JP2736478B2 - How to build structures - Google Patents

How to build structures

Info

Publication number
JP2736478B2
JP2736478B2 JP24824291A JP24824291A JP2736478B2 JP 2736478 B2 JP2736478 B2 JP 2736478B2 JP 24824291 A JP24824291 A JP 24824291A JP 24824291 A JP24824291 A JP 24824291A JP 2736478 B2 JP2736478 B2 JP 2736478B2
Authority
JP
Japan
Prior art keywords
work station
assembling
precast member
construction
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP24824291A
Other languages
Japanese (ja)
Other versions
JPH0559817A (en
Inventor
純 山崎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujita Kk
Original Assignee
Fujita Kk
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujita Kk filed Critical Fujita Kk
Priority to JP24824291A priority Critical patent/JP2736478B2/en
Publication of JPH0559817A publication Critical patent/JPH0559817A/en
Application granted granted Critical
Publication of JP2736478B2 publication Critical patent/JP2736478B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、各種の高層構造物を構
築する方法に関する。
The present invention relates to a method for constructing various high-rise structures.

【0002】[0002]

【従来の技術】従来、事務所ビル等の高層構造物を構築
する場合には、構造物を構築する箇所の地上にタワーク
レーンを配設し、このタワークレーンを用いて、まず第
1層目の構造物を構築するための予め工場で製作された
節柱,梁,床,壁等を吊り上げ、これを順次組付けるこ
とにより第一層目を構築し、次いで、該第1層目の構造
物の上部にタワークレーンを移載して第2層目の構造物
を構築し、以下所望の階層数となるまで、上記作業を繰
り返し行う。そして、構築され構造物の床面積が広い場
合には、前記タワークレーンを複数台並設して前記構築
作業を行うようにしていた。
2. Description of the Related Art Conventionally, when constructing a high-rise structure such as an office building, a tower crane is arranged on the ground where the structure is to be constructed, and the tower crane is used first for the first floor. The first layer is constructed by suspending the columns, beams, floors, walls, and the like previously manufactured at the factory for constructing the first structure, and assembling them sequentially, and then the structure of the first layer A tower crane is transferred to the upper part of the object to construct a second-layer structure, and the above operation is repeated until the number of layers reaches a desired number. When the floor area of the constructed structure is large, the construction work is performed by arranging a plurality of tower cranes in parallel.

【0003】[0003]

【発明が解決しようとする課題】しかしながら、上述の
ような従来の高層構造物の構築方法では、タワークレー
ンを主体に構造物の構築を行うものであるため、各階層
を構成する各種プレキャスト部材を組付ける場合には、
大工およびタワークレーン用オペレータ等の多くの人手
を要し、作業コストが上昇するほか、建設の生産性も低
く、無人化施工にはほど遠いものであった。また、タワ
ークレーンは、その設置高さが高くなるほど地上からの
ブーム先端の位置が上昇するため、プレキャスト部材を
吊り上げるワイヤロープの長さが長くなり、吊り上げら
れるプレキャスト部材およびブームが風にあおられて揺
動しし、危険が伴うとともに、構築階層が上昇するに伴
いタワークレーンの段取替えを行わなければならず、そ
の段取替え作業が煩雑になり、しかも段取替え時は実際
の構築作業ができないという問題がある。さらに、タワ
ークレーンには死角があるため、その作業範囲が狭く、
構造物の全ての作業範囲をカバーできるようにすると、
タワークレーンの台数が上昇するという問題があった。
However, in the above-described conventional method of constructing a high-rise structure, since the structure is constructed mainly by a tower crane, various precast members constituting each story are formed. When assembling,
It requires a lot of labor such as a carpenter and an operator for a tower crane, which increases the operating cost, lowers the productivity of construction, and is far from unmanned construction. In addition, as the height of the tower crane from the ground rises as the height of the tower crane increases, the length of the wire rope that suspends the precast member increases, and the suspended precast member and the boom are blown by the wind. In addition to swinging and causing danger, the tower crane must be replaced as the building level rises, which makes the setup replacement work complicated, and the actual construction work cannot be performed at the time of setup replacement. There's a problem. Furthermore, the tower crane has a blind spot, so its working range is narrow,
Being able to cover the entire working range of the structure
There was a problem that the number of tower cranes increased.

