RU104569U1 - DOUBLE LEVEL DEPTH LAYOUT STATION SYSTEM COMPLEX - Google Patents

DOUBLE LEVEL DEPTH LAYOUT STATION SYSTEM COMPLEX Download PDF

Info

Publication number
RU104569U1
RU104569U1 RU2011108036/03U RU2011108036U RU104569U1 RU 104569 U1 RU104569 U1 RU 104569U1 RU 2011108036/03 U RU2011108036/03 U RU 2011108036/03U RU 2011108036 U RU2011108036 U RU 2011108036U RU 104569 U1 RU104569 U1 RU 104569U1
Authority
RU
Russia
Prior art keywords
lower levels
platforms
subway
lobby
level
Prior art date
Application number
RU2011108036/03U
Other languages
Russian (ru)
Inventor
Валерий Михайлович Абрамсон
Артур Максович Минц
Николай Иванович Шумаков
Original Assignee
Общество С Ограниченной Ответственностью "Спецметропроект" (Ооо "Спецметропроект")
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Общество С Ограниченной Ответственностью "Спецметропроект" (Ооо "Спецметропроект") filed Critical Общество С Ограниченной Ответственностью "Спецметропроект" (Ооо "Спецметропроект")
Priority to RU2011108036/03U priority Critical patent/RU104569U1/en
Application granted granted Critical
Publication of RU104569U1 publication Critical patent/RU104569U1/en

Links

Abstract

Станционный комплекс метрополитена глубокого заложения двухуровневый, включающий двухуровневый тоннель с плитой проезжей части, разделяющий его на верхний и нижний уровни с линиями метрополитена с платформами, смонтированными в верхнем и нижнем уровнях, и эскалаторные тоннели, связанные с верхним и нижним уровнями посредством переходов для обеспечения входа (выхода) на платформы, при этом в эскалаторных тоннелях установлены каскадные системы эскалаторов и подъемников для обеспечения выхода в вестибюли или спуска из вестибюлей на станцию или переход на платформы верхнего/нижнего уровней и обратно, при этом на верхнем и нижнем уровнях размещены технологические отсеки для вспомогательного оборудования метрополитена, а на платформах установлены светопрозрачные ограждения, проемы раздвижных дверей которых выполнены на расстоянии друг от друга, соответствующем расположению дверей вагонов поездов метрополитена для обеспечения их синхронизированного открывания-закрывания. The deep-seated metro station complex is two-level, including a two-level tunnel with a roadway slab, dividing it into upper and lower levels with underground lines with platforms mounted in the upper and lower levels, and escalator tunnels connected with the upper and lower levels through transitions to provide entry (exit) to the platforms, while in escalator tunnels cascading systems of escalators and elevators are installed to provide access to the lobby or down from the lobby for a hundred or switching to platforms of upper / lower levels and vice versa, while technological compartments for auxiliary equipment of the subway are located on the upper and lower levels, and translucent barriers are installed on the platforms, the openings of the sliding doors of which are made at a distance from each other, corresponding to the location of the doors of train cars subway to ensure their synchronized opening-closing.

Description

2011108036                                                                                                               2011108036

СТАНЦИОННЫЙ КОМПЛЕКС МЕТРОПОЛИТЕНА ГЛУБОКОГО STATIONARY COMPLEX OF THE DEEP METRO

ЗАЛОЖЕНИЯ ДВУХУРОВНЕВЫЙTWO LEVEL PROVISIONS

Предлагаемая полезная модель относится к области строительства, а более конкретно к строительству станций метрополитена глубокого заложения.The proposed utility model relates to the field of construction, and more specifically to the construction of deep underground stations.

В настоящее время разработаны, сооружены и успешно используются целый ряд станционных комплексов метрополитена.At present, a number of metro station complexes have been developed, constructed and successfully used.

Однако, в связи с расширением территорий крупных мегаполисов, таких как Москва, Санкт-Петербург и др. с увеличением пассажирского потока возникает острая необходимость в срочном обеспечении этих мегаполисов новыми линиями и станциями метрополитена высокой пропускной способности при эффективной поточной организации строительства.However, in connection with the expansion of territories of large megacities, such as Moscow, St. Petersburg, etc. with an increase in passenger flow, there is an urgent need for urgently providing these megacities with new lines and metro stations of high throughput with efficient flow-through organization of construction.

Известен станционный комплекс метрополитена глубокого заложения двухуровневый, включающий двухуровневый тоннель с плитой проезжей части, разделяющий его на верхний и нижний уровни (интернет адрес , статья «Что станет с метро в этом году» опубликована на сайте 03.02.2011).The well-known deep-level metro station complex is two-level, including a two-level tunnel with a slab of carriageway, dividing it into upper and lower levels (Internet address, the article “What will become of the metro this year” is published on the site 02/03/2011).

