CN107447768A - CFRD reverse drainage system - Google Patents

CFRD reverse drainage system Download PDF

Info

Publication number
CN107447768A
CN107447768A CN201710868559.XA CN201710868559A CN107447768A CN 107447768 A CN107447768 A CN 107447768A CN 201710868559 A CN201710868559 A CN 201710868559A CN 107447768 A CN107447768 A CN 107447768A
Authority
CN
China
Prior art keywords
upstream
dam body
drainpipe
cfrd
row well
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201710868559.XA
Other languages
Chinese (zh)
Inventor
姜媛媛
窦向贤
卢羽平
何兰
唐瑜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201710868559.XA priority Critical patent/CN107447768A/en
Publication of CN107447768A publication Critical patent/CN107447768A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D19/00Keeping dry foundation sites or other areas in the ground
    • E02D19/06Restraining of underground water
    • E02D19/10Restraining of underground water by lowering level of ground water
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/18Making embankments, e.g. dikes, dams

Abstract

The invention belongs to Hydraulic and Hydro-Power Engineering field, specifically disclosing a kind of can make the timely and effective CFRD reverse drainage system collected that seeped water in dam.The CFRD reverse drainage system, including water side are arranged on the drainpipe at the toe board of upstream and are arranged on the upstream row well of dam body upstream internal;Also include being arranged on collecting conduit in the upstream rockfill area of dam body, be filled with block filler in collecting conduit, formed with collecting water space between block filler;Upstream row well is connected with collecting conduit, and the water inlet end of drainpipe is stretched in upstream row well or in collecting conduit.By setting collecting conduit in the rockfill area of upstream, and block filler is filled in collecting conduit, the collection water space formed between block filler then make it that infiltration timely and effective can collect in dam body, and then is outwards excluded from drainpipe and upstream row well beneficial to infiltration in dam body.

