PL82945B2 - - Google Patents

Download PDF

Info

Publication number
PL82945B2
PL82945B2 PL15454372A PL15454372A PL82945B2 PL 82945 B2 PL82945 B2 PL 82945B2 PL 15454372 A PL15454372 A PL 15454372A PL 15454372 A PL15454372 A PL 15454372A PL 82945 B2 PL82945 B2 PL 82945B2
Authority
PL
Poland
Prior art keywords
hall
halls
assembling
segments
assembly
Prior art date
Application number
PL15454372A
Other languages
Polish (pl)
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed filed Critical
Priority to PL15454372A priority Critical patent/PL82945B2/pl
Publication of PL82945B2 publication Critical patent/PL82945B2/pl

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

Pierwszenstwo: 05.04.1972 (P. 154543) Zgloszenie ogloszono: 31.05.1973 Opis patentowy opublikowano: 30.12.1975 82945 KI. 37e,21/14 MKP' E04g 21/14 Twórcawynalazku: Janusz Zakowski Uprawniony z patentu tymczasowego: Gliwickie Biuro Projektów Budownictwa Przemyslowego, Gliwice (Polska) Sposób montazu hal stalowych typu lekkiego Przedmiotem wynalazku jest sposób montazu hal stalowych typu lekkiego bez uzycia ciezkiego sprzetu montazowego.Dotychczas znane sposoby montazu hal stalowych polegaja na stawianiu slupów, a nastepnie na montowa¬ niu przygotowanych na placu budowy segmentów konstrukcji nosnej dachu i montowaniu pokrycia. Aktualnie stosowane metody wznoszenia hal wymagaja osobnych cykli montazowych dla slupów, scian konstrukcji nosnej dachu i dla montazu pokrycia dachu. Czynnosci zwiazane z montazem wymagaja wielu skomplikowanych i róznorodnych operacji wykonywanych na wysokosci polegajacych na polaczeniu elementów konstrukcji. Do podnoszenia poszczególnych elementów konstrukcji uzywany jest ciezki sprzet montazowy taki jak dzwigi, zurawie.Celem wynalazku jest ograniczenie ilosci i rodzajów cykli montazowych oraz skrócenie czasu montazu.Przeniesienie czynnosci montazowych polegajacych na laczeniu duzych elementów odbywajacych sie na duzych wysokosciach na poziom terenu. Wyeliminowanie ciezkiego sprzetu montazowego, dzwigów, zurawi, a zastapie¬ nie go prostymi urzadzeniami jak wciagarki bebnowe i maszt montazowy.W celu rozwiazania wytyczonego zadania wedlug wynalazku hale podzielono przekrojami poprzecznymi na segmenty o zmodulowanej dlugosci np. 3,0 m. Pojedynczy segmenTskonstruowano w formie ramy montowanej na poziomie terenu, a nastepnie podnoszonej za pomoca wciagarek linowych bebnowych.Dalsze szczególy i zalety wynalazku omówione sa blizej na przykladzie wykonania uwidocznionym na rysunku, na którym fig. od 1 do 8 przedstawia kolejne etapy podnoszenia gotowych segmentów hali, a fig. 9 przedstawia perspektywe hali wmontazu. j Jak uwidoczniono na fig. 9 sposób wedlug wynalazku polega na przygotowaniu fundamentu hali tak, aby stanowil równoczesnie torowisko 1 dla wózków montazowych 2, a po wykonaniu hali jako kanal dla instalacji elektrycznych i technologicznych. Podnoszenie skonstruowanego segmentu 5 hali odbywa sie za pomoca wciagarek 3 linowych, bebnowych ustawionych na przedluzeniu osi scian, przy czym dla podniesienia pierwszego segmentu nalezy zastosowac maszt posredni 4, dla nastepnych zas wykorzystuje sie juz stojace segmenty 5 jako posrednie oparcie dJa lin. Pojedynczy segment 5 skonstruowano w formie ramy skladajacej sie z rygla w postaci2 82 945 kompletnego wiezara dachowego i slupów stanowiacych slupy hali zmontowanej w pozycji lezacej na poziomie terenu w taki sposób, aby podniesienie jej moglo odbyc sie przez obrót wokól punktów podparcia slupów w kierunku równoleglym do osi podluznej hali. W tym ukladzie wiezar dachowy musi byc skonstruowany przestrzennie w sposób zapewniajacy mu' statecznosc przy podnoszeniu, a punkty podparcia slupów na fundamentach musza