Технической задачей предлагаемой полезной модели является разработка типовой конструкции станционного комплекса глубокого заложения, обеспечивающей сокращение сроков проектирования и строительства при одновременном уменьшении стоимости затрат и увеличении пропускной способности станционного комплекса.The technical task of the proposed utility model is the development of a typical design of a deep-seated station complex, which reduces the design and construction time while reducing cost costs and increasing the capacity of the station complex.

Технический результат достигается тем, что станционный комплекс метрополитена глубокого заложения двухуровневый, включает: двухуровневый тоннель с плитой проезжей части, разделяющий его на верхний и нижний уровни, линии метрополитена с платформами смонтированные на верхнем и нижнем уровнях, эскалаторные тоннели, связанные с верхним и нижним уровнями посредством переходов с возможностью обеспечения входа (выхода) на платформы, при этом в эскалаторных тоннелях установлены каскадные системы эскалаторов и подъемников, обеспечивающие выход в вестибюли или спуск из вестибюля на станцию, а также переход на платформы верхнего и нижнего уровней и обратно, на верхнем и нижнем уровнях размещены технологические отсеки для вспомогательного оборудования метрополитена, а на платформах установлены светопрозрачные ограждения,, проемы раздвижных дверей которых выполнены на расстоянии друг от друга, соответствующем расположению дверей вагонов поездов метрополитена для обеспечения их синхронизированного открывания-закрывания.The technical result is achieved by the fact that the station complex of the deep underground is two-level, includes: a two-level tunnel with a slab of the carriageway, dividing it into upper and lower levels, metro lines with platforms mounted at the upper and lower levels, escalator tunnels associated with the upper and lower levels through transitions with the possibility of providing entrance (exit) to the platforms, while cascade systems of escalators and elevators are installed in escalator tunnels, providing you The entrance to the lobby or the descent from the lobby to the station, as well as the transition to platforms of the upper and lower levels and vice versa, technological compartments for auxiliary equipment of the subway are located on the upper and lower levels, and translucent barriers are installed on the platforms, the openings of sliding doors of which are made at a distance from each other, corresponding to the location of the doors of subway train cars to ensure their synchronized opening-closing.

Предлагаемая полезная модель поясняется чертежом, где на Фиг.1 - вид станционного комплекса в плане, Фиг.2 - разрез по А-А; фиг.3 - разрез по Б-Б; Фиг.4 - разрез по С-С.The proposed utility model is illustrated in the drawing, where in Fig.1 is a plan view of the station complex, Fig.2 is a section along AA; figure 3 is a section along BB; Figure 4 is a section along CC.

Станционный комплекс включает двухуровневый тоннель 1 с плитой проезжей части 2, разделяющей его на нижний 3 и верхний 4 уровни, в которых смонтированы линии метрополитена 5, платформы 6 и технологические отсеки 7. Комплекс снабжен эскалаторными тоннелями 8, связанными переходами 9 с платформами 6 верхнего 4 и нижнего 3 уровней. В эскалаторных тоннелях 8 установлены эскалаторные каскады и подъемниками для людей с ограниченными физическими возможностями 10, обеспечивающие доставку пассажиров с платформ 6 в вестибюли 11 при выходе, при входе - из вестибюлей 11 на платформы 6 для посадки. На платформах 6 установлены светопрозрачные ограждения 12 двери которых сосны с дверями вагонов поездов метрополитена и снабжены механизмами обеспечения их синхронизированного открывания-закрывания. В эскалаторных тоннелях 8 под эскалаторными каскадами 10 размещены технологические отсеки 13.The station complex includes a two-level tunnel 1 with a slab of the carriageway 2, dividing it into lower 3 and upper 4 levels, in which metro lines 5, platforms 6 and technological compartments are mounted 7. The complex is equipped with escalator tunnels 8, connected by passages 9 with platforms 6 of the upper 4 and lower 3 levels. In escalator tunnels 8, escalator cascades and lifts for people with disabilities 10 are installed, ensuring the delivery of passengers from platforms 6 to lobby 11 at the exit, at the entrance from lobby 11 to platform 6 for landing. On platforms 6, translucent fences 12 are installed, the doors of which are pine with the doors of subway carriages and are equipped with mechanisms to ensure their synchronized opening-closing. In the escalator tunnels 8 under the escalator cascades 10 there are technological compartments 13.

Предлагаемая полезная модель функционирует следующим образом.The proposed utility model operates as follows.