Description

CFRD reverse drainage system
Technical field
The invention belongs to Hydraulic and Hydro-Power Engineering field, and in particular to a kind of CFRD reverse drainage system.
Background technology
After the CFRD dam foundation is cleared up and toe board excavates, if riverbed position monolith ground is that upstream is low, downstream Height, or the level of tail water be higher than upstream toe board basic elevation when, then in rock work progress will because of the discrepancy in elevation shape Into inverse osmosis current.After the completion of toe board and panel concrete construction, before dam upstream apron fills beginning, the construction time it is each Kind current hydraulic pressure (riverbed infiltration, construction water and rainwater) must discharge, the larger head that otherwise inverse osmosis current are formed in time Difference will likely cause bedding material seepage failure, so as to destroy bedding material grain composition, make the function of bedding material seepage flow out of hand; In addition, reverse water pressure is also possible to lift or pressure break abutment wall and panel, water sealing structure is destroyed, so as to influence rock antiseepage system The anti-seepage effect of system.For the rock on deep covering layer ground, water drainage of deep foundation pit problem is more prominent;Therefore, face The design of sheetpile masonry dam construction time reverse drainage measure is extremely important.
At present, for the CFRD during construction panel level of tail water it is not high in the case of, generally use draining Pipe carries out reverse drainage, i.e., the pre-buried drainpipe at the toe board of dam upstream, and the water inlet end of drainpipe gos deep into dam body rockfill area; For the construction time level of tail water it is higher in the case of, the drainage system of generally use " drainpipe+gully " composition carries out reverse Draining, i.e., gully, while pre-buried drainpipe at the toe board of dam upstream, the water inlet end depth of drainpipe are set inside the dam body of upstream Enter in communication to gully inside.What existing reverse drainage system was unfavorable for seeping water in dam collects, and infiltration excludes effect one As.
The content of the invention
It can make the timely and effective concrete surface collected that seeped water in dam the technical problem to be solved in the present invention is to provide a kind of Sheetpile masonry dam reverse drainage system.
The technical solution adopted for the present invention to solve the technical problems is:CFRD reverse drainage system, The drainpipe at the toe board of upstream is arranged on including water side and is arranged on the upstream row well of dam body upstream internal;Also include setting Collecting conduit in the upstream rockfill area of dam body, is filled with block filler in the collecting conduit, between the block filler Formed with collection water space;The upstream row well connects with collecting conduit, and the water inlet end of the drainpipe stretches to upstream drainage In well or in collecting conduit.
It is further that the drainpipe is along suitable river to arrangement, the L-shaped knot of drainpipe pipeline section stretched into collecting conduit Structure, the water inlet end of the drainpipe are located at the upper end of " L " shape structure.
It is further that the drainpipe is at least two be spaced apart.
It is further that the quantity of the upstream row well is at least flatly, elevation direction of the upstream row well along dam body Set, and the top of upstream row well be located at dam body elevation 1/3rd heights of dam sentence under position.
It is further that the collecting conduit is along Yokogawa to the bottom for being laid in upstream rockfill area.
It is further that the block filler is sandy gravel.
It is further, in addition to is arranged on the downstream row well of dam body downstream inner, the top of the downstream row well It is higher than the top of upstream row well.
It is further that the quantity of the downstream row well is at least flatly, and the bottom of downstream row well is in the dam foundation On face.
Present invention also offers a kind of method for blocking of CFRD reverse drainage system, this method is used to seal The CFRD reverse drainage system stated is blocked, it comprises the following steps:
A, drainpipe is blocked in dry season, the bedding that dam body upstream is carried out after drainpipe closure fills;
B, treat that dam body upstream apron is filled to cope level less than at 3~5m of upstream row well cope level and the base of upstream When effluent position is risen at 3~5m of cope level that elevation fills less than dam body upstream apron, the closure of upstream row well is carried out;
C, continue to fill dam body upstream progress bedding, treat that dam body upstream apron is filled to cope level and downstream row well Cope level equal-height position and upstream Water Level in Foundation Pit are risen at 3~5m of cope level that elevation fills less than dam body upstream apron When, carry out the closure of downstream row well.