byc wyksztalcone w formie przegubów. Slupy segmentu sa tak skonstruowane, ze po podniesieniu i polaczeniu z sasiednim segmentem zapewniaja statecznosc podluzna i poprzeczna hali bez ko¬ niecznosci montowania dodatkowych stezen. Slupy mozna wyposazyc w konstrukcje okien przymocowanych do nich jeszcze przed podniesieniem. PL PLPriority: April 5, 1972 (P. 154543) Application announced: May 31, 1973 Patent description was published: December 30, 1975 82945 KI. 37e, 21/14 MKP 'E04g 21/14 Creator of the invention: Janusz Zakowski Authorized by the provisional patent: Gliwice Biuro Projektów Budownictwa Przemysłowego, Gliwice (Poland) Method of assembling light type steel halls The subject of the invention is the method of assembling light type steel halls without the use of heavy assembly equipment The hitherto known methods of assembling steel halls consist in placing poles, and then assembling the segments of the supporting structure of the roof prepared at the construction site and mounting the covering. The currently used methods of erecting halls require separate assembly cycles for the columns, the walls of the roof supporting structure and for the assembly of the roof covering. The assembly activities require many complex and varied operations performed at a height by joining the elements of the structure. Heavy assembly equipment such as cranes and cranes are used to lift individual elements of the structure. The aim of the invention is to reduce the number and types of assembly cycles and to shorten assembly time. Eliminating heavy assembly equipment, cranes, cranes, and replacing it with simple devices such as drum winches and an assembly mast. In order to solve the task, according to the invention, the halls were divided by cross-sections into segments with a modulated length, e.g. 3.0 m. A single segment T was constructed in the form of a drum. frame mounted at ground level and then lifted by drum rope winches. Further details and advantages of the invention are discussed in more detail in the example of the embodiment shown in the drawing, in which Figures 1 to 8 show the successive stages of lifting the finished hall segments, and Fig. 9 shows the perspective of the wmontazu hall. As shown in Fig. 9, the method according to the invention consists in the preparation of the hall foundation so that it will simultaneously constitute a track 1 for assembly carriages 2, and after the hall is constructed as a conduit for electrical and technological installations. The constructed segment 5 of the hall is raised by 3-rope, drum winches placed on the extension of the axis of the walls, while for lifting the first segment, an intermediate mast 4 should be used, and for the next segment, standing segments 5 are used as an intermediate support for two ropes. A single segment 5 was constructed in the form of a frame consisting of a transom in the form of a complete roof truss and poles constituting the columns of the hall assembled in a position lying on the ground level in such a way that its lifting could take place by turning around the support points of the poles in the direction parallel to hall longitudinal axis. In this arrangement, the roof truss has to be spatially constructed in such a way as to provide it with lifting stability and the support points of the columns on the foundations have to be formed in the form of hinges. Segment columns are constructed in such a way that, after being raised and connected to the adjacent segment, they provide longitudinal and transverse stability of the hall without the need to install additional braces. The poles can be equipped with window structures attached to them before lifting. PL PL

Claims (3)