Пассажиры входят в вестибюль 11 и проходят к эскалаторным тоннелям 8. Далее по эскалаторным каскадам (люди с ограниченными физическими возможностями по подъемникам) 10 спускаются на верхний 4 или нижний 3 уровни. По переходам 9 проходят на платформы 6 для посадки в поезда метрополитена 5. Светопрозрачные ограждения обеспечивают безопасность пассажирского потока, так как препятствуют падению пассажиров на рельсовые пути линий метрополитена 5. При остановке поезда на станции происходит синхронное открывание дверей поезда и дверей светопрозрачных перегородок 12, что позволяет осуществить высадку и посадку пассажиров.Passengers enter the lobby 11 and go to the escalator tunnels 8. Further along the escalator cascades (people with disabilities along the lifts) 10 go down to the upper 4 or lower 3 levels. At junctions 9, they pass to platforms 6 for boarding metro trains 5. Translucent fencing ensures the safety of the passenger flow, as they prevent passengers from falling onto the rail tracks of metro lines 5. When the train stops at the station, the doors of the train and doors of translucent partitions 12 are opened simultaneously, which allows you to disembark and embark passengers.

При высадке пассажиры из выгонов выходят на платформы 6, далее через переходы 9 и эскалаторные тоннели 8 по каскадам эскалаторов и подъемников 10 выходят в вестибюли 11 и далее в город, или осуществляют переход на платформы 6 другого уровня.When disembarking, passengers leave the pastures on platforms 6, then through passages 9 and escalator tunnels 8 through cascades of escalators and elevators 10 go to the vestibules 11 and further into the city, or transfer to platforms 6 of a different level.

Наличие технологических отсеков 7 в тоннеле 1 и отсеков 13 в эскалаторном тоннеле 8 позволяет разместить в них необходимые коммуникации и оборудование станционного комплекса, необходимое для его бесперебойной и безопасной работы.The presence of technological compartments 7 in tunnel 1 and compartments 13 in the escalator tunnel 8 allows you to place in them the necessary communications and equipment of the station complex, necessary for its uninterrupted and safe operation.

Таким образом, предлагаемое техническое решение, разработанное в связи с новой концепцией строительства типовых станций метрополитена, является новым конструкторским решение в строительстве станционных комплексов метрополитена и позволяет осуществить бесперебойную и безопасную транспортировку большого пассажирского потока при существенном снижении сроков строительства и его стоимости.Thus, the proposed technical solution, developed in connection with the new concept of building typical metro stations, is a new design solution in the construction of metro station complexes and allows for uninterrupted and safe transportation of large passenger flows with a significant reduction in construction time and cost.

Наличие подъемников, обеспечивающее доставку инвалидов, проезд и выход на станциях назначения позволяет обеспечить возможность их безопасного передвижения по метрополитену и соответственно по городу.The presence of lifts, providing the delivery of disabled people, travel and access to destination stations makes it possible to ensure their safe movement in the subway and, accordingly, in the city.

В связи с участившимися падениями пассажиров на линии метрополитена решение с установкой светопрозрачных перегородок существенно повысит безопасность пассажиров метрополитена, в особенности в часы наибольшего потока и соответственно загруженности платформ, а также при посадке-высадке из поездов метрополитена. Выполнение перегородок светопрозрачными не искажает архитектурный облик станции и визуально не уменьшает ее пространство и не снижает обзорность.In connection with the frequent fall of passengers on the subway line, the decision to install translucent partitions will significantly increase the safety of subway passengers, especially during busy hours and, accordingly, platform loads, as well as during boarding and unloading from subway trains. The implementation of partitions translucent does not distort the architectural appearance of the station and visually does not reduce its space and does not reduce visibility.

Таким образом, предложенная конструкция станционного комплекса глубокого заложения двухуровневого является современным техническим решением с высокой степенью обеспечения безопасного и комфортного проезда пассажиров метрополитена.Thus, the proposed design of a two-level deep-laying station complex is a modern technical solution with a high degree of ensuring safe and comfortable passage of subway passengers.

Claims (1)

Станционный комплекс метрополитена глубокого заложения двухуровневый, включающий двухуровневый тоннель с плитой проезжей части, разделяющий его на верхний и нижний уровни с линиями метрополитена с платформами, смонтированными в верхнем и нижнем уровнях, и эскалаторные тоннели, связанные с верхним и нижним уровнями посредством переходов для обеспечения входа (выхода) на платформы, при этом в эскалаторных тоннелях установлены каскадные системы эскалаторов и подъемников для обеспечения выхода в вестибюли или спуска из вестибюлей на станцию или переход на платформы верхнего/нижнего уровней и обратно, при этом на верхнем и нижнем уровнях размещены технологические отсеки для вспомогательного оборудования метрополитена, а на платформах установлены светопрозрачные ограждения, проемы раздвижных дверей которых выполнены на расстоянии друг от друга, соответствующем расположению дверей вагонов поездов метрополитена для обеспечения их синхронизированного открывания-закрывания.
Figure 00000001
The deep-seated metro station complex is two-level, including a two-level tunnel with a roadway slab, dividing it into upper and lower levels with underground lines with platforms mounted in the upper and lower levels, and escalator tunnels connected with the upper and lower levels through transitions to provide entry (exit) to the platforms, while in escalator tunnels cascading systems of escalators and elevators are installed to provide access to the lobby or down from the lobby for a hundred or switching to platforms of upper / lower levels and vice versa, while technological compartments for auxiliary equipment of the subway are located on the upper and lower levels, and translucent barriers are installed on the platforms, the openings of the sliding doors of which are made at a distance from each other, corresponding to the location of the doors of train cars subway to ensure their synchronized opening-closing.
Figure 00000001
RU2011108036/03U 2011-03-03 2011-03-03 DOUBLE LEVEL DEPTH LAYOUT STATION SYSTEM COMPLEX RU104569U1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
RU2011108036/03U RU104569U1 (en) 2011-03-03 2011-03-03 DOUBLE LEVEL DEPTH LAYOUT STATION SYSTEM COMPLEX