It is further that after drainpipe closure, infiltration is by upstream row well or by upstream row well and downstream in dam body Gully pump drainage;After the closure of upstream row well, infiltration is by downstream row well pump drainage in dam body.
The beneficial effects of the invention are as follows:By setting collecting conduit in the rockfill area of upstream, and filled in collecting conduit Block filler, the collection water space formed between block filler then make it that infiltration timely and effective can collect in dam body, and then is beneficial to Infiltration outwards excludes from drainpipe and upstream row well in dam body, avoids bedding material and is saturated destruction, and ensure that concrete The anti-seepage effect of rock seepage control system.Collecting conduit seeps water along Yokogawa to laying beneficial to abundant collect in dam.It is set Downstream row well can ensure after drainpipe and the closure of upstream row well, in dam body infiltration smoothly outwards exclude, it is effectively slow The pressure of reverse drainage closure period is solved, is normally filled for dam and provides space and time.
Brief description of the drawings
Fig. 1 is the floor plan of CFRD reverse drainage system in the present invention;
Fig. 2 is the sectional view of the line A-A along Fig. 1;
Fig. 3 is the sectional view of the line B-B along Fig. 1;
Fig. 4 is the sectional view of the line C-C along Fig. 1;
In figure mark for:Dam body 100, upstream toe board 110, upstream rockfill area 120, drainpipe 210, upstream row well 220, Collecting conduit 230, block filler 231, downstream row well 240.
Embodiment
The invention will be further described below in conjunction with the accompanying drawings.
With reference to shown in Fig. 1, Fig. 2, Fig. 3 and Fig. 4, CFRD reverse drainage system, including water side are set Drainpipe 210 at upstream toe board 110, it is arranged on the upstream row well 220 of the upstream internal of dam body 100 and is arranged on dam Collecting conduit 230 in the upstream rockfill area 120 of body 100;Block filler 231, block filler are filled with collecting conduit 230 Formed with collection water space between 231;Upstream row well 220 connects with collecting conduit 230, and the water inlet end of drainpipe 210 stretches to In upstream row well 220 or in collecting conduit 230.By setting collecting conduit 230 in the upstream rockfill area 120, beneficial to making dam Infiltration collects in body 100;Meanwhile the filling block filler 231 in the collecting conduit 230, and between block filler 231 formed with Collect water space, can either so form support to the enrockment in upstream rockfill area 120, avoid the formation of dam body cavity, and cause dam Infiltration timely and effective can be pooled to collection water space in body 100, and then be seeped water beneficial in dam body 100 from drainpipe 210 and upstream Gully 220 outwards excludes, and drainage effect is preferable.
Wherein, drainpipe 210 is used to infiltration in dam body 100 being discharged in the foundation ditch of upstream, then using the pump drainage of dam System will arrange outside the water body in the foundation ditch of upstream;Drainpipe 210 is generally pre-buried to be arranged on the upstream internal of dam body 100, its water side by Upstream toe board 110 passes corresponding with upstream foundation ditch, and its water inlet end is stretched in upstream row well 220 or in collecting conduit 230 Collect infiltration.In order to, by being arranged outside drainpipe 210, generally make water inlet end be higher than water side when setting drainpipe 210 beneficial to infiltration; It is preferred that drainpipe 210 is made using zinc-plated steel floral tube.
Preferably, drainpipe 210 along river to arrangement;Also, it is generally spaced and arranges that the drainpipe 210 of more than two is carried out Draining.Can be that the water inlet end of whole drainpipes 210 is all stretched in upstream row well 220 or collected during more drainpipes 210 In water covered conduit 230;It can also be that the water inlet end of a portion drainpipe 210 is stretched in upstream row well 220, another part The water inlet end of drainpipe 210 is stretched in collecting conduit 230., to the drainpipe 210 of arrangement, on the one hand can conveniently it be applied along river Work, the length of drainpipe 210 on the other hand can be saved, it is cost-effective.
Seeped water in order to preferably collect in dam body 100, as shown in figure 3, stretching into the drainpipe in collecting conduit 230 The L-shaped structure of 210 pipeline sections, the water inlet end of drainpipe 210 are located at the upper end of " L " shape structure.
Dry constructed because the upstream apron of dam body 100 fills needs, therefore can only be after the closure of drainpipe 210 Bedding construction can be carried out;In order to ensure the construction period, while again in order to which infiltration in dam body 100 is effectively discharged, therefore The upstream internal of dam body 100 is provided with upstream row well 220.Upstream row well 220 is mainly used in dam body after drainpipe 210 blocks Infiltration excludes in 100, and it is generally set along the elevation direction of dam body 100, and the top of upstream row well 220 is located at dam body 100 / 3rd heights of dam of elevation sentence under position.Positional distance at this is referred at 1/3rd heights of dam of the elevation of dam body 100 The height in dam foundation face is 1/3rd of the design altitude of dam body 100.The quantity of upstream row well 220 can be according to the rule of dam body 100 The amount of infiltration carries out relative set in mould and dam body 100, typically at least sets flatly;The dam body collected in upstream row well 220 Infiltration can pass through the outside pump drainage of draining pump in 100.