【0004】本発明は、上記のような事情に鑑みなされ
たもので、構造物構築施工の高効率化を図るとともに、
無人化を容易にし、かつ死角のない広い作業範囲を確保
でき、さらに天候に左右されない構築作業を可能にした
構造物の構築方法を提供することを目的とする。
[0004] The present invention has been made in view of the above-described circumstances, and aims to improve the efficiency of construction and construction of a structure.
It is an object of the present invention to provide a method of constructing a structure that facilitates unmanned operation, secures a wide working range without blind spots, and enables construction work that is not affected by weather.

【0005】[0005]

【課題を解決するための手段】上記目的を達成するため
に本発明は、構造物建設領域の周囲に立設した伸縮自在
な複数本のロングポストと、前記ロングポスト上に設け
られ、前記構造物の建設領域をカバーできる広さの作業
ステーションと、前記作業ステーション内に設置され、
プレキャスト部材の組付け指定位置へ自動制御される荷
吊り用天井クレーンおよびプレキャスト部材組立ロボッ
ト、溶接ロボットその他の組立設備機器とを有し、前記
作業ステーションにおいて前記天井クレーンおよび組立
設備機器を組立位置へ自動的に移動することにより天井
クレーンで吊り上げられたプレキャスト部材を指定位置
に組付け、前記ロングポストを地上から1階層分ずつ伸
長して前記作業ステーションを上昇させ、各階層を最下
階から計画高さの最上階まで順次構築するようにしたこ
とを特徴とする。また、本発明は、作業ステーションの
天井部に屋根膜が開閉可能に設けられていることを特徴
とする。
SUMMARY OF THE INVENTION In order to achieve the above object, the present invention provides a plurality of telescopic long posts erected around a structure construction area, and a plurality of telescopic long posts provided on the long posts. A work station large enough to cover the construction area of the object, and installed in the work station;
A ceiling crane for hanging loads and a precast member assembling robot, a welding robot, and other assembling equipment automatically controlled to a designated position for assembling the precast member, and the assembling position of the overhead crane and the assembling equipment at the work station. Assembling the precast member lifted by the overhead crane by automatically moving it to the designated position, extending the long post by one layer from the ground, raising the work station, and planning each layer from the lowest floor It is characterized by being constructed sequentially up to the top floor of the height. Further, the present invention is characterized in that a roof film is provided on the ceiling of the work station so as to be openable and closable.

【0006】[0006]

【実施例】以下、本発明の一実施例を図1および図2に
ついて説明する。図1および図2において、10は、地
上11に最下階(地下階)から最上階(12階)まで順
番に構築された構造物であり、この構造物10の周囲に
位置する地上11上には、複数のロングポスト12が立
設されている。この各ロングポスト12は、伸縮自在な
テレスコピックタイプのブームから構成され、その各ブ
ーム素子は不図示の油圧シリンダを備え、この各油圧シ
リンダを伸縮動作することにより、各ロングポスト12
を構築される構造物10の各階層に応じて同一レベルに
同期して伸縮できるようになっている。
DETAILED DESCRIPTION OF THE PREFERRED EMBODIMENTS One embodiment of the present invention will be described below with reference to FIGS. In FIGS. 1 and 2, reference numeral 10 denotes a structure which is constructed on the ground 11 in order from the lowest floor (basement floor) to the top floor (12th floor). , A plurality of long posts 12 are erected. Each of the long posts 12 is composed of a telescopic type boom that can be extended and retracted, and each of the boom elements includes a hydraulic cylinder (not shown).
Can be expanded and contracted in synchronization with the same level according to each layer of the structure 10 to be constructed.