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
RU2011108036/03U RU104569U1 (en) 2011-03-03 2011-03-03 DOUBLE LEVEL DEPTH LAYOUT STATION SYSTEM COMPLEX

Publications (1)

Publication Number Publication Date
RU104569U1 true RU104569U1 (en) 2011-05-20

Family

ID=44734032

Family Applications (1)

Application Number Title Priority Date Filing Date
RU2011108036/03U RU104569U1 (en) 2011-03-03 2011-03-03 DOUBLE LEVEL DEPTH LAYOUT STATION SYSTEM COMPLEX

Country Status (1)

Country Link
RU (1) RU104569U1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755311A (en) * 2018-06-11 2018-11-06 中铁工程设计咨询集团有限公司 A kind of underground railway station traffic system
RU2715497C1 (en) * 2019-05-16 2020-02-28 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Method of erection and arrangement of a single-span underground metro station of an open method of performing works
RU2766876C1 (en) * 2021-06-23 2022-03-16 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Method for construction of escalator cascade complex for the entrance to the metro station, constructed using cut-and-cover method
RU2808273C1 (en) * 2023-02-14 2023-11-28 Акционерное общество "Научно-исследовательский центр "Строительство" Subway line in deep urban areas

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108755311A (en) * 2018-06-11 2018-11-06 中铁工程设计咨询集团有限公司 A kind of underground railway station traffic system
RU2715497C1 (en) * 2019-05-16 2020-02-28 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Method of erection and arrangement of a single-span underground metro station of an open method of performing works
RU2766876C1 (en) * 2021-06-23 2022-03-16 Открытое акционерное общество "Научно-исследовательский, проектно-изыскательский институт "Ленметрогипротранс" Method for construction of escalator cascade complex for the entrance to the metro station, constructed using cut-and-cover method
RU2808273C1 (en) * 2023-02-14 2023-11-28 Акционерное общество "Научно-исследовательский центр "Строительство" Subway line in deep urban areas

Similar Documents

Publication Publication Date Title
WO2021223571A1 (en) One-way circulation rapid transfer structure for intersecting subway lines
EA021287B1 (en) Double-level deep subway station complex
KR20090076879A (en) A safety exit pass way for mono rail system
KR20090117159A (en) Urban railway honey comb transit structure of station
JP2008106436A (en) Transportation system for being booted toward city center region
RU104569U1 (en) DOUBLE LEVEL DEPTH LAYOUT STATION SYSTEM COMPLEX
US9010251B2 (en) Urban transport installation using track ropes
RU2014129199A (en) INSTALLATION OF A SUSPENDED ROPE FOR TRANSPORTATION OF PASSENGERS
CN105926379A (en) Monorail traffic overhead section overhauling passage and application method thereof
CN214992754U (en) Integrated flowing water railway passenger station
CN107313448B (en) Multi-line transfer subway station
RU141153U1 (en) STATION COMPLEX OF LITTLE LOCATION METRO
CN102582630A (en) Urban viaduct type light rail public transportation system
CN112096131B (en) Transportation hub complex personnel evacuation facility
RU146088U1 (en) STATION COMPLEX OF THE METRO WITH ONE VESTIBULE SEPARATED BY THE FIRE PARTITION
Tough et al. Passenger conveyors
RU94281U1 (en) TUNNEL TYPE
JP2018094955A (en) Transportation system
JP2022548277A (en) How urban rail transit trains operate
RU2752036C1 (en) High speed metro
RU92651U1 (en) LIFT FOR TRANSPORTATION OF CARS
CN110626359A (en) Underground one deck side formula station public area arrangement structure
CN105083309A (en) Fully-automatic hinged-door boarding/alighting system for rail transit
CN108001458B (en) Plane design method for island type platform in subway or light rail station and passenger guiding method
CN212593953U (en) Passenger transport platform and rail entertainment equipment

Legal Events

Date Code Title Description
MM9K Utility model has become invalid (non-payment of fees)

Effective date: 20190304