Collecting conduit 230 is used to make infiltration in dam body 100 to collect, effectively to exclude;In order to make in dam body 100 Infiltration fully collects to collecting conduit 230, and generally along Yokogawa to collecting conduit 230 is laid, Yokogawa is to referring to perpendicular to Shun He To direction.The purpose of filling block filler 231 is in order to avoid forming dam internal cavity, to prevent to dam in collecting conduit 230 Body 100 adversely affects, and block filler 231 is preferably sandy gravel;And the collection water space formed between block filler 231 then can Enough ensure the effect of catchmenting of collecting conduit 230.Collecting conduit 230 is arranged in upstream rockfill area 120, is because upstream rockfill area Predominantly enrockment, fines are less in 120, therefore collection water space will not be plugged, and ensure that the effect catchmented.Preferably, will collect Water covered conduit 230 is located at the bottom of upstream rockfill area 120, and upstream row well 220 is located to the surface of collecting conduit 230.
As a preferred embodiment of the present invention, in conjunction with shown in Fig. 1 and Fig. 4, the CFRD is reversely arranged Water system also includes the downstream row well 240 for being arranged on the downstream inner of dam body 100, and upstream row is compared at the top of downstream row well 240 The top of well 220 is high.Set downstream row well 240 can ensure to block in drainpipe 210 and upstream row well 220 Afterwards, infiltration smoothly outwards excludes in dam body 100, effectively alleviates the pressure of reverse drainage closure period, normally fills and carries for dam Space and time are supplied.
Downstream row well 240 is mainly used in seep water in dam body 100 after drainpipe 210 and upstream row well 220 block Exclude, it can also aid in the outwards row's infiltration of upstream row well 220, reduce the discharge pressure of upstream row well 220.Downstream drainage Well 240 is generally set along the elevation direction of dam body 100, and its bottom is on dam foundation face;The quantity of downstream row well 240 can Relative set is carried out according to the amount to be seeped water in the scale of dam body 100 and dam body 100, typically at least provided with flatly;Downstream row well Infiltration can pass through the outside pump drainage of draining pump in the dam body 100 collected in 240.Due to the bedding of the upstream of dam body 100 fill need by The top covering of upstream row well 220, in order to cause the interior infiltration of dam body 100 is effectively outer to arrange under larger lid weight power, Therefore the top of the downstream row well 240 set needs higher than the top of upstream row well 220.
The method for blocking of CFRD reverse drainage system, for blocking above-mentioned CFRD Reverse drainage system, it comprises the following steps:
A, drainpipe 210 is blocked in dry season, drainpipe 210 carries out the upstream of dam body 100 bedding after blocking is filled out Build;
B, treat the upstream apron of dam body 100 fill to cope level less than at the 3~5m of cope level of upstream row well 220 and When upstream Water Level in Foundation Pit is risen at 3~5m of cope level that elevation fills less than the upstream apron of dam body 100, upstream drainage is carried out The closure of well 220;
C, continue to fill the upstream of dam body 100 progress bedding, treat that the upstream apron of dam body 100 is filled to cope level and downstream The cope level equal-height position of gully 240 and upstream Water Level in Foundation Pit rise to elevation and are less than the top that the upstream apron of dam body 100 fills When at 3~5m of elevation, the closure of downstream row well 240 is carried out.
Wherein, after drainpipe 210 blocks, infiltration is by upstream row well 220 or by upstream row well 220 in dam body 100 With the pump drainage of downstream row well 240;After upstream row well 220 blocks, infiltration is by the pump drainage of downstream row well 240 in dam body 100.
Using the CFRD reverse drainage system in the present invention dam body 100 is outwards excluded in the dam construction phase Interior infiltration, and CFRD reverse drainage system is blocked using the method for blocking in the present invention, Neng Gou Ensure that infiltration is obtained on the premise of effectively excluding in dam body 100, substantially reduce the construction of the upstream of dam body 100 and seeped water by dam body 100 Influence, ensure that the backfill of cell material, bedding material before dam is smoothed out, so as to reduce construction risk, effectively alleviate draining Pipe 210, upstream row well 220 block the pressure of infiltration in period dam body 100 successively, and effectively save the duration.