【0007】各ロングポスト12の上端には、構造物1
0を最下階から順次構築するための作業ステーション1
3が設置されている。この作業ステーション13は、最
小に縮小した状態のロングポスト12上に地上で組立て
られるもので、四周囲を壁材14および太陽電池パネル
15により覆った建屋16を有する。この建屋16は構
造物10の四周囲より大きい形に成形されているととも
に、建屋16の内側には、相対向する辺の壁側に位置し
て一対の走行レール17が並列に設置され、この走行レ
ール17上には複数台の天上クレーン18が走行レール
17の長手方向に沿って走行可能に設置されている。各
天井クレーン18は、走行レール17間に走行装置19
を介して横架した桁材20と、この桁材20に走行可能
に取り付けた、構造物構築用のプレキャスト部材Pを吊
り上げる巻上装置21とから構成され、さらに、桁材2
0には、組立ロボット23または溶接ロボット24が走
行可能に取り付けられている。
At the upper end of each long post 12, a structure 1
Work station 1 for building 0 sequentially from the lowest floor
3 are installed. The work station 13 is assembled on the ground on the long post 12 which has been reduced to a minimum. The work station 13 has a building 16 covered with a wall member 14 and a solar panel 15 on four sides. This building 16 is formed in a shape larger than the four circumferences of the structure 10, and a pair of running rails 17 are installed in parallel on the inside of the building 16 on the wall side of the opposite side. A plurality of ceiling cranes 18 are installed on the traveling rail 17 so as to be able to travel along the longitudinal direction of the traveling rail 17. Each overhead crane 18 has a traveling device 19 between the traveling rails 17.
And a hoisting device 21 for lifting a precast member P for constructing a structure, which is mounted on the girder material 20 so as to be able to travel.
At 0, an assembly robot 23 or a welding robot 24 is attached so as to be able to run.

【0008】巻上装置21は、これから吊下げられるワ
イヤロープ21aの先端に取り付けたフック21bを有
し、このフック21bは、プレキャスト部材Pの種類ご
とに標準化された吊り部位置と吊り穴および不図示の自
動玉掛装置との組合わせにより無人で荷吊りが行われる
ようになっており、また、吊りフック21bは基本的に
は3点吊りによりどのような荷吊りに対しても可能にな
っている。組立ロボット23は、CCDカメラを備え、
このCCDカメラによりプレキャスト部材同志の組付け
位置を監視し、得られた映像から既設部材と組付けられ
る部材との位置の差を求め、これにより組立ロボット2
3および天井クレーン18を制御してプレキャスト部材
Pの組立てを行う。また、作業ステーション13の天井
部には、採光および換気を兼ねたロール式屋根膜28が
開閉可能に設けられている。
The hoisting device 21 has a hook 21b attached to the tip of a wire rope 21a to be hung up. The hook 21b is provided with a hanger position, a hanger hole, and a hanger standardized for each type of the precast member P. The load can be hung unmanned by combination with the automatic slinging device shown in the figure, and the hanging hook 21b is basically capable of hanging any load by three-point hanging. I have. The assembly robot 23 includes a CCD camera,
The CCD camera monitors the assembly position of the precast members and obtains the difference between the position of the existing member and the member to be assembled from the obtained image.
3 and the overhead crane 18 are controlled to assemble the precast member P. On the ceiling of the work station 13, a roll-type roof film 28 which is also used for lighting and ventilation is provided so as to be openable and closable.

【0009】高層構造物10の建方施工に際しては、ま
ず、地上11上にて、構造物の建築領域の外側にこれを
取り囲むようにして複数本のロングポスト12を立設
し、これらロングポスト12上に作業ステーション13
を組立てる。その後、構造物10の1階層分の構築に必
要な高さに各ロングポスト12を伸長して作業ステーシ
ョン13全体を上昇させる。しかる後、不図示の出入場
管理システムによりチェックされた搬送車26を建設敷
地内の指定位置に誘導し、天井クレーン18に搭載され
た位置決めシステムおよび自動玉掛装置(いずれも不図
示)により搬送車26上のプレキャスト部材Pを吊り上
げ、構築階層の組立位置、あるいはストックヤード27
に運搬する。このとき、空になった搬送車26は指定位
置から退場し、次のプレキャスト部材を積んだ搬送車2
6が指定位置へ誘導される。天井クレーン18にて指定
された組付位置へ運搬されたプレキャスト部材Pは、位
置決めシステムにより組付位置にセットされ、組立ロボ
ット23および溶接ロボット24により既設部材に固定
する。
In constructing the high-rise structure 10, first, a plurality of long posts 12 are erected on the ground 11 outside the construction area of the structure so as to surround the building. Working station 13 on 12
Assemble Thereafter, each of the long posts 12 is extended to a height required for constructing one level of the structure 10, and the entire work station 13 is raised. Thereafter, the transport vehicle 26 checked by the entrance control system (not shown) is guided to a designated position in the construction site, and the transport vehicle 26 is mounted on the overhead traveling crane 18 by a positioning system and an automatic slinging device (both not shown). 26, the precast member P is lifted, and the assembly position of the building hierarchy or the stockyard 27
Transport to At this time, the empty transport vehicle 26 exits from the designated position and transport vehicle 2 loaded with the next precast member.
6 is guided to the designated position. The precast member P transported to the specified mounting position by the overhead crane 18 is set at the mounting position by the positioning system, and is fixed to the existing member by the assembly robot 23 and the welding robot 24.

