02-26 2001-02-26 Method of combined mining of bedded mineral deposits RU2194858C2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2001105332/03A RU2194858C2 (en) 2001-02-26 2001-02-26 Method of combined mining of bedded mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2001105332/03A RU2194858C2 (en) 2001-02-26 2001-02-26 Method of combined mining of bedded mineral deposits

Publications (2)

Publication Number Publication Date
RU2194858C2 RU2194858C2 (en) 2002-12-20
RU2001105332A true RU2001105332A (en) 2003-01-27

Family

ID=20246511

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2001105332/03A RU2194858C2 (en) 2001-02-26 2001-02-26 Method of combined mining of bedded mineral deposits

Country Status (1)

Country Link
RU (1) RU2194858C2 (en)

Families Citing this family (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2455488C2 (en) * 2010-09-27 2012-07-10 Учреждение Российской академии наук Институт горного дела Севера им. Н.В. Черского Сибирского отделения РАН Method to recover outbalance reserves in combined development of coal beds
RU2520225C2 (en) * 2013-02-05 2014-06-20 Черных Николай Георгиевич Method for open underground development of main inclined mine openings (shafts)
RU2559272C1 (en) * 2014-04-22 2015-08-10 Федеральное государственное бюджетное учреждение науки Институт горного дела Севера им. Н.В. Черского Сибирского отделения Российской академии наук Method of combined development of flat seams of coal deposits
RU2704061C1 (en) * 2018-12-01 2019-10-23 Владимир Васильевич Галайко Method for combined development of flat seams of coal deposits

Similar Documents

Publication Publication Date Title
CN110242301A (en) A kind of modified water-protection coal-mining method of two step slip casting of top plate water-bearing layer
AU2017101825A4 (en) Construction method of strong karst water-rich urban shallow-buried tunnel cantilever boring machine
CN102518470B (en) Method for preventing and controlling water by using freezing pipes in annular water intercepting tunnel
CN103821558A (en) Coal mine gob filling mining system and gob-side entry retaining filling process
RU2344291C2 (en) System of deposit development
CN104088637B (en) A kind of residual coal second mining of upper group shallow embedding method under coal seam group condition
RU2312218C2 (en) Combined development method for flat-laying seams of coal field
RU2209972C2 (en) Method of mining of jointly occurring steep thin ore bodies in stable and medium-stable rocks
RU2001105332A (en) METHOD FOR COMBINED DEVELOPMENT OF LAYERED DEPOSITS
CN109630116B (en) Mining method for inclined medium-thickness blind ore body
RU2194858C2 (en) Method of combined mining of bedded mineral deposits
CN212225213U (en) Inclined shaft construction equipment
RU2395691C2 (en) Method for strengthening of hydraulic stowage massif surfaces
CN109403972A (en) Sublevel open stoping afterwards filling mining method
RU2471990C1 (en) Method to mine sloping and inclined coal beds of average capacity
SU1122828A1 (en) Method of combination mining of seam deposits
JP3819902B2 (en) How to reach the shield machine
RU2238407C1 (en) Method for combined extraction of mineral resources deposits
SU861606A1 (en) Method of mining thin steeply deeping veins
RU2005117488A (en) METHOD FOR DEVELOPING OVERBREEDS
SU829991A1 (en) Method of filling worked area
RU2229600C1 (en) Method for excavation of steep-falling ore deposits
SU1416694A1 (en) Method of open mining of mineral deposits
RU2513729C1 (en) Method to develop thick steeply-dipping ore bodies
RU2238406C2 (en) Method for open-underground extraction of deposits