1. Zastrzezenia patentowe 1. Sposób montazu hal stalowych typu lekkiego, znamiennny tym, ze segmenty hali (5) montowa¬ ne na poziomie terenu podnosi sie za pomoca wciagarek (2).1. Claims 1. A method of assembling light steel halls, characterized in that the segments of the hall (5) assembled at ground level are lifted by means of winches (2). 2. Sposób montazu hal wedlug zastrz. 1,znamienny tym, ze podnoszenie odbywa sie przez obrót wokól punktów podparcia slupów (6) w kierunku równoleglym do osi podluznej hali.2. The method of assembling the halls according to claim A method according to claim 1, characterized in that the lifting takes place by rotation around the support points of the posts (6) in a direction parallel to the longitudinal axis of the hall. 3. Sposób montazu hal wedlug zastrz. 1, z n a m i e n n,y t y m, ze przy wykonywaniu hali wykorzystuje sie juz stojace segmenty (5) jako posrednie oparcie dla lin.KI. 37e,21/14 82 945 MKP E04g 21/14 X 5 ft~ rA- /rr?£ ii r-A- gfcbLi, Figi fig5 4 r— 2 5 -ig '— "^ n a ^ W ^mmif ¦\ * ^:£_ F.'92 fig6 TJg3 h^L M. A Ji £ Tig4 Fig7 H- v 11AAA/\7\ /\ A i ,4\i^|^y^ ^^^* s _£_ Fig8 PL PL3. The method of assembling the halls according to claim 1, with n a m and e n n, y t y m that in the construction of the hall, already standing segments (5) are already used as an intermediate support for the rope. 37e, 21/14 82 945 MKP E04g 21/14 X 5 ft ~ rA- / rr? £ ii rA- gfcbLi, Figi fig5 4 r— 2 5 -ig '- "^ na ^ W ^ mmif ¦ \ * ^: £ _ F.'92 fig6 TJg3 h ^ L M. A Ji £ Tig4 Fig7 H- v 11AAA / \ 7 \ / \ A i, 4 \ i ^ | ^ y ^ ^^^ * s _ £ _ Fig8 PL PL
PL15454372A 1972-04-05 1972-04-05 PL82945B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
PL15454372A PL82945B2 (en) 1972-04-05 1972-04-05

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PL15454372A PL82945B2 (en) 1972-04-05 1972-04-05

Publications (1)

Publication Number Publication Date
PL82945B2 true PL82945B2 (en) 1975-10-31

Family

ID=19958074

Family Applications (1)

Application Number Title Priority Date Filing Date
PL15454372A PL82945B2 (en) 1972-04-05 1972-04-05

Country Status (1)

Country Link
PL (1) PL82945B2 (en)

Similar Documents

Publication Publication Date Title
JP5629316B2 (en) Telescopic tower assembly and method
EP3647512B1 (en) Self-climbing device for vertical and quasi-vertical concrete surfaces
CN108928783B (en) Shear type climbing hoisting machine for existing building additionally installed elevator
KR101040664B1 (en) Rotating bridge crane
US3127996A (en) Climbing cranes
DE2146701A1 (en) Multi-storey building construction from prefabricated building units and methods for erecting the same
CN111021205A (en) Concrete anti-collision guardrail formwork device and manufacturing method
US3818084A (en) Method and apparatus for the construction of multi-storey buildings
PL82945B2 (en)
JP2736478B2 (en) How to build structures
JPH01256636A (en) Construction method of building frame
RU2002125622A (en) SCREWLESS METHOD FOR MOUNTING AND DISMANTLING DRILLING, TOWER MAST AND TOWER STRUCTURES BY ENLARGED SECTIONS
RU2768534C1 (en) Method of mounting a permanent quick-erect lightweight support for emergency recovery works on power transmission lines
SU964093A1 (en) Method of erecting long sectionated structures
SU850785A1 (en) Method of erecting the span structure of a gallery
SU1040096A1 (en) Jig for assembling and installation of prefabricated structures
CN211946033U (en) Utilize heavy object hoisting device of H shaped steel post shore
SU1728415A1 (en) Suspension roof of blocked cells
RU2119028C1 (en) Method for erection of building covering by raising procedure
RU1773854C (en) Self-hoisting crane
SU449876A1 (en) Self-lifting crane
SU1017657A1 (en) Bridge crane and method of mounting same
RU2065012C1 (en) Method for erecting monolithic building in tunnel-type framework and framework for erecting monolithic building
JP2590671B2 (en) Construction method of steel frame using overhead crane frame
SU853031A1 (en) High-building construction method