Claims (10)

1. CFRD reverse drainage system, including water side are arranged on the drainpipe at upstream toe board (110) place (210) and it is arranged on the upstream row well (220) of dam body (100) upstream internal;It is characterized in that:Also include being arranged on dam body (100) the collecting conduit (230) in upstream rockfill area (120), the collecting conduit (230) is interior to be filled with block filler (231), formed with collection water space between the block filler (231);The upstream row well (220) and collecting conduit (230) Connection, the water inlet end of the drainpipe (210) are stretched in upstream row well (220) or in collecting conduit (230).
2. CFRD reverse drainage system as claimed in claim 1, it is characterised in that:The drainpipe (210) along suitable river to arrangement, the L-shaped structure of drainpipe (210) pipeline section stretched into collecting conduit (230), the drainpipe (210) water inlet end is located at the upper end of " L " shape structure.
3. CFRD reverse drainage system as claimed in claim 2, it is characterised in that:The drainpipe (210) it is at least two be spaced apart.
4. CFRD reverse drainage system as claimed in claim 1, it is characterised in that:The upstream row well (220) quantity is at least flatly, and elevation direction of the upstream row well (220) along dam body (100) is set, and upstream row well (220) top be located at dam body (100) elevation 1/3rd heights of dam sentence under position.
5. CFRD reverse drainage system as claimed in claim 1, it is characterised in that:The collecting conduit (230) along Yokogawa to the bottom for being laid in upstream rockfill area (120).
6. CFRD reverse drainage system as claimed in claim 5, it is characterised in that:The block filler (231) it is sandy gravel.
7. the CFRD reverse drainage system as described in claim 1,2,3,4,5 or 6, it is characterised in that:Also Downstream row well (240) including being arranged on dam body (100) downstream inner, compare upstream at the top of the downstream row well (240) The top of gully (220) is high.
8. CFRD reverse drainage system as claimed in claim 7, it is characterised in that:The downstream row well (240) quantity is at least flatly, and the bottom of downstream row well (240) is on dam foundation face.
9. the method for blocking of CFRD reverse drainage system, it is characterised in that for blocking such as claim 7 or CFRD reverse drainage system described in 8, it comprises the following steps:
A, drainpipe (210) is blocked in dry season, the bedding of dam body (100) upstream is carried out after drainpipe (210) closure Fill;
B, treat dam body (100) upstream apron fill to cope level less than at upstream row well (220) 3~5m of cope level and When upstream Water Level in Foundation Pit is risen at 3~5m of cope level that elevation fills less than dam body (100) upstream apron, upstream row is carried out The closure of well (220);
C, continue to fill dam body (100) upstream progress bedding, treat that dam body (100) upstream apron is filled to cope level and downstream Gully (240) cope level equal-height position and upstream Water Level in Foundation Pit rise to elevation and filled less than dam body (100) upstream apron When at 3~5m of cope level, the closure of downstream row well (240) is carried out.
10. the method for blocking of CFRD reverse drainage system as claimed in claim 1, it is characterised in that:Row After water pipe (210) closure, infiltration is by upstream row well (220) or by upstream row well (220) and downstream row in dam body (100) Well (240) pump drainage;After upstream row well (220) closure, infiltration is by downstream row well (240) pump drainage in dam body (100).
CN201710868559.XA 2017-09-22 2017-09-22 CFRD reverse drainage system Pending CN107447768A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710868559.XA CN107447768A (en) 2017-09-22 2017-09-22 CFRD reverse drainage system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710868559.XA CN107447768A (en) 2017-09-22 2017-09-22 CFRD reverse drainage system

Publications (1)

Publication Number Publication Date
CN107447768A true CN107447768A (en) 2017-12-08

Family

ID=60498061

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710868559.XA Pending CN107447768A (en) 2017-09-22 2017-09-22 CFRD reverse drainage system

Country Status (1)

Country Link
CN (1) CN107447768A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152414A (en) * 2021-04-30 2021-07-23 中国葛洲坝集团第一工程有限公司 Construction method for plugging water burst point of water delivery gallery bottom plate
CN113152414B (en) * 2021-04-30 2024-04-26 中国葛洲坝集团第一工程有限公司 Plugging construction method for water-flushing point of bottom plate of water delivery and drainage gallery

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08269975A (en) * 1995-03-31 1996-10-15 Sato Kogyo Co Ltd Landslide preventing method
CN1587536A (en) * 2004-07-15 2005-03-02 国家电力公司华东勘测设计研究院 Back ward water draining system of face plate rock-fill dam dam body and its construction method
CN101429759A (en) * 2008-12-12 2009-05-13 中国葛洲坝集团股份有限公司 Inverse drainage processing method in high concrete panel rock-fill dam construction period
CN105970882A (en) * 2016-04-19 2016-09-28 长江勘测规划设计研究有限责任公司 Structure solving reverse osmosis water problem of dam body in construction process of concrete-faced rockfill dam and construction method thereof
CN207211173U (en) * 2017-09-22 2018-04-10 中国电建集团成都勘测设计研究院有限公司 CFRD reverse drainage system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH08269975A (en) * 1995-03-31 1996-10-15 Sato Kogyo Co Ltd Landslide preventing method
CN1587536A (en) * 2004-07-15 2005-03-02 国家电力公司华东勘测设计研究院 Back ward water draining system of face plate rock-fill dam dam body and its construction method
CN101429759A (en) * 2008-12-12 2009-05-13 中国葛洲坝集团股份有限公司 Inverse drainage processing method in high concrete panel rock-fill dam construction period
CN105970882A (en) * 2016-04-19 2016-09-28 长江勘测规划设计研究有限责任公司 Structure solving reverse osmosis water problem of dam body in construction process of concrete-faced rockfill dam and construction method thereof
CN207211173U (en) * 2017-09-22 2018-04-10 中国电建集团成都勘测设计研究院有限公司 CFRD reverse drainage system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113152414A (en) * 2021-04-30 2021-07-23 中国葛洲坝集团第一工程有限公司 Construction method for plugging water burst point of water delivery gallery bottom plate
CN113152414B (en) * 2021-04-30 2024-04-26 中国葛洲坝集团第一工程有限公司 Plugging construction method for water-flushing point of bottom plate of water delivery and drainage gallery

Similar Documents

Publication Publication Date Title
CN104131575B (en) A kind of karst height grows the leak stopping water discharge method of the stratum dam foundation
CN201835198U (en) Drainage roadbed for high underground water level
CN109371918B (en) Dam structure with permanent combination of multifunctional drainage box culvert and construction method thereof
CN103510528A (en) Blind trench water discharging structure used for underground structure up-floating prevention
CN106087953B (en) A kind of drainage and construction method for preventing and treating mountain area large size spoil ground mud-rock flow
CN209011090U (en) A kind of hydraulic engineering irrigates, flood control dam
CN102383408B (en) Greening method for high water level impermeable saline and alkaline lands and greening system
CN206448286U (en) It is a kind of to be used to reduce the radial system of grey field dam seepage line
CN108385627A (en) Power station diversion tunnel plugging construction method based on karst landform
CN204551510U (en) A kind of filled-up ground catchments pressure reduction well drop and drainage structure
CN108951557B (en) Irrigation and flood control dam for hydraulic engineering
CN209482261U (en) With the dam structure faced forever in conjunction with multi-functional drainage box culvert
CN105970882B (en) Solve the structure and its building method of face dam construction time dam body reverse osmosis water problems
CN207211173U (en) CFRD reverse drainage system
CN208168937U (en) A kind of tunnel bottom discharge structure
CN218148458U (en) Deep water deep foundation pit drainage system of fissure development rock stratum
CN110185051A (en) Deep narrow excavation water discharge method
CN208619166U (en) Tunnel roof waterproof flow guiding structure
CN209412838U (en) A kind of Cut Slopes of Expansive Soil structure
CN110670613A (en) Anti-seepage structure of foundation pit elevator shaft and construction method thereof
CN104929081A (en) Enrockment concrete permeable dike and construction method thereof
CN205907658U (en) Be used for anti - structure that seeps water of concrete -faced rockfill dam construction time dam body
CN204435321U (en) A kind of steam power station water intaking open channel
CN210946854U (en) Anti-seepage structure of foundation pit elevator shaft
CN107447768A (en) CFRD reverse drainage system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20171208