【0010】上述した運搬、組立て作業を繰り返し行う
ことにより地下階から地上1階層分の構造物の構築が完
了すると、ロングポスト12は、さらに1階層の構築作
業に必要な高さだけ伸長し、作業ステーション13を上
昇させた後、上述の作業を繰り返し行うことで、最下階
層から最上階層までの構築を順次実行する。そして、計
画高さまでの構造物10の構築が完了したならば、ロン
グポスト12を縮小して作業ステーション13を地上部
まで下降させ、作業ステーション13を解体する。
When the construction of one level above the ground from the basement floor is completed by repeating the above-mentioned transportation and assembly work, the long post 12 is further extended by the height necessary for the construction work of one level, After the work station 13 is raised, the above-mentioned work is repeatedly performed, whereby the construction from the lowest level to the highest level is sequentially performed. Then, when the construction of the structure 10 up to the planned height is completed, the long post 12 is reduced, the work station 13 is lowered to the ground portion, and the work station 13 is disassembled.

【0011】このように本実施例においては、地上に構
築される構造物の外周囲にこれを取り囲むようにして複
数のブーム式ロングポスト12を立設し、このロングポ
スト12上に天井クレーン18,組立ロボット23およ
び溶接ロボット24等を組込んだ作業ステーション13
を組立て、ロングポスト12を伸長して作業ステーショ
ン13を1階層分ずつ上昇させ、作業ステーション13
内の天井クレーン18,組立ロボット23および溶接ロ
ボット24を作動させることにより、各階層を順次構築
するようにしたので、構造物10を効率良く構築するこ
とができるとともに、構造物の無人化施工を実現化する
ことができる。また、地上で作業ステーション13を組
立てた後は、ロングポスト12を伸縮するだけで作業ス
テーション13を上昇、下降できるから、計画高さまで
構造物が構築され、かつ作業ステーションが撤去される
まで従来のような段取替えが不要になり、構造物の構築
作業を向上できる。さらにまた、天井クレーン18を用
いているため、大きな吊上げ能力が得られるほか、死角
のない広い作業範囲を確保できる。また、作業ステーシ
ョン13の天井部は開閉可能な屋根膜28によって覆わ
れる構造になっているから、天候に関らず構造物の構築
作業を行うことができる。さらに、作業ステーション1
3の外壁に太陽電池パネル15を設けることにより、こ
れから得られる電力を作業所の簡単な照明および制御機
器などに利用することができ、これに伴い、作業ステー
ション13の省エネルギ化が可能になる。
As described above, in this embodiment, a plurality of boom-type long posts 12 are erected around a structure built on the ground so as to surround the structure, and an overhead crane 18 is mounted on the long post 12. Work station 13 which incorporates an assembly robot 23, a welding robot 24, etc.
Is assembled, the long post 12 is extended, and the work station 13 is raised one layer at a time.
By operating the ceiling crane 18, the assembly robot 23, and the welding robot 24 in the building, the respective layers are sequentially constructed, so that the structure 10 can be efficiently constructed and unmanned construction of the structure can be performed. Can be realized. Also, after assembling the work station 13 on the ground, the work station 13 can be raised and lowered only by extending and retracting the long post 12, so that the structure is constructed up to the planned height and the conventional work station is removed until the work station is removed. Such a setup change becomes unnecessary, and the construction work of the structure can be improved. Furthermore, since the overhead crane 18 is used, a large lifting capacity can be obtained, and a wide working range without blind spots can be secured. In addition, since the ceiling of the work station 13 is covered with the roof film 28 that can be opened and closed, construction work of the structure can be performed regardless of the weather. In addition, work station 1
By providing the solar cell panel 15 on the outer wall of the third unit 3, the electric power obtained from the solar cell panel 15 can be used for simple lighting and control equipment of a work place, and accordingly, the energy saving of the work station 13 can be achieved. .

【0012】なお、本発明は、上記実施例に示す構成の
ものに限定されない。例えば、ロングポストはブーム式
のものに限らず、その他の伸縮できる構造のものでも良
いほか、伸縮手段もワイヤ,その他の方式を利用しても
良い。
The present invention is not limited to the configuration shown in the above embodiment. For example, the long post is not limited to the boom type, and may have another structure that can be expanded and contracted. In addition, the expansion and contraction means may use a wire or another method.

【0013】[0013]

【発明の効果】以上のように本発明の構造物の構築方法
によれば、構造物建設領域の周囲に立設した複数本の伸
縮自在なロングポスト上に構造物建設領域を全てカバー
できる広さの作業ステーションを組立て、この作業ステ
ーションを上昇して、作業ステーション内に設置した天
井クレーン、組立ロボットおよび溶接ロボット等の組立
設備機器により構造物の最下階から計画高さの最上階ま
で各階層ごとに構築するようにしたので、構造物構築施
工の高効率化が可能になるとともに、無人化を容易に実
現でき、さらに死角のない広い作業範囲を確保できる。
また、作業ステーションの天井部を開閉可能な屋根膜で
覆うことにより、天候に左右されることなく構造物を構
築することができるという効果がある。
As described above, according to the method for constructing a structure according to the present invention, the entire structure construction area can be covered on a plurality of telescopic long posts erected around the structure construction area. Assemble the work station, raise the work station, and use the assembly equipment such as overhead cranes, assembling robots, and welding robots installed in the work station to assemble the work from the bottom floor of the structure to the top floor of the planned height. Since the building is constructed for each level, it is possible to increase the efficiency of the construction and construction of the structure, to easily realize unmanned operation, and to secure a wide working range without blind spots.
In addition, by covering the ceiling of the work station with a roof film that can be opened and closed, there is an effect that a structure can be constructed without being affected by the weather.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明方法を用いた構造物の構築作業の一例を
示す概略構成図である。
FIG. 1 is a schematic configuration diagram showing an example of a construction work of a structure using the method of the present invention.

【図2】本実施例における作業ステーション部の詳細を
示す一部切欠き斜視図である。
FIG. 2 is a partially cutaway perspective view showing details of a work station section in the embodiment.

【符号の説明】[Explanation of symbols]

10 構造物 11 地上 12 ロングポスト 13 作業ステーション 16 建屋 18 天井クレーン 23 組立ロボット 24 溶接ロボット 26 搬送車 28 開閉屋根膜 DESCRIPTION OF SYMBOLS 10 Structure 11 Above ground 12 Long post 13 Work station 16 Building 18 Overhead crane 23 Assembly robot 24 Welding robot 26 Transport vehicle 28 Opening / closing roof membrane

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 構造物建設領域の周囲に立設した伸縮自
在な複数本のロングポストと、 前記ロングポスト上に設けられ、前記構造物の建設領域
をカバーできる広さの作業ステーションと、 前記作業ステーション内に設置され、プレキャスト部材
の組付け指定位置へ自動制御される荷吊り用天井クレー
ンおよびプレキャスト部材組立ロボット、溶接ロボット
その他の組立設備機器とを有し、 前記作業ステーションにおいて前記天井クレーンおよび
組立設備機器を組立位置へ自動的に移動することにより
天井クレーンで吊り上げられたプレキャスト部材を指定
位置に組付け、 前記ロングポストを地上から1階層分ずつ伸長して前記
作業ステーションを上昇させ、 各階層を最下階から計画高さの最上階まで順次構築する
ようにした、 ことを特徴とする構造物の構築方法。
1. A plurality of telescopic long posts erected around a structure construction area; a work station provided on the long post and having a size capable of covering the construction area of the structure; A ceiling crane and a precast member assembling robot, which are installed in a work station and are automatically controlled to a designated position for assembling a precast member, have a welding robot and other assembling equipment, and the overhead crane and the By automatically moving the assembly equipment to the assembling position, assembling the precast member lifted by the overhead crane to the designated position, extending the long posts by one layer from the ground and raising the work station, The hierarchy is constructed sequentially from the lowest floor to the top floor of the planned height. How to build a structure.
【請求項2】 作業ステーションの天井部に屋根膜が開
閉可能に設けられていることを特徴とする請求項1記載
の構造物の構築方法。
2. The method according to claim 1, wherein a roof film is provided on the ceiling of the work station so as to be openable and closable.
JP24824291A 1991-09-02 1991-09-02 How to build structures Expired - Fee Related JP2736478B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP24824291A JP2736478B2 (en) 1991-09-02 1991-09-02 How to build structures

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP24824291A JP2736478B2 (en) 1991-09-02 1991-09-02 How to build structures

Publications (2)

Publication Number Publication Date
JPH0559817A JPH0559817A (en) 1993-03-09
JP2736478B2 true JP2736478B2 (en) 1998-04-02

Family

ID=17175274

Family Applications (1)

Application Number Title Priority Date Filing Date
JP24824291A Expired - Fee Related JP2736478B2 (en) 1991-09-02 1991-09-02 How to build structures

Country Status (1)

Country Link
JP (1) JP2736478B2 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2308934B1 (en) * 2007-05-29 2009-09-25 Navarra Intelligent Concrete System, S.L AUTOMATIC BUILDING CONSTRUCTION SYSTEM.
KR100863592B1 (en) * 2007-08-14 2008-10-14 (주)씨.에스 구조 엔지니어링 Temporary construction system for the automation of building projects and construction method using the same
CN103510715B (en) * 2013-09-10 2015-10-21 东莞市彩丽建筑维护技术有限公司 A kind of method and caliberating device demarcating concrete prefabricated wallboard installation construction datum
JP6494236B2 (en) * 2014-10-10 2019-04-03 株式会社タダノ Operation control device for transfer device
KR101668177B1 (en) * 2015-01-18 2016-10-20 정용주 Electric Powered Multistage Work Platform
KR101681544B1 (en) * 2015-11-24 2016-12-01 홍익대학교 산학협력단 Automated system for constructin a concrete structure
JP7303673B2 (en) * 2019-06-25 2023-07-05 株式会社安藤・間 Materials and equipment transportation method
KR102349508B1 (en) * 2021-07-01 2022-01-11 한밭대학교 산학협력단 Atypical building construction apparatus and atypical building construction method

Also Published As

Publication number Publication date
JPH0559817A (en) 1993-03-09

Similar Documents

Publication Publication Date Title
US5255489A (en) Construction apparatus for buildings and constructing method therewith
EP0487516B1 (en) Construction apparatus and construction method
JP2736478B2 (en) How to build structures
JP4651857B2 (en) Building demolition method
JPH0571225A (en) Temporarily set roof of complete weather type
JP3069835B2 (en) Uchigumi scaffold structure
JP2750472B2 (en) Building construction method and device
JPH08120936A (en) Method and device for constructing multistoried building
JPH10245994A (en) Temporary curing body
RU226627U1 (en) DEVICE FOR VERTICAL MOVEMENT OF A TOWER CRANE JIM
JP2703102B2 (en) Building construction method and construction transfer device
CN118148251A (en) Rope film structure based on chargeable box body and construction method
JPH10167668A (en) Vertical and horizontal transporting device and its operation
JPH08184207A (en) Construction method for power plant using ceiling crane
JPH0416496A (en) Lifting device at building
WO2022231457A1 (en) Method for installing a supporting structure for a gravitational energy storage device
JP2000053375A (en) Vertical carrier system corresponding to slewing overhead crane
JPH035567A (en) Temporary installation method for working suspension scaffold
JP3103715B2 (en) Lifting transfer device and lifting transfer method
JPH06117111A (en) Hanging and building method of component in construction of multistoried building
JPH06158731A (en) Platform for building construction
JPH11303403A (en) Constructing method of building using temporary roof frame
JPH05141092A (en) Construction of structure
SU870644A1 (en) Arrangement for servicing outer walls of multistorey buildings
JPH06212804A (en) Method of construction of aluminum curtain wall large-sized unit and suspending jig

Legal Events

Date Code Title Description
LAPS Cancellation because of no payment of annual fees