SU1573079A1 - Method of washing tailing pond - Google Patents

Method of washing tailing pond Download PDF

Info

Publication number
SU1573079A1
SU1573079A1 SU884462708A SU4462708A SU1573079A1 SU 1573079 A1 SU1573079 A1 SU 1573079A1 SU 884462708 A SU884462708 A SU 884462708A SU 4462708 A SU4462708 A SU 4462708A SU 1573079 A1 SU1573079 A1 SU 1573079A1
Authority
SU
USSR - Soviet Union
Prior art keywords
cards
section
dams
tier
filling
Prior art date
Application number
SU884462708A
Other languages
Russian (ru)
Inventor
Владимир Иванович Головишников
Алла Павловна Щетинина
Original Assignee
Всесоюзный научно-исследовательский и проектно-конструкторский институт по осушению месторождений полезных ископаемых, специальным горным работам, рудничной геологии и маркшейдерскому делу
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Всесоюзный научно-исследовательский и проектно-конструкторский институт по осушению месторождений полезных ископаемых, специальным горным работам, рудничной геологии и маркшейдерскому делу filed Critical Всесоюзный научно-исследовательский и проектно-конструкторский институт по осушению месторождений полезных ископаемых, специальным горным работам, рудничной геологии и маркшейдерскому делу
Priority to SU884462708A priority Critical patent/SU1573079A1/en
Application granted granted Critical
Publication of SU1573079A1 publication Critical patent/SU1573079A1/en

Links

Landscapes

  • Separation Of Solids By Using Liquids Or Pneumatic Power (AREA)

Abstract

Изобретение относитс  к гидротехническому строительству. Цель изобретени  - упрощение технологии работ. Хвостохранилище 1 заполн ют посекционно. Создание секций начинают с самой дальней от водосбросного колодца 3, причем каждую последующую секцию создают после заполнени  (замыва) предыдущей. Секцию выполн ют в виде смежных карт 5 и 6 путем намыва из хвостов двух дамб - отсечной 7 и разделительной 8. Перва  дамба отсекает секцию от остальной емкости хвостохранилища, втора  раздел ет ее на карты. Заполнение осуществл ют на полную высоту из выпусков распределительного пульповода, расположенного вдоль разделительной дамбы 8, путем поочередного замыва каждого  руса карт с последующим возведением отсечной и разделительной дамб следующего  руса из намытых хвостов. 5 ил.FIELD OF THE INVENTION The invention relates to hydraulic engineering. The purpose of the invention is to simplify the work technology. Tailing 1 is filled section by section. The creation of sections starts from the farthest from the spillway well 3, and each subsequent section is created after filling (closing) of the previous one. The section is made in the form of contiguous cards 5 and 6 by washing out the tailings of two dams - cut-off 7 and dividing 8. The first dam cuts off the section from the rest of the tailing tank, the second splits it into cards. Filling is carried out to the full height from the outlets of the distribution slurry line located along separation dam 8 by alternately closing each tier of cards with the subsequent erection of the cut-off and separation dams of the next tier from the washed tailings. 5 il.

Description

7 6 777 6 77

Фиг. 2FIG. 2

7 9 щ к7 9 u to

4four

//

1one

11eleven

Фиг.33

Фиг ЛFIG L

Claims (1)

Формула изобретенияClaim Способ намыва хвостохранилища, включающий образование секций посредством 20 дамб ограждений, заполнение их хвостами из выпусков распределительного пульпопровода, сброс осветленной воды через водосбросный колодец и последующую рекультивацию поверхности, отличающийся тем, что, с целью упрощения технологии работ, образование секций начинают с самой дальней от водосбросного колодца, причем образование последующей секции осуществляют после заполнения предыдущей, при этом секции выполняют в виде двух смежных карт путем намыва из хвостов отсечной и разделительной дамб первого яруса карт и заполняют на полную высоту из выпусков распределительного пульповода, который располагают вдоль» разделительной дамбы, путем поочередного замыва каждого яруса карт с последующим возведением отсечной и разделительной дамб следующего яруса из намытых хвостов.The method of washing the tailings, including the formation of sections by 20 dams of fences, filling them with tails from the outlets of the distribution slurry pipeline, discharging clarified water through a spillway well and subsequent land reclamation, characterized in that, in order to simplify the technology of work, the formation of sections begins with the farthest from the spillway well, and the formation of the next section is carried out after filling the previous one, while the sections are made in the form of two adjacent cards by washing from the tails of tsechnoy and dividing dams of the first tier of cards and fill to the full height from the outlets of the distribution slurry conduit, which is located along the "dividing dam, by alternately washing each tier of cards with the subsequent construction of the cut-off and dividing dams of the next tier from the washed tails. Фиг. 4FIG. 4 Фиг. 5FIG. 5
SU884462708A 1988-07-18 1988-07-18 Method of washing tailing pond SU1573079A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU884462708A SU1573079A1 (en) 1988-07-18 1988-07-18 Method of washing tailing pond

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU884462708A SU1573079A1 (en) 1988-07-18 1988-07-18 Method of washing tailing pond

Publications (1)

Publication Number Publication Date
SU1573079A1 true SU1573079A1 (en) 1990-06-23

Family

ID=21390691

Family Applications (1)

Application Number Title Priority Date Filing Date
SU884462708A SU1573079A1 (en) 1988-07-18 1988-07-18 Method of washing tailing pond

Country Status (1)

Country Link
SU (1) SU1573079A1 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101838992A (en) * 2010-06-23 2010-09-22 贵阳铝镁设计研究院 Method for dry-method compatibilization of valley-type wet-method red dump site
CN101851926A (en) * 2010-06-23 2010-10-06 贵阳铝镁设计研究院 Method for carrying out dry-method capacity expansion in mountainside wet-process red mud disposal site
CN104831678A (en) * 2015-01-30 2015-08-12 王健 Ecological restoration method for tailing depot reclamation after tailing depot closure
CN108643132A (en) * 2018-06-29 2018-10-12 长江勘测规划设计研究有限责任公司 The grinding concrete structure and its construction method of composite pulp material are injected in rock ballast material
RU2808151C1 (en) * 2023-05-04 2023-11-24 федеральное государственное бюджетное образовательное учреждение высшего образования "Иркутский национальный исследовательский технический университет" (ФГБОУ ВО "ИРНИТУ") Method for stacking concentration tailings

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
Авторское свидетельство СССР № 685752, кл. Е 02 В 7/06, 1977. Авторское свидетельство СССР № 1052614, кл. Е 02 В 7/06, 1981. *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101838992A (en) * 2010-06-23 2010-09-22 贵阳铝镁设计研究院 Method for dry-method compatibilization of valley-type wet-method red dump site
CN101851926A (en) * 2010-06-23 2010-10-06 贵阳铝镁设计研究院 Method for carrying out dry-method capacity expansion in mountainside wet-process red mud disposal site
CN101851926B (en) * 2010-06-23 2014-03-12 贵阳铝镁设计研究院有限公司 Method for carrying out dry-method capacity expansion in mountainside wet-process red mud disposal site
CN101838992B (en) * 2010-06-23 2014-03-12 贵阳铝镁设计研究院有限公司 Method for dry-method compatibilization of valley-type wet-method red dump site
CN104831678A (en) * 2015-01-30 2015-08-12 王健 Ecological restoration method for tailing depot reclamation after tailing depot closure
CN108643132A (en) * 2018-06-29 2018-10-12 长江勘测规划设计研究有限责任公司 The grinding concrete structure and its construction method of composite pulp material are injected in rock ballast material
CN108643132B (en) * 2018-06-29 2021-01-26 长江勘测规划设计研究有限责任公司 Rolled concrete structure with composite slurry injected into stone slag material and construction method thereof
RU2808151C1 (en) * 2023-05-04 2023-11-24 федеральное государственное бюджетное образовательное учреждение высшего образования "Иркутский национальный исследовательский технический университет" (ФГБОУ ВО "ИРНИТУ") Method for stacking concentration tailings

Similar Documents

Publication Publication Date Title
CN1182817A (en) Method for quick harnessing wide river course silted by mud and sand
SU1573079A1 (en) Method of washing tailing pond
SU926288A1 (en) Method for hydraulically deposing muck in stock-piles and tail storage facilities
SU1730346A1 (en) Method for storing dressing waste in tailing dump
SU1030491A1 (en) Twin water lock
RU2016163C1 (en) Method of underwater formation of silting structure layer
RU135329U1 (en) INTEGRATED STRUCTURE
SU1663098A1 (en) Method for soil washing up
SU1698354A1 (en) Method of erecting weirs
SU866033A1 (en) Method of constructing hydraulic-fill structures
SU1629375A1 (en) Method for hydraulic filling of structures
SU1740672A1 (en) Ore storage for hydraulic production
SU1682442A1 (en) Method for washing up soil
SU1778218A1 (en) Method for erection of hydraulic mine dump
SU1134664A1 (en) Method of hydraulic filling of hydraulic structure
CN2298284Y (en) Hydraulic spile wall
SU1458483A1 (en) Method of erecting earth structure
Hand et al. Syracuse channels: evidence of a catastrophic flood
SU889784A1 (en) Method of erecting hydraulically filled structures in water ducts
SU1155663A1 (en) Method of constructing a tail pond
SU1488385A1 (en) Chart of hydraulic deposition of a dam and method of its deposition
SU1714020A1 (en) Hydraulic filling method
SU1528845A1 (en) Method of storing hydraulically deposited rock
SU1100364A1 (en) Method of constructing dams of locally available materials
SU1449629A1 (en) Method of erecting an earth dam