RU1630342C - Method of making frozen massif in dam foundation - Google Patents

Method of making frozen massif in dam foundation

Info

Publication number
RU1630342C
RU1630342C SU894694953A SU4694953A RU1630342C RU 1630342 C RU1630342 C RU 1630342C SU 894694953 A SU894694953 A SU 894694953A SU 4694953 A SU4694953 A SU 4694953A RU 1630342 C RU1630342 C RU 1630342C
Authority
RU
Russia
Prior art keywords
dam
base
talik
channel
permafrost
Prior art date
Application number
SU894694953A
Other languages
Russian (ru)
Inventor
В.Н. Грандилевский
С.В. Соболь
А.К. Битюрин
В.И. Хорьков
Original Assignee
Горьковский инженерно-строительный институт им.В.П.Чкалова
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Горьковский инженерно-строительный институт им.В.П.Чкалова filed Critical Горьковский инженерно-строительный институт им.В.П.Чкалова
Priority to SU894694953A priority Critical patent/RU1630342C/en
Application granted granted Critical
Publication of RU1630342C publication Critical patent/RU1630342C/en

Links

Landscapes

  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Изобретение относитс  к гидротехнике . Цель изобретени  - повышение эксплуатационной надежности плотины и снижение затрат на поддержание основани  в мерзлом состо нии. Вечно- мерзлое основание 1 включает несквозной подрусловой талик 2. Основание талика 2 обозначено верхней границей мерзлоты 3. При возведении плотины 4 наполн ют водохранилище 5 и выполн ют противофильтрацнонную завесу 6, Русло в мш-:;ио б,е.- 7 перекрывают перемыч-- кой 8. Участок 9 русла в нижнем бьефе осушают II громораживают. 1 ил.The invention relates to hydraulic engineering. The purpose of the invention is to increase the operational reliability of the dam and reduce the cost of maintaining the base in a frozen state. The permafrost base 1 includes a continuous under-bed talik 2. The base of the talik 2 is indicated by the upper boundary of the permafrost 3. When the dam 4 is erected, fill the reservoir 5 and carry out an anti-filter curtain 6, Channel in the railroad - :; Ib, f. - Coy 8. Section 9 of the channel in the downstream drained II thunder. 1 ill.

Description

Изобретение относитс  к гидротехнике , а именно к строительству глухих плотин и дамб хвостохранилищ в районах распространени  вечной мерзлоты на водотоках с несквозным .юдрусло- выми таликами.The invention relates to hydraulic engineering, in particular to the construction of dead dams and tailing dams in permafrost areas on watercourses with continuous through-throat taliks.

Цель изобретени  - повышение эксплуатационной надежности плотины и снижение затрат на поддержание основани  в мерзлом состо нии.The purpose of the invention is to increase the operational reliability of the dam and reduce the cost of maintaining the base in a frozen state.

На чертеже изображен массив вдоль тока воды по телу и основанию плотины , вертикальный разрез.The drawing shows an array along the stream of water along the body and base of the dam, a vertical section.

Способ реализуют следующим образом .The method is implemented as follows.

На вечномерэлом основании 1, включающем несквозной подрусловой талик 2, обозначенный верхней границей мерзлоты 3 в бытовых услови х, стро тOn a permanent permafrost base 1, including a continuous under-bed talik 2, indicated by the upper boundary of permafrost 3 under domestic conditions,

глухую нефпльтрующуго плотину 4 мерзлого типа из местных материалов. В талике 2 под плотиной 4 одновременно с возведением плотины 4 и наполнением водохранилища 5 выполн ют мерзлотную противофильтрацнонную завесу Ь. С созданием завесы 6 прекращаетс  фильтраци  воды в подрусловой талик 2 из водохранилища 5. После выполне-- ни  мерзлотной завесы 6 русло в нижнем бьефе 7 перекрывают водонепроницаемой перемычкой 8 из местных материалов с негрунтовым противофильтра- ционным экраном. Рассто ние между плотиной 4 и перемычкой 8 при проектировании конкретного объекта назначают по результатам прогнозов температурного режима основани  на период эксплуатации. Затем участок 9 руслаdead frozen oil dam 4 frozen type of local materials. In talik 2, under dam 4, simultaneously with the construction of dam 4 and filling of the reservoir 5, a permafrost anti-filtration curtain b is made. With the creation of a curtain 6, the filtration of water into the under-bed talik 2 from the reservoir 5 is stopped. After the permafrost curtain 6 is completed, the channel in the lower pool 7 is blocked by a waterproof bridge 8 made of local materials with a non-ground anti-filter screen. The distance between the dam 4 and the jumper 8 when designing a particular object is assigned according to the results of forecasts of the temperature regime of the base for the period of operation. Then section 9 of the channel

о соoh co

о соoh co

44

юYu

316316

Гв нижнем бьефе 7 между плотиной 4 и перемычкой 8 осушают и поддерживают далее в осушенном xsoctoHmm, откачива  по мере необходимости воду, по - вившуюс  йа участке 9 вследствие 1 фильтрации из нижнего бьефа 7 и выладени „атмосферных осадков. Дл  поддержани  участка 9 в осушенном состо нии русло 8 его пределах засыпают грунтом с устройством системы поверх- ностного подоотведени . Далее подрус- ловой талик 2 под осушенным участком 9 русла промораживают естественным холодом Промораживание талика 2 ведут в период эксплуатации сооружени . Со временем верхн   граница мерзлотыIn the lower pool 7 between the dam 4 and the jumper 8, they are drained and maintained further in the drained xsoctoHmm, pumping out water as necessary in section 9 as a result of 1 filtration from the lower pool 7 and the precipitation. To keep section 9 in the dried state, the channel 8 is covered with soil with a surface underflow system. Next, the under-bed talik 2 under the drained section of the channel 9 is frozen with natural cold. Freezing of the talik 2 is carried out during the operation of the structure. Over time, the upper limit of permafrost

принимает положение 10, подрусловой талик 2 под плотиной 4 и участком 9 русла в нижнем бьефе 7 оказываетс  полностью промороженным, а в основании плотины образуетс  монолитный массив мерзлого грунта. takes position 10, the under-bed talik 2 under the dam 4 and the channel section 9 in the downstream 7 is completely frozen out, and a monolithic mass of frozen ground is formed at the base of the dam.

Предлагаемый способ создани  мерзлого массива в основании плотины поз- вол ет исключить оттаивание грунтов основани  в нижнем бьефе непосредстThe proposed method of creating a frozen massif at the dam base allows to exclude thawing of the base soil in the downstream directly

венно за плотиной, обеспечить промораживание подруслового талика, образовать в основании монолитный мерзлый массив грунта, распростран ющийс  в сторону нижнего бьефа, что существенно повысит надежность основани  плотины в эксплуатации.beneath the dam, to freeze the under-bed talik, to form a monolithic frozen mass of soil at the base, spreading towards the downstream, which will significantly increase the reliability of the dam base in operation.

- -

5 5

00

(5(5

00

Claims (1)

Формула изобретени The claims Способ создани  мерзлого м-гссива в основании плотины, включающий выполнение мерзлотной противофильтраци- онной завесы в талике под плотиной, отличающийс  тем, что, с целью повышени 4 эксплуатационной надежности плотины и снижени  затрат на поддержание основани  в мерзлом состо нии, после выполнени  завесы перекрывают русло в нижнем бьефе плотины водонепроницаемой перемычкой, осушают участок русла между плотиной, и перемычкой, поддерживают его в осушенном состо нии и промораживают талик под- этим участком посредством подачи естественного холода в период эксплуатации сооружени .A method of creating a frozen m-bulk at the base of a dam, comprising making a permafrost antifiltration curtain in a talik under a dam, characterized in that, in order to increase the operational reliability of the dam and reduce the cost of maintaining the base in a frozen state, the channel is blocked after the curtain is made in the downstream of the dam with a waterproof jumper, drain the section of the channel between the dam and the bridge, maintain it in a dried state and freeze the talik under this section by feeding naturally cold during operation of the facility. 5.5. з з г юs z g y / / //// // ///7/ /7/ГЯ/7 /ГЯ7Г///77±;-. -t -.:. /// 7 / / 7 / ГЯ / 7 / ГЯ7Г /// 77 ±; -. -t -.:. тшЗtshz
SU894694953A 1989-05-24 1989-05-24 Method of making frozen massif in dam foundation RU1630342C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU894694953A RU1630342C (en) 1989-05-24 1989-05-24 Method of making frozen massif in dam foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU894694953A RU1630342C (en) 1989-05-24 1989-05-24 Method of making frozen massif in dam foundation

Publications (1)

Publication Number Publication Date
RU1630342C true RU1630342C (en) 1992-12-23

Family

ID=21449299

Family Applications (1)

Application Number Title Priority Date Filing Date
SU894694953A RU1630342C (en) 1989-05-24 1989-05-24 Method of making frozen massif in dam foundation

Country Status (1)

Country Link
RU (1) RU1630342C (en)

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Богословский п .А. О строительстве земл ных плотин в районах распространени многолетнемер лых грунтов. Труды Горьковского инженерно-строительного института им. В.П.Чкалова, вып. 29. - Горький, 19Ь8. Авторское свидетельстве оССР № 15Ь8Ь05, кл. В 02 В 3/16, 1988. *

Similar Documents

Publication Publication Date Title
CN114319401A (en) Foundation pit slope drainage system
RU2307891C1 (en) Ground dam built on permafrost base
CN207228292U (en) One kind omits water system in printing slowly after first catchmenting
RU1630342C (en) Method of making frozen massif in dam foundation
CN105970882A (en) Structure solving reverse osmosis water problem of dam body in construction process of concrete-faced rockfill dam and construction method thereof
RU2406800C2 (en) Method for erection of gabion mat of biopositive design
CN107558587A (en) One kind omits water system in printing slowly after first catchmenting
Bornschein et al. Dam break during the flood in Saxony/Germany in August 2002
SU1573079A1 (en) Method of washing tailing pond
RU2785656C1 (en) Thaw-type embankment dam on a permafrost foundation
RU2768715C1 (en) Earth dam drainage system
SU1698354A1 (en) Method of erecting weirs
RU2310035C2 (en) Method for frozen earth-filled dam erection
RU2320810C2 (en) Method to erect paving of gabion mats in flood season
RU2382139C1 (en) Riverbed-diversion structure of seasonal waterway on permafrost
CN107447768A (en) CFRD reverse drainage system
SU1717709A1 (en) Method of ice dam construction
RU2299949C1 (en) Method for upstream structure construction in permafrost ground and upstream structure
RU2309219C1 (en) Earth-fill dam of frozen type
SU1030471A1 (en) Concrete dam on rock base
Serra et al. The Rigoso project. Two old masonry dams to be recovered
SU874849A1 (en) Method of erecting an earth dam with counter-filtration elements
SU1701796A1 (en) Guarding dike of water accumulator on frozen base
RU2016165C1 (en) Drainage of an earthen dam based on a watertight foundation
SU1114726A1 (en) Method for erecting earth dam